Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Athelmonarch ( Plan of Midship Section for Athelmonarch, 24th April 1928 1918, Request for Special Survey for Athelmonarch, 17th January 1927 1927, Plan of Crankshaft for Athelmonarch, 13th January 1927 1927, Plan of Shafting for Athelmonarch, 13th January 1927 1927, Letter from Kenneth Inglis, Lloyd's Register, Greenock, to the Secretary, London, regarding telegram on omission of length & capacity from report for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram on total length & capacity to be entered into register book for Athelmonarch, 10th May 1928 1928, Telegram from Surveyors, Greenock, to Lloyd's Committee, London, regarding total length & capacity for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram asking for total length & capacity for Athelmonarch, 9th May 1928 1928, Memo to the Chief Ship Surveyor regarding First Entry when due Revised Rule for Athelmonarch, 1st May 1928 1928, Form for Vessels of 100 Tons & Upwards for Athelmonarch, 10th April 1928 1928, Memo regarding Classification for Athelmonarch, 30th April 1928 1928, Steel or Motorship Report for Athelmonarch, 21st April 1928 1928, Report on Oil Engine Machinery for Athelmonarch, 27th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Electric Fittings for Athelmonarch, 19th April 1928 1928, Memo regarding fees for Oil Engines Continuous Survey for Athelmonarch, 16th November 1928 1928, Profile & Deck Plan for Athelmonarch, 19th June 1928 1928, Letter from Clerk to the Classification Committee to the Secretary of Lloyd's Register, Liverpool, regarding fee for continuous survey for Athelmonarch, 16th November 1938 1938, Letter from H W Soar, Secretary to the Liverpool Committee to the Secretary of Lloyd's Register, London, regarding if portion of fees chargeable for Athelmonarch, 15th November 1938 1938, Report of Survey for Repairs, &c for Athelmonarch, 1st November 1938 1938, Certificate of Survey for Athelmonarch, 15th September 1938 1938, Certificate of Testing for Athelmonarch, 15th September 1938 1938, Certificate of Survey of Machinery for Athelmonarch, 14th November 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 3rd November 1938 1938, Letter from H Nightingale, Surveyor to Lloyd's Register to the Secretary of Lloyd's Register, Wokingham, regarding survey dates, report numbers & register book entry for Athelmonarch, 25th June 1943 1943, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelmonarch, 6th July 1943 1943, Certificate of Survey of Damage for Athelmonarch, 21st April 1943 1943, Certificate of Survey for Athelmonarch, 21st April 1943 1943, Copy of a Certificate of Survey of Port Donkey Boiler for Athelmonarch, 20th April 1943 1943, Copy of a Certificate of Survey of Repairs for Athelmonarch, 20th April 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 17th April 1943 1943, Telegram from Committee, to Lloyds Register, Greenock, regarding asking for total length & capacity for Athelmonarch, Undated no date, Report of Total Loss, Casualty, &c for Athelmonarch, Undated no date, Report of Survey for Repairs, &c for Athelmonarch, Undated no date, Plan of Crankshaft for Athelmonarch, Undated no date, Photograph of View on Front of Cracked Crosshead for Athelmonarch, Undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

10/02/1928 ( Plan of Midship Section for Athelmonarch, 24th April 1928 1918, Request for Special Survey for Athelmonarch, 17th January 1927 1927, Plan of Crankshaft for Athelmonarch, 13th January 1927 1927, Plan of Shafting for Athelmonarch, 13th January 1927 1927, Letter from Kenneth Inglis, Lloyd's Register, Greenock, to the Secretary, London, regarding telegram on omission of length & capacity from report for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram on total length & capacity to be entered into register book for Athelmonarch, 10th May 1928 1928, Telegram from Surveyors, Greenock, to Lloyd's Committee, London, regarding total length & capacity for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram asking for total length & capacity for Athelmonarch, 9th May 1928 1928, Memo to the Chief Ship Surveyor regarding First Entry when due Revised Rule for Athelmonarch, 1st May 1928 1928, Form for Vessels of 100 Tons & Upwards for Athelmonarch, 10th April 1928 1928, Memo regarding Classification for Athelmonarch, 30th April 1928 1928, Steel or Motorship Report for Athelmonarch, 21st April 1928 1928, Report on Oil Engine Machinery for Athelmonarch, 27th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Electric Fittings for Athelmonarch, 19th April 1928 1928, Memo regarding fees for Oil Engines Continuous Survey for Athelmonarch, 16th November 1928 1928, Profile & Deck Plan for Athelmonarch, 19th June 1928 1928, Letter from Clerk to the Classification Committee to the Secretary of Lloyd's Register, Liverpool, regarding fee for continuous survey for Athelmonarch, 16th November 1938 1938, Letter from H W Soar, Secretary to the Liverpool Committee to the Secretary of Lloyd's Register, London, regarding if portion of fees chargeable for Athelmonarch, 15th November 1938 1938, Report of Survey for Repairs, &c for Athelmonarch, 1st November 1938 1938, Certificate of Survey for Athelmonarch, 15th September 1938 1938, Certificate of Testing for Athelmonarch, 15th September 1938 1938, Certificate of Survey of Machinery for Athelmonarch, 14th November 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 3rd November 1938 1938, Letter from H Nightingale, Surveyor to Lloyd's Register to the Secretary of Lloyd's Register, Wokingham, regarding survey dates, report numbers & register book entry for Athelmonarch, 25th June 1943 1943, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelmonarch, 6th July 1943 1943, Certificate of Survey of Damage for Athelmonarch, 21st April 1943 1943, Certificate of Survey for Athelmonarch, 21st April 1943 1943, Copy of a Certificate of Survey of Port Donkey Boiler for Athelmonarch, 20th April 1943 1943, Copy of a Certificate of Survey of Repairs for Athelmonarch, 20th April 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 17th April 1943 1943, Telegram from Committee, to Lloyds Register, Greenock, regarding asking for total length & capacity for Athelmonarch, Undated no date, Report of Total Loss, Casualty, &c for Athelmonarch, Undated no date, Report of Survey for Repairs, &c for Athelmonarch, Undated no date, Plan of Crankshaft for Athelmonarch, Undated no date, Photograph of View on Front of Cracked Crosshead for Athelmonarch, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

