Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Orungal - 1927
The process of transferring a vessel to water, but not necessarily her completion.
12/05/1922
The port or place in which the vessel’s construction took place, at the time of writing.
Linthouse, Govan
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Stiffening of Engine Seating
Broad categories and subdivisions of vessels related to their purpose or function.
Passenger cargo
Type of fuel used onboard a vessel.
Steam - Oil
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
The year in which a vessel’s construction is completed.
1923
Unique identifier for a given ship, it is assigned by a builder.
499
The country in which the vessel’s construction took place, at the time of writing.
United Kingdom
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
A vessel’s means of propulsion.
Steam
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5809
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Pertinent, useful or interesting recorded content.
New work is shown in red
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.