Name of ship as recorded on the record

Ship name

Chile ( Freeboard Verification Form for Steamers for Chile, 20th December 1915 1915, Report on Electric Lighting Installation for Chile, 28th December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Chile, 1st February 1916 1916, Steel Steamer Report for Chile, 21st January 1916 1916, Report on Machinery for Chile, 20th January 1916 1916, Report on Boilers for Chile, 20th January 1916 1916, Memo regarding surveyor's report on cause of port crankshaft break for Chile, 25th October 1932 1932, Certificate of Survey of Damage & Repairs for Chile, 13th September 1932 1932, Certificate of Examination of Forgings for Chile, 23rd August 1932 1932, Certificate of Survey of Part of the Machinery for Chile, 10th September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 15th September 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Plan of Crankshafts for Chile, 7th September 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of amended vertical cross tube donkey boiler plan for Chile, 30th August 1939 1939, Boiler Endorsement for Chile, 30th August 1939 1939, Letter from G Langkilds Femm, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding amendments to vertical donkey boiler for Chile, 23rd August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of vertical cross tube donkey boiler plan for Chile, 15th August 1939 1939, Vertical Cross Tube Donkey Boiler Endorsement, submitting plan merits approval for specified working pressure, minimum radii of dished plates, welding of firebox crown plate, boiler construction under survey & testing for Chile, 14th August 1939 1939, Letter from C H Kruhoffer, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding the forwarding of vertical crosstube donkey boiler plan for Chile, 9th August 1939 1939, Certificate of Survey of Donkey Boiler & Machinery for Chile, 17th January 1939 1939, Plan of Vertical Cross Tube Boiler for Chile, 5th August 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Chile, 24th January 1940 1940, Report of Survey for Repairs, &c for Chile, 15th January 1940 1940, Certificate of Survey of Repairs for Chile, 23rd January 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding damage through striking logs for Chile, 25th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 17th January 1940 1940, Report on Boilers for Chile, 12th January 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 3 for Chile, 16th July 1942 1942, Report of Survey for Repairs, &c for Chile, 1st June 1942 1942, Certificate of Survey of Damage for Chile, 23rd May 1942 1942, Certificate of Survey of Repairs for Chile, 23rd May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the engines partly held for SS No 3 for Chile, 23rd July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 1st June 1942 1942, Report of Total Loss, Casualty, &c for Chile, Undated no date, List of Spare Gear for the Machinery of Chile, Undated no date )

Chilie ( Memo regarding classification of Chilie, 1st February 1916 1916 )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

17/11/1915 ( Freeboard Verification Form for Steamers for Chile, 20th December 1915 1915, Report on Electric Lighting Installation for Chile, 28th December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Chile, 1st February 1916 1916, Steel Steamer Report for Chile, 21st January 1916 1916, Report on Machinery for Chile, 20th January 1916 1916, Memo regarding classification of Chilie, 1st February 1916 1916, Report on Boilers for Chile, 20th January 1916 1916, Memo regarding surveyor's report on cause of port crankshaft break for Chile, 25th October 1932 1932, Certificate of Survey of Damage & Repairs for Chile, 13th September 1932 1932, Certificate of Examination of Forgings for Chile, 23rd August 1932 1932, Certificate of Survey of Part of the Machinery for Chile, 10th September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 15th September 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Plan of Crankshafts for Chile, 7th September 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of amended vertical cross tube donkey boiler plan for Chile, 30th August 1939 1939, Boiler Endorsement for Chile, 30th August 1939 1939, Letter from G Langkilds Femm, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding amendments to vertical donkey boiler for Chile, 23rd August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of vertical cross tube donkey boiler plan for Chile, 15th August 1939 1939, Vertical Cross Tube Donkey Boiler Endorsement, submitting plan merits approval for specified working pressure, minimum radii of dished plates, welding of firebox crown plate, boiler construction under survey & testing for Chile, 14th August 1939 1939, Letter from C H Kruhoffer, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding the forwarding of vertical crosstube donkey boiler plan for Chile, 9th August 1939 1939, Certificate of Survey of Donkey Boiler & Machinery for Chile, 17th January 1939 1939, Plan of Vertical Cross Tube Boiler for Chile, 5th August 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Chile, 24th January 1940 1940, Report of Survey for Repairs, &c for Chile, 15th January 1940 1940, Certificate of Survey of Repairs for Chile, 23rd January 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding damage through striking logs for Chile, 25th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 17th January 1940 1940, Report on Boilers for Chile, 12th January 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 3 for Chile, 16th July 1942 1942, Report of Survey for Repairs, &c for Chile, 1st June 1942 1942, Certificate of Survey of Damage for Chile, 23rd May 1942 1942, Certificate of Survey of Repairs for Chile, 23rd May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the engines partly held for SS No 3 for Chile, 23rd July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 1st June 1942 1942, Report of Total Loss, Casualty, &c for Chile, Undated no date, List of Spare Gear for the Machinery of Chile, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

303 ( Freeboard Verification Form for Steamers for Chile, 20th December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Chile, 1st February 1916 1916, Certificate of Survey of Damage & Repairs for Chile, 13th September 1932 1932, Certificate of Examination of Forgings for Chile, 23rd August 1932 1932, Certificate of Survey of Part of the Machinery for Chile, 10th September 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Plan of Crankshafts for Chile, 7th September 1932 1932, Vertical Cross Tube Donkey Boiler Endorsement, submitting plan merits approval for specified working pressure, minimum radii of dished plates, welding of firebox crown plate, boiler construction under survey & testing for Chile, 14th August 1939 1939, Certificate of Survey of Donkey Boiler & Machinery for Chile, 17th January 1939 1939, Plan of Vertical Cross Tube Boiler for Chile, 5th August 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Chile, 24th January 1940 1940, Certificate of Survey of Repairs for Chile, 23rd January 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding damage through striking logs for Chile, 25th January 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 3 for Chile, 16th July 1942 1942, Certificate of Survey of Damage for Chile, 23rd May 1942 1942, Certificate of Survey of Repairs for Chile, 23rd May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the engines partly held for SS No 3 for Chile, 23rd July 1942 1942, Report of Total Loss, Casualty, &c for Chile, Undated no date, List of Spare Gear for the Machinery of Chile, Undated no date )

The port in which a vessel is registered or permanently based.