400 ( Plan of Midship Section for Athelmonarch, 24th April 1928 1918, Request for Special Survey for Athelmonarch, 17th January 1927 1927, Plan of Crankshaft for Athelmonarch, 13th January 1927 1927, Plan of Shafting for Athelmonarch, 13th January 1927 1927, Letter from Kenneth Inglis, Lloyd's Register, Greenock, to the Secretary, London, regarding telegram on omission of length & capacity from report for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram on total length & capacity to be entered into register book for Athelmonarch, 10th May 1928 1928, Telegram from Surveyors, Greenock, to Lloyd's Committee, London, regarding total length & capacity for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram asking for total length & capacity for Athelmonarch, 9th May 1928 1928, Memo to the Chief Ship Surveyor regarding First Entry when due Revised Rule for Athelmonarch, 1st May 1928 1928, Form for Vessels of 100 Tons & Upwards for Athelmonarch, 10th April 1928 1928, Memo regarding Classification for Athelmonarch, 30th April 1928 1928, Steel or Motorship Report for Athelmonarch, 21st April 1928 1928, Report on Oil Engine Machinery for Athelmonarch, 27th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Electric Fittings for Athelmonarch, 19th April 1928 1928, Memo regarding fees for Oil Engines Continuous Survey for Athelmonarch, 16th November 1928 1928, Profile & Deck Plan for Athelmonarch, 19th June 1928 1928, Letter from Clerk to the Classification Committee to the Secretary of Lloyd's Register, Liverpool, regarding fee for continuous survey for Athelmonarch, 16th November 1938 1938, Letter from H W Soar, Secretary to the Liverpool Committee to the Secretary of Lloyd's Register, London, regarding if portion of fees chargeable for Athelmonarch, 15th November 1938 1938, Report of Survey for Repairs, &c for Athelmonarch, 1st November 1938 1938, Certificate of Survey for Athelmonarch, 15th September 1938 1938, Certificate of Testing for Athelmonarch, 15th September 1938 1938, Certificate of Survey of Machinery for Athelmonarch, 14th November 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 3rd November 1938 1938, Letter from H Nightingale, Surveyor to Lloyd's Register to the Secretary of Lloyd's Register, Wokingham, regarding survey dates, report numbers & register book entry for Athelmonarch, 25th June 1943 1943, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelmonarch, 6th July 1943 1943, Certificate of Survey of Damage for Athelmonarch, 21st April 1943 1943, Certificate of Survey for Athelmonarch, 21st April 1943 1943, Copy of a Certificate of Survey of Port Donkey Boiler for Athelmonarch, 20th April 1943 1943, Copy of a Certificate of Survey of Repairs for Athelmonarch, 20th April 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 17th April 1943 1943, Telegram from Committee, to Lloyds Register, Greenock, regarding asking for total length & capacity for Athelmonarch, Undated no date, Report of Total Loss, Casualty, &c for Athelmonarch, Undated no date, Report of Survey for Repairs, &c for Athelmonarch, Undated no date, Plan of Crankshaft for Athelmonarch, Undated no date, Photograph of View on Front of Cracked Crosshead for Athelmonarch, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Port Glasgow ( Plan of Midship Section for Athelmonarch, 24th April 1928 1918, Profile & Deck Plan for Athelmonarch, 19th June 1928 1928 )

Greenock ( Request for Special Survey for Athelmonarch, 17th January 1927 1927, Plan of Crankshaft for Athelmonarch, 13th January 1927 1927, Plan of Shafting for Athelmonarch, 13th January 1927 1927, Letter from Kenneth Inglis, Lloyd's Register, Greenock, to the Secretary, London, regarding telegram on omission of length & capacity from report for Athelmonarch, 9th May 1928 1928, Report on Oil Engine Machinery for Athelmonarch, 27th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Certificate of Survey for Athelmonarch, 15th September 1938 1938, Certificate of Testing for Athelmonarch, 15th September 1938 1938 )

London ( Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram asking for total length & capacity for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to the Secretary of Lloyd's Register, Liverpool, regarding fee for continuous survey for Athelmonarch, 16th November 1938 1938 )

Liverpool ( Form for Vessels of 100 Tons & Upwards for Athelmonarch, 10th April 1928 1928, Letter from H W Soar, Secretary to the Liverpool Committee to the Secretary of Lloyd's Register, London, regarding if portion of fees chargeable for Athelmonarch, 15th November 1938 1938, Certificate of Survey of Machinery for Athelmonarch, 14th November 1938 1938 )

Port Glasgow; Greenock ( Steel or Motorship Report for Athelmonarch, 21st April 1928 1928 )

Greenock; Glasgow ( Report on Electric Fittings for Athelmonarch, 19th April 1928 1928 )

Birkenhead; Liverpool ( Report of Survey for Repairs, &c for Athelmonarch, 1st November 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 3rd November 1938 1938 )

Colombo ( Letter from H Nightingale, Surveyor to Lloyd's Register to the Secretary of Lloyd's Register, Wokingham, regarding survey dates, report numbers & register book entry for Athelmonarch, 25th June 1943 1943, Certificate of Survey of Damage for Athelmonarch, 21st April 1943 1943, Certificate of Survey for Athelmonarch, 21st April 1943 1943, Copy of a Certificate of Survey of Port Donkey Boiler for Athelmonarch, 20th April 1943 1943, Copy of a Certificate of Survey of Repairs for Athelmonarch, 20th April 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 17th April 1943 1943, Report of Survey for Repairs, &c for Athelmonarch, Undated no date )

A vessel’s means of propulsion.

Propulsion

Motor (internal combustion) ( Plan of Midship Section for Athelmonarch, 24th April 1928 1918, Request for Special Survey for Athelmonarch, 17th January 1927 1927, Plan of Crankshaft for Athelmonarch, 13th January 1927 1927, Plan of Shafting for Athelmonarch, 13th January 1927 1927, Letter from Kenneth Inglis, Lloyd's Register, Greenock, to the Secretary, London, regarding telegram on omission of length & capacity from report for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram on total length & capacity to be entered into register book for Athelmonarch, 10th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram asking for total length & capacity for Athelmonarch, 9th May 1928 1928, Memo to the Chief Ship Surveyor regarding First Entry when due Revised Rule for Athelmonarch, 1st May 1928 1928, Form for Vessels of 100 Tons & Upwards for Athelmonarch, 10th April 1928 1928, Steel or Motorship Report for Athelmonarch, 21st April 1928 1928, Report on Oil Engine Machinery for Athelmonarch, 27th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Profile & Deck Plan for Athelmonarch, 19th June 1928 1928, Letter from Clerk to the Classification Committee to the Secretary of Lloyd's Register, Liverpool, regarding fee for continuous survey for Athelmonarch, 16th November 1938 1938, Report of Survey for Repairs, &c for Athelmonarch, 1st November 1938 1938, Certificate of Survey for Athelmonarch, 15th September 1938 1938, Certificate of Testing for Athelmonarch, 15th September 1938 1938, Certificate of Survey of Machinery for Athelmonarch, 14th November 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 3rd November 1938 1938, Certificate of Survey of Damage for Athelmonarch, 21st April 1943 1943, Certificate of Survey for Athelmonarch, 21st April 1943 1943, Copy of a Certificate of Survey of Port Donkey Boiler for Athelmonarch, 20th April 1943 1943, Copy of a Certificate of Survey of Repairs for Athelmonarch, 20th April 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 17th April 1943 1943, Report of Total Loss, Casualty, &c for Athelmonarch, Undated no date, Report of Survey for Repairs, &c for Athelmonarch, Undated no date, Plan of Crankshaft for Athelmonarch, Undated no date, Photograph of View on Front of Cracked Crosshead for Athelmonarch, Undated no date )

