Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
25/04/1930
The year in which a vessel’s construction is completed.
1931
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Vickers Armstrongs Ltd
The name of the yard where the vessel was built.
Naval Yard
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Memo
The individual and/or organisation listed
Furness Withy & Co Ltd
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
The official record pronounced by the Committee
Burnt - Laid up
Vessel’s place of loss or disposal/last known recorded location.
Hebburn on Tyne
1930
Pertinent, useful or interesting recorded content.
Also refers to vessel Bermuda
Name of ship as recorded on the record
Monarch of Bermuda
The process of transferring a vessel to water, but not necessarily her completion.
17/03/1931
Unique identifier for a given ship, it is assigned by a builder.
1
The port or place in which the vessel’s construction took place, at the time of writing.
High Walker, Newcastle
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Broad categories and subdivisions of vessels related to their purpose or function.
Quadruple Screw Steamer
Predominant material(s) utilised in a vessel’s construction.
Steel
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
l 1930
Contextual information related to the reasons of the vessel’s loss or disposal.
Fire Broke out in Public rooms while in Dry Dock at Hebburn on Tyne & Laid up
Recorded date for the vessel’s loss or disposal.
24/03/1947
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.