Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Barbara ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )
Santa Cruz ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913 )
The process of transferring a vessel to water, but not necessarily her completion.
06/11/1912 ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
393 ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )
Location where a vessel’s survey was undertaken.
Philadelphia ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913 )
East Stroudsburg, Pennsylvania ( Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912 )
Baltimore ( Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942 )
Baltimore, Maryland ( Certificate of Survey of Repairs for Barbara, 28th January 1942 1942 )
A vessel’s means of propulsion.
Steam ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )
Is the steamer assisted by sail?
No ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Submarine ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )
The country or national waters where a vessel is lost/disposed of, or last recorded.
United States ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
LCSM ( Steel Steamer Report for Santa Cruz, 19th February 1913 1913 )
The listed port to which a given vessel belongs.
New York ( Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
W R Grace & Co ( Steel Steamer Report for Santa Cruz, 19th February 1913 1913 )
A H Hull & Co Inc ( Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942 )
A H Bull & Co Inc ( Report of Total Loss, Casualty, &c for Barbara, Undated no date )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; A & CP; +LMC 2,13; FD ( Steel Steamer Report for Santa Cruz, 19th February 1913 1913 )
+LMC 2,13 FD ( Report on Machinery for Santa Cruz, 5th February 1913 1913 )
Elec Light ( Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913 )
+100A1; Fitted for Oil Fuel 2,13 FP above 150F; Subject D BLR ( Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942 )
+100A1 1,41; S S Bal 2nd No 3-12,37; S S Bal No 1-41; +LMC 7,41; TS CL 1,41; fitted for oil fuel 2,13 F P above 150F ( Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942 )
+100A1 7,41; SS 2nd No 3-12,37; SS No 1-41; Fitted for Oil Fuel 2,13 Fp above 150f; +LMC 7,41; BS 7,41; TS 1,41 CL ( Report of Total Loss, Casualty, &c for Barbara, Undated no date )
The name of the port/place of destination given.
New York ( Steel Steamer Report for Santa Cruz, 19th February 1913 1913 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5082 ( Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913 )
4637 ( Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )
Type and configuration of the engine(s) supplied for a vessel.
Triple Invertor ( Report on Machinery for Santa Cruz, 5th February 1913 1913 )
Date in which construction of a vessel’s engines were completed.
The year in which a vessel’s construction is completed.
1913 ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
William Cramp & Son Ship & Engine Building Co ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Philadelphia ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )
Broad categories and subdivisions of vessels related to their purpose or function.
Cargo ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912 )
undefined ( Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )
Screw Steamer ( Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )
Is electric lighting fitted to the vessel?
No ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )
The official record pronounced by the Committee
Sunk ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )
Vessel’s area of loss or disposal/last known recorded location.
Atlantic Coast ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )
Recorded date for the vessel’s loss or disposal.
12/03/1942 ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Phl ( Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913 )
Bal ( Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942 )
The individual and/or organisation listed
Atlantic & Pacific Steamship Co ( Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913 )
A H Hull Steamship Co Inc ( Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942 )
A H Bull Steamship Co Inc ( Report of Total Loss, Casualty, &c for Barbara, Undated no date )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
William Thomas Crossley ( Steel Steamer Report for Santa Cruz, 19th February 1913 1913 )
W T Crossley ( Report on Machinery for Santa Cruz, 5th February 1913 1913 )
Recorded information related to a vessel’s movements.
Philadelphia; New York ( Steel Steamer Report for Santa Cruz, 19th February 1913 1913 )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Steel Steamer Report for Santa Cruz, 19th February 1913 1913 )
Name of surveyor.
Location of construction for a vessel’s engines.
Philadelphia ( Report on Machinery for Santa Cruz, 5th February 1913 1913, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942 )
The port in which a vessel is registered or permanently based.
New York ( Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.