Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

10/10/1916

The year in which a vessel’s construction is completed.

Year of ship completion

1909

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Goole Shipbuilding & Repairing Co Ltd

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Goole

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

39076

The port in which a vessel is registered or permanently based.

Port of registry

Christiania

The date of first visit by a surveyor.

Date of first survey

23/09/1916

The individual and/or organisation listed

Ship owner

R Blakstadt

Location where the document is written.

Location of Document Creation

Cardiff

Location where a vessel’s survey was undertaken.

Location of Survey

Cardiff

Date of the meeting of the Classing Committee.

Date of Classing committee

17/10/1916

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Location of construction for a vessel’s engines.

Location of engine build

Middlesbrough

Engine builder as written

Richardson Westgarth & Co Ltd

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Name of ship as recorded on the record

Ship name

Fulvio

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

19/06/1909

Unique identifier for a given ship, it is assigned by a builder.

Yard no

128

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Cff

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

9 Report of Survey for Repairs, &c., of Engines & Boilers

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

23/09/1916

Name of the individual/entity/organisation responsible for authoring the record

Document author

J G Hunter

Name of surveyor.

Surveyor

J G Hunter

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1 8,16; SS Dub No 1-13; +LMC 7,13; BS 8,16; TS 8,16

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

305

Date in which construction of a vessel’s engines were completed.

Year of engine build

1909

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

1

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.