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Freeboard Verification Form for Steamers for Chile, 20th December 1915 1915, Report on Electric Lighting Installation for Chile, 28th December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Chile, 1st February 1916 1916, Steel Steamer Report for Chile, 21st January 1916 1916, Report on Machinery for Chile, 20th January 1916 1916, Memo regarding classification of Chilie, 1st February 1916 1916, Report on Boilers for Chile, 20th January 1916 1916, Memo regarding surveyor's report on cause of port crankshaft break for Chile, 25th October 1932 1932, Certificate of Survey of Damage & Repairs for Chile, 13th September 1932 1932, Certificate of Examination of Forgings for Chile, 23rd August 1932 1932, Certificate of Survey of Part of the Machinery for Chile, 10th September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 15th September 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Plan of Crankshafts for Chile, 7th September 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of amended vertical cross tube donkey boiler plan for Chile, 30th August 1939 1939, Boiler Endorsement for Chile, 30th August 1939 1939, Letter from G Langkilds Femm, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding amendments to vertical donkey boiler for Chile, 23rd August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of vertical cross tube donkey boiler plan for Chile, 15th August 1939 1939, Vertical Cross Tube Donkey Boiler Endorsement, submitting plan merits approval for specified working pressure, minimum radii of dished plates, welding of firebox crown plate, boiler construction under survey & testing for Chile, 14th August 1939 1939, Letter from C H Kruhoffer, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding the forwarding of vertical crosstube donkey boiler plan for Chile, 9th August 1939 1939, Certificate of Survey of Donkey Boiler & Machinery for Chile, 17th January 1939 1939, Plan of Vertical Cross Tube Boiler for Chile, 5th August 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Chile, 24th January 1940 1940, Report of Survey for Repairs, &c for Chile, 15th January 1940 1940, Certificate of Survey of Repairs for Chile, 23rd January 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding damage through striking logs for Chile, 25th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 17th January 1940 1940, Report on Boilers for Chile, 12th January 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 3 for Chile, 16th July 1942 1942, Report of Survey for Repairs, &c for Chile, 1st June 1942 1942, Certificate of Survey of Damage for Chile, 23rd May 1942 1942, Certificate of Survey of Repairs for Chile, 23rd May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the engines partly held for SS No 3 for Chile, 23rd July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 1st June 1942 1942, Report of Total Loss, Casualty, &c for Chile, Undated no date, List of Spare Gear for the Machinery of Chile, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Freeboard Verification Form for Steamers for Chile, 20th December 1915 1915, Report on Electric Lighting Installation for Chile, 28th December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Chile, 1st February 1916 1916, Steel Steamer Report for Chile, 21st January 1916 1916, Report on Machinery for Chile, 20th January 1916 1916, Memo regarding classification of Chilie, 1st February 1916 1916, Report on Boilers for Chile, 20th January 1916 1916, Memo regarding surveyor's report on cause of port crankshaft break for Chile, 25th October 1932 1932, Certificate of Survey of Damage & Repairs for Chile, 13th September 1932 1932, Certificate of Examination of Forgings for Chile, 23rd August 1932 1932, Certificate of Survey of Part of the Machinery for Chile, 10th September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 15th September 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Plan of Crankshafts for Chile, 7th September 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of amended vertical cross tube donkey boiler plan for Chile, 30th August 1939 1939, Boiler Endorsement for Chile, 30th August 1939 1939, Letter from G Langkilds Femm, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding amendments to vertical donkey boiler for Chile, 23rd August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of vertical cross tube donkey boiler plan for Chile, 15th August 1939 1939, Vertical Cross Tube Donkey Boiler Endorsement, submitting plan merits approval for specified working pressure, minimum radii of dished plates, welding of firebox crown plate, boiler construction under survey & testing for Chile, 14th August 1939 1939, Letter from C H Kruhoffer, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding the forwarding of vertical crosstube donkey boiler plan for Chile, 9th August 1939 1939, Certificate of Survey of Donkey Boiler & Machinery for Chile, 17th January 1939 1939, Plan of Vertical Cross Tube Boiler for Chile, 5th August 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Chile, 24th January 1940 1940, Report of Survey for Repairs, &c for Chile, 15th January 1940 1940, Certificate of Survey of Repairs for Chile, 23rd January 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding damage through striking logs for Chile, 25th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 17th January 1940 1940, Report on Boilers for Chile, 12th January 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 3 for Chile, 16th July 1942 1942, Report of Survey for Repairs, &c for Chile, 1st June 1942 1942, Certificate of Survey of Damage for Chile, 23rd May 1942 1942, Certificate of Survey of Repairs for Chile, 23rd May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the engines partly held for SS No 3 for Chile, 23rd July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 1st June 1942 1942, Report of Total Loss, Casualty, &c for Chile, Undated no date, List of Spare Gear for the Machinery of Chile, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Freeboard Verification Form for Steamers for Chile, 20th December 1915 1915, Report on Electric Lighting Installation for Chile, 28th December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Chile, 1st February 1916 1916, Steel Steamer Report for Chile, 21st January 1916 1916, Report on Machinery for Chile, 20th January 1916 1916, Memo regarding classification of Chilie, 1st February 1916 1916, Report on Boilers for Chile, 20th January 1916 1916, Memo regarding surveyor's report on cause of port crankshaft break for Chile, 25th October 1932 1932, Certificate of Survey of Damage & Repairs for Chile, 13th September 1932 1932, Certificate of Examination of Forgings for Chile, 23rd August 1932 1932, Certificate of Survey of Part of the Machinery for Chile, 10th September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 15th September 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Plan of Crankshafts for Chile, 7th September 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of amended vertical cross tube donkey boiler plan for Chile, 30th August 1939 1939, Boiler Endorsement for Chile, 30th August 1939 1939, Letter from G Langkilds Femm, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding amendments to vertical donkey boiler for Chile, 23rd August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of vertical cross tube donkey boiler plan for Chile, 15th August 1939 1939, Vertical Cross Tube Donkey Boiler Endorsement, submitting plan merits approval for specified working pressure, minimum radii of dished plates, welding of firebox crown plate, boiler construction under survey & testing for Chile, 14th August 1939 1939, Letter from C H Kruhoffer, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding the forwarding of vertical crosstube donkey boiler plan for Chile, 9th August 1939 1939, Certificate of Survey of Donkey Boiler & Machinery for Chile, 17th January 1939 1939, Plan of Vertical Cross Tube Boiler for Chile, 5th August 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Chile, 24th January 1940 1940, Report of Survey for Repairs, &c for Chile, 15th January 1940 1940, Certificate of Survey of Repairs for Chile, 23rd January 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding damage through striking logs for Chile, 25th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 17th January 1940 1940, Report on Boilers for Chile, 12th January 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 3 for Chile, 16th July 1942 1942, Report of Survey for Repairs, &c for Chile, 1st June 1942 1942, Certificate of Survey of Damage for Chile, 23rd May 1942 1942, Certificate of Survey of Repairs for Chile, 23rd May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the engines partly held for SS No 3 for Chile, 23rd July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 1st June 1942 1942, Report of Total Loss, Casualty, &c for Chile, Undated no date, List of Spare Gear for the Machinery of Chile, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Freeboard Verification Form for Steamers for Chile, 20th December 1915 1915, Report on Electric Lighting Installation for Chile, 28th December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Chile, 1st February 1916 1916, Steel Steamer Report for Chile, 21st January 1916 1916, Report on Machinery for Chile, 20th January 1916 1916, Memo regarding classification of Chilie, 1st February 1916 1916, Report on Boilers for Chile, 20th January 1916 1916, Memo regarding surveyor's report on cause of port crankshaft break for Chile, 25th October 1932 1932, Certificate of Survey of Damage & Repairs for Chile, 13th September 1932 1932, Certificate of Examination of Forgings for Chile, 23rd August 1932 1932, Certificate of Survey of Part of the Machinery for Chile, 10th September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 15th September 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Plan of Crankshafts for Chile, 7th September 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of amended vertical cross tube donkey boiler plan for Chile, 30th August 1939 1939, Boiler Endorsement for Chile, 30th August 1939 1939, Letter from G Langkilds Femm, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding amendments to vertical donkey boiler for Chile, 23rd August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of vertical cross tube donkey boiler plan for Chile, 15th August 1939 1939, Vertical Cross Tube Donkey Boiler Endorsement, submitting plan merits approval for specified working pressure, minimum radii of dished plates, welding of firebox crown plate, boiler construction under survey & testing for Chile, 14th August 1939 1939, Letter from C H Kruhoffer, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding the forwarding of vertical crosstube donkey boiler plan for Chile, 9th August 1939 1939, Certificate of Survey of Donkey Boiler & Machinery for Chile, 17th January 1939 1939, Plan of Vertical Cross Tube Boiler for Chile, 5th August 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Chile, 24th January 1940 1940, Report of Survey for Repairs, &c for Chile, 15th January 1940 1940, Certificate of Survey of Repairs for Chile, 23rd January 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding damage through striking logs for Chile, 25th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 17th January 1940 1940, Report on Boilers for Chile, 12th January 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 3 for Chile, 16th July 1942 1942, Report of Survey for Repairs, &c for Chile, 1st June 1942 1942, Certificate of Survey of Damage for Chile, 23rd May 1942 1942, Certificate of Survey of Repairs for Chile, 23rd May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the engines partly held for SS No 3 for Chile, 23rd July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 1st June 1942 1942, Report of Total Loss, Casualty, &c for Chile, Undated no date, List of Spare Gear for the Machinery of Chile, Undated no date )

