Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Arriaga ( Plan of Wet Back Scotch Marine Boiler for Arriaga, 8th June 1937 1937, Inboard Profile Plan for Arriaga, 28th March 1938 1938, Midship Section Plan for Arriaga, 29th March 1938 1938, Second Deck Aft Plan for Arriaga, 18th November 1938 1938, Midship Section Plan for Arriaga, 4th April 1938 1938, Inboard Profile Plan for Arriaga, 4th April 1938 1938, Outboard Profile Plan for Arriaga, 26th October 1939 1939, Memo to the Chief Ship Surveyor regarding missing alterations plan for Arriaga, 31st July 1942 1942, Report of Survey for Repairs, &c for Arriaga, 22nd June 1942 1942, Certificate of Survey of Repairs for Arriaga, 29th May 1942 1942, Certificate of Survey of Boiler & Machinery for Arriaga, 11th April 1942 1942, Memo to the Chief Engineer Surveyor regarding the LMC Survey partly held & damage to Arriaga, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Arriaga, 22nd June 1942 1942, Plan of Intermediate Shaft for Arriaga, Undated no date )
Petroheat ( Request for Special Survey for Petroheat, 12th April 1938 1938, Memo to the Chief Ship Surveyor regarding construction of Petroheat, 9th May 1940 1940, Steel Motorship Report for Petroheat, 29th March 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding machinery, pumping & electrical equipment for of Petroheat, 3rd July 1940 1940, Memo regarding similarities with another ship & electric lighting for Petroheat, 7th May 1940 1940, Memo regarding pumping arrangements for Petroheat, 9th May 1940 1940, Report on Oil Engine Machinery for Petroheat, 9th March 1940 1940, Report on Boilers for Petroheat, 29th February 1940 1940, Memo regarding electric installation for Petroheat, 14th May 1940 1940, Report on Electrical Equipment for Petroheat, 3rd March 1940 1940, Report of Total Loss, Casualty, &c for Petroheat, Undated no date, Sketch of Arrangement of Engine Room Bilge Sections for Petroheat, Undated no date, Sketch of Engine Room Bilge Pumping Arrangement for Petroheat, Undated no date, Sketch of Strainer & Foot Valve for Petroheat, Undated no date, Sketch of Main Engine Crankshaft for Petroheat, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
17/10/1939 ( Plan of Wet Back Scotch Marine Boiler for Arriaga, 8th June 1937 1937, Request for Special Survey for Petroheat, 12th April 1938 1938, Inboard Profile Plan for Arriaga, 28th March 1938 1938, Midship Section Plan for Arriaga, 29th March 1938 1938, Second Deck Aft Plan for Arriaga, 18th November 1938 1938, Midship Section Plan for Arriaga, 4th April 1938 1938, Inboard Profile Plan for Arriaga, 4th April 1938 1938, Outboard Profile Plan for Arriaga, 26th October 1939 1939, Memo to the Chief Ship Surveyor regarding construction of Petroheat, 9th May 1940 1940, Steel Motorship Report for Petroheat, 29th March 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding machinery, pumping & electrical equipment for of Petroheat, 3rd July 1940 1940, Memo regarding similarities with another ship & electric lighting for Petroheat, 7th May 1940 1940, Memo regarding pumping arrangements for Petroheat, 9th May 1940 1940, Report on Oil Engine Machinery for Petroheat, 9th March 1940 1940, Report on Boilers for Petroheat, 29th February 1940 1940, Memo regarding electric installation for Petroheat, 14th May 1940 1940, Report on Electrical Equipment for Petroheat, 3rd March 1940 1940, Memo to the Chief Ship Surveyor regarding missing alterations plan for Arriaga, 31st July 1942 1942, Report of Survey for Repairs, &c for Arriaga, 22nd June 1942 1942, Certificate of Survey of Repairs for Arriaga, 29th May 1942 1942, Certificate of Survey of Boiler & Machinery for Arriaga, 11th April 1942 1942, Memo to the Chief Engineer Surveyor regarding the LMC Survey partly held & damage to Arriaga, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Arriaga, 22nd June 1942 1942, Report of Total Loss, Casualty, &c for Petroheat, Undated no date, Sketch of Arrangement of Engine Room Bilge Sections for Petroheat, Undated no date, Sketch of Engine Room Bilge Pumping Arrangement for Petroheat, Undated no date, Sketch of Strainer & Foot Valve for Petroheat, Undated no date, Sketch of Main Engine Crankshaft for Petroheat, Undated no date, Plan of Intermediate Shaft for Arriaga, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
4 ( Plan of Wet Back Scotch Marine Boiler for Arriaga, 8th June 1937 1937, Request for Special Survey for Petroheat, 12th April 1938 1938, Inboard Profile Plan for Arriaga, 28th March 1938 1938, Midship Section Plan for Arriaga, 29th March 1938 1938, Second Deck Aft Plan for Arriaga, 18th November 1938 1938, Midship Section Plan for Arriaga, 4th April 1938 1938, Inboard Profile Plan for Arriaga, 4th April 1938 1938, Outboard Profile Plan for Arriaga, 26th October 1939 1939, Memo to the Chief Ship Surveyor regarding construction of Petroheat, 9th May 1940 1940, Steel Motorship Report for Petroheat, 29th March 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding machinery, pumping & electrical equipment for of Petroheat, 3rd July 1940 1940, Memo regarding similarities with another ship & electric lighting for Petroheat, 7th May 1940 1940, Memo regarding pumping arrangements for Petroheat, 9th May 1940 1940, Report on Oil Engine Machinery for Petroheat, 9th March 1940 1940, Report on Boilers for Petroheat, 29th February 1940 1940, Memo regarding electric installation for Petroheat, 14th May 1940 1940, Report on Electrical Equipment for Petroheat, 3rd March 1940 1940, Memo to the Chief Ship Surveyor regarding missing alterations plan for Arriaga, 31st July 1942 1942, Report of Survey for Repairs, &c for Arriaga, 22nd June 1942 1942, Certificate of Survey of Repairs for Arriaga, 29th May 1942 1942, Certificate of Survey of Boiler & Machinery for Arriaga, 11th April 1942 1942, Memo to the Chief Engineer Surveyor regarding the LMC Survey partly held & damage to Arriaga, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Arriaga, 22nd June 1942 1942, Report of Total Loss, Casualty, &c for Petroheat, Undated no date, Sketch of Arrangement of Engine Room Bilge Sections for Petroheat, Undated no date, Sketch of Engine Room Bilge Pumping Arrangement for Petroheat, Undated no date, Sketch of Strainer & Foot Valve for Petroheat, Undated no date, Sketch of Main Engine Crankshaft for Petroheat, Undated no date, Plan of Intermediate Shaft for Arriaga, Undated no date )
Location where a vessel’s survey was undertaken.