undefined ( Telegram from Surveyors, Greenock, to Lloyd's Committee, London, regarding total length & capacity for Athelmonarch, 9th May 1928 1928, Memo regarding Classification for Athelmonarch, 30th April 1928 1928, Report on Electric Fittings for Athelmonarch, 19th April 1928 1928, Memo regarding fees for Oil Engines Continuous Survey for Athelmonarch, 16th November 1928 1928, Letter from H W Soar, Secretary to the Liverpool Committee to the Secretary of Lloyd's Register, London, regarding if portion of fees chargeable for Athelmonarch, 15th November 1938 1938, Letter from H Nightingale, Surveyor to Lloyd's Register to the Secretary of Lloyd's Register, Wokingham, regarding survey dates, report numbers & register book entry for Athelmonarch, 25th June 1943 1943, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelmonarch, 6th July 1943 1943, Telegram from Committee, to Lloyds Register, Greenock, regarding asking for total length & capacity for Athelmonarch, Undated no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Plan of Midship Section for Athelmonarch, 24th April 1928 1918, Request for Special Survey for Athelmonarch, 17th January 1927 1927, Plan of Crankshaft for Athelmonarch, 13th January 1927 1927, Plan of Shafting for Athelmonarch, 13th January 1927 1927, Letter from Kenneth Inglis, Lloyd's Register, Greenock, to the Secretary, London, regarding telegram on omission of length & capacity from report for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram on total length & capacity to be entered into register book for Athelmonarch, 10th May 1928 1928, Telegram from Surveyors, Greenock, to Lloyd's Committee, London, regarding total length & capacity for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram asking for total length & capacity for Athelmonarch, 9th May 1928 1928, Memo to the Chief Ship Surveyor regarding First Entry when due Revised Rule for Athelmonarch, 1st May 1928 1928, Form for Vessels of 100 Tons & Upwards for Athelmonarch, 10th April 1928 1928, Memo regarding Classification for Athelmonarch, 30th April 1928 1928, Steel or Motorship Report for Athelmonarch, 21st April 1928 1928, Report on Oil Engine Machinery for Athelmonarch, 27th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Electric Fittings for Athelmonarch, 19th April 1928 1928, Memo regarding fees for Oil Engines Continuous Survey for Athelmonarch, 16th November 1928 1928, Profile & Deck Plan for Athelmonarch, 19th June 1928 1928, Letter from Clerk to the Classification Committee to the Secretary of Lloyd's Register, Liverpool, regarding fee for continuous survey for Athelmonarch, 16th November 1938 1938, Letter from H W Soar, Secretary to the Liverpool Committee to the Secretary of Lloyd's Register, London, regarding if portion of fees chargeable for Athelmonarch, 15th November 1938 1938, Report of Survey for Repairs, &c for Athelmonarch, 1st November 1938 1938, Certificate of Survey for Athelmonarch, 15th September 1938 1938, Certificate of Testing for Athelmonarch, 15th September 1938 1938, Certificate of Survey of Machinery for Athelmonarch, 14th November 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 3rd November 1938 1938, Letter from H Nightingale, Surveyor to Lloyd's Register to the Secretary of Lloyd's Register, Wokingham, regarding survey dates, report numbers & register book entry for Athelmonarch, 25th June 1943 1943, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelmonarch, 6th July 1943 1943, Certificate of Survey of Damage for Athelmonarch, 21st April 1943 1943, Certificate of Survey for Athelmonarch, 21st April 1943 1943, Copy of a Certificate of Survey of Port Donkey Boiler for Athelmonarch, 20th April 1943 1943, Copy of a Certificate of Survey of Repairs for Athelmonarch, 20th April 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 17th April 1943 1943, Telegram from Committee, to Lloyds Register, Greenock, regarding asking for total length & capacity for Athelmonarch, Undated no date, Report of Total Loss, Casualty, &c for Athelmonarch, Undated no date, Report of Survey for Repairs, &c for Athelmonarch, Undated no date, Plan of Crankshaft for Athelmonarch, Undated no date, Photograph of View on Front of Cracked Crosshead for Athelmonarch, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Plan of Midship Section for Athelmonarch, 24th April 1928 1918, Request for Special Survey for Athelmonarch, 17th January 1927 1927, Plan of Crankshaft for Athelmonarch, 13th January 1927 1927, Plan of Shafting for Athelmonarch, 13th January 1927 1927, Letter from Kenneth Inglis, Lloyd's Register, Greenock, to the Secretary, London, regarding telegram on omission of length & capacity from report for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram on total length & capacity to be entered into register book for Athelmonarch, 10th May 1928 1928, Telegram from Surveyors, Greenock, to Lloyd's Committee, London, regarding total length & capacity for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram asking for total length & capacity for Athelmonarch, 9th May 1928 1928, Memo to the Chief Ship Surveyor regarding First Entry when due Revised Rule for Athelmonarch, 1st May 1928 1928, Form for Vessels of 100 Tons & Upwards for Athelmonarch, 10th April 1928 1928, Memo regarding Classification for Athelmonarch, 30th April 1928 1928, Steel or Motorship Report for Athelmonarch, 21st April 1928 1928, Report on Oil Engine Machinery for Athelmonarch, 27th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Electric Fittings for Athelmonarch, 19th April 1928 1928, Memo regarding fees for Oil Engines Continuous Survey for Athelmonarch, 16th November 1928 1928, Profile & Deck Plan for Athelmonarch, 19th June 1928 1928, Letter from Clerk to the Classification Committee to the Secretary of Lloyd's Register, Liverpool, regarding fee for continuous survey for Athelmonarch, 16th November 1938 1938, Letter from H W Soar, Secretary to the Liverpool Committee to the Secretary of Lloyd's Register, London, regarding if portion of fees chargeable for Athelmonarch, 15th November 1938 1938, Report of Survey for Repairs, &c for Athelmonarch, 1st November 1938 1938, Certificate of Survey for Athelmonarch, 15th September 1938 1938, Certificate of Testing for Athelmonarch, 15th September 1938 1938, Certificate of Survey of Machinery for Athelmonarch, 14th November 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 3rd November 1938 1938, Letter from H Nightingale, Surveyor to Lloyd's Register to the Secretary of Lloyd's Register, Wokingham, regarding survey dates, report numbers & register book entry for Athelmonarch, 25th June 1943 1943, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelmonarch, 6th July 1943 1943, Certificate of Survey of Damage for Athelmonarch, 21st April 1943 1943, Certificate of Survey for Athelmonarch, 21st April 1943 1943, Copy of a Certificate of Survey of Port Donkey Boiler for Athelmonarch, 20th April 1943 1943, Copy of a Certificate of Survey of Repairs for Athelmonarch, 