The official record pronounced by the Committee

Loss or disposal

Sunk ( Freeboard Verification Form for Steamers for Chile, 20th December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Chile, 1st February 1916 1916, Certificate of Survey of Damage & Repairs for Chile, 13th September 1932 1932, Certificate of Examination of Forgings for Chile, 23rd August 1932 1932, Certificate of Survey of Part of the Machinery for Chile, 10th September 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Plan of Crankshafts for Chile, 7th September 1932 1932, Vertical Cross Tube Donkey Boiler Endorsement, submitting plan merits approval for specified working pressure, minimum radii of dished plates, welding of firebox crown plate, boiler construction under survey & testing for Chile, 14th August 1939 1939, Certificate of Survey of Donkey Boiler & Machinery for Chile, 17th January 1939 1939, Plan of Vertical Cross Tube Boiler for Chile, 5th August 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Chile, 24th January 1940 1940, Certificate of Survey of Repairs for Chile, 23rd January 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding damage through striking logs for Chile, 25th January 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 3 for Chile, 16th July 1942 1942, Certificate of Survey of Damage for Chile, 23rd May 1942 1942, Certificate of Survey of Repairs for Chile, 23rd May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the engines partly held for SS No 3 for Chile, 23rd July 1942 1942, Report of Total Loss, Casualty, &c for Chile, Undated no date, List of Spare Gear for the Machinery of Chile, Undated no date )

Vessel’s area of loss or disposal/last known recorded location.

