Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Barbara ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )

Santa Cruz ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913 )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

06/11/1912 ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

393 ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )

A vessel’s means of propulsion.

Propulsion

Steam ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sunk by Submarine ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )

The country or national waters where a vessel is lost/disposed of, or last recorded.

Country of loss or disposal

United States ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1; A & CP; +LMC 2,13; FD ( Steel Steamer Report for Santa Cruz, 19th February 1913 1913 )

+LMC 2,13 FD ( Report on Machinery for Santa Cruz, 5th February 1913 1913 )

Elec Light ( Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913 )

+100A1; Fitted for Oil Fuel 2,13 FP above 150F; Subject D BLR ( Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942 )

+100A1 1,41; S S Bal 2nd No 3-12,37; S S Bal No 1-41; +LMC 7,41; TS CL 1,41; fitted for oil fuel 2,13 F P above 150F ( Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942 )

+100A1 7,41; SS 2nd No 3-12,37; SS No 1-41; Fitted for Oil Fuel 2,13 Fp above 150f; +LMC 7,41; BS 7,41; TS 1,41 CL ( Report of Total Loss, Casualty, &c for Barbara, Undated no date )

The name of the port/place of destination given.

Type and configuration of the engine(s) supplied for a vessel.

The year in which a vessel’s construction is completed.

Year of ship completion

1913 ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

William Cramp & Son Ship & Engine Building Co ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Philadelphia ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Cargo ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912 )

undefined ( Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )

Screw Steamer ( Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )

The official record pronounced by the Committee

Loss or disposal

Sunk ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )

Vessel’s area of loss or disposal/last known recorded location.

Area of ship loss

Atlantic Coast ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

12/03/1942 ( Longitudinal Section Plan for Barbara, 26th February 1912 1912, Plan of Steel Boiler for Barbara, 15th March 1912 1912, Plan of Vertical Marine Donkey Boiler for Barbara, 30th April 1912 1912, Longitudinal Section Plan for Barbara, 19th March 1912 1912, Plan of Upper Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Second Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of Orlop Deck Plating & Cargo Hatch Coamings for Barbara, 15th April 1912 1912, Plan of General Cross Section for Barbara, 26th February 1912 1912, Plan of General Cross Section for Barbara, 15th March 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Santa Cruz, 6th March 1913 1913, Steel Steamer Report for Santa Cruz, 19th February 1913 1913, Report on Machinery for Santa Cruz, 5th February 1913 1913, Report on Electric Lighting Installation for Santa Cruz, 5th February 1913 1913, Letter from Malcolm K Scott, Secretary of Lloyd's Register, London, to A H Bull & Co Inc, The Bull Steam Ship Lines Building, New York, regarding classification & arrangements for Special Survey No 1 for the Barbara, 6th February 1942 1942, Report of Survey for Repairs, &c for Barbara, 9th February 1942 1942, Certificate of Survey of Repairs for Barbara, 28th January 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Barbara, 9th February 1942 1942, Report of Total Loss, Casualty, &c for Barbara, Undated no date )

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Recorded information related to a vessel’s movements.

Voyage information

Philadelphia; New York ( Steel Steamer Report for Santa Cruz, 19th February 1913 1913 )

Physical arrangement of a ship’s masts, sails and rigging.

The port in which a vessel is registered or permanently based.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.