Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
07/08/1964
The year in which a vessel’s construction is completed.
1965
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Ansaldo S p A Cantiere Navale
The port or place in which the vessel’s construction took place, at the time of writing.
Genoa Sestri
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
1803
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
30/07/1964
Location where the document is written.
Augsburg
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
Type and configuration of the engine(s) supplied for a vessel.
W8V17 5/22A Supercharged
Date in which construction of a vessel’s engines were completed.
1964
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
1964
Name of ship as recorded on the record
Raphael
The process of transferring a vessel to water, but not necessarily her completion.
29/11/1964
Unique identifier for a given ship, it is assigned by a builder.
1598
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Aug
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4c First Entry Report on Auxiliary Internal Combus
The date of first visit by a surveyor.
29/11/1963
Name of the individual/entity/organisation responsible for authoring the record
G Haack; S Dinnen
Location where a vessel’s survey was undertaken.
Augsburg
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Augsburg
M A N A G
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.