Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
08/11/1934
The year in which a vessel’s construction is completed.
1927
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Cammell, Laird & Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Birkenhead
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Letter
The listed port to which a given vessel belongs.
London
Name of the individual/entity/organisation responsible for authoring the record
G T Champness
Name of surveyor.
Gerald Thurlow Champness
A vessel’s means of propulsion.
Steam
Predominant material(s) utilised in a vessel’s construction.
Steel
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Arandora Star - 1929
The process of transferring a vessel to water, but not necessarily her completion.
01/02/1928
Unique identifier for a given ship, it is assigned by a builder.
921
The country in which the vessel’s construction took place, at the time of writing.
United Kingdom
The country (flag) that a vessel is registered to, at the time of writing.
United Kingdom
The individual and/or organisation listed
Blue Star Line Ltd
Location where the document is written.
Southampton
Broad categories and subdivisions of vessels related to their purpose or function.
Passenger
Type of fuel used onboard a vessel.
Steam - Oil
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Pertinent, useful or interesting recorded content.
States that ther is some urgency that to the proposal and an early consideraton of the plan is needed
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.