Area of ship loss

West Coast of Africa ( Freeboard Verification Form for Steamers for Chile, 20th December 1915 1915, Report on Electric Lighting Installation for Chile, 28th December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Chile, 1st February 1916 1916, Steel Steamer Report for Chile, 21st January 1916 1916, Report on Machinery for Chile, 20th January 1916 1916, Memo regarding classification of Chilie, 1st February 1916 1916, Report on Boilers for Chile, 20th January 1916 1916, Memo regarding surveyor's report on cause of port crankshaft break for Chile, 25th October 1932 1932, Certificate of Survey of Damage & Repairs for Chile, 13th September 1932 1932, Certificate of Examination of Forgings for Chile, 23rd August 1932 1932, Certificate of Survey of Part of the Machinery for Chile, 10th September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 15th September 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Plan of Crankshafts for Chile, 7th September 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of amended vertical cross tube donkey boiler plan for Chile, 30th August 1939 1939, Boiler Endorsement for Chile, 30th August 1939 1939, Letter from G Langkilds Femm, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding amendments to vertical donkey boiler for Chile, 23rd August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of vertical cross tube donkey boiler plan for Chile, 15th August 1939 1939, Vertical Cross Tube Donkey Boiler Endorsement, submitting plan merits approval for specified working pressure, minimum radii of dished plates, welding of firebox crown plate, boiler construction under survey & testing for Chile, 14th August 1939 1939, Letter from C H Kruhoffer, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding the forwarding of vertical crosstube donkey boiler plan for Chile, 9th August 1939 1939, Certificate of Survey of Donkey Boiler & Machinery for Chile, 17th January 1939 1939, Plan of Vertical Cross Tube Boiler for Chile, 5th August 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Chile, 24th January 1940 1940, Report of Survey for Repairs, &c for Chile, 15th January 1940 1940, Certificate of Survey of Repairs for Chile, 23rd January 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding damage through striking logs for Chile, 25th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 17th January 1940 1940, Report on Boilers for Chile, 12th January 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 3 for Chile, 16th July 1942 1942, Report of Survey for Repairs, &c for Chile, 1st June 1942 1942, Certificate of Survey of Damage for Chile, 23rd May 1942 1942, Certificate of Survey of Repairs for Chile, 23rd May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the engines partly held for SS No 3 for Chile, 23rd July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 1st June 1942 1942, Report of Total Loss, Casualty, &c for Chile, Undated no date, List of Spare Gear for the Machinery of Chile, Undated no date )

The country or national waters where a vessel is lost/disposed of, or last recorded.

Country of loss or disposal

Africa ( Report on Electric Lighting Installation for Chile, 28th December 1915 1915, Steel Steamer Report for Chile, 21st January 1916 1916, Report on Machinery for Chile, 20th January 1916 1916, Memo regarding classification of Chilie, 1st February 1916 1916, Report on Boilers for Chile, 20th January 1916 1916, Memo regarding surveyor's report on cause of port crankshaft break for Chile, 25th October 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 15th September 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of amended vertical cross tube donkey boiler plan for Chile, 30th August 1939 1939, Boiler Endorsement for Chile, 30th August 1939 1939, Letter from G Langkilds Femm, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding amendments to vertical donkey boiler for Chile, 23rd August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of vertical cross tube donkey boiler plan for Chile, 15th August 1939 1939, Letter from C H Kruhoffer, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding the forwarding of vertical crosstube donkey boiler plan for Chile, 9th August 1939 1939, Report of Survey for Repairs, &c for Chile, 15th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 17th January 1940 1940, Report on Boilers for Chile, 12th January 1940 1940, Report of Survey for Repairs, &c for Chile, 1st June 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 1st June 1942 1942 )

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

The year in which a vessel’s construction is completed.

Year of ship completion

1915 ( Freeboard Verification Form for Steamers for Chile, 20th December 1915 1915, Report on Electric Lighting Installation for Chile, 28th December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Chile, 1st February 1916 1916, Steel Steamer Report for Chile, 21st January 1916 1916, Report on Machinery for Chile, 20th January 1916 1916, Memo regarding classification of Chilie, 1st February 1916 1916, Report on Boilers for Chile, 20th January 1916 1916, Memo regarding surveyor's report on cause of port crankshaft break for Chile, 25th October 1932 1932, Certificate of Survey of Damage & Repairs for Chile, 13th September 1932 1932, Certificate of Examination of Forgings for Chile, 23rd August 1932 1932, Certificate of Survey of Part of the Machinery for Chile, 10th September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 15th September 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Plan of Crankshafts for Chile, 7th September 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of amended vertical cross tube donkey boiler plan for Chile, 30th August 1939 1939, Boiler Endorsement for Chile, 30th August 1939 1939, Letter from G Langkilds Femm, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding amendments to vertical donkey boiler for Chile, 23rd August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of vertical cross tube donkey boiler plan for Chile, 15th August 1939 1939, Vertical Cross Tube Donkey Boiler Endorsement, submitting plan merits approval for specified working pressure, minimum radii of dished plates, welding of firebox crown plate, boiler construction under survey & testing for Chile, 14th August 1939 1939, Letter from C H Kruhoffer, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding the forwarding of vertical crosstube donkey boiler plan for Chile, 9th August 1939 1939, Certificate of Survey of Donkey Boiler & Machinery for Chile, 17th January 1939 1939, Plan of Vertical Cross Tube Boiler for Chile, 5th August 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Chile, 24th January 1940 1940, Report of Survey for Repairs, &c for Chile, 15th January 1940 1940, Certificate of Survey of Repairs for Chile, 23rd January 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding damage through striking logs for Chile, 25th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 17th January 1940 1940, Report on Boilers for Chile, 12th January 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 3 for Chile, 16th July 1942 1942, Report of Survey for Repairs, &c for Chile, 1st June 1942 1942, Certificate of Survey of Damage for Chile, 23rd May 1942 1942, Certificate of Survey of Repairs for Chile, 23rd May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the engines partly held for SS No 3 for Chile, 23rd July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 1st June 1942 1942, Report of Total Loss, Casualty, &c for Chile, Undated no date, List of Spare Gear for the Machinery of Chile, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Burmeister & Wains Maskin & Skibsbyggeri ( Freeboard Verification Form for Steamers for Chile, 20th December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Chile, 1st February 1916 1916, Certificate of Survey of Damage & Repairs for Chile, 13th September 1932 1932, Certificate of Examination of Forgings for Chile, 23rd August 1932 1932, Certificate of Survey of Part of the Machinery for Chile, 10th September 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Plan of Crankshafts for Chile, 7th September 1932 1932, Vertical Cross Tube Donkey Boiler Endorsement, submitting plan merits approval for specified working pressure, minimum radii of dished plates, welding of firebox crown plate, boiler construction under survey & testing for Chile, 14th August 1939 1939, Certificate of Survey of Donkey Boiler & Machinery for Chile, 17th January 1939 1939, Plan of Vertical Cross Tube Boiler for Chile, 5th August 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Chile, 24th January 1940 1940, Certificate of Survey of Repairs for Chile, 23rd January 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding damage through striking logs for Chile, 25th January 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 3 for Chile, 16th July 1942 1942, Certificate of Survey of Damage for Chile, 23rd May 1942 1942, Certificate of Survey of Repairs for Chile, 23rd May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the engines partly held for SS No 3 for Chile, 23rd July 1942 1942, Report of Total Loss, Casualty, &c for Chile, Undated no date, List of Spare Gear for the Machinery of Chile, Undated no date )

