Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
30/07/1928
The year in which a vessel’s construction is completed.
1929
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Stabilimento Tecnico Triestino
The port or place in which the vessel’s construction took place, at the time of writing.
Trieste
Additional numbers that feature on a given record that may be used for identification.
Lloyd's 3019 HK
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
26/07/1928
Location where the document is written.
Vienna
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Pertinent, useful or interesting recorded content.
Ship Castings No 685; Manufactured by Witkowitzer Bergbau & Eisenh Gew of Witkowitz
Name of ship as recorded on the record
Fusijama
The process of transferring a vessel to water, but not necessarily her completion.
01/12/1928
Unique identifier for a given ship, it is assigned by a builder.
773
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Ship Castings
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Trieste 8341
The date of first visit by a surveyor.
15/06/1928
Name of the individual/entity/organisation responsible for authoring the record
Hans Kolbow
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.