Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

British Petrol ( Plan of Auxiliary & Waste Heat Boiler for British Petrol, 1924 1924, Plan of Crankshaft for British Petrol, 15th July 1924 1924, Plan of Flywheel Shaft for British Petrol, 12th August 1924 1924, Plan of Auxiliary Boiler for British Petrol, 1st August 1924 1924, Freeboard Verification Form for Steamers for British Petrol, 3rd July 1925 1925, Report of Surveys for Freeboard-Steam Ships for British Petrol, 16th June 1925 1925, Report on Electric Fittings for British Petrol, 22nd September 1925 1925, Memo from the Chief Ship Surveyor to the Classing Committee regarding proportions of sheerstrake & class of British Petrol, 9th October 1925 1925, Steel Motorship Report for British Petrol, 29th September 1925 1925, Form for Vessels of 100 Tons & Upwards for British Petrol, 10th September 1925 1925, Report on Oil Engine Machinery for British Petrol, 22nd September 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Memo for British Petrol, 2nd November 1928 1928, Plan of Main Engine Crankshaft for British Petrol, 19th May 1930 1930, Report of Surveys for freeboard for British Petrol, 7th April 1932 1932, Freeboard Verification Form for Tankers for British Petrol, 16th April 1932 1932, Report on Oil Engine Machinery for British Petrol, 25th June 1932 1932, Copy of a Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding British Petrol, 26th October 1937 1937, Main Propelling Oil Engines Shafting Endorsement for British Petrol, 25th October 1937 1937, Plan of Stern Tube & Propeller Shaft for British Petrol, 15th October 1937 1937, Plan of Double Bottom in Machinery Space for British Petrol, 18th September 1937 1937, Plan of Thrust & Intermediate Shafting for British Petrol, 15th October 1937 1937, Report of Survey for Repairs, &c for British Petrol, 19th February 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for British Petrol, 13th February 1938 1938, Report on Oil Engine Machinery for British Petrol, 13th February 1938 1938, Report of Total Loss, Casualty, &c for British Petrol, Undated no date, Freeboard & Draught Document for British Petrol, Undated no date, List of British Tanker Co Vessels Amended F W Allowance, including British Petrol, Undated no date, Copy of Freeboard Report for British Petrol, Undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

08/06/1925 ( Plan of Auxiliary & Waste Heat Boiler for British Petrol, 1924 1924, Plan of Crankshaft for British Petrol, 15th July 1924 1924, Plan of Flywheel Shaft for British Petrol, 12th August 1924 1924, Plan of Auxiliary Boiler for British Petrol, 1st August 1924 1924, Freeboard Verification Form for Steamers for British Petrol, 3rd July 1925 1925, Report of Surveys for Freeboard-Steam Ships for British Petrol, 16th June 1925 1925, Report on Electric Fittings for British Petrol, 22nd September 1925 1925, Memo from the Chief Ship Surveyor to the Classing Committee regarding proportions of sheerstrake & class of British Petrol, 9th October 1925 1925, Steel Motorship Report for British Petrol, 29th September 1925 1925, Form for Vessels of 100 Tons & Upwards for British Petrol, 10th September 1925 1925, Report on Oil Engine Machinery for British Petrol, 22nd September 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Memo for British Petrol, 2nd November 1928 1928, Plan of Main Engine Crankshaft for British Petrol, 19th May 1930 1930, Report of Surveys for freeboard for British Petrol, 7th April 1932 1932, Freeboard Verification Form for Tankers for British Petrol, 16th April 1932 1932, Report on Oil Engine Machinery for British Petrol, 25th June 1932 1932, Copy of a Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding British Petrol, 26th October 1937 1937, Main Propelling Oil Engines Shafting Endorsement for British Petrol, 25th October 1937 1937, Plan of Stern Tube & Propeller Shaft for British Petrol, 15th October 1937 1937, Plan of Double Bottom in Machinery Space for British Petrol, 18th September 1937 1937, Plan of Thrust & Intermediate Shafting for British Petrol, 15th October 1937 1937, Report of Survey for Repairs, &c for British Petrol, 19th February 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for British Petrol, 13th February 1938 1938, Report on Oil Engine Machinery for British Petrol, 13th February 1938 1938, Report of Total Loss, Casualty, &c for British Petrol, Undated no date, Freeboard & Draught Document for British Petrol, Undated no date, List of British Tanker Co Vessels Amended F W Allowance, including British Petrol, Undated no date, Copy of Freeboard Report for British Petrol, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

