Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

22/02/1924

The year in which a vessel’s construction is completed.

Year of ship completion

1885

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

London & Glasgow Engineering & Iron Shipbuilding Co Ltd

The name of the yard where the vessel was built.

Yard name

Middleton Yard

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

Letter

The individual and/or organisation listed

Ship owner

H W Ritscher

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Cargo

A vessel’s means of propulsion.

Propulsion

Sail

System of measurement that replaced ‘Builder’s Old Measurement’, taking a vessel’s internal capacity as the standard. Vessels built between 1836 and 1854 were legally required to display both tonnages.

Gross Register Tonnage (NM)

1316

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Prescribed by flag/registration authorities, and usually excludes a small part of the stern. It is measured from the foreside of the stern at the extreme top to the afterside of the stern post.

Registered Length

233.5

Measurement from the underside of the upper deck on the centre line to the upper side of the bottom plating.

Registered Depth

21.4

Name of ship as recorded on the record

Ship name

Pass of Leny

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

13/10/1885

Unique identifier for a given ship, it is assigned by a builder.

Yard no

250

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Glasgow

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

Name of the individual/entity/organisation responsible for authoring the record

Document author

Assistant to the Secretary, Lloyds Register London

Physical arrangement of a ship’s masts, sails and rigging.

Rig

Bk - Barque

Is the steamer assisted by sail?

Sail assisted steamer

No

Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.

Net Register Tonnage

1279

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Also referred to as extreme breadth. The distance from the extreme starboard side to the extreme port side.

Registered Beam

36.4

Physical extent of a record.

Number of parts

1