Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
31/10/1907
The year in which a vessel’s construction is completed.
1908
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Sir W G Armstrong, Whitworth & Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Walker, Newcastle
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Newcastle 55487
Name of the individual/entity/organisation responsible for authoring the record
The Wallsend Slipway & Engineering Co Ltd
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1907
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold for Breaking up purpose
1907
Name of ship as recorded on the record
Joyo Maru
The process of transferring a vessel to water, but not necessarily her completion.
12/08/1908
Unique identifier for a given ship, it is assigned by a builder.
806
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Boiler
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Location where the document is written.
Wallsend on Tyne
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
The official record pronounced by the Committee
Broken up
Recorded date for the vessel’s loss or disposal.
__/__/0000
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.