Titusville Pa ( Plan of Wet Back Scotch Marine Boiler for Arriaga, 8th June 1937 1937 )
New York ( Request for Special Survey for Petroheat, 12th April 1938 1938, Report on Electrical Equipment for Petroheat, 3rd March 1940 1940 )
Rochester N Y ( Inboard Profile Plan for Arriaga, 28th March 1938 1938, Midship Section Plan for Arriaga, 29th March 1938 1938, Second Deck Aft Plan for Arriaga, 18th November 1938 1938, Midship Section Plan for Arriaga, 4th April 1938 1938, Inboard Profile Plan for Arriaga, 4th April 1938 1938 )
Rochester New York; New York ( Steel Motorship Report for Petroheat, 29th March 1940 1940, Report on Oil Engine Machinery for Petroheat, 9th March 1940 1940, Report on Boilers for Petroheat, 29th February 1940 1940 )
Baltimore ( Report of Survey for Repairs, &c for Arriaga, 22nd June 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Arriaga, 22nd June 1942 1942 )
Baltimore, Maryland ( Certificate of Survey of Repairs for Arriaga, 29th May 1942 1942, Certificate of Survey of Boiler & Machinery for Arriaga, 11th April 1942 1942 )
A vessel’s means of propulsion.
undefined ( Plan of Wet Back Scotch Marine Boiler for Arriaga, 8th June 1937 1937, Memo to the Chief Ship Surveyor regarding construction of Petroheat, 9th May 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding machinery, pumping & electrical equipment for of Petroheat, 3rd July 1940 1940, Memo regarding similarities with another ship & electric lighting for Petroheat, 7th May 1940 1940, Memo to the Chief Ship Surveyor regarding missing alterations plan for Arriaga, 31st July 1942 1942, Memo to the Chief Engineer Surveyor regarding the LMC Survey partly held & damage to Arriaga, 27th July 1942 1942, Sketch of Arrangement of Engine Room Bilge Sections for Petroheat, Undated no date, Sketch of Engine Room Bilge Pumping Arrangement for Petroheat, Undated no date, Sketch of Strainer & Foot Valve for Petroheat, Undated no date, Plan of Intermediate Shaft for Arriaga, Undated no date )
Motor (internal combustion) ( Request for Special Survey for Petroheat, 12th April 1938 1938, Inboard Profile Plan for Arriaga, 28th March 1938 1938, Midship Section Plan for Arriaga, 29th March 1938 1938, Second Deck Aft Plan for Arriaga, 18th November 1938 1938, Midship Section Plan for Arriaga, 4th April 1938 1938, Inboard Profile Plan for Arriaga, 4th April 1938 1938, Outboard Profile Plan for Arriaga, 26th October 1939 1939, Steel Motorship Report for Petroheat, 29th March 1940 1940, Memo regarding pumping arrangements for Petroheat, 9th May 1940 1940, Report on Oil Engine Machinery for Petroheat, 9th March 1940 1940, Report on Boilers for Petroheat, 29th February 1940 1940, Memo regarding electric installation for Petroheat, 14th May 1940 1940, Report on Electrical Equipment for Petroheat, 3rd March 1940 1940, Report of Survey for Repairs, &c for Arriaga, 22nd June 1942 1942, Certificate of Survey of Repairs for Arriaga, 29th May 1942 1942, Certificate of Survey of Boiler & Machinery for Arriaga, 11th April 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Arriaga, 22nd June 1942 1942, Report of Total Loss, Casualty, &c for Petroheat, Undated no date, Sketch of Main Engine Crankshaft for Petroheat, Undated no date )
Is the steamer assisted by sail?
No ( Plan of Wet Back Scotch Marine Boiler for Arriaga, 8th June 1937 1937, Request for Special Survey for Petroheat, 12th April 1938 1938, Inboard Profile Plan for Arriaga, 28th March 1938 1938, Midship Section Plan for Arriaga, 29th March 1938 1938, Second Deck Aft Plan for Arriaga, 18th November 1938 1938, Midship Section Plan for Arriaga, 4th April 1938 1938, Inboard Profile Plan for Arriaga, 4th April 1938 1938, Outboard Profile Plan for Arriaga, 26th October 1939 1939, Memo to the Chief Ship Surveyor regarding construction of Petroheat, 9th May 1940 1940, Steel Motorship Report for Petroheat, 29th March 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding machinery, pumping & electrical equipment for of Petroheat, 3rd July 1940 1940, Memo regarding similarities with another ship & electric lighting for Petroheat, 7th May 1940 1940, Memo regarding pumping arrangements for Petroheat, 9th May 1940 1940, Report on Oil Engine Machinery for Petroheat, 9th March 1940 1940, Report on Boilers for Petroheat, 29th February 1940 1940, Memo regarding electric installation for Petroheat, 14th May 1940 1940, Report on Electrical Equipment for Petroheat, 3rd March 1940 1940, Memo to the Chief Ship Surveyor regarding missing alterations plan for Arriaga, 31st July 1942 1942, Report of Survey for Repairs, &c for Arriaga, 22nd June 1942 1942, Certificate of Survey of Repairs for Arriaga, 29th May 1942 1942, Certificate of Survey of Boiler & Machinery for Arriaga, 11th April 1942 1942, Memo to the Chief Engineer Surveyor regarding the LMC Survey partly held & damage to Arriaga, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Arriaga, 22nd June 1942 1942, Report of Total Loss, Casualty, &c for Petroheat, Undated no date, Sketch of Arrangement of Engine Room Bilge Sections for Petroheat, Undated no date, Sketch of Engine Room Bilge Pumping Arrangement for Petroheat, Undated no date, Sketch of Strainer & Foot Valve for Petroheat, Undated no date, Sketch of Main Engine Crankshaft for Petroheat, Undated no date, Plan of Intermediate Shaft for Arriaga, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Plan of Wet Back Scotch Marine Boiler for Arriaga, 8th June 1937 1937, Request for Special Survey for Petroheat, 12th April 1938 1938, Inboard Profile Plan for Arriaga, 28th March 1938 1938, Midship Section Plan for Arriaga, 29th March 1938 1938, Second Deck Aft Plan for Arriaga, 18th November 1938 1938, Midship Section Plan for Arriaga, 4th April 1938 1938, Inboard Profile Plan for Arriaga, 4th April 1938 1938, Outboard Profile Plan for Arriaga, 26th October 1939 1939, Memo to the Chief Ship