Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
13/03/1936
The year in which a vessel’s construction is completed.
1936
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Howaldtswerke A G
The port or place in which the vessel’s construction took place, at the time of writing.
Hamburg
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
C11 Surveys for Freeboard
The port in which a vessel is registered or permanently based.
Liverpool
The individual and/or organisation listed
United Africa Co Ltd
Location where the document is written.
Hamburg
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 With Freeboard (Contemplated)
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to Shipbreakers for Breaking up in Japan
Physical extent of a record.
2
Name of ship as recorded on the record
Liberian
The process of transferring a vessel to water, but not necessarily her completion.
29/02/1936
Unique identifier for a given ship, it is assigned by a builder.
739
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Ham
Additional numbers that feature on a given record that may be used for identification.
34858
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Name of the individual/entity/organisation responsible for authoring the record
R B Shepheard
Location where a vessel’s survey was undertaken.
Hamburg
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
The country or national waters where a vessel is lost/disposed of, or last recorded.
Japan
Pertinent, useful or interesting recorded content.
Also refers to Vessel Guinean
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.