Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

03/10/1921

The year in which a vessel’s construction is completed.

Year of ship completion

1920

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Cammell, Laird & Co Ltd

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Birkenhead

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Liv

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

8 Report of Survey for Repairs, &c.

The country (flag) that a vessel is registered to, at the time of writing.

Country of registration

United Kingdom

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

10/03/1921

Name of the individual/entity/organisation responsible for authoring the record

Document author

Geo L Lyle

Name of surveyor.

Surveyor

George Laird Lyle

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

100A1

Recorded information related to a vessel’s movements.

Voyage information

Birkenhead

A vessel’s means of propulsion.

Propulsion

Motor (internal combustion)

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

398

Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.

Net Register Tonnage

185

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Pertinent, useful or interesting recorded content.

Notes - interesting informations

Character listed as "Electrically welded; subject to annual survey; Experimental"

Name of ship as recorded on the record

Ship name

Fullagar - 1920

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

02/05/1920

Unique identifier for a given ship, it is assigned by a builder.

Yard no

822

The country in which the vessel’s construction took place, at the time of writing.

Country of build

United Kingdom

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

82808

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

Liverpool 81523

The listed port to which a given vessel belongs.

Port belonging to

Liverpool

The date of first visit by a surveyor.

Date of first survey

04/04/1921

The individual and/or organisation listed

Ship owner

T & J Brocklebank & Co

Location where the document is written.

Location of Document Creation

Birkenhead

Location where a vessel’s survey was undertaken.

Location of Survey

Birkenhead

Date of the meeting of the Classing Committee.

Date of Classing committee

10/07/1921

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Coaster

Type of fuel used onboard a vessel.

Fuel

Motor - Oil

Is the steamer assisted by sail?

Sail assisted steamer

No

A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.

Under Deck Tonnage

260

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

1