Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

__/__/0000

The year in which a vessel’s construction is completed.

Year of ship completion

1910

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

John Fullerton & Co

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

Report of Total Loss, Casualty, &c./ Wreck reports

The individual and/or organisation listed

Ship owner

Frontier Town Steamship Co Ltd

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1 8,41; S S 2nd No 3-6,34; S S No 1,38; +LMC 6,38; B S 8,41; TS 7,41 CL

The name of the port/place from which a vessel’s voyage originated.

Voyage from

Birkenhead

The name of the port/place of destination given.

Destined voyage

Newry

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

The official record pronounced by the Committee

Loss or disposal

Missing

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

27/10/1941

Name of ship as recorded on the record

Ship name

Walnut

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

25/02/1910

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Paisley

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Ship manager

J Fisher & Sons Ltd

Date of the meeting of the Classing Committee.

Date of Classing committee

09/12/1941

Recorded information related to a vessel’s movements.

Voyage information

Birkenhead; Newry

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

340

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Missing

Physical extent of a record.

Number of parts

1

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.