Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

02/02/1923

The year in which a vessel’s construction is completed.

Year of ship completion

1923

Unique identifier for a given ship, it is assigned by a builder.

Yard no

499

The country in which the vessel’s construction took place, at the time of writing.

Country of build

United Kingdom

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

GR130 Vessels of 100 tons and upwards

The country (flag) that a vessel is registered to, at the time of writing.

Country of registration

United Kingdom

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Ship manager

Lord Ernest Hamilton

A vessel’s means of propulsion.

Propulsion

Steam

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

5809

Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.

Net Register Tonnage

3518

Location of construction for a vessel’s engines.

Location of engine build

Linthouse

Date in which construction of a vessel’s engines were completed.

Year of engine build

1923

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Horsepower shaft

3150

Also referred to as extreme breadth. The distance from the extreme starboard side to the extreme port side.

Registered Beam

55.25

Physical extent of a record.

Number of parts

1

Name of ship as recorded on the record

Ship name

Fezara - 1923

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

12/05/1922

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Linthouse, Govan

A unique number allocated to a specific vessel by an official registration authority of the country of registry (flag) that the vessel belongs to (post. 1855).

Official number

146699

Additional numbers that feature on a given record that may be used for identification.

Other numbers document know by

59753

The listed port to which a given vessel belongs.

Port belonging to

London

The individual and/or organisation listed

Ship owner

Khedivial Mail Steamship & Graving Dock Co Ltd

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Passenger cargo

Type of fuel used onboard a vessel.

Fuel

Steam - Oil

Is the steamer assisted by sail?

Sail assisted steamer

No

A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.

Under Deck Tonnage

4416

Description/specifications listed of the vessel’s engines and machinery. (The engines/machinery may have been surveyed separately before being assigned to a vessel).

Engine/Machinery details

Single Geared Turbines Rotary

The country, at the time of writing, where a vessel’s engines were constructed.

Country of engine build

United Kingdom

Engine builder as written

Alexander Stephen & Sons Ltd

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Prescribed by flag/registration authorities, and usually excludes a small part of the stern. It is measured from the foreside of the stern at the extreme top to the afterside of the stern post.

Registered Length

390.85

Measurement from the underside of the upper deck on the centre line to the upper side of the bottom plating.

Registered Depth

28.1

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.