20th April 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 17th April 1943 1943, Telegram from Committee, to Lloyds Register, Greenock, regarding asking for total length & capacity for Athelmonarch, Undated no date, Report of Total Loss, Casualty, &c for Athelmonarch, Undated no date, Report of Survey for Repairs, &c for Athelmonarch, Undated no date, Plan of Crankshaft for Athelmonarch, Undated no date, Photograph of View on Front of Cracked Crosshead for Athelmonarch, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Plan of Midship Section for Athelmonarch, 24th April 1928 1918, Request for Special Survey for Athelmonarch, 17th January 1927 1927, Plan of Crankshaft for Athelmonarch, 13th January 1927 1927, Plan of Shafting for Athelmonarch, 13th January 1927 1927, Letter from Kenneth Inglis, Lloyd's Register, Greenock, to the Secretary, London, regarding telegram on omission of length & capacity from report for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram on total length & capacity to be entered into register book for Athelmonarch, 10th May 1928 1928, Telegram from Surveyors, Greenock, to Lloyd's Committee, London, regarding total length & capacity for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram asking for total length & capacity for Athelmonarch, 9th May 1928 1928, Memo to the Chief Ship Surveyor regarding First Entry when due Revised Rule for Athelmonarch, 1st May 1928 1928, Form for Vessels of 100 Tons & Upwards for Athelmonarch, 10th April 1928 1928, Memo regarding Classification for Athelmonarch, 30th April 1928 1928, Steel or Motorship Report for Athelmonarch, 21st April 1928 1928, Report on Oil Engine Machinery for Athelmonarch, 27th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Electric Fittings for Athelmonarch, 19th April 1928 1928, Memo regarding fees for Oil Engines Continuous Survey for Athelmonarch, 16th November 1928 1928, Profile & Deck Plan for Athelmonarch, 19th June 1928 1928, Letter from Clerk to the Classification Committee to the Secretary of Lloyd's Register, Liverpool, regarding fee for continuous survey for Athelmonarch, 16th November 1938 1938, Letter from H W Soar, Secretary to the Liverpool Committee to the Secretary of Lloyd's Register, London, regarding if portion of fees chargeable for Athelmonarch, 15th November 1938 1938, Report of Survey for Repairs, &c for Athelmonarch, 1st November 1938 1938, Certificate of Survey for Athelmonarch, 15th September 1938 1938, Certificate of Testing for Athelmonarch, 15th September 1938 1938, Certificate of Survey of Machinery for Athelmonarch, 14th November 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 3rd November 1938 1938, Letter from H Nightingale, Surveyor to Lloyd's Register to the Secretary of Lloyd's Register, Wokingham, regarding survey dates, report numbers & register book entry for Athelmonarch, 25th June 1943 1943, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelmonarch, 6th July 1943 1943, Certificate of Survey of Damage for Athelmonarch, 21st April 1943 1943, Certificate of Survey for Athelmonarch, 21st April 1943 1943, Copy of a Certificate of Survey of Port Donkey Boiler for Athelmonarch, 20th April 1943 1943, Copy of a Certificate of Survey of Repairs for Athelmonarch, 20th April 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 17th April 1943 1943, Telegram from Committee, to Lloyds Register, Greenock, regarding asking for total length & capacity for Athelmonarch, Undated no date, Report of Total Loss, Casualty, &c for Athelmonarch, Undated no date, Report of Survey for Repairs, &c for Athelmonarch, Undated no date, Plan of Crankshaft for Athelmonarch, Undated no date, Photograph of View on Front of Cracked Crosshead for Athelmonarch, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Plan of Midship Section for Athelmonarch, 24th April 1928 1918, Request for Special Survey for Athelmonarch, 17th January 1927 1927, Plan of Crankshaft for Athelmonarch, 13th January 1927 1927, Plan of Shafting for Athelmonarch, 13th January 1927 1927, Letter from Kenneth Inglis, Lloyd's Register, Greenock, to the Secretary, London, regarding telegram on omission of length & capacity from report for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram on total length & capacity to be entered into register book for Athelmonarch, 10th May 1928 1928, Telegram from Surveyors, Greenock, to Lloyd's Committee, London, regarding total length & capacity for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram asking for total length & capacity for Athelmonarch, 9th May 1928 1928, Memo to the Chief Ship Surveyor regarding First Entry when due Revised Rule for Athelmonarch, 1st May 1928 1928, Form for Vessels of 100 Tons & Upwards for Athelmonarch, 10th April 1928 1928, Memo regarding Classification for Athelmonarch, 30th April 1928 1928, Steel or Motorship Report for Athelmonarch, 21st April 1928 1928, Report on Oil Engine Machinery for Athelmonarch, 27th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Electric Fittings for Athelmonarch, 19th April 1928 1928, Memo regarding fees for Oil Engines Continuous Survey for Athelmonarch, 16th November 1928 1928, Profile & Deck Plan for Athelmonarch, 19th June 1928 1928, Letter from Clerk to the Classification Committee to the Secretary of Lloyd's Register, Liverpool, regarding fee for continuous survey for Athelmonarch, 16th November 1938 1938, Letter from H W Soar, Secretary to the Liverpool Committee to the Secretary of Lloyd's Register, London, regarding if portion of fees chargeable for Athelmonarch, 15th November 1938 1938, Report of Survey for Repairs, &c for Athelmonarch, 1st November 1938 1938, Certificate of Survey for Athelmonarch, 15th September 1938 1938, Certificate of Testing for Athelmonarch, 15th September 1938 1938, Certificate of Survey of Machinery for Athelmonarch, 14th November 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 3rd November 1938 1938, Letter from H Nightingale, Surveyor to Lloyd's Register to the Secretary of Lloyd's Register, Wokingham, regarding survey dates, report numbers & register book entry for Athelmonarch, 25th June 1943 1943, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelmonarch, 6th July 1943 1943, Certificate of Survey of Damage for Athelmonarch, 21st April 1943 1943, Certificate of Survey for Athelmonarch, 21st April 1943 1943, Copy of a Certificate of Survey of Port Donkey Boiler for Athelmonarch, 20th April 1943 1943, Copy of a Certificate of Survey of Repairs for Athelmonarch, 20th April 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 17th April 1943 1943, Telegram from Committee, to Lloyds Register, Greenock, regarding asking for total length & capacity for Athelmonarch, Undated no date, Report of Total Loss, Casualty, &c for Athelmonarch, Undated no date, Report of Survey for Repairs, &c for Athelmonarch, Undated no date, Plan of Crankshaft for Athelmonarch, Undated no date, Photograph of View on Front of Cracked Crosshead for Athelmonarch, Undated no date )

