Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

25/01/1958

The year in which a vessel’s construction is completed.

Year of ship completion

1958

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Kockums Mek Verkstads A B

Unique identifier for a given ship, it is assigned by a builder.

Yard no

394

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Mmo

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

1 Steel Steamer or Motorship

The port in which a vessel is registered or permanently based.

Port of registry

Malmo

The date of first visit by a surveyor.

Date of first survey

29/01/1957

The individual and/or organisation listed

Ship owner

Rederi AB Clipper

Name of the individual/entity/organisation responsible for authoring the record

Document author

K Little

Location where a vessel’s survey was undertaken.

Location of Survey

Malmo

Date of the meeting of the Classing Committee.

Date of Classing committee

04/03/1958

A vessel’s means of propulsion.

Propulsion

Motor (internal combustion)

Is the steamer assisted by sail?

Sail assisted steamer

No

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

A vessel’s calculated maximum speed.

Speed (knots)

1958

Draft

1958

Pertinent, useful or interesting recorded content.

Notes - interesting informations

Title of the Document has been Altered; Also refers to vessel Helfrid Billner

Name of ship as recorded on the record

Ship name

Bitterfeld

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

07/10/1957

Name of the shipbuilder as it appears on the record.

Shipbuilder's signature

Kockums Mekaniska Verkstads Aktiebolag

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Malmo

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

3734

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

Malmo 3568

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

Y

The date of last visit by a surveyor.

Date of latest survey

14/01/1958

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Ship manager

Einar Hansen

Location where the document is written.

Location of Document Creation

Malmo

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1; Carrying Petroleum in Bulk; DS 1,58; +LMC ES DBS TS CL 1,58

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Tanker

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

13069

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Recorded information relating the specific cargo being conveyed.

Cargo

Petroleum in bulk

Physical extent of a record.

Number of parts

3

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.