Burmeister & Wains Maskin & Skibsbygger ( Report on Electric Lighting Installation for Chile, 28th December 1915 1915, Steel Steamer Report for Chile, 21st January 1916 1916, Report on Machinery for Chile, 20th January 1916 1916, Memo regarding classification of Chilie, 1st February 1916 1916, Report on Boilers for Chile, 20th January 1916 1916, Memo regarding surveyor's report on cause of port crankshaft break for Chile, 25th October 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 15th September 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of amended vertical cross tube donkey boiler plan for Chile, 30th August 1939 1939, Boiler Endorsement for Chile, 30th August 1939 1939, Letter from G Langkilds Femm, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding amendments to vertical donkey boiler for Chile, 23rd August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of vertical cross tube donkey boiler plan for Chile, 15th August 1939 1939, Letter from C H Kruhoffer, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding the forwarding of vertical crosstube donkey boiler plan for Chile, 9th August 1939 1939, Report of Survey for Repairs, &c for Chile, 15th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 17th January 1940 1940, Report on Boilers for Chile, 12th January 1940 1940, Report of Survey for Repairs, &c for Chile, 1st June 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 1st June 1942 1942 )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Copenhagen ( Freeboard Verification Form for Steamers for Chile, 20th December 1915 1915, Report on Electric Lighting Installation for Chile, 28th December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Chile, 1st February 1916 1916, Steel Steamer Report for Chile, 21st January 1916 1916, Report on Machinery for Chile, 20th January 1916 1916, Memo regarding classification of Chilie, 1st February 1916 1916, Report on Boilers for Chile, 20th January 1916 1916, Memo regarding surveyor's report on cause of port crankshaft break for Chile, 25th October 1932 1932, Certificate of Survey of Damage & Repairs for Chile, 13th September 1932 1932, Certificate of Examination of Forgings for Chile, 23rd August 1932 1932, Certificate of Survey of Part of the Machinery for Chile, 10th September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 15th September 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Plan of Crankshafts for Chile, 7th September 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of amended vertical cross tube donkey boiler plan for Chile, 30th August 1939 1939, Boiler Endorsement for Chile, 30th August 1939 1939, Letter from G Langkilds Femm, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding amendments to vertical donkey boiler for Chile, 23rd August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of vertical cross tube donkey boiler plan for Chile, 15th August 1939 1939, Vertical Cross Tube Donkey Boiler Endorsement, submitting plan merits approval for specified working pressure, minimum radii of dished plates, welding of firebox crown plate, boiler construction under survey & testing for Chile, 14th August 1939 1939, Letter from C H Kruhoffer, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding the forwarding of vertical crosstube donkey boiler plan for Chile, 9th August 1939 1939, Certificate of Survey of Donkey Boiler & Machinery for Chile, 17th January 1939 1939, Plan of Vertical Cross Tube Boiler for Chile, 5th August 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Chile, 24th January 1940 1940, Report of Survey for Repairs, &c for Chile, 15th January 1940 1940, Certificate of Survey of Repairs for Chile, 23rd January 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding damage through striking logs for Chile, 25th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 17th January 1940 1940, Report on Boilers for Chile, 12th January 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 3 for Chile, 16th July 1942 1942, Report of Survey for Repairs, &c for Chile, 1st June 1942 1942, Certificate of Survey of Damage for Chile, 23rd May 1942 1942, Certificate of Survey of Repairs for Chile, 23rd May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the engines partly held for SS No 3 for Chile, 23rd July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 1st June 1942 1942, Report of Total Loss, Casualty, &c for Chile, Undated no date, List of Spare Gear for the Machinery of Chile, Undated no date )

A vessel’s means of propulsion.

Propulsion

undefined ( Freeboard Verification Form for Steamers for Chile, 20th December 1915 1915, Memo regarding classification of Chilie, 1st February 1916 1916, Certificate of Survey of Part of the Machinery for Chile, 10th September 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Chile, 24th January 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding damage through striking logs for Chile, 25th January 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 3 for Chile, 16th July 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the engines partly held for SS No 3 for Chile, 23rd July 1942 1942 )

Steam ( Report on Electric Lighting Installation for Chile, 28th December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Chile, 1st February 1916 1916, Steel Steamer Report for Chile, 21st January 1916 1916, Report on Machinery for Chile, 20th January 1916 1916, Report on Boilers for Chile, 20th January 1916 1916, Certificate of Survey of Donkey Boiler & Machinery for Chile, 17th January 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 17th January 1940 1940, List of Spare Gear for the Machinery of Chile, Undated no date )

