Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
03/02/1955
The year in which a vessel’s construction is completed.
1914
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Burmeister & Wain
The port or place in which the vessel’s construction took place, at the time of writing.
Copenhagen
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
International Load Line Certificate
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Location where the document is written.
Hong Kong
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5347
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold for Breaking up
Name of ship as recorded on the record
Hoi Hung
The process of transferring a vessel to water, but not necessarily her completion.
11/10/1913
Unique identifier for a given ship, it is assigned by a builder.
293
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
ZCKI
The port in which a vessel is registered or permanently based.
Hong Kong
Name of the individual/entity/organisation responsible for authoring the record
James A Anderson
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.