Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
06/08/1904
The year in which a vessel’s construction is completed.
1899
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Craig, Taylor & Co
The port or place in which the vessel’s construction took place, at the time of writing.
Thornaby on Tees
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Undefined
The date of first visit by a surveyor.
05/12/1904
The individual and/or organisation listed
W R Rea
Name of the individual/entity/organisation responsible for authoring the record
J G Mackillop
Location where a vessel’s survey was undertaken.
Barry
Date of the meeting of the Classing Committee.
17/06/1904
The name of the port/place of destination given.
New York
A vessel’s means of propulsion.
Steam
System of measurement that replaced ‘Builder’s Old Measurement’, taking a vessel’s internal capacity as the standard. Vessels built between 1836 and 1854 were legally required to display both tonnages.
4158
Date in which construction of a vessel’s engines were completed.
1899
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
2
Name of ship as recorded on the record
Ormley
The process of transferring a vessel to water, but not necessarily her completion.
08/06/1899
Unique identifier for a given ship, it is assigned by a builder.
63
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
6903
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
06/08/1904
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
D J Olsen - 1904
Location where the document is written.
Barry
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
Deferred
The name of the port/place from which a vessel’s voyage originated.
Barry
Broad categories and subdivisions of vessels related to their purpose or function.
Cargo
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Sunderland
W Allan & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No