Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

29/04/1936

The year in which a vessel’s construction is completed.

Year of ship completion

1936

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Deutsche Schiff & Maschinenbau; AG Werk Seebeck

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Wesermunde

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

1787

The listed port to which a given vessel belongs.

Port belonging to

Liverpool

The date of first visit by a surveyor.

Date of first survey

25/06/1935

The individual and/or organisation listed

Ship owner

United Africa Co Ltd

Location where the document is written.

Location of Document Creation

Bremen

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+LMC 4,36; FD CL

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Screw Steamer

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

5424

Location of construction for a vessel’s engines.

Location of engine build

Wesermunde

Engine builder as written

Deschimag Werk Seebeck

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Draft

1936

Pertinent, useful or interesting recorded content.

Notes - interesting informations

Also refers to Vessels Nigerian & Ethiopian

Name of ship as recorded on the record

Ship name

Leonian

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

25/02/1936

Unique identifier for a given ship, it is assigned by a builder.

Yard no

898

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Bmn

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

4 Report on Steam Reciprocating Engine Machinery

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

Y

The date of last visit by a surveyor.

Date of latest survey

22/04/1936

Name of the individual/entity/organisation responsible for authoring the record

Document author

A H A Carstensen

Location where a vessel’s survey was undertaken.

Location of Survey

Wesermunde

Date of the meeting of the Classing Committee.

Date of Classing committee

15/05/1936

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Triple Expansion With Exhaust Turbine System Bauer Wach

Date in which construction of a vessel’s engines were completed.

Year of engine build

1936

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

A vessel’s calculated maximum speed.

Speed (knots)

1936

Physical extent of a record.

Number of parts

1

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.