Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
02/11/1949
The year in which a vessel’s construction is completed.
1927
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
W J Yarwood & Sons Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Northwich
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
119190
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
06/09/1949
Name of the individual/entity/organisation responsible for authoring the record
E M Sellex
Location where a vessel’s survey was undertaken.
London
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Dagenham
Russell Newbery & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
1949
Name of ship as recorded on the record
Castlegate
The process of transferring a vessel to water, but not necessarily her completion.
08/10/1927
Unique identifier for a given ship, it is assigned by a builder.
372
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Lon
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report on Oil Engine Machinery
The date of first visit by a surveyor.
22/08/1949
The individual and/or organisation listed
Esso Transportation Co
Location where the document is written.
London
Broad categories and subdivisions of vessels related to their purpose or function.
Screw Motor Vessel
Predominant material(s) utilised in a vessel’s construction.
Steel
Type and configuration of the engine(s) supplied for a vessel.
High Speed Compression Ignition
Date in which construction of a vessel’s engines were completed.
1949
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1949
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.