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

17/06/1943 ( Plan of Midship Section for Athelmonarch, 24th April 1928 1918, Request for Special Survey for Athelmonarch, 17th January 1927 1927, Plan of Crankshaft for Athelmonarch, 13th January 1927 1927, Plan of Shafting for Athelmonarch, 13th January 1927 1927, Letter from Kenneth Inglis, Lloyd's Register, Greenock, to the Secretary, London, regarding telegram on omission of length & capacity from report for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram on total length & capacity to be entered into register book for Athelmonarch, 10th May 1928 1928, Telegram from Surveyors, Greenock, to Lloyd's Committee, London, regarding total length & capacity for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram asking for total length & capacity for Athelmonarch, 9th May 1928 1928, Memo to the Chief Ship Surveyor regarding First Entry when due Revised Rule for Athelmonarch, 1st May 1928 1928, Form for Vessels of 100 Tons & Upwards for Athelmonarch, 10th April 1928 1928, Memo regarding Classification for Athelmonarch, 30th April 1928 1928, Steel or Motorship Report for Athelmonarch, 21st April 1928 1928, Report on Oil Engine Machinery for Athelmonarch, 27th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Electric Fittings for Athelmonarch, 19th April 1928 1928, Memo regarding fees for Oil Engines Continuous Survey for Athelmonarch, 16th November 1928 1928, Profile & Deck Plan for Athelmonarch, 19th June 1928 1928, Letter from Clerk to the Classification Committee to the Secretary of Lloyd's Register, Liverpool, regarding fee for continuous survey for Athelmonarch, 16th November 1938 1938, Letter from H W Soar, Secretary to the Liverpool Committee to the Secretary of Lloyd's Register, London, regarding if portion of fees chargeable for Athelmonarch, 15th November 1938 1938, Report of Survey for Repairs, &c for Athelmonarch, 1st November 1938 1938, Certificate of Survey for Athelmonarch, 15th September 1938 1938, Certificate of Testing for Athelmonarch, 15th September 1938 1938, Certificate of Survey of Machinery for Athelmonarch, 14th November 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 3rd November 1938 1938, Letter from H Nightingale, Surveyor to Lloyd's Register to the Secretary of Lloyd's Register, Wokingham, regarding survey dates, report numbers & register book entry for Athelmonarch, 25th June 1943 1943, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelmonarch, 6th July 1943 1943, Certificate of Survey of Damage for Athelmonarch, 21st April 1943 1943, Certificate of Survey for Athelmonarch, 21st April 1943 1943, Copy of a Certificate of Survey of Port Donkey Boiler for Athelmonarch, 20th April 1943 1943, Copy of a Certificate of Survey of Repairs for Athelmonarch, 20th April 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 17th April 1943 1943, Telegram from Committee, to Lloyds Register, Greenock, regarding asking for total length & capacity for Athelmonarch, Undated no date, Report of Total Loss, Casualty, &c for Athelmonarch, Undated no date, Report of Survey for Repairs, &c for Athelmonarch, Undated no date, Plan of Crankshaft for Athelmonarch, Undated no date, Photograph of View on Front of Cracked Crosshead for Athelmonarch, Undated no date )

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1 4,28; Carrying Molasses or Petroleum In Bulk; Lloyds A & CP; +LMC 4,28; Longitudinal Framing ( Steel or Motorship Report for Athelmonarch, 21st April 1928 1928 )

+LMC 4,28 ( Report on Oil Engine Machinery for Athelmonarch, 27th March 1928 1928 )

See Accompanying Machy Report ( Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928 )

Elec Light ( Report on Electric Fittings for Athelmonarch, 19th April 1928 1928 )

+100A1 Carrying Molasses or Petroleum in Bulk; Both S 9,38; CS 11,38 Without Spl Cdn ( Report of Survey for Repairs, &c for Athelmonarch, 1st November 1938 1938 )

CS 11,38; Without Special Conditions; Both S 9,38 ( Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 3rd November 1938 1938 )

DBS 2,43 ( Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 17th April 1943 1943 )

+100A1 9,42; SS No 3-7,41; +LMC 7,41; DBS 4,41; TS 12,40 CL; Oil Engines; Carrying Molasses or Petroleum in Bulk ( Report of Total Loss, Casualty, &c for Athelmonarch, Undated no date )

+100A1; 9,42; Carrying Molasses or Petroleum In Bulk; SS Liv 3-7,41; Lloyds A & CP; Progressive Survey of Oil Tanks; DBS 4,41; +LMC 7,41; Oil Engines; Continuous Survey; CL 12,40 ( Report of Survey for Repairs, &c for Athelmonarch, Undated no date )

The year in which a vessel’s construction is completed.

Year of ship completion

1928 ( Plan of Midship Section for Athelmonarch, 24th April 1928 1918, Request for Special Survey for Athelmonarch, 17th January 1927 1927, Plan of Crankshaft for Athelmonarch, 13th January 1927 1927, Plan of Shafting for Athelmonarch, 13th January 1927 1927, Letter from Kenneth Inglis, Lloyd's Register, Greenock, to the Secretary, London, regarding telegram on omission of length & capacity from report for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram on total length & capacity to be entered into register book for Athelmonarch, 10th May 1928 1928, Telegram from Surveyors, Greenock, to Lloyd's Committee, London, regarding total length & capacity for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram asking for total length & capacity for Athelmonarch, 9th May 1928 1928, Memo to the Chief Ship Surveyor regarding First Entry when due Revised Rule for Athelmonarch, 1st May 1928 1928, Form for Vessels of 100 Tons & Upwards for Athelmonarch, 10th April 1928 1928, Memo regarding Classification for Athelmonarch, 30th April 1928 1928, Steel or Motorship Report for Athelmonarch, 21st April 1928 1928, Report on Oil Engine Machinery for Athelmonarch, 27th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Electric Fittings for Athelmonarch, 19th April 1928 1928, Memo regarding fees for Oil Engines Continuous Survey for Athelmonarch, 16th November 1928 1928, Profile & Deck Plan for Athelmonarch, 19th June 1928 1928, Letter from Clerk to the Classification Committee to the Secretary of Lloyd's Register, Liverpool, regarding fee for continuous survey for Athelmonarch, 16th November 1938 1938, Letter from H W Soar, Secretary to the Liverpool Committee to the Secretary of Lloyd's Register, London, regarding if portion of fees chargeable for Athelmonarch, 15th November 1938 1938, Report of Survey for Repairs, &c for Athelmonarch, 1st November 1938 1938, Certificate of Survey for Athelmonarch, 15th September 1938 1938, Certificate of Testing for Athelmonarch, 15th September 1938 1938, Certificate of Survey of Machinery for Athelmonarch, 14th November 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 3rd November 1938 1938, Letter from H Nightingale, Surveyor to Lloyd's Register to the Secretary of Lloyd's Register, Wokingham, regarding survey dates, report numbers & register book entry for Athelmonarch, 25th June 1943 1943, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelmonarch, 6th July 1943 1943, Certificate of Survey of Damage for Athelmonarch, 21st April 1943 1943, Certificate of Survey for Athelmonarch, 21st April 1943 1943, Copy of a Certificate of Survey of Port Donkey Boiler for Athelmonarch, 20th April 1943 1943, Copy of a Certificate of Survey of Repairs for Athelmonarch, 20th April 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 17th April 1943 1943, Telegram from Committee, to Lloyds Register, Greenock, regarding asking for total length & capacity for Athelmonarch, Undated no date, Report of Total Loss, Casualty, &c for Athelmonarch, Undated no date, Report of Survey for Repairs, &c for Athelmonarch, Undated no date, Plan of Crankshaft for Athelmonarch, Undated no date, Photograph of View on Front of Cracked Crosshead for Athelmonarch, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