Motor (internal combustion) ( Memo regarding surveyor's report on cause of port crankshaft break for Chile, 25th October 1932 1932, Certificate of Survey of Damage & Repairs for Chile, 13th September 1932 1932, Certificate of Examination of Forgings for Chile, 23rd August 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 15th September 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Plan of Crankshafts for Chile, 7th September 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of amended vertical cross tube donkey boiler plan for Chile, 30th August 1939 1939, Boiler Endorsement for Chile, 30th August 1939 1939, Letter from G Langkilds Femm, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding amendments to vertical donkey boiler for Chile, 23rd August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of vertical cross tube donkey boiler plan for Chile, 15th August 1939 1939, Vertical Cross Tube Donkey Boiler Endorsement, submitting plan merits approval for specified working pressure, minimum radii of dished plates, welding of firebox crown plate, boiler construction under survey & testing for Chile, 14th August 1939 1939, Letter from C H Kruhoffer, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding the forwarding of vertical crosstube donkey boiler plan for Chile, 9th August 1939 1939, Plan of Vertical Cross Tube Boiler for Chile, 5th August 1939 1939, Report of Survey for Repairs, &c for Chile, 15th January 1940 1940, Certificate of Survey of Repairs for Chile, 23rd January 1940 1940, Report on Boilers for Chile, 12th January 1940 1940, Report of Survey for Repairs, &c for Chile, 1st June 1942 1942, Certificate of Survey of Damage for Chile, 23rd May 1942 1942, Certificate of Survey of Repairs for Chile, 23rd May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 1st June 1942 1942, Report of Total Loss, Casualty, &c for Chile, Undated no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Freeboard Verification Form for Steamers for Chile, 20th December 1915 1915, Report on Electric Lighting Installation for Chile, 28th December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Chile, 1st February 1916 1916, Steel Steamer Report for Chile, 21st January 1916 1916, Report on Machinery for Chile, 20th January 1916 1916, Memo regarding classification of Chilie, 1st February 1916 1916, Report on Boilers for Chile, 20th January 1916 1916, Memo regarding surveyor's report on cause of port crankshaft break for Chile, 25th October 1932 1932, Certificate of Survey of Damage & Repairs for Chile, 13th September 1932 1932, Certificate of Examination of Forgings for Chile, 23rd August 1932 1932, Certificate of Survey of Part of the Machinery for Chile, 10th September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 15th September 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Plan of Crankshafts for Chile, 7th September 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of amended vertical cross tube donkey boiler plan for Chile, 30th August 1939 1939, Boiler Endorsement for Chile, 30th August 1939 1939, Letter from G Langkilds Femm, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding amendments to vertical donkey boiler for Chile, 23rd August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of vertical cross tube donkey boiler plan for Chile, 15th August 1939 1939, Vertical Cross Tube Donkey Boiler Endorsement, submitting plan merits approval for specified working pressure, minimum radii of dished plates, welding of firebox crown plate, boiler construction under survey & testing for Chile, 14th August 1939 1939, Letter from C H Kruhoffer, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding the forwarding of vertical crosstube donkey boiler plan for Chile, 9th August 1939 1939, Certificate of Survey of Donkey Boiler & Machinery for Chile, 17th January 1939 1939, Plan of Vertical Cross Tube Boiler for Chile, 5th August 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Chile, 24th January 1940 1940, Report of Survey for Repairs, &c for Chile, 15th January 1940 1940, Certificate of Survey of Repairs for Chile, 23rd January 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding damage through striking logs for Chile, 25th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 17th January 1940 1940, Report on Boilers for Chile, 12th January 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 3 for Chile, 16th July 1942 1942, Report of Survey for Repairs, &c for Chile, 1st June 1942 1942, Certificate of Survey of Damage for Chile, 23rd May 1942 1942, Certificate of Survey of Repairs for Chile, 23rd May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the engines partly held for SS No 3 for Chile, 23rd July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 1st June 1942 1942, Report of Total Loss, Casualty, &c for Chile, Undated no date, List of Spare Gear for the Machinery of Chile, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Freeboard Verification Form for Steamers for Chile, 20th December 1915 1915, Report on Electric Lighting Installation for Chile, 28th December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Chile, 1st February 1916 1916, Steel Steamer Report for Chile, 21st January 1916 1916, Report on Machinery for Chile, 20th January 1916 1916, Memo regarding classification of Chilie, 1st February 1916 1916, Report on Boilers for Chile, 20th January 1916 1916, Memo regarding surveyor's report on cause of port crankshaft break for Chile, 25th October 1932 1932, Certificate of Survey of Damage & Repairs for Chile, 13th September 1932 1932, Certificate of Examination of Forgings for Chile, 23rd August 1932 1932, Certificate of Survey of Part of the Machinery for Chile, 10th September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 15th September 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Plan of Crankshafts for Chile, 7th September 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of amended vertical cross tube donkey boiler plan for Chile, 30th August 1939 1939, Boiler Endorsement for Chile, 30th August 1939 1939, Letter from G Langkilds Femm, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding amendments to vertical donkey boiler for Chile, 23rd August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of vertical cross tube donkey boiler plan for Chile, 15th August 1939 1939, Vertical Cross Tube Donkey Boiler Endorsement, submitting plan merits approval for specified working pressure, minimum radii of dished plates, welding of firebox crown plate, boiler construction under survey & testing for Chile, 14th August 1939 1939, Letter from C H Kruhoffer, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding the forwarding of vertical crosstube donkey boiler plan for Chile, 9th August 1939 1939, Certificate of Survey of Donkey Boiler & Machinery for Chile, 17th January 1939 1939, Plan of Vertical Cross Tube Boiler for Chile, 5th August 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Chile, 24th January 1940 1940, Report of Survey for Repairs, &c for Chile, 15th January 1940 1940, Certificate of Survey of Repairs for Chile, 23rd January 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding damage through striking logs for Chile, 25th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 17th January 1940 1940, Report on Boilers for Chile, 12th January 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 3 for Chile, 16th July 1942 1942, Report of Survey for Repairs, &c for Chile, 1st June 1942 1942, Certificate of Survey of Damage for Chile, 23rd May 1942 1942, Certificate of Survey of Repairs for Chile, 23rd May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the engines partly held for SS No 3 for Chile, 23rd July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 1st June 1942 1942, Report of Total Loss, Casualty, &c for Chile, Undated no date, List of Spare Gear for the Machinery of Chile, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Freeboard Verification Form for Steamers for Chile, 20th December 1915 1915, Report on Electric Lighting Installation for Chile, 28th December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Chile, 1st February 1916 1916, Steel Steamer Report for Chile, 21st January 1916 1916, Report on Machinery for Chile, 20th January 1916 1916, Memo regarding classification of Chilie, 1st February 1916 1916, Report on Boilers for Chile, 20th January 1916 1916, Memo regarding surveyor's report on cause of port crankshaft break for Chile, 25th