Surveyor regarding construction of Petroheat, 9th May 1940 1940, Steel Motorship Report for Petroheat, 29th March 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding machinery, pumping & electrical equipment for of Petroheat, 3rd July 1940 1940, Memo regarding similarities with another ship & electric lighting for Petroheat, 7th May 1940 1940, Memo regarding pumping arrangements for Petroheat, 9th May 1940 1940, Report on Oil Engine Machinery for Petroheat, 9th March 1940 1940, Report on Boilers for Petroheat, 29th February 1940 1940, Memo regarding electric installation for Petroheat, 14th May 1940 1940, Report on Electrical Equipment for Petroheat, 3rd March 1940 1940, Memo to the Chief Ship Surveyor regarding missing alterations plan for Arriaga, 31st July 1942 1942, Report of Survey for Repairs, &c for Arriaga, 22nd June 1942 1942, Certificate of Survey of Repairs for Arriaga, 29th May 1942 1942, Certificate of Survey of Boiler & Machinery for Arriaga, 11th April 1942 1942, Memo to the Chief Engineer Surveyor regarding the LMC Survey partly held & damage to Arriaga, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Arriaga, 22nd June 1942 1942, Report of Total Loss, Casualty, &c for Petroheat, Undated no date, Sketch of Arrangement of Engine Room Bilge Sections for Petroheat, Undated no date, Sketch of Engine Room Bilge Pumping Arrangement for Petroheat, Undated no date, Sketch of Strainer & Foot Valve for Petroheat, Undated no date, Sketch of Main Engine Crankshaft for Petroheat, Undated no date, Plan of Intermediate Shaft for Arriaga, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Plan of Wet Back Scotch Marine Boiler for Arriaga, 8th June 1937 1937, Request for Special Survey for Petroheat, 12th April 1938 1938, Inboard Profile Plan for Arriaga, 28th March 1938 1938, Midship Section Plan for Arriaga, 29th March 1938 1938, Second Deck Aft Plan for Arriaga, 18th November 1938 1938, Midship Section Plan for Arriaga, 4th April 1938 1938, Inboard Profile Plan for Arriaga, 4th April 1938 1938, Outboard Profile Plan for Arriaga, 26th October 1939 1939, Memo to the Chief Ship Surveyor regarding construction of Petroheat, 9th May 1940 1940, Steel Motorship Report for Petroheat, 29th March 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding machinery, pumping & electrical equipment for of Petroheat, 3rd July 1940 1940, Memo regarding similarities with another ship & electric lighting for Petroheat, 7th May 1940 1940, Memo regarding pumping arrangements for Petroheat, 9th May 1940 1940, Report on Oil Engine Machinery for Petroheat, 9th March 1940 1940, Report on Boilers for Petroheat, 29th February 1940 1940, Memo regarding electric installation for Petroheat, 14th May 1940 1940, Report on Electrical Equipment for Petroheat, 3rd March 1940 1940, Memo to the Chief Ship Surveyor regarding missing alterations plan for Arriaga, 31st July 1942 1942, Report of Survey for Repairs, &c for Arriaga, 22nd June 1942 1942, Certificate of Survey of Repairs for Arriaga, 29th May 1942 1942, Certificate of Survey of Boiler & Machinery for Arriaga, 11th April 1942 1942, Memo to the Chief Engineer Surveyor regarding the LMC Survey partly held & damage to Arriaga, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Arriaga, 22nd June 1942 1942, Report of Total Loss, Casualty, &c for Petroheat, Undated no date, Sketch of Arrangement of Engine Room Bilge Sections for Petroheat, Undated no date, Sketch of Engine Room Bilge Pumping Arrangement for Petroheat, Undated no date, Sketch of Strainer & Foot Valve for Petroheat, Undated no date, Sketch of Main Engine Crankshaft for Petroheat, Undated no date, Plan of Intermediate Shaft for Arriaga, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Plan of Wet Back Scotch Marine Boiler for Arriaga, 8th June 1937 1937, Request for Special Survey for Petroheat, 12th April 1938 1938, Inboard Profile Plan for Arriaga, 28th March 1938 1938, Midship Section Plan for Arriaga, 29th March 1938 1938, Second Deck Aft Plan for Arriaga, 18th November 1938 1938, Midship Section Plan for Arriaga, 4th April 1938 1938, Inboard Profile Plan for Arriaga, 4th April 1938 1938, Outboard Profile Plan for Arriaga, 26th October 1939 1939, Memo to the Chief Ship Surveyor regarding construction of Petroheat, 9th May 1940 1940, Steel Motorship Report for Petroheat, 29th March 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding machinery, pumping & electrical equipment for of Petroheat, 3rd July 1940 1940, Memo regarding similarities with another ship & electric lighting for Petroheat, 7th May 1940 1940, Memo regarding pumping arrangements for Petroheat, 9th May 1940 1940, Report on Oil Engine Machinery for Petroheat, 9th March 1940 1940, Report on Boilers for Petroheat, 29th February 1940 1940, Memo regarding electric installation for Petroheat, 14th May 1940 1940, Report on Electrical Equipment for Petroheat, 3rd March 1940 1940, Memo to the Chief Ship Surveyor regarding missing alterations plan for Arriaga, 31st July 1942 1942, Report of Survey for Repairs, &c for Arriaga, 22nd June 1942 1942, Certificate of Survey of Repairs for Arriaga, 29th May 1942 1942, Certificate of Survey of Boiler & Machinery for Arriaga, 11th April 1942 1942, Memo to the Chief Engineer Surveyor regarding the LMC Survey partly held & damage to Arriaga, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Arriaga, 22nd June 1942 1942, Report of Total Loss, Casualty, &c for Petroheat, Undated no date, Sketch of Arrangement of Engine Room Bilge Sections for Petroheat, Undated no date, Sketch of Engine Room Bilge Pumping Arrangement for Petroheat, Undated no date, Sketch of Strainer & Foot Valve for Petroheat, Undated no date, Sketch of Main Engine Crankshaft for Petroheat, Undated no date, Plan of Intermediate Shaft for Arriaga, Undated no date )
Vessel’s area of loss or disposal/last known recorded location.
