Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
07/07/1913
The year in which a vessel’s construction is completed.
1913
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
John Cran & Co
The port or place in which the vessel’s construction took place, at the time of writing.
Leith
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
1194
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
01/07/1913
Location where the document is written.
Stockholm
Date of the meeting of the Classing Committee.
24/10/1913
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Stockholm
J & C G Bolinders Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
1913
Name of ship as recorded on the record
Linares
The process of transferring a vessel to water, but not necessarily her completion.
05/09/1913
Unique identifier for a given ship, it is assigned by a builder.
97
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Skm
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4 Report on Machinery
The date of first visit by a surveyor.
15/11/1912
Name of the individual/entity/organisation responsible for authoring the record
Albert Isakson
Location where a vessel’s survey was undertaken.
Stockholm
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
Type and configuration of the engine(s) supplied for a vessel.
Bolinders two Stroke Cycle Reversible
Date in which construction of a vessel’s engines were completed.
1913
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1913
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.