Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
28/07/1936
The year in which a vessel’s construction is completed.
1936
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Odense Staalskibsvaerft
The port or place in which the vessel’s construction took place, at the time of writing.
Odense
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
C11 Surveys for Freeboard
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Name of the individual/entity/organisation responsible for authoring the record
S Sandersen
Location where a vessel’s survey was undertaken.
Odense
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Recorded information relating the specific cargo being conveyed.
Petroleum in bulk
Pertinent, useful or interesting recorded content.
Also refers to Vessels Henning Maersk & Barendrecht
Name of ship as recorded on the record
Loosdrecht
The process of transferring a vessel to water, but not necessarily her completion.
28/06/1936
Unique identifier for a given ship, it is assigned by a builder.
58
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Cpn
Additional numbers that feature on a given record that may be used for identification.
35015
The individual and/or organisation listed
Phs van Ommeren Scheepvaartbedrijf
Location where the document is written.
Copenhagen
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Carrying Petroleum in bulk; (Contemplated)
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
9314
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Physical extent of a record.
2
Have you noticed missing or incorrect data or images for this document?