Atlantic ( Plan of Wet Back Scotch Marine Boiler for Arriaga, 8th June 1937 1937, Request for Special Survey for Petroheat, 12th April 1938 1938, Inboard Profile Plan for Arriaga, 28th March 1938 1938, Midship Section Plan for Arriaga, 29th March 1938 1938, Second Deck Aft Plan for Arriaga, 18th November 1938 1938, Midship Section Plan for Arriaga, 4th April 1938 1938, Inboard Profile Plan for Arriaga, 4th April 1938 1938, Outboard Profile Plan for Arriaga, 26th October 1939 1939, Memo to the Chief Ship Surveyor regarding construction of Petroheat, 9th May 1940 1940, Steel Motorship Report for Petroheat, 29th March 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding machinery, pumping & electrical equipment for of Petroheat, 3rd July 1940 1940, Memo regarding similarities with another ship & electric lighting for Petroheat, 7th May 1940 1940, Memo regarding pumping arrangements for Petroheat, 9th May 1940 1940, Report on Oil Engine Machinery for Petroheat, 9th March 1940 1940, Report on Boilers for Petroheat, 29th February 1940 1940, Memo regarding electric installation for Petroheat, 14th May 1940 1940, Report on Electrical Equipment for Petroheat, 3rd March 1940 1940, Memo to the Chief Ship Surveyor regarding missing alterations plan for Arriaga, 31st July 1942 1942, Report of Survey for Repairs, &c for Arriaga, 22nd June 1942 1942, Certificate of Survey of Repairs for Arriaga, 29th May 1942 1942, Certificate of Survey of Boiler & Machinery for Arriaga, 11th April 1942 1942, Memo to the Chief Engineer Surveyor regarding the LMC Survey partly held & damage to Arriaga, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Arriaga, 22nd June 1942 1942, Report of Total Loss, Casualty, &c for Petroheat, Undated no date, Sketch of Arrangement of Engine Room Bilge Sections for Petroheat, Undated no date, Sketch of Engine Room Bilge Pumping Arrangement for Petroheat, Undated no date, Sketch of Strainer & Foot Valve for Petroheat, Undated no date, Sketch of Main Engine Crankshaft for Petroheat, Undated no date, Plan of Intermediate Shaft for Arriaga, Undated no date )
Recorded date for the vessel’s loss or disposal.
27/06/1942 ( Plan of Wet Back Scotch Marine Boiler for Arriaga, 8th June 1937 1937, Request for Special Survey for Petroheat, 12th April 1938 1938, Inboard Profile Plan for Arriaga, 28th March 1938 1938, Midship Section Plan for Arriaga, 29th March 1938 1938, Second Deck Aft Plan for Arriaga, 18th November 1938 1938, Midship Section Plan for Arriaga, 4th April 1938 1938, Inboard Profile Plan for Arriaga, 4th April 1938 1938, Outboard Profile Plan for Arriaga, 26th October 1939 1939, Memo to the Chief Ship Surveyor regarding construction of Petroheat, 9th May 1940 1940, Steel Motorship Report for Petroheat, 29th March 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding machinery, pumping & electrical equipment for of Petroheat, 3rd July 1940 1940, Memo regarding similarities with another ship & electric lighting for Petroheat, 7th May 1940 1940, Memo regarding pumping arrangements for Petroheat, 9th May 1940 1940, Report on Oil Engine Machinery for Petroheat, 9th March 1940 1940, Report on Boilers for Petroheat, 29th February 1940 1940, Memo regarding electric installation for Petroheat, 14th May 1940 1940, Report on Electrical Equipment for Petroheat, 3rd March 1940 1940, Memo to the Chief Ship Surveyor regarding missing alterations plan for Arriaga, 31st July 1942 1942, Report of Survey for Repairs, &c for Arriaga, 22nd June 1942 1942, Certificate of Survey of Repairs for Arriaga, 29th May 1942 1942, Certificate of Survey of Boiler & Machinery for Arriaga, 11th April 1942 1942, Memo to the Chief Engineer Surveyor regarding the LMC Survey partly held & damage to Arriaga, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Arriaga, 22nd June 1942 1942, Report of Total Loss, Casualty, &c for Petroheat, Undated no date, Sketch of Arrangement of Engine Room Bilge Sections for Petroheat, Undated no date, Sketch of Engine Room Bilge Pumping Arrangement for Petroheat, Undated no date, Sketch of Strainer & Foot Valve for Petroheat, Undated no date, Sketch of Main Engine Crankshaft for Petroheat, Undated no date, Plan of Intermediate Shaft for Arriaga, Undated no date )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
2100 ( Request for Special Survey for Petroheat, 12th April 1938 1938 )
2345 ( Steel Motorship Report for Petroheat, 29th March 1940 1940, Report on Oil Engine Machinery for Petroheat, 9th March 1940 1940, Report on Boilers for Petroheat, 29th February 1940 1940, Report on Electrical Equipment for Petroheat, 3rd March 1940 1940 )
2469 ( Report of Survey for Repairs, &c for Arriaga, 22nd June 1942 1942, Certificate of Survey of Repairs for Arriaga, 29th May 1942 1942, Certificate of Survey of Boiler & Machinery for Arriaga, 11th April 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Arriaga, 22nd June 1942 1942 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
N.Yk ( Steel Motorship Report for Petroheat, 29th March 1940 1940, Report on Oil Engine Machinery for Petroheat, 9th March 1940 1940, Report on Boilers for Petroheat, 29th February 1940 1940, Report on Electrical Equipment for Petroheat, 3rd March 1940 1940 )
Bal ( Report of Survey for Repairs, &c for Arriaga, 22nd June 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Arriaga, 22nd June 1942 1942 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Frank T Johnson ( Steel Motorship Report for Petroheat, 29th March 1940 1940 )
F T Johnson ( Report of Total Loss, Casualty, &c for Petroheat, Undated no date )
The listed port to which a given vessel belongs.
Location of construction for a vessel’s engines.
