Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

19/02/1913

The year in which a vessel’s construction is completed.

Year of ship completion

1913

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

William Cramp & Son Ship & Engine Building Co

Unique identifier for a given ship, it is assigned by a builder.

Yard no

393

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

Signal letter/Call sign

LCSM

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

1992

The listed port to which a given vessel belongs.

Port belonging to

New York

The date of first visit by a surveyor.

Date of first survey

13/05/1912

The individual and/or organisation listed

Ship owner

Atlantic & Pacific Steamship Co

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Master

William Thomas Crossley

Location where the document is written.

Location of Document Creation

Philadelphia

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1; A & CP; +LMC 2,13; FD

Recorded information related to a vessel’s movements.

Voyage information

Philadelphia; New York

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Screw Steamer

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

The official record pronounced by the Committee

Loss or disposal

Sunk

Vessel’s area of loss or disposal/last known recorded location.

Area of ship loss

Atlantic Coast

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

12/03/1942

Name of ship as recorded on the record

Ship name

Santa Cruz

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

06/11/1912

Name of the shipbuilder as it appears on the record.

Shipbuilder's signature

H W Hand

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Philadelphia

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Phl

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

Steel Steamer

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

Y

The date of last visit by a surveyor.

Date of latest survey

03/02/1913

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Ship manager

W R Grace & Co

Name of the individual/entity/organisation responsible for authoring the record

Document author

David Millar

Location where a vessel’s survey was undertaken.

Location of Survey

Philadelphia

Date of the meeting of the Classing Committee.

Date of Classing committee

07/03/1913

The name of the port/place of destination given.

Destined voyage

New York

Physical arrangement of a ship’s masts, sails and rigging.

Rig

Sr - Schooner

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

5082

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sunk by Submarine

The country or national waters where a vessel is lost/disposed of, or last recorded.

Country of loss or disposal

United States

Physical extent of a record.

Number of parts

2

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.