Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
08/02/1945
The year in which a vessel’s construction is completed.
1944
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Burrard Dry Dock Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Vancouver, British Columbia
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
6450
The listed port to which a given vessel belongs.
Montreal
The date of first visit by a surveyor.
23/11/1944
The individual and/or organisation listed
Minister of Munitions & Supply of Canada
Name of the individual/entity/organisation responsible for authoring the record
R Knox; A B M Coleman; W E Baillie
Location where a vessel’s survey was undertaken.
Vancouver B C
Date of the meeting of the Classing Committee.
04/05/1945
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Lachine P Q
Canadian Allis Chalmers Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Physical extent of a record.
1
Name of ship as recorded on the record
Fairmount Park
The process of transferring a vessel to water, but not necessarily her completion.
05/12/1944
Unique identifier for a given ship, it is assigned by a builder.
227
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Vcr
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
5a Report on Boilers
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
31/01/1945
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Park Steam Ship Co Ltd
Location where the document is written.
Vancouver B C
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See F E Machy Rpt
Broad categories and subdivisions of vessels related to their purpose or function.
Screw Steamer
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
7145
Date in which construction of a vessel’s engines were completed.
1945
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
1945
Pertinent, useful or interesting recorded content.
Also refers to Vessel Winona Park; R Knox; A B M Coleman has signed on behalf of W E Baillie
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.