Auburn, New York ( Report on Oil Engine Machinery for Petroheat, 9th March 1940 1940, Report on Boilers for Petroheat, 29th February 1940 1940 )
Auburn; New York ( Report of Survey for Repairs, &c, of Engines & Boilers for Arriaga, 22nd June 1942 1942 )
Recorded information relating the specific cargo being conveyed.
Petroleum in bulk ( Report of Total Loss, Casualty, &c for Petroheat, Undated no date )
The year in which a vessel’s construction is completed.
1939 ( Plan of Wet Back Scotch Marine Boiler for Arriaga, 8th June 1937 1937, Request for Special Survey for Petroheat, 12th April 1938 1938, Inboard Profile Plan for Arriaga, 28th March 1938 1938, Midship Section Plan for Arriaga, 29th March 1938 1938, Second Deck Aft Plan for Arriaga, 18th November 1938 1938, Midship Section Plan for Arriaga, 4th April 1938 1938, Inboard Profile Plan for Arriaga, 4th April 1938 1938, Outboard Profile Plan for Arriaga, 26th October 1939 1939, Memo to the Chief Ship Surveyor regarding construction of Petroheat, 9th May 1940 1940, Steel Motorship Report for Petroheat, 29th March 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding machinery, pumping & electrical equipment for of Petroheat, 3rd July 1940 1940, Memo regarding similarities with another ship & electric lighting for Petroheat, 7th May 1940 1940, Memo regarding pumping arrangements for Petroheat, 9th May 1940 1940, Report on Oil Engine Machinery for Petroheat, 9th March 1940 1940, Report on Boilers for Petroheat, 29th February 1940 1940, Memo regarding electric installation for Petroheat, 14th May 1940 1940, Report on Electrical Equipment for Petroheat, 3rd March 1940 1940, Memo to the Chief Ship Surveyor regarding missing alterations plan for Arriaga, 31st July 1942 1942, Report of Survey for Repairs, &c for Arriaga, 22nd June 1942 1942, Certificate of Survey of Repairs for Arriaga, 29th May 1942 1942, Certificate of Survey of Boiler & Machinery for Arriaga, 11th April 1942 1942, Memo to the Chief Engineer Surveyor regarding the LMC Survey partly held & damage to Arriaga, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Arriaga, 22nd June 1942 1942, Report of Total Loss, Casualty, &c for Petroheat, Undated no date, Sketch of Arrangement of Engine Room Bilge Sections for Petroheat, Undated no date, Sketch of Engine Room Bilge Pumping Arrangement for Petroheat, Undated no date, Sketch of Strainer & Foot Valve for Petroheat, Undated no date, Sketch of Main Engine Crankshaft for Petroheat, Undated no date, Plan of Intermediate Shaft for Arriaga, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Dolomite Marine Corp; Sullivans Drydock & Repair Corp ( Plan of Wet Back Scotch Marine Boiler for Arriaga, 8th June 1937 1937, Request for Special Survey for Petroheat, 12th April 1938 1938, Inboard Profile Plan for Arriaga, 28th March 1938 1938, Midship Section Plan for Arriaga, 29th March 1938 1938, Second Deck Aft Plan for Arriaga, 18th November 1938 1938, Midship Section Plan for Arriaga, 4th April 1938 1938, Inboard Profile Plan for Arriaga, 4th April 1938 1938, Outboard Profile Plan for Arriaga, 26th October 1939 1939, Memo to the Chief Ship Surveyor regarding construction of Petroheat, 9th May 1940 1940, Steel Motorship Report for Petroheat, 29th March 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding machinery, pumping & electrical equipment for of Petroheat, 3rd July 1940 1940, Memo regarding similarities with another ship & electric lighting for Petroheat, 7th May 1940 1940, Memo regarding pumping arrangements for Petroheat, 9th May 1940 1940, Report on Oil Engine Machinery for Petroheat, 9th March 1940 1940, Report on Boilers for Petroheat, 29th February 1940 1940, Memo regarding electric installation for Petroheat, 14th May 1940 1940, Report on Electrical Equipment for Petroheat, 3rd March 1940 1940, Memo to the Chief Ship Surveyor regarding missing alterations plan for Arriaga, 31st July 1942 1942, Report of Survey for Repairs, &c for Arriaga, 22nd June 1942 1942, Certificate of Survey of Repairs for Arriaga, 29th May 1942 1942, Certificate of Survey of Boiler & Machinery for Arriaga, 11th April 1942 1942, Memo to the Chief Engineer Surveyor regarding the LMC Survey partly held & damage to Arriaga, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Arriaga, 22nd June 1942 1942, Report of Total Loss, Casualty, &c for Petroheat, Undated no date, Sketch of Arrangement of Engine Room Bilge Sections for Petroheat, Undated no date, Sketch of Engine Room Bilge Pumping Arrangement for Petroheat, Undated no date, Sketch of Strainer & Foot Valve for Petroheat, Undated no date, Sketch of Main Engine Crankshaft for Petroheat, Undated no date, Plan of Intermediate Shaft for Arriaga, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Rochester, NY; Brooklyn, NY ( Plan of Wet Back Scotch Marine Boiler for Arriaga, 8th June 1937 1937, Request for Special Survey for Petroheat, 12th April 1938 1938, Inboard Profile Plan for Arriaga, 28th March 1938 1938, Midship Section Plan for Arriaga, 29th March 1938 1938, Second Deck Aft Plan for Arriaga, 18th November 1938 1938, Midship Section Plan for Arriaga, 4th April 1938 1938, Inboard Profile Plan for Arriaga, 4th April 1938 1938, Outboard Profile Plan for Arriaga, 26th October 1939 1939, Memo to the Chief Ship Surveyor regarding construction of Petroheat, 9th May 1940 1940, Steel Motorship Report for Petroheat, 29th March 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding machinery, pumping & electrical equipment for of Petroheat, 3rd July 1940 1940, Memo regarding similarities with another ship & electric lighting for Petroheat, 7th May 1940 1940, Memo regarding pumping arrangements for Petroheat, 9th May 1940 1940, Report on Oil Engine Machinery for Petroheat, 9th March 1940 1940, Report on Boilers for Petroheat, 29th February 1940 1940, Memo regarding electric installation for Petroheat, 14th May 1940 1940, Report on Electrical Equipment for Petroheat, 3rd March 1940 1940, Memo to the Chief Ship Surveyor regarding missing alterations plan for Arriaga, 31st July 1942 1942, Report of Survey for Repairs, &c for Arriaga, 22nd June 1942 1942, Certificate of Survey of Repairs for Arriaga, 29th May 1942 1942, Certificate of Survey of Boiler & Machinery for Arriaga, 11th April 1942 1942, Memo to the Chief Engineer Surveyor regarding the LMC Survey partly held & damage to Arriaga, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Arriaga, 22nd June 1942 1942, Report of Total Loss, Casualty, &c for Petroheat, Undated no date, Sketch of Arrangement of Engine Room Bilge Sections for Petroheat, Undated