Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
01/11/1922
The year in which a vessel’s construction is completed.
1922
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Furness Shipbuilding Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Haverton Hill on Tees
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
11445
The listed port to which a given vessel belongs.
London
The date of first visit by a surveyor.
30/09/1920
The individual and/or organisation listed
Prince Line Ltd
Name of the individual/entity/organisation responsible for authoring the record
William Morrison; William Cowie
Name of surveyor.
William Morrison; William Cowie
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 12,22; FD CL; Fitted for Oil Fuel 12,22; FP above 150F
Broad categories and subdivisions of vessels related to their purpose or function.
Screw Steamer
Predominant material(s) utilised in a vessel’s construction.
Steel
Type and configuration of the engine(s) supplied for a vessel.
Inverted Triple Expansion
Date in which construction of a vessel’s engines were completed.
1922
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1922
Physical extent of a record.
1
Name of ship as recorded on the record
Egyptian Prince
The process of transferring a vessel to water, but not necessarily her completion.
29/11/1921
Unique identifier for a given ship, it is assigned by a builder.
27
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mdb
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4 Report on Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
18/12/1922
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Furness Withy & Co Ltd
Location where the document is written.
Middlesbrough
Location where a vessel’s survey was undertaken.
Middlesbrough
Date of the meeting of the Classing Committee.
19/12/1922
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Middlesbrough
Richardson Westgarth & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
1922
Pertinent, useful or interesting recorded content.
Also refers to Vessel Egyptiana
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.