Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

20/01/1899

The year in which a vessel’s construction is completed.

Year of ship completion

1899

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

R Napier & Sons

Unique identifier for a given ship, it is assigned by a builder.

Yard no

463

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Gls

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

4 Report on Machinery

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

Y

The date of last visit by a surveyor.

Date of latest survey

20/01/1899

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Master

A Simpson

Location where the document is written.

Location of Document Creation

Glasgow

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Triple Expansion

Date in which construction of a vessel’s engines were completed.

Year of engine build

1899

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

1

Name of ship as recorded on the record

Ship name

Moravian

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

30/09/1898

Name of the shipbuilder as it appears on the record.

Shipbuilder's signature

Napier

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Glasgow

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

16720

The listed port to which a given vessel belongs.

Port belonging to

Aberdeen

The date of first visit by a surveyor.

Date of first survey

16/12/1897

The individual and/or organisation listed

Ship owner

George Thompson & Co

Name of the individual/entity/organisation responsible for authoring the record

Document author

J Kerr

Location where a vessel’s survey was undertaken.

Location of Survey

Glasgow

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

4573

Location of construction for a vessel’s engines.

Location of engine build

Glasgow

Engine builder as written

R Napier & Sons

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?