William Hamilton & Co ( Plan of Midship Section for Athelmonarch, 24th April 1928 1918, Request for Special Survey for Athelmonarch, 17th January 1927 1927, Plan of Crankshaft for Athelmonarch, 13th January 1927 1927, Plan of Shafting for Athelmonarch, 13th January 1927 1927, Letter from Kenneth Inglis, Lloyd's Register, Greenock, to the Secretary, London, regarding telegram on omission of length & capacity from report for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram on total length & capacity to be entered into register book for Athelmonarch, 10th May 1928 1928, Telegram from Surveyors, Greenock, to Lloyd's Committee, London, regarding total length & capacity for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram asking for total length & capacity for Athelmonarch, 9th May 1928 1928, Memo to the Chief Ship Surveyor regarding First Entry when due Revised Rule for Athelmonarch, 1st May 1928 1928, Form for Vessels of 100 Tons & Upwards for Athelmonarch, 10th April 1928 1928, Memo regarding Classification for Athelmonarch, 30th April 1928 1928, Steel or Motorship Report for Athelmonarch, 21st April 1928 1928, Report on Oil Engine Machinery for Athelmonarch, 27th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Electric Fittings for Athelmonarch, 19th April 1928 1928, Memo regarding fees for Oil Engines Continuous Survey for Athelmonarch, 16th November 1928 1928, Profile & Deck Plan for Athelmonarch, 19th June 1928 1928, Letter from Clerk to the Classification Committee to the Secretary of Lloyd's Register, Liverpool, regarding fee for continuous survey for Athelmonarch, 16th November 1938 1938, Letter from H W Soar, Secretary to the Liverpool Committee to the Secretary of Lloyd's Register, London, regarding if portion of fees chargeable for Athelmonarch, 15th November 1938 1938, Report of Survey for Repairs, &c for Athelmonarch, 1st November 1938 1938, Certificate of Survey for Athelmonarch, 15th September 1938 1938, Certificate of Testing for Athelmonarch, 15th September 1938 1938, Certificate of Survey of Machinery for Athelmonarch, 14th November 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 3rd November 1938 1938, Letter from H Nightingale, Surveyor to Lloyd's Register to the Secretary of Lloyd's Register, Wokingham, regarding survey dates, report numbers & register book entry for Athelmonarch, 25th June 1943 1943, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelmonarch, 6th July 1943 1943, Certificate of Survey of Damage for Athelmonarch, 21st April 1943 1943, Certificate of Survey for Athelmonarch, 21st April 1943 1943, Copy of a Certificate of Survey of Port Donkey Boiler for Athelmonarch, 20th April 1943 1943, Copy of a Certificate of Survey of Repairs for Athelmonarch, 20th April 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 17th April 1943 1943, Telegram from Committee, to Lloyds Register, Greenock, regarding asking for total length & capacity for Athelmonarch, Undated no date, Report of Total Loss, Casualty, &c for Athelmonarch, Undated no date, Report of Survey for Repairs, &c for Athelmonarch, Undated no date, Plan of Crankshaft for Athelmonarch, Undated no date, Photograph of View on Front of Cracked Crosshead for Athelmonarch, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Glasgow ( Plan of Midship Section for Athelmonarch, 24th April 1928 1918, Request for Special Survey for Athelmonarch, 17th January 1927 1927, Plan of Crankshaft for Athelmonarch, 13th January 1927 1927, Plan of Shafting for Athelmonarch, 13th January 1927 1927, Letter from Kenneth Inglis, Lloyd's Register, Greenock, to the Secretary, London, regarding telegram on omission of length & capacity from report for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram on total length & capacity to be entered into register book for Athelmonarch, 10th May 1928 1928, Telegram from Surveyors, Greenock, to Lloyd's Committee, London, regarding total length & capacity for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram asking for total length & capacity for Athelmonarch, 9th May 1928 1928, Memo to the Chief Ship Surveyor regarding First Entry when due Revised Rule for Athelmonarch, 1st May 1928 1928, Form for Vessels of 100 Tons & Upwards for Athelmonarch, 10th April 1928 1928, Memo regarding Classification for Athelmonarch, 30th April 1928 1928, Steel or Motorship Report for Athelmonarch, 21st April 1928 1928, Report on Oil Engine Machinery for Athelmonarch, 27th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Electric Fittings for Athelmonarch, 19th April 1928 1928, Memo regarding fees for Oil Engines Continuous Survey for Athelmonarch, 16th November 1928 1928, Profile & Deck Plan for Athelmonarch, 19th June 1928 1928, Letter from Clerk to the Classification Committee to the Secretary of Lloyd's Register, Liverpool, regarding fee for continuous survey for Athelmonarch, 16th November 1938 1938, Letter from H W Soar, Secretary to the Liverpool Committee to the Secretary of Lloyd's Register, London, regarding if portion of fees chargeable for Athelmonarch, 15th November 1938 1938, Report of Survey for Repairs, &c for Athelmonarch, 1st November 1938 1938, Certificate of Survey for Athelmonarch, 15th September 1938 1938, Certificate of Testing for Athelmonarch, 15th September 1938 1938, Certificate of Survey of Machinery for Athelmonarch, 14th November 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 3rd November 1938 1938, Letter from H Nightingale, Surveyor to Lloyd's Register to the Secretary of Lloyd's Register, Wokingham, regarding survey dates, report numbers & register book entry for Athelmonarch, 25th June 1943 1943, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelmonarch, 6th July 1943 1943, Certificate of Survey of Damage for Athelmonarch, 21st April 1943 1943, Certificate of Survey for Athelmonarch, 21st April 1943 1943, Copy of a Certificate of Survey of Port Donkey Boiler for Athelmonarch, 20th April 1943 1943, Copy of a Certificate of Survey of Repairs for Athelmonarch, 20th April 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 17th April 1943 1943, Telegram from Committee, to Lloyds Register, Greenock, regarding asking for total length & capacity for Athelmonarch, Undated no date, Report of Total Loss, Casualty, &c for Athelmonarch, Undated no date, Report of Survey for Repairs, &c for Athelmonarch, Undated no date, Plan of Crankshaft for Athelmonarch, Undated no date, Photograph of View on Front of Cracked Crosshead for Athelmonarch, Undated no date )

Broad categories and subdivisions of vessels related to their purpose or function.

