Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

27/03/1958

The year in which a vessel’s construction is completed.

Year of ship completion

1944

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Richard Dunston Ltd

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Lgs

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

8 Report of Ship Surveys & Repairs

The port in which a vessel is registered or permanently based.

Port of registry

London

The date of first visit by a surveyor.

Date of first survey

22/03/1958

The individual and/or organisation listed

Ship owner

Parkinson Howard Ltd

Location where the document is written.

Location of Document Creation

Lagos

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

Amended Class to 100A1 for Towing Services on the Coast of Ghana; Deferred for S S; (Postponement Until 8,58) Approved; But MBS 3,58

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Coaster

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

54

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Draft

1958

Name of ship as recorded on the record

Ship name

Parhow Tid

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

__/11/1944

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Thorne

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

1840

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

Lagos 1606

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

23/03/1958

Name of the individual/entity/organisation responsible for authoring the record

Document author

J Whitehead

Location where a vessel’s survey was undertaken.

Location of Survey

Tema

Date of the meeting of the Classing Committee.

Date of Classing committee

06/05/1958

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

A vessel’s calculated maximum speed.

Speed (knots)

1958

Physical extent of a record.

Number of parts

1