Date recorded as the time of writing.

Date of document

31/01/1930

The year in which a vessel’s construction is completed.

Year of ship completion

1930

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

William Pickersgill & Sons Ltd

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Sunderland

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

GR130 Vessels of 100 tons & upwards

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Ship manager

Philip Edward Haldin

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Cargo

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Triple Compound Direct Acting Vertical

Date in which construction of a vessel’s engines were completed.

Year of engine build

1930

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

A vessel’s calculated maximum speed.

Speed (knots)

1930

Physical extent of a record.

Number of parts

1

Name of ship as recorded on the record

Ship name

Wellington Court

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

30/12/1929

Unique identifier for a given ship, it is assigned by a builder.

Yard no

228

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

Signal letter/Call sign

LFMS

The port in which a vessel is registered or permanently based.

Port of registry

London

The individual and/or organisation listed

Ship owner

United British Steam Ship Co Ltd

Location where the document is written.

Location of Document Creation

London

Physical arrangement of a ship’s masts, sails and rigging.

Rig

Sr - Schooner

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

4979

Location of construction for a vessel’s engines.

Location of engine build

Sunderland

Engine builder as written

North Eastern Marine Engineering Co Ltd

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Draft

1930