October 1932 1932, Certificate of Survey of Damage & Repairs for Chile, 13th September 1932 1932, Certificate of Examination of Forgings for Chile, 23rd August 1932 1932, Certificate of Survey of Part of the Machinery for Chile, 10th September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 15th September 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Plan of Crankshafts for Chile, 7th September 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of amended vertical cross tube donkey boiler plan for Chile, 30th August 1939 1939, Boiler Endorsement for Chile, 30th August 1939 1939, Letter from G Langkilds Femm, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding amendments to vertical donkey boiler for Chile, 23rd August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of vertical cross tube donkey boiler plan for Chile, 15th August 1939 1939, Vertical Cross Tube Donkey Boiler Endorsement, submitting plan merits approval for specified working pressure, minimum radii of dished plates, welding of firebox crown plate, boiler construction under survey & testing for Chile, 14th August 1939 1939, Letter from C H Kruhoffer, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding the forwarding of vertical crosstube donkey boiler plan for Chile, 9th August 1939 1939, Certificate of Survey of Donkey Boiler & Machinery for Chile, 17th January 1939 1939, Plan of Vertical Cross Tube Boiler for Chile, 5th August 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Chile, 24th January 1940 1940, Report of Survey for Repairs, &c for Chile, 15th January 1940 1940, Certificate of Survey of Repairs for Chile, 23rd January 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding damage through striking logs for Chile, 25th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 17th January 1940 1940, Report on Boilers for Chile, 12th January 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 3 for Chile, 16th July 1942 1942, Report of Survey for Repairs, &c for Chile, 1st June 1942 1942, Certificate of Survey of Damage for Chile, 23rd May 1942 1942, Certificate of Survey of Repairs for Chile, 23rd May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the engines partly held for SS No 3 for Chile, 23rd July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 1st June 1942 1942, Report of Total Loss, Casualty, &c for Chile, Undated no date, List of Spare Gear for the Machinery of Chile, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Freeboard Verification Form for Steamers for Chile, 20th December 1915 1915, Report on Electric Lighting Installation for Chile, 28th December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Chile, 1st February 1916 1916, Steel Steamer Report for Chile, 21st January 1916 1916, Report on Machinery for Chile, 20th January 1916 1916, Memo regarding classification of Chilie, 1st February 1916 1916, Report on Boilers for Chile, 20th January 1916 1916, Memo regarding surveyor's report on cause of port crankshaft break for Chile, 25th October 1932 1932, Certificate of Survey of Damage & Repairs for Chile, 13th September 1932 1932, Certificate of Examination of Forgings for Chile, 23rd August 1932 1932, Certificate of Survey of Part of the Machinery for Chile, 10th September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 15th September 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Plan of Crankshafts for Chile, 7th September 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of amended vertical cross tube donkey boiler plan for Chile, 30th August 1939 1939, Boiler Endorsement for Chile, 30th August 1939 1939, Letter from G Langkilds Femm, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding amendments to vertical donkey boiler for Chile, 23rd August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of vertical cross tube donkey boiler plan for Chile, 15th August 1939 1939, Vertical Cross Tube Donkey Boiler Endorsement, submitting plan merits approval for specified working pressure, minimum radii of dished plates, welding of firebox crown plate, boiler construction under survey & testing for Chile, 14th August 1939 1939, Letter from C H Kruhoffer, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding the forwarding of vertical crosstube donkey boiler plan for Chile, 9th August 1939 1939, Certificate of Survey of Donkey Boiler & Machinery for Chile, 17th January 1939 1939, Plan of Vertical Cross Tube Boiler for Chile, 5th August 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Chile, 24th January 1940 1940, Report of Survey for Repairs, &c for Chile, 15th January 1940 1940, Certificate of Survey of Repairs for Chile, 23rd January 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding damage through striking logs for Chile, 25th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 17th January 1940 1940, Report on Boilers for Chile, 12th January 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 3 for Chile, 16th July 1942 1942, Report of Survey for Repairs, &c for Chile, 1st June 1942 1942, Certificate of Survey of Damage for Chile, 23rd May 1942 1942, Certificate of Survey of Repairs for Chile, 23rd May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the engines partly held for SS No 3 for Chile, 23rd July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 1st June 1942 1942, Report of Total Loss, Casualty, &c for Chile, Undated no date, List of Spare Gear for the Machinery of Chile, Undated no date )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sunk by Submarine ( Freeboard Verification Form for Steamers for Chile, 20th December 1915 1915, Report on Electric Lighting Installation for Chile, 28th December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Chile, 1st February 1916 1916, Steel Steamer Report for Chile, 21st January 1916 1916, Report on Machinery for Chile, 20th January 1916 1916, Memo regarding classification of Chilie, 1st February 1916 1916, Report on Boilers for Chile, 20th January 1916 1916, Memo regarding surveyor's report on cause of port crankshaft break for Chile, 25th October 1932 1932, Certificate of Survey of Damage & Repairs for Chile, 13th September 1932 1932, Certificate of Examination of Forgings for Chile, 23rd August 1932 1932, Certificate of Survey of Part of the Machinery for Chile, 10th September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 15th September 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Plan of Crankshafts for Chile, 7th September 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of amended vertical cross tube donkey boiler plan for Chile, 30th August 1939 1939, Boiler Endorsement for Chile, 30th August 1939 1939, Letter from G Langkilds Femm, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding amendments to vertical donkey boiler for Chile, 23rd August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of vertical cross tube donkey boiler plan for Chile, 15th August 1939 1939, Vertical Cross Tube Donkey Boiler Endorsement, submitting plan merits approval for specified working pressure, minimum radii of dished plates, welding of firebox crown plate, boiler construction under survey & testing for Chile, 14th August 1939 1939, Letter from C H Kruhoffer, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding the forwarding of vertical crosstube donkey boiler plan for Chile, 9th August 1939 1939, Certificate of Survey of Donkey Boiler & Machinery for Chile, 17th January 1939 1939, Plan of Vertical Cross Tube Boiler for Chile, 5th August 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Chile, 24th January 1940 1940, Report of Survey for Repairs, &c for Chile, 15th January 1940 1940, Certificate of Survey of Repairs for Chile, 23rd January 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding damage through striking logs for Chile, 25th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 17th January 1940 1940, Report on Boilers for Chile, 12th January 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 3 for Chile, 16th July 1942 1942, Report of Survey for Repairs, &c for Chile, 1st June 1942 1942, Certificate of Survey of Damage for Chile, 23rd May 1942 1942, Certificate of Survey of Repairs for Chile, 23rd May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the engines partly held for SS No 3 for Chile, 23rd July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 1st June 1942 1942, Report of Total Loss, Casualty, &c for Chile, Undated no date, List of Spare Gear for the Machinery of Chile, Undated no date )

