Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
23/04/1914
The year in which a vessel’s construction is completed.
1914
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Short Bros Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Sunderland
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
8394
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Sunderland 26112
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
17/04/1914
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
J Knott
Name of the individual/entity/organisation responsible for authoring the record
William Morrison; Lewis C Davis
Name of surveyor.
William Morrison
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 5,14; FD
Broad categories and subdivisions of vessels related to their purpose or function.
Screw Steamer
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5943
Location of construction for a vessel’s engines.
Stockton
Blair & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold for breaking up Purposes
Physical extent of a record.
1
Name of ship as recorded on the record
Moorish Prince
The process of transferring a vessel to water, but not necessarily her completion.
26/02/1914
Unique identifier for a given ship, it is assigned by a builder.
384
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mdb
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4 Report on Machinery
The listed port to which a given vessel belongs.
Newcastle
The date of first visit by a surveyor.
24/10/1913
The individual and/or organisation listed
Prince Line Ltd
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Thomas
Location where the document is written.
Middlesbrough
Location where a vessel’s survey was undertaken.
Stockton on Tees
Date of the meeting of the Classing Committee.
26/05/1914
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Quadruple Compound
Date in which construction of a vessel’s engines were completed.
1914
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Recorded date for the vessel’s loss or disposal.
__/__/0000
Have you noticed missing or incorrect data or images for this document?