Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

01/06/1942

The year in which a vessel’s construction is completed.

Year of ship completion

1915

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Burmeister & Wains Maskin & Skibsbygger

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

C.Tn

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

9 Report of Survey for Repairs, &c., of Engines and Boilers

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

19/05/1942

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Ship manager

United Baltic Corporation

Location where the document is written.

Location of Document Creation

Cape Town

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1 12,41; S S Cpn No 3-6,28; S S Cpn No 2-2,35; Examined 4,41; +LMC(CS) 7,37 3,39; DB S 1,40; S 4,41 CL

Recorded information related to a vessel’s movements.

Voyage information

Cape Town; United Kingdom

A vessel’s means of propulsion.

Propulsion

Motor (internal combustion)

Is the steamer assisted by sail?

Sail assisted steamer

No

Location of construction for a vessel’s engines.

Location of engine build

Copenhagen

Engine builder as written

Akt Burmeister & Wain

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Vessel’s area of loss or disposal/last known recorded location.

Area of ship loss

West Coast of Africa

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

09/06/1942

Name of ship as recorded on the record

Ship name

Chile

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

17/11/1915

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Copenhagen

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

3088

The listed port to which a given vessel belongs.

Port belonging to

London

The date of first visit by a surveyor.

Date of first survey

01/04/1942

The individual and/or organisation listed

Ship owner

Ministry of War Transport

Name of the individual/entity/organisation responsible for authoring the record

Document author

T H Noel

Location where a vessel’s survey was undertaken.

Location of Survey

Cape Town

Date of the meeting of the Classing Committee.

Date of Classing committee

28/07/1942

The name of the port/place of destination given.

Destined voyage

United Kingdom

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

6956

Date in which construction of a vessel’s engines were completed.

Year of engine build

1915

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sunk by Submarine

The country or national waters where a vessel is lost/disposed of, or last recorded.

Country of loss or disposal

Africa

Physical extent of a record.

Number of parts

1