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

09/06/1942 ( Freeboard Verification Form for Steamers for Chile, 20th December 1915 1915, Report on Electric Lighting Installation for Chile, 28th December 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Chile, 1st February 1916 1916, Steel Steamer Report for Chile, 21st January 1916 1916, Report on Machinery for Chile, 20th January 1916 1916, Memo regarding classification of Chilie, 1st February 1916 1916, Report on Boilers for Chile, 20th January 1916 1916, Memo regarding surveyor's report on cause of port crankshaft break for Chile, 25th October 1932 1932, Certificate of Survey of Damage & Repairs for Chile, 13th September 1932 1932, Certificate of Examination of Forgings for Chile, 23rd August 1932 1932, Certificate of Survey of Part of the Machinery for Chile, 10th September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 15th September 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Photograph of Damage to Chile, 10th August 1932 1932, Plan of Crankshafts for Chile, 7th September 1932 1932, Letter from the Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of amended vertical cross tube donkey boiler plan for Chile, 30th August 1939 1939, Boiler Endorsement for Chile, 30th August 1939 1939, Letter from G Langkilds Femm, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding amendments to vertical donkey boiler for Chile, 23rd August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of vertical cross tube donkey boiler plan for Chile, 15th August 1939 1939, Vertical Cross Tube Donkey Boiler Endorsement, submitting plan merits approval for specified working pressure, minimum radii of dished plates, welding of firebox crown plate, boiler construction under survey & testing for Chile, 14th August 1939 1939, Letter from C H Kruhoffer, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding the forwarding of vertical crosstube donkey boiler plan for Chile, 9th August 1939 1939, Certificate of Survey of Donkey Boiler & Machinery for Chile, 17th January 1939 1939, Plan of Vertical Cross Tube Boiler for Chile, 5th August 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Chile, 24th January 1940 1940, Report of Survey for Repairs, &c for Chile, 15th January 1940 1940, Certificate of Survey of Repairs for Chile, 23rd January 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding damage through striking logs for Chile, 25th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 17th January 1940 1940, Report on Boilers for Chile, 12th January 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 3 for Chile, 16th July 1942 1942, Report of Survey for Repairs, &c for Chile, 1st June 1942 1942, Certificate of Survey of Damage for Chile, 23rd May 1942 1942, Certificate of Survey of Repairs for Chile, 23rd May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the engines partly held for SS No 3 for Chile, 23rd July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 1st June 1942 1942, Report of Total Loss, Casualty, &c for Chile, Undated no date, List of Spare Gear for the Machinery of Chile, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Copenhagen ( Report on Electric Lighting Installation for Chile, 28th December 1915 1915, Steel Steamer Report for Chile, 21st January 1916 1916, Report on Machinery for Chile, 20th January 1916 1916, Report on Boilers for Chile, 20th January 1916 1916, Letter from G Langkilds Femm, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding amendments to vertical donkey boiler for Chile, 23rd August 1939 1939, Letter from C H Kruhoffer, Copenhagen Surveyor, to the Secretary for Lloyd's Register, London, regarding the forwarding of vertical crosstube donkey boiler plan for Chile, 9th August 1939 1939, Certificate of Survey of Donkey Boiler & Machinery for Chile, 17th January 1939 1939, Certificate of Survey of Repairs for Chile, 23rd January 1940 1940 )

Kobe ( Certificate of Survey of Damage & Repairs for Chile, 13th September 1932 1932, Certificate of Examination of Forgings for Chile, 23rd August 1932 1932, Certificate of Survey of Part of the Machinery for Chile, 10th September 1932 1932 )

Tama; Kobe, Japan; Kobe ( Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 15th September 1932 1932 )

London ( Letter from the Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of amended vertical cross tube donkey boiler plan for Chile, 30th August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Copenhagen Surveyors regarding approval of vertical cross tube donkey boiler plan for Chile, 15th August 1939 1939 )

Kobenhavn ( Plan of Vertical Cross Tube Boiler for Chile, 5th August 1939 1939 )

Nakskov; Copenhagen ( Report of Survey for Repairs, &c for Chile, 15th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 17th January 1940 1940 )

Copenhagen; Nakskov ( Report on Boilers for Chile, 12th January 1940 1940 )

Cape Town ( Report of Survey for Repairs, &c for Chile, 1st June 1942 1942, Certificate of Survey of Damage for Chile, 23rd May 1942 1942, Certificate of Survey of Repairs for Chile, 23rd May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Certificate of Survey of Part Machinery for Chile, 19th May 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 1st June 1942 1942 )

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Vertical Compound wound Dynamo ( Report on Electric Lighting Installation for Chile, 28th December 1915 1915 )

2 off 4 stroke Cycle single acting Diesel oil engines ( Report on Machinery for Chile, 20th January 1916 1916 )

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1; shelter dk with fbd; Lloyds A & CP; +LMC 12,15; Oil engines ( Steel Steamer Report for Chile, 21st January 1916 1916 )

+LMC 12,15; Oil engines ( Report on Machinery for Chile, 20th January 1916 1916 )

+100A1 4,32; Shelter dk with freeboard; S S Cpn No 3-6,28; +LMC 12,27; +LMC(M) 6,29; DB S 5,31; TS(CL) S 4,31; P 4,32 ( Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 15th September 1932 1932 )

See Cpn 11096 ( Report of Survey for Repairs, &c for Chile, 15th January 1940 1940, Report on Boilers for Chile, 12th January 1940 1940 )

CS 3,39; NDB 40; without spl cond; DB S 1,40 ( Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 17th January 1940 1940 )

Deferred for G/E &c ( Report of Survey for Repairs, &c for Chile, 1st June 1942 1942 )

+100A1 12,41; S S Cpn No 3-6,28; S S Cpn No 2-2,35; Examined 4,41; +LMC(CS) 7,37 3,39; DB S 1,40; S 4,41 CL ( Report of Survey for Repairs, &c, of Engines & Boilers for Chile, 1st June 1942 1942 )

+100A1 shelter dk with fbd; Examined 4,41; S S No 3-6,28; S S No 2-35; +LMC CS 7,37; 3,39; DB S 1,40; TS 4,41 CL; Oil Engine; NDB 40 ( Report of Total Loss, Casualty, &c for Chile, Undated no date )

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.