1196 ( Plan of Auxiliary & Waste Heat Boiler for British Petrol, 1924 1924, Plan of Crankshaft for British Petrol, 15th July 1924 1924, Plan of Flywheel Shaft for British Petrol, 12th August 1924 1924, Plan of Auxiliary Boiler for British Petrol, 1st August 1924 1924, Freeboard Verification Form for Steamers for British Petrol, 3rd July 1925 1925, Report of Surveys for Freeboard-Steam Ships for British Petrol, 16th June 1925 1925, Report on Electric Fittings for British Petrol, 22nd September 1925 1925, Memo from the Chief Ship Surveyor to the Classing Committee regarding proportions of sheerstrake & class of British Petrol, 9th October 1925 1925, Steel Motorship Report for British Petrol, 29th September 1925 1925, Form for Vessels of 100 Tons & Upwards for British Petrol, 10th September 1925 1925, Report on Oil Engine Machinery for British Petrol, 22nd September 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Memo for British Petrol, 2nd November 1928 1928, Plan of Main Engine Crankshaft for British Petrol, 19th May 1930 1930, Report of Surveys for freeboard for British Petrol, 7th April 1932 1932, Freeboard Verification Form for Tankers for British Petrol, 16th April 1932 1932, Report on Oil Engine Machinery for British Petrol, 25th June 1932 1932, Copy of a Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding British Petrol, 26th October 1937 1937, Main Propelling Oil Engines Shafting Endorsement for British Petrol, 25th October 1937 1937, Plan of Stern Tube & Propeller Shaft for British Petrol, 15th October 1937 1937, Plan of Double Bottom in Machinery Space for British Petrol, 18th September 1937 1937, Plan of Thrust & Intermediate Shafting for British Petrol, 15th October 1937 1937, Report of Survey for Repairs, &c for British Petrol, 19th February 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for British Petrol, 13th February 1938 1938, Report on Oil Engine Machinery for British Petrol, 13th February 1938 1938, Report of Total Loss, Casualty, &c for British Petrol, Undated no date, Freeboard & Draught Document for British Petrol, Undated no date, List of British Tanker Co Vessels Amended F W Allowance, including British Petrol, Undated no date, Copy of Freeboard Report for British Petrol, Undated no date )

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined ( Plan of Auxiliary & Waste Heat Boiler for British Petrol, 1924 1924, Plan of Crankshaft for British Petrol, 15th July 1924 1924, Plan of Flywheel Shaft for British Petrol, 12th August 1924 1924, Plan of Auxiliary Boiler for British Petrol, 1st August 1924 1924, Freeboard Verification Form for Steamers for British Petrol, 3rd July 1925 1925, Report of Surveys for Freeboard-Steam Ships for British Petrol, 16th June 1925 1925, Report on Electric Fittings for British Petrol, 22nd September 1925 1925, Memo for British Petrol, 2nd November 1928 1928, Plan of Main Engine Crankshaft for British Petrol, 19th May 1930 1930, Report of Surveys for freeboard for British Petrol, 7th April 1932 1932, Freeboard Verification Form for Tankers for British Petrol, 16th April 1932 1932, Copy of a Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding British Petrol, 26th October 1937 1937, Main Propelling Oil Engines Shafting Endorsement for British Petrol, 25th October 1937 1937, Plan of Stern Tube & Propeller Shaft for British Petrol, 15th October 1937 1937, Plan of Double Bottom in Machinery Space for British Petrol, 18th September 1937 1937, Plan of Thrust & Intermediate Shafting for British Petrol, 15th October 1937 1937, Report of Total Loss, Casualty, &c for British Petrol, Undated no date, Freeboard & Draught Document for British Petrol, Undated no date, List of British Tanker Co Vessels Amended F W Allowance, including British Petrol, Undated no date, Copy of Freeboard Report for British Petrol, Undated no date )