no date, Sketch of Engine Room Bilge Pumping Arrangement for Petroheat, Undated no date, Sketch of Strainer & Foot Valve for Petroheat, Undated no date, Sketch of Main Engine Crankshaft for Petroheat, Undated no date, Plan of Intermediate Shaft for Arriaga, Undated no date )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Plan of Wet Back Scotch Marine Boiler for Arriaga, 8th June 1937 1937, Request for Special Survey for Petroheat, 12th April 1938 1938, Inboard Profile Plan for Arriaga, 28th March 1938 1938, Midship Section Plan for Arriaga, 29th March 1938 1938, Midship Section Plan for Arriaga, 4th April 1938 1938, Inboard Profile Plan for Arriaga, 4th April 1938 1938, Outboard Profile Plan for Arriaga, 26th October 1939 1939, Memo to the Chief Ship Surveyor regarding construction of Petroheat, 9th May 1940 1940, Steel Motorship Report for Petroheat, 29th March 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding machinery, pumping & electrical equipment for of Petroheat, 3rd July 1940 1940, Memo regarding similarities with another ship & electric lighting for Petroheat, 7th May 1940 1940, Memo regarding pumping arrangements for Petroheat, 9th May 1940 1940, Report on Oil Engine Machinery for Petroheat, 9th March 1940 1940, Report on Boilers for Petroheat, 29th February 1940 1940, Memo regarding electric installation for Petroheat, 14th May 1940 1940, Report on Electrical Equipment for Petroheat, 3rd March 1940 1940, Memo to the Chief Ship Surveyor regarding missing alterations plan for Arriaga, 31st July 1942 1942, Report of Survey for Repairs, &c for Arriaga, 22nd June 1942 1942, Certificate of Survey of Repairs for Arriaga, 29th May 1942 1942, Certificate of Survey of Boiler & Machinery for Arriaga, 11th April 1942 1942, Memo to the Chief Engineer Surveyor regarding the LMC Survey partly held & damage to Arriaga, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Arriaga, 22nd June 1942 1942, Sketch of Arrangement of Engine Room Bilge Sections for Petroheat, Undated no date, Sketch of Engine Room Bilge Pumping Arrangement for Petroheat, Undated no date, Sketch of Strainer & Foot Valve for Petroheat, Undated no date, Sketch of Main Engine Crankshaft for Petroheat, Undated no date, Plan of Intermediate Shaft for Arriaga, Undated no date )
Twin Screw Motor Vessel ( Second Deck Aft Plan for Arriaga, 18th November 1938 1938 )
Tanker ( Report of Total Loss, Casualty, &c for Petroheat, Undated no date )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Plan of Wet Back Scotch Marine Boiler for Arriaga, 8th June 1937 1937, Request for Special Survey for Petroheat, 12th April 1938 1938, Inboard Profile Plan for Arriaga, 28th March 1938 1938, Midship Section Plan for Arriaga, 29th March 1938 1938, Second Deck Aft Plan for Arriaga, 18th November 1938 1938, Midship Section Plan for Arriaga, 4th April 1938 1938, Inboard Profile Plan for Arriaga, 4th April 1938 1938, Outboard Profile Plan for Arriaga, 26th October 1939 1939, Memo to the Chief Ship Surveyor regarding construction of Petroheat, 9th May 1940 1940, Steel Motorship Report for Petroheat, 29th March 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding machinery, pumping & electrical equipment for of Petroheat, 3rd July 1940 1940, Memo regarding similarities with another ship & electric lighting for Petroheat, 7th May 1940 1940, Memo regarding pumping arrangements for Petroheat, 9th May 1940 1940, Report on Oil Engine Machinery for Petroheat, 9th March 1940 1940, Report on Boilers for Petroheat, 29th February 1940 1940, Memo regarding electric installation for Petroheat, 14th May 1940 1940, Report on Electrical Equipment for Petroheat, 3rd March 1940 1940, Memo to the Chief Ship Surveyor regarding missing alterations plan for Arriaga, 31st July 1942 1942, Report of Survey for Repairs, &c for Arriaga, 22nd June 1942 1942, Certificate of Survey of Repairs for Arriaga, 29th May 1942 1942, Certificate of Survey of Boiler & Machinery for Arriaga, 11th April 1942 1942, Memo to the Chief Engineer Surveyor regarding the LMC Survey partly held & damage to Arriaga, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Arriaga, 22nd June 1942 1942, Report of Total Loss, Casualty, &c for Petroheat, Undated no date, Sketch of Arrangement of Engine Room Bilge Sections for Petroheat, Undated no date, Sketch of Engine Room Bilge Pumping Arrangement for Petroheat, Undated no date, Sketch of Strainer & Foot Valve for Petroheat, Undated no date, Sketch of Main Engine Crankshaft for Petroheat, Undated no date, Plan of Intermediate Shaft for Arriaga, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Plan of Wet Back Scotch Marine Boiler for Arriaga, 8th June 1937 1937, Request for Special Survey for Petroheat, 12th April 1938 1938, Inboard Profile Plan for Arriaga, 28th March 1938 1938, Midship Section Plan for Arriaga, 29th March 1938 1938, Second Deck Aft Plan for Arriaga, 18th November 1938 1938, Midship Section Plan for Arriaga, 4th April 1938 1938, Inboard Profile Plan for Arriaga, 4th April 1938 1938, Outboard Profile Plan for Arriaga, 26th October 1939 1939, Memo to the Chief Ship Surveyor regarding construction of Petroheat, 9th May 1940 1940, Steel Motorship Report for Petroheat, 29th March 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding machinery, pumping & electrical equipment for of Petroheat, 3rd July 1940 1940, Memo regarding similarities with another ship & electric lighting for Petroheat, 7th May 1940 1940, Memo regarding pumping arrangements for Petroheat, 9th May 1940 1940, Report on Oil Engine Machinery for Petroheat, 9th March 1940 1940, Report on Boilers for Petroheat, 29th February 1940 1940, Memo regarding electric installation for Petroheat, 14th May 1940 1940, Report on Electrical Equipment for Petroheat, 3rd March 1940 1940, Memo to the Chief Ship Surveyor regarding missing alterations plan for Arriaga, 31st July 1942 1942, Report of Survey for Repairs, &c for Arriaga, 22nd June 1942 1942, Certificate of Survey of Repairs for Arriaga, 29th May 1942 1942, Certificate of Survey of Boiler & Machinery for Arriaga, 11th April 1942 1942, Memo to the Chief Engineer Surveyor regarding the LMC Survey partly held & damage to Arriaga, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Arriaga, 22nd June 1942 1942, Report of Total Loss, Casualty, &c for Petroheat, Undated no date, Sketch of Arrangement of Engine Room Bilge Sections for Petroheat, Undated no date, Sketch of Engine Room Bilge Pumping Arrangement for Petroheat, Undated no date, Sketch of Strainer & Foot Valve for Petroheat, Undated no date, Sketch of