Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
27/02/1884
The year in which a vessel’s construction is completed.
1883
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
R Williamson & Son
Unique identifier for a given ship, it is assigned by a builder.
80
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Whn
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Iron Ship
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
27/02/1884
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
John Casson & Co
Name of the individual/entity/organisation responsible for authoring the record
Charles Buchanan
Location where a vessel’s survey was undertaken.
Workington
Date of the meeting of the Classing Committee.
11/03/1884
The name of the port/place of destination given.
Coasting
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Derwent
The process of transferring a vessel to water, but not necessarily her completion.
17/12/1883
Name of the shipbuilder as it appears on the record.
R Williamson & Son
The port or place in which the vessel’s construction took place, at the time of writing.
Workington
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
3708
The listed port to which a given vessel belongs.
Workington
The date of first visit by a surveyor.
13/03/1883
The individual and/or organisation listed
Derwent Steamship Co Ltd
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
James Larkin
Location where the document is written.
Whitehaven
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; LA & CP; Iron Frame Steel Plate; 1 Dk Iron
Recorded information related to a vessel’s movements.
Workington; Coasting
Broad categories and subdivisions of vessels related to their purpose or function.
Screw Steamer
Predominant material(s) utilised in a vessel’s construction.
Iron & Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
267
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Pertinent, useful or interesting recorded content.
Title of the Document has been Altered
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.