Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

28/03/1914

The year in which a vessel’s construction is completed.

Year of ship completion

1914

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Short Bros Ltd

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Sunderland

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

8358

Additional numbers that feature on a given record that may be used for identification.

Other numbers document know by

Sunderland 26112

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

20/03/1914

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Master

Thomas

Location where the document is written.

Location of Document Creation

Middlesbrough

Location where a vessel’s survey was undertaken.

Location of Survey

Stockton on Tees

Date of the meeting of the Classing Committee.

Date of Classing committee

26/05/1914

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Location of construction for a vessel’s engines.

Location of engine build

Stockton

Engine builder as written

Blair & Co Ltd

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sold for breaking up Purposes

Physical extent of a record.

Number of parts

1

Name of ship as recorded on the record

Ship name

Moorish Prince

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

26/02/1914

Unique identifier for a given ship, it is assigned by a builder.

Yard no

384

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Mdb

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

5a Report on Boilers

The listed port to which a given vessel belongs.

Port belonging to

Newcastle

The date of first visit by a surveyor.

Date of first survey

08/01/1914

The individual and/or organisation listed

Ship owner

Prince Line Ltd

Name of the individual/entity/organisation responsible for authoring the record

Document author

William Morrison; Lewis C Davis

Name of surveyor.

Surveyor

William Morrison

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

See Minute On Sld Fe 26112

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Screw Steamer

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

5943

Date in which construction of a vessel’s engines were completed.

Year of engine build

1914

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

The official record pronounced by the Committee

Loss or disposal

To be broken up

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

__/__/0000

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.