Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
28/06/1967
The year in which a vessel’s construction is completed.
1945
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
William Gray & Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
West Hartlepool
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
1492
The port in which a vessel is registered or permanently based.
Panama
The date of first visit by a surveyor.
09/01/1967
Name of the individual/entity/organisation responsible for authoring the record
B B Girling; D G Jackland; J Nugent
Location where a vessel’s survey was undertaken.
Sasebo
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Vessel’s place of loss or disposal/last known recorded location.
Shodojima
Physical extent of a record.
1
Name of ship as recorded on the record
Clovelly
The process of transferring a vessel to water, but not necessarily her completion.
28/02/1945
Unique identifier for a given ship, it is assigned by a builder.
1179
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nag
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
8 Report of Ship Surveys & Repairs
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
12/01/1967
Location where the document is written.
Nagasaki
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
3655
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to Sanoyasu Shoji KK for Breaking up at Shodojima Island
Vessel’s area of loss or disposal/last known recorded location.
Kobe
Pertinent, useful or interesting recorded content.
Note in classification reads \'See Committee minute 22/05/1907
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.