Main Engine Crankshaft for Petroheat, Undated no date, Plan of Intermediate Shaft for Arriaga, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Plan of Wet Back Scotch Marine Boiler for Arriaga, 8th June 1937 1937, Request for Special Survey for Petroheat, 12th April 1938 1938, Inboard Profile Plan for Arriaga, 28th March 1938 1938, Midship Section Plan for Arriaga, 29th March 1938 1938, Second Deck Aft Plan for Arriaga, 18th November 1938 1938, Midship Section Plan for Arriaga, 4th April 1938 1938, Inboard Profile Plan for Arriaga, 4th April 1938 1938, Outboard Profile Plan for Arriaga, 26th October 1939 1939, Memo to the Chief Ship Surveyor regarding construction of Petroheat, 9th May 1940 1940, Steel Motorship Report for Petroheat, 29th March 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding machinery, pumping & electrical equipment for of Petroheat, 3rd July 1940 1940, Memo regarding similarities with another ship & electric lighting for Petroheat, 7th May 1940 1940, Memo regarding pumping arrangements for Petroheat, 9th May 1940 1940, Report on Oil Engine Machinery for Petroheat, 9th March 1940 1940, Report on Boilers for Petroheat, 29th February 1940 1940, Memo regarding electric installation for Petroheat, 14th May 1940 1940, Report on Electrical Equipment for Petroheat, 3rd March 1940 1940, Memo to the Chief Ship Surveyor regarding missing alterations plan for Arriaga, 31st July 1942 1942, Report of Survey for Repairs, &c for Arriaga, 22nd June 1942 1942, Certificate of Survey of Repairs for Arriaga, 29th May 1942 1942, Certificate of Survey of Boiler & Machinery for Arriaga, 11th April 1942 1942, Memo to the Chief Engineer Surveyor regarding the LMC Survey partly held & damage to Arriaga, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Arriaga, 22nd June 1942 1942, Report of Total Loss, Casualty, &c for Petroheat, Undated no date, Sketch of Arrangement of Engine Room Bilge Sections for Petroheat, Undated no date, Sketch of Engine Room Bilge Pumping Arrangement for Petroheat, Undated no date, Sketch of Strainer & Foot Valve for Petroheat, Undated no date, Sketch of Main Engine Crankshaft for Petroheat, Undated no date, Plan of Intermediate Shaft for Arriaga, Undated no date )
Is electric lighting fitted to the vessel?
No ( Plan of Wet Back Scotch Marine Boiler for Arriaga, 8th June 1937 1937, Request for Special Survey for Petroheat, 12th April 1938 1938, Inboard Profile Plan for Arriaga, 28th March 1938 1938, Midship Section Plan for Arriaga, 29th March 1938 1938, Second Deck Aft Plan for Arriaga, 18th November 1938 1938, Midship Section Plan for Arriaga, 4th April 1938 1938, Inboard Profile Plan for Arriaga, 4th April 1938 1938, Outboard Profile Plan for Arriaga, 26th October 1939 1939, Memo to the Chief Ship Surveyor regarding construction of Petroheat, 9th May 1940 1940, Steel Motorship Report for Petroheat, 29th March 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding machinery, pumping & electrical equipment for of Petroheat, 3rd July 1940 1940, Memo regarding similarities with another ship & electric lighting for Petroheat, 7th May 1940 1940, Memo regarding pumping arrangements for Petroheat, 9th May 1940 1940, Report on Oil Engine Machinery for Petroheat, 9th March 1940 1940, Report on Boilers for Petroheat, 29th February 1940 1940, Memo regarding electric installation for Petroheat, 14th May 1940 1940, Report on Electrical Equipment for Petroheat, 3rd March 1940 1940, Memo to the Chief Ship Surveyor regarding missing alterations plan for Arriaga, 31st July 1942 1942, Report of Survey for Repairs, &c for Arriaga, 22nd June 1942 1942, Certificate of Survey of Repairs for Arriaga, 29th May 1942 1942, Certificate of Survey of Boiler & Machinery for Arriaga, 11th April 1942 1942, Memo to the Chief Engineer Surveyor regarding the LMC Survey partly held & damage to Arriaga, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Arriaga, 22nd June 1942 1942, Report of Total Loss, Casualty, &c for Petroheat, Undated no date, Sketch of Arrangement of Engine Room Bilge Sections for Petroheat, Undated no date, Sketch of Engine Room Bilge Pumping Arrangement for Petroheat, Undated no date, Sketch of Strainer & Foot Valve for Petroheat, Undated no date, Sketch of Main Engine Crankshaft for Petroheat, Undated no date, Plan of Intermediate Shaft for Arriaga, Undated no date )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Submarine ( Plan of Wet Back Scotch Marine Boiler for Arriaga, 8th June 1937 1937, Request for Special Survey for Petroheat, 12th April 1938 1938, Inboard Profile Plan for Arriaga, 28th March 1938 1938, Midship Section Plan for Arriaga, 29th March 1938 1938, Second Deck Aft Plan for Arriaga, 18th November 1938 1938, Midship Section Plan for Arriaga, 4th April 1938 1938, Inboard Profile Plan for Arriaga, 4th April 1938 1938, Outboard Profile Plan for Arriaga, 26th October 1939 1939, Memo to the Chief Ship Surveyor regarding construction of Petroheat, 9th May 1940 1940, Steel Motorship Report for Petroheat, 29th March 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding machinery, pumping & electrical equipment for of Petroheat, 3rd July 1940 1940, Memo regarding similarities with another ship & electric lighting for Petroheat, 7th May 1940 1940, Memo regarding pumping arrangements for Petroheat, 9th May 1940 1940, Report on Oil Engine Machinery for Petroheat, 9th March 1940 1940, Report on Boilers for Petroheat, 29th February 1940 1940, Memo regarding electric installation for Petroheat, 14th May 1940 1940, Report on Electrical Equipment for Petroheat, 3rd March 1940 1940, Memo to the Chief Ship Surveyor regarding missing alterations plan for Arriaga, 31st July 1942 1942, Report of Survey for Repairs, &c for Arriaga, 22nd June 1942 1942, Certificate of Survey of Repairs for Arriaga, 29th May 1942 1942, Certificate of Survey of Boiler & Machinery for Arriaga, 11th April 1942 1942, Memo to the Chief Engineer Surveyor regarding the LMC Survey partly held & damage to Arriaga, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Arriaga, 22nd June 1942 1942, Report of Total Loss, Casualty, &c for Petroheat, Undated no date, Sketch of Arrangement of Engine Room Bilge Sections for Petroheat, Undated no date, Sketch of Engine Room Bilge Pumping Arrangement for Petroheat, Undated no date, Sketch of Strainer & Foot Valve for Petroheat, Undated no date, Sketch of Main Engine Crankshaft for Petroheat, Undated no date, Plan of Intermediate Shaft for Arriaga, Undated no date )
The country or national waters where a vessel is lost/disposed of, or last recorded.