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Plan of Midship Section for Athelmonarch, 24th April 1928 1918, Request for Special Survey for Athelmonarch, 17th January 1927 1927, Plan of Crankshaft for Athelmonarch, 13th January 1927 1927, Plan of Shafting for Athelmonarch, 13th January 1927 1927, Letter from Kenneth Inglis, Lloyd's Register, Greenock, to the Secretary, London, regarding telegram on omission of length & capacity from report for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram on total length & capacity to be entered into register book for Athelmonarch, 10th May 1928 1928, Telegram from Surveyors, Greenock, to Lloyd's Committee, London, regarding total length & capacity for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram asking for total length & capacity for Athelmonarch, 9th May 1928 1928, Memo to the Chief Ship Surveyor regarding First Entry when due Revised Rule for Athelmonarch, 1st May 1928 1928, Form for Vessels of 100 Tons & Upwards for Athelmonarch, 10th April 1928 1928, Memo regarding Classification for Athelmonarch, 30th April 1928 1928, Steel or Motorship Report for Athelmonarch, 21st April 1928 1928, Report on Oil Engine Machinery for Athelmonarch, 27th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Electric Fittings for Athelmonarch, 19th April 1928 1928, Memo regarding fees for Oil Engines Continuous Survey for Athelmonarch, 16th November 1928 1928, Profile & Deck Plan for Athelmonarch, 19th June 1928 1928, Letter from Clerk to the Classification Committee to the Secretary of Lloyd's Register, Liverpool, regarding fee for continuous survey for Athelmonarch, 16th November 1938 1938, Letter from H W Soar, Secretary to the Liverpool Committee to the Secretary of Lloyd's Register, London, regarding if portion of fees chargeable for Athelmonarch, 15th November 1938 1938, Report of Survey for Repairs, &c for Athelmonarch, 1st November 1938 1938, Certificate of Survey for Athelmonarch, 15th September 1938 1938, Certificate of Testing for Athelmonarch, 15th September 1938 1938, Certificate of Survey of Machinery for Athelmonarch, 14th November 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 3rd November 1938 1938, Letter from H Nightingale, Surveyor to Lloyd's Register to the Secretary of Lloyd's Register, Wokingham, regarding survey dates, report numbers & register book entry for Athelmonarch, 25th June 1943 1943, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelmonarch, 6th July 1943 1943, Certificate of Survey of Damage for Athelmonarch, 21st April 1943 1943, Certificate of Survey for Athelmonarch, 21st April 1943 1943, Copy of a Certificate of Survey of Port Donkey Boiler for Athelmonarch, 20th April 1943 1943, Copy of a Certificate of Survey of Repairs for Athelmonarch, 20th April 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 17th April 1943 1943, Telegram from Committee, to Lloyds Register, Greenock, regarding asking for total length & capacity for Athelmonarch, Undated no date, Report of Total Loss, Casualty, &c for Athelmonarch, Undated no date, Report of Survey for Repairs, &c for Athelmonarch, Undated no date, Plan of Crankshaft for Athelmonarch, Undated no date, Photograph of View on Front of Cracked Crosshead for Athelmonarch, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Plan of Midship Section for Athelmonarch, 24th April 1928 1918, Request for Special Survey for Athelmonarch, 17th January 1927 1927, Plan of Crankshaft for Athelmonarch, 13th January 1927 1927, Plan of Shafting for Athelmonarch, 13th January 1927 1927, Letter from Kenneth Inglis, Lloyd's Register, Greenock, to the Secretary, London, regarding telegram on omission of length & capacity from report for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram on total length & capacity to be entered into register book for Athelmonarch, 10th May 1928 1928, Telegram from Surveyors, Greenock, to Lloyd's Committee, London, regarding total length & capacity for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram asking for total length & capacity for Athelmonarch, 9th May 1928 1928, Memo to the Chief Ship Surveyor regarding First Entry when due Revised Rule for Athelmonarch, 1st May 1928 1928, Form for Vessels of 100 Tons & Upwards for Athelmonarch, 10th April 1928 1928, Memo regarding Classification for Athelmonarch, 30th April 1928 1928, Steel or Motorship Report for Athelmonarch, 21st April 1928 1928, Report on Oil Engine Machinery for Athelmonarch, 27th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Electric Fittings for Athelmonarch, 19th April 1928 1928, Memo regarding fees for Oil Engines Continuous Survey for Athelmonarch, 16th November 1928 1928, Profile & Deck Plan for Athelmonarch, 19th June 1928 1928, Letter from Clerk to the Classification Committee to the Secretary of Lloyd's Register, Liverpool, regarding fee for continuous survey for Athelmonarch, 16th November 1938 1938, Letter from H W Soar, Secretary to the Liverpool Committee to the Secretary of Lloyd's Register, London, regarding if portion of fees chargeable for Athelmonarch, 15th November 1938 1938, Report of Survey for Repairs, &c for Athelmonarch, 1st November 1938 1938, Certificate of Survey for Athelmonarch, 15th September 1938 1938, Certificate of Testing for Athelmonarch, 15th September 1938 1938, Certificate of Survey of Machinery for Athelmonarch, 14th November 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 3rd November 1938 1938, Letter from H Nightingale, Surveyor to Lloyd's Register to the Secretary of Lloyd's Register, Wokingham, regarding survey dates, report numbers & register book entry for Athelmonarch, 25th June 1943 1943, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelmonarch, 6th July 1943 1943, Certificate of Survey of Damage for Athelmonarch, 21st April 1943 1943, Certificate of Survey for Athelmonarch, 21st April 1943 1943, Copy of a Certificate of Survey of Port Donkey Boiler for Athelmonarch, 20th April 1943 1943, Copy of a Certificate of Survey of Repairs for Athelmonarch, 20th April 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 17th April 1943 1943, Telegram from Committee, to Lloyds Register, Greenock, regarding asking for total length & capacity for Athelmonarch, Undated no date, Report of Total Loss, Casualty, &c for Athelmonarch, Undated no date, Report of Survey for Repairs, &c for Athelmonarch, Undated no date, Plan of Crankshaft for Athelmonarch, Undated no date, Photograph of View on Front of Cracked Crosshead for Athelmonarch, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Plan of Midship Section for Athelmonarch, 24th April 1928 1918, Request for Special Survey for Athelmonarch, 17th January 1927 1927, Plan of Crankshaft for Athelmonarch, 13th January 1927 1927, Plan of Shafting for Athelmonarch, 13th January 1927 1927, Letter from Kenneth Inglis, Lloyd's Register, Greenock, to the Secretary, London, regarding telegram on omission of length & capacity from report for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram on total length & capacity to be entered into register book for Athelmonarch, 10th May 1928 1928, Telegram from Surveyors, Greenock, to Lloyd's Committee, London, regarding total length & capacity for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram asking for total length & capacity for Athelmonarch, 9th May 1928 1928, Memo to the Chief Ship Surveyor regarding First Entry when due Revised Rule for Athelmonarch, 1st May 1928 1928, Form for Vessels of 100 Tons & Upwards for Athelmonarch, 10th April 1928 1928, Memo regarding Classification for Athelmonarch, 30th April 1928 1928, Steel or Motorship Report for Athelmonarch, 21st April 1928 1928, Report on Oil Engine Machinery for Athelmonarch, 27th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Electric Fittings for Athelmonarch, 19th April 1928 1928, Memo regarding fees for Oil Engines Continuous Survey for Athelmonarch, 16th November 1928 1928, Profile & Deck Plan for Athelmonarch, 19th June 1928 1928, Letter from Clerk to the Classification Committee to the Secretary of Lloyd's Register, Liverpool, regarding fee for continuous survey for Athelmonarch, 16th November 1938 1938, Letter from H W Soar, Secretary to the Liverpool Committee to the Secretary of Lloyd's Register, London, regarding if portion of fees chargeable for Athelmonarch, 15th November 1938 1938, Report of Survey for Repairs, &c for Athelmonarch, 1st November 1938 1938, Certificate of