Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
16/05/1933
The year in which a vessel’s construction is completed.
1908
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Sir W G Armstrong, Whitworth & Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Walker, Newcastle
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
90116
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Falmouth 7423
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
16/05/1933
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
C T Bowling & Co Ltd
Location where the document is written.
Newcastle on Tyne
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
To be Broken up
Recorded information related to a vessel’s movements.
Newcastle; Laid Up
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Newcastle
Wallsend Slipway & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
The official record pronounced by the Committee
Broken up
Recorded date for the vessel’s loss or disposal.
__/__/0000
Physical extent of a record.
1
Name of ship as recorded on the record
Camillo
The process of transferring a vessel to water, but not necessarily her completion.
12/08/1908
Unique identifier for a given ship, it is assigned by a builder.
806
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
9 Report of Survey for Repairs, &c., of Engines & Boilers
The port in which a vessel is registered or permanently based.
Liverpool
The date of first visit by a surveyor.
16/05/1933
The individual and/or organisation listed
Bear Creek Oil & Shipping Co Ltd
Name of the individual/entity/organisation responsible for authoring the record
E J Stoddart
Location where a vessel’s survey was undertaken.
Newcastle on Tyne
Date of the meeting of the Classing Committee.
13/02/1934
The name of the port/place of destination given.
Laid Up
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5135
Date in which construction of a vessel’s engines were completed.
1908
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1933
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold for Breaking up purpose
1933
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.