North America ( Plan of Wet Back Scotch Marine Boiler for Arriaga, 8th June 1937 1937, Request for Special Survey for Petroheat, 12th April 1938 1938, Inboard Profile Plan for Arriaga, 28th March 1938 1938, Midship Section Plan for Arriaga, 29th March 1938 1938, Second Deck Aft Plan for Arriaga, 18th November 1938 1938, Midship Section Plan for Arriaga, 4th April 1938 1938, Inboard Profile Plan for Arriaga, 4th April 1938 1938, Outboard Profile Plan for Arriaga, 26th October 1939 1939, Memo to the Chief Ship Surveyor regarding construction of Petroheat, 9th May 1940 1940, Steel Motorship Report for Petroheat, 29th March 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding machinery, pumping & electrical equipment for of Petroheat, 3rd July 1940 1940, Memo regarding similarities with another ship & electric lighting for Petroheat, 7th May 1940 1940, Memo regarding pumping arrangements for Petroheat, 9th May 1940 1940, Report on Oil Engine Machinery for Petroheat, 9th March 1940 1940, Report on Boilers for Petroheat, 29th February 1940 1940, Memo regarding electric installation for Petroheat, 14th May 1940 1940, Report on Electrical Equipment for Petroheat, 3rd March 1940 1940, Memo to the Chief Ship Surveyor regarding missing alterations plan for Arriaga, 31st July 1942 1942, Report of Survey for Repairs, &c for Arriaga, 22nd June 1942 1942, Certificate of Survey of Repairs for Arriaga, 29th May 1942 1942, Certificate of Survey of Boiler & Machinery for Arriaga, 11th April 1942 1942, Memo to the Chief Engineer Surveyor regarding the LMC Survey partly held & damage to Arriaga, 27th July 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Arriaga, 22nd June 1942 1942, Report of Total Loss, Casualty, &c for Petroheat, Undated no date, Sketch of Arrangement of Engine Room Bilge Sections for Petroheat, Undated no date, Sketch of Engine Room Bilge Pumping Arrangement for Petroheat, Undated no date, Sketch of Strainer & Foot Valve for Petroheat, Undated no date, Sketch of Main Engine Crankshaft for Petroheat, Undated no date, Plan of Intermediate Shaft for Arriaga, Undated no date )
The individual and/or organisation listed
Dotomite Marine Corp ( Request for Special Survey for Petroheat, 12th April 1938 1938 )
Dolomite 3 Corp ( Steel Motorship Report for Petroheat, 29th March 1940 1940, Report on Oil Engine Machinery for Petroheat, 9th March 1940 1940, Report on Boilers for Petroheat, 29th February 1940 1940, Report on Electrical Equipment for Petroheat, 3rd March 1940 1940 )
Lago Petroleum Corp ( Report of Survey for Repairs, &c for Arriaga, 22nd June 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Arriaga, 22nd June 1942 1942 )
Dolomite S Corp ( Report of Total Loss, Casualty, &c for Petroheat, Undated no date )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
WDWC ( Steel Motorship Report for Petroheat, 29th March 1940 1940 )
The port in which a vessel is registered or permanently based.
New York ( Steel Motorship Report for Petroheat, 29th March 1940 1940 )
Panama ( Report of Survey for Repairs, &c, of Engines & Boilers for Arriaga, 22nd June 1942 1942 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Carrying Petroleum in bulk for service on the Great Lakes & coastwise from eastport me to the west indies; LMC 3 40 ( Steel Motorship Report for Petroheat, 29th March 1940 1940 )
LMC 3 40 ( Report on Oil Engine Machinery for Petroheat, 9th March 1940 1940 )
D B 184 ( Report on Boilers for Petroheat, 29th February 1940 1940 )
Elec Light ( Report on Electrical Equipment for Petroheat, 3rd March 1940 1940 )
+100A1; Carrying Petroleum in bulk for service on the Great Lakes & coastwise from eastport me to the west indies; S T S N 4,42 ( Report of Survey for Repairs, &c for Arriaga, 22nd June 1942 1942 )
As now; S T S N4,42 ( Report of Survey for Repairs, &c, of Engines & Boilers for Arriaga, 22nd June 1942 1942 )
+100A1 9,41; LMC 3,40; P 541; S 541; carrying Petroleum in bulk for service on the Great Lakes & coastwise from Eastport, ME to the West Indies; oil engines ( Report of Total Loss, Casualty, &c for Petroheat, Undated no date )
Type and configuration of the engine(s) supplied for a vessel.
2 Oil Engines S R Geared to 2 Screw Shafts ( Report on Oil Engine Machinery for Petroheat, 9th March 1940 1940 )
Date in which construction of a vessel’s engines were completed.
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.