Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
21/01/1928
The year in which a vessel’s construction is completed.
1927
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
W J Yarwood & Sons Ltd
Unique identifier for a given ship, it is assigned by a builder.
372
A unique number allocated to a specific vessel by an official registration authority of the country of registry (flag) that the vessel belongs to (post. 1855).
149655
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
93191
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Liverpool 89427
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
16/01/1928
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
J Hamilton
Location where the document is written.
Liverpool
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
A1 Barge 1,28; Carrying Petrn in Portable Tanks for Canal & Inland Waterways Service; Lloyds A & CP; +LMC 1,28; CL; Elec Light
Broad categories and subdivisions of vessels related to their purpose or function.
Barge
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
51
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Recorded information relating the specific cargo being conveyed.
petroleum
Physical extent of a record.
2
Name of ship as recorded on the record
Castlegate
The process of transferring a vessel to water, but not necessarily her completion.
08/10/1927
Name of the shipbuilder as it appears on the record.
Albert Yarwood
The port or place in which the vessel’s construction took place, at the time of writing.
Northwich
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Liv
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
1 Steel Steamer or Motorship
The port in which a vessel is registered or permanently based.
Liverpool
The date of first visit by a surveyor.
18/05/1927
The individual and/or organisation listed
The Anglo American Oil Co Ltd
Name of the individual/entity/organisation responsible for authoring the record
E H Dean
Location where a vessel’s survey was undertaken.
Northwich
Date of the meeting of the Classing Committee.
07/02/1928
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1928
1928
Pertinent, useful or interesting recorded content.
Title of Document has been Altered; Also refers to Vessel Parkgate
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.