Cargo ( Form for Vessels of 100 Tons & Upwards for British Petrol, 10th September 1925 1925 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Plan of Auxiliary & Waste Heat Boiler for British Petrol, 1924 1924, Plan of Crankshaft for British Petrol, 15th July 1924 1924, Plan of Flywheel Shaft for British Petrol, 12th August 1924 1924, Plan of Auxiliary Boiler for British Petrol, 1st August 1924 1924, Freeboard Verification Form for Steamers for British Petrol, 3rd July 1925 1925, Report of Surveys for Freeboard-Steam Ships for British Petrol, 16th June 1925 1925, Report on Electric Fittings for British Petrol, 22nd September 1925 1925, Memo from the Chief Ship Surveyor to the Classing Committee regarding proportions of sheerstrake & class of British Petrol, 9th October 1925 1925, Steel Motorship Report for British Petrol, 29th September 1925 1925, Form for Vessels of 100 Tons & Upwards for British Petrol, 10th September 1925 1925, Report on Oil Engine Machinery for British Petrol, 22nd September 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Memo for British Petrol, 2nd November 1928 1928, Plan of Main Engine Crankshaft for British Petrol, 19th May 1930 1930, Report of Surveys for freeboard for British Petrol, 7th April 1932 1932, Freeboard Verification Form for Tankers for British Petrol, 16th April 1932 1932, Report on Oil Engine Machinery for British Petrol, 25th June 1932 1932, Copy of a Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding British Petrol, 26th October 1937 1937, Main Propelling Oil Engines Shafting Endorsement for British Petrol, 25th October 1937 1937, Plan of Stern Tube & Propeller Shaft for British Petrol, 15th October 1937 1937, Plan of Double Bottom in Machinery Space for British Petrol, 18th September 1937 1937, Plan of Thrust & Intermediate Shafting for British Petrol, 15th October 1937 1937, Report of Survey for Repairs, &c for British Petrol, 19th February 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for British Petrol, 13th February 1938 1938, Report on Oil Engine Machinery for British Petrol, 13th February 1938 1938, Report of Total Loss, Casualty, &c for British Petrol, Undated no date, Freeboard & Draught Document for British Petrol, Undated no date, List of British Tanker Co Vessels Amended F W Allowance, including British Petrol, Undated no date, Copy of Freeboard Report for British Petrol, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Plan of Auxiliary & Waste Heat Boiler for British Petrol, 1924 1924, Plan of Crankshaft for British Petrol, 15th July 1924 1924, Plan of Flywheel Shaft for British Petrol, 12th August 1924 1924, Plan of Auxiliary Boiler for British Petrol, 1st August 1924 1924, Freeboard Verification Form for Steamers for British Petrol, 3rd July 1925 1925, Report of Surveys for Freeboard-Steam Ships for British Petrol, 16th June 1925 1925, Report on Electric Fittings for British Petrol, 22nd September 1925 1925, Memo from the Chief Ship Surveyor to the Classing Committee regarding proportions of sheerstrake & class of British Petrol, 9th October 1925 1925, Steel Motorship Report for British Petrol, 29th September 1925 1925, Form for Vessels of 100 Tons & Upwards for British Petrol, 10th September 1925 1925, Report on Oil Engine Machinery for British Petrol, 22nd September 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Memo for British Petrol, 2nd November 1928 1928, Plan of Main Engine Crankshaft for British Petrol, 19th May 1930 1930, Report of Surveys for freeboard for British Petrol, 7th April 1932 1932, Freeboard Verification Form for Tankers for British Petrol, 16th April 1932 1932, Report on Oil Engine Machinery for British Petrol, 25th June 1932 1932, Copy of a Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding British Petrol, 26th October 1937 1937, Main Propelling Oil Engines Shafting Endorsement for British Petrol, 25th October 1937 1937, Plan of Stern Tube & Propeller Shaft for British Petrol, 15th October 1937 1937, Plan of Double Bottom in Machinery Space for British Petrol, 18th September 1937 1937, Plan of Thrust & Intermediate Shafting for British Petrol, 15th October 1937 1937, Report of Survey for Repairs, &c for British Petrol, 19th February 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for British Petrol, 13th February 1938 1938, Report on Oil Engine Machinery for British Petrol, 13th February 1938 1938, Report of Total Loss, Casualty, &c for British Petrol, Undated no date, Freeboard & Draught Document for British Petrol, Undated no date, List of British Tanker Co Vessels Amended F W Allowance, including British Petrol, Undated no date, Copy of Freeboard Report for British Petrol, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Plan of Auxiliary & Waste Heat Boiler for British Petrol, 1924 1924, Plan of Crankshaft for British Petrol, 15th July 1924 1924, Plan of Flywheel Shaft for British Petrol, 12th August 1924 1924, Plan of Auxiliary Boiler for British Petrol, 1st August 1924 1924, Freeboard Verification Form for Steamers for British Petrol, 3rd July 1925 1925, Report of Surveys for Freeboard-Steam Ships for British Petrol, 16th June 1925 1925, Report on Electric Fittings for British Petrol, 22nd September 1925 1925, Memo from the Chief Ship Surveyor to the Classing Committee regarding proportions of sheerstrake & class of British Petrol, 9th October 1925 1925, Steel Motorship Report for British Petrol, 29th September 1925 1925, Form for