Survey for Athelmonarch, 15th September 1938 1938, Certificate of Testing for Athelmonarch, 15th September 1938 1938, Certificate of Survey of Machinery for Athelmonarch, 14th November 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 3rd November 1938 1938, Letter from H Nightingale, Surveyor to Lloyd's Register to the Secretary of Lloyd's Register, Wokingham, regarding survey dates, report numbers & register book entry for Athelmonarch, 25th June 1943 1943, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelmonarch, 6th July 1943 1943, Certificate of Survey of Damage for Athelmonarch, 21st April 1943 1943, Certificate of Survey for Athelmonarch, 21st April 1943 1943, Copy of a Certificate of Survey of Port Donkey Boiler for Athelmonarch, 20th April 1943 1943, Copy of a Certificate of Survey of Repairs for Athelmonarch, 20th April 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 17th April 1943 1943, Telegram from Committee, to Lloyds Register, Greenock, regarding asking for total length & capacity for Athelmonarch, Undated no date, Report of Total Loss, Casualty, &c for Athelmonarch, Undated no date, Report of Survey for Repairs, &c for Athelmonarch, Undated no date, Plan of Crankshaft for Athelmonarch, Undated no date, Photograph of View on Front of Cracked Crosshead for Athelmonarch, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Plan of Midship Section for Athelmonarch, 24th April 1928 1918, Request for Special Survey for Athelmonarch, 17th January 1927 1927, Plan of Crankshaft for Athelmonarch, 13th January 1927 1927, Plan of Shafting for Athelmonarch, 13th January 1927 1927, Letter from Kenneth Inglis, Lloyd's Register, Greenock, to the Secretary, London, regarding telegram on omission of length & capacity from report for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram on total length & capacity to be entered into register book for Athelmonarch, 10th May 1928 1928, Telegram from Surveyors, Greenock, to Lloyd's Committee, London, regarding total length & capacity for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram asking for total length & capacity for Athelmonarch, 9th May 1928 1928, Memo to the Chief Ship Surveyor regarding First Entry when due Revised Rule for Athelmonarch, 1st May 1928 1928, Form for Vessels of 100 Tons & Upwards for Athelmonarch, 10th April 1928 1928, Memo regarding Classification for Athelmonarch, 30th April 1928 1928, Steel or Motorship Report for Athelmonarch, 21st April 1928 1928, Report on Oil Engine Machinery for Athelmonarch, 27th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Electric Fittings for Athelmonarch, 19th April 1928 1928, Memo regarding fees for Oil Engines Continuous Survey for Athelmonarch, 16th November 1928 1928, Profile & Deck Plan for Athelmonarch, 19th June 1928 1928, Letter from Clerk to the Classification Committee to the Secretary of Lloyd's Register, Liverpool, regarding fee for continuous survey for Athelmonarch, 16th November 1938 1938, Letter from H W Soar, Secretary to the Liverpool Committee to the Secretary of Lloyd's Register, London, regarding if portion of fees chargeable for Athelmonarch, 15th November 1938 1938, Report of Survey for Repairs, &c for Athelmonarch, 1st November 1938 1938, Certificate of Survey for Athelmonarch, 15th September 1938 1938, Certificate of Testing for Athelmonarch, 15th September 1938 1938, Certificate of Survey of Machinery for Athelmonarch, 14th November 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 3rd November 1938 1938, Letter from H Nightingale, Surveyor to Lloyd's Register to the Secretary of Lloyd's Register, Wokingham, regarding survey dates, report numbers & register book entry for Athelmonarch, 25th June 1943 1943, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelmonarch, 6th July 1943 1943, Certificate of Survey of Damage for Athelmonarch, 21st April 1943 1943, Certificate of Survey for Athelmonarch, 21st April 1943 1943, Copy of a Certificate of Survey of Port Donkey Boiler for Athelmonarch, 20th April 1943 1943, Copy of a Certificate of Survey of Repairs for Athelmonarch, 20th April 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 17th April 1943 1943, Telegram from Committee, to Lloyds Register, Greenock, regarding asking for total length & capacity for Athelmonarch, Undated no date, Report of Total Loss, Casualty, &c for Athelmonarch, Undated no date, Report of Survey for Repairs, &c for Athelmonarch, Undated no date, Plan of Crankshaft for Athelmonarch, Undated no date, Photograph of View on Front of Cracked Crosshead for Athelmonarch, Undated no date )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sunk by Submarine ( Plan of Midship Section for Athelmonarch, 24th April 1928 1918, Request for Special Survey for Athelmonarch, 17th January 1927 1927, Plan of Crankshaft for Athelmonarch, 13th January 1927 1927, Plan of Shafting for Athelmonarch, 13th January 1927 1927, Letter from Kenneth Inglis, Lloyd's Register, Greenock, to the Secretary, London, regarding telegram on omission of length & capacity from report for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram on total length & capacity to be entered into register book for Athelmonarch, 10th May 1928 1928, Telegram from Surveyors, Greenock, to Lloyd's Committee, London, regarding total length & capacity for Athelmonarch, 9th May 1928 1928, Letter from Clerk to the Classification Committee to The Surveyors, Greenock, regarding telegram asking for total length & capacity for Athelmonarch, 9th May 1928 1928, Memo to the Chief Ship Surveyor regarding First Entry when due Revised Rule for Athelmonarch, 1st May 1928 1928, Form for Vessels of 100 Tons & Upwards for Athelmonarch, 10th April 1928 1928, Memo regarding Classification for Athelmonarch, 30th April 1928 1928, Steel or Motorship Report for Athelmonarch, 21st April 1928 1928, Report on Oil Engine Machinery for Athelmonarch, 27th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Boilers for Athelmonarch, 24th March 1928 1928, Report on Electric Fittings for Athelmonarch, 19th April 1928 1928, Memo regarding fees for Oil Engines Continuous Survey for Athelmonarch, 16th November 1928 1928, Profile & Deck Plan for Athelmonarch, 19th June 1928 1928, Letter from Clerk to the Classification Committee to the Secretary of Lloyd's Register, Liverpool, regarding fee for continuous survey for Athelmonarch, 16th November 1938 1938, Letter from H W Soar, Secretary to the Liverpool Committee to the Secretary of Lloyd's Register, London, regarding if portion of fees chargeable for Athelmonarch, 15th November 1938 1938, Report of Survey for Repairs, &c for Athelmonarch, 1st November 1938 1938, Certificate of Survey for Athelmonarch, 15th September 1938 1938, Certificate of Testing for Athelmonarch, 15th September 1938 1938, Certificate of Survey of Machinery for Athelmonarch, 14th November 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 3rd November 1938 1938, Letter from H Nightingale, Surveyor to Lloyd's Register to the Secretary of Lloyd's Register, Wokingham, regarding survey dates, report numbers & register book entry for Athelmonarch, 25th June 1943 1943, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Athelmonarch, 6th July 1943 1943, Certificate of Survey of Damage for Athelmonarch, 21st April 1943 1943, Certificate of Survey for Athelmonarch, 21st April 1943 1943, Copy of a Certificate of Survey of Port Donkey Boiler for Athelmonarch, 20th April 1943 1943, Copy of a Certificate of Survey of Repairs for Athelmonarch, 20th April 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Athelmonarch, 17th April 1943 1943, Telegram from Committee, to Lloyds Register, Greenock, regarding asking for total length & capacity for Athelmonarch, Undated no date, Report of Total Loss, Casualty, &c for Athelmonarch, Undated no date, Report of Survey for Repairs, &c for Athelmonarch, Undated no date, Plan of Crankshaft for Athelmonarch, Undated no date, Photograph of View on Front of Cracked Crosshead for Athelmonarch, Undated no date )

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Physical arrangement of a ship’s masts, sails and rigging.

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Reciprocating 4 Stroke Single Vertical Direct Acting Internal Combustion ( Form for Vessels of 100 Tons & Upwards for Athelmonarch, 10th April 1928 1928 )

Burmeister & Wain (2 Sets) ( Report on Oil Engine Machinery for Athelmonarch, 27th March 1928 1928 )