Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

04/10/1918

The year in which a vessel’s construction is completed.

Year of ship completion

1918

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

The Northumberland Shipbuilding Co Ltd

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Howdon Newcastle on Tyne

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Ship manager

Charles Wood Gordon

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Triple Expansion Direct Acting Vertical Inverted Cylinder

Date in which construction of a vessel’s engines were completed.

Year of engine build

1918

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

A vessel’s calculated maximum speed.

Speed (knots)

r 1918

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sold to the British Iron & Steel Corporation for Breaking up at Cardiff

Draft

1918

Name of ship as recorded on the record

Ship name

War Castle

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

26/07/1918

Unique identifier for a given ship, it is assigned by a builder.

Yard no

250

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

Vessels 100 Tons & Upwards

The individual and/or organisation listed

Ship owner

The Shipping Controller

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Cargo

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

5685

Location of construction for a vessel’s engines.

Location of engine build

Wallsend on Tyne

Engine builder as written

North Eastern Marine Engineering Co Ltd

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

The official record pronounced by the Committee

Loss or disposal

To be broken up

Vessel’s place of loss or disposal/last known recorded location.

Place of ship loss

Cardiff

Physical extent of a record.

Number of parts

1

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.