Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

13/07/1962

The year in which a vessel’s construction is completed.

Year of ship completion

1962

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Mitsubishi Shipbuilding & Engineering Co Ltd

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Hiroshima

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

2024

The listed port to which a given vessel belongs.

Port belonging to

Odessa

The date of first visit by a surveyor.

Date of first survey

11/07/1961

The individual and/or organisation listed

Ship owner

V/O Sudoimport Moscow U S S R

Location where the document is written.

Location of Document Creation

Shimonoseki

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

See Rpt 4b

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Tanker

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

22226

Date in which construction of a vessel’s engines were completed.

Year of engine build

1962

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

A vessel’s calculated maximum speed.

Speed (knots)

1962

Physical extent of a record.

Number of parts

1

Name of ship as recorded on the record

Ship name

Lebedin

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

08/03/1962

Unique identifier for a given ship, it is assigned by a builder.

Yard no

146

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Smk

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

Report on Boilers

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

04/07/1962

Name of the individual/entity/organisation responsible for authoring the record

Document author

W A Cook; J Nonomura

Location where a vessel’s survey was undertaken.

Location of Survey

Hiroshima

Date of the meeting of the Classing Committee.

Date of Classing committee

14/09/1962

A vessel’s means of propulsion.

Propulsion

Motor (internal combustion)

Is the steamer assisted by sail?

Sail assisted steamer

No

Location of construction for a vessel’s engines.

Location of engine build

Hiroshima Japan

Engine builder as written

Mitsubishi Ship Building & Engineering Co Ltd

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Draft

1962

Pertinent, useful or interesting recorded content.

Notes - interesting informations

Title of Document has been Altered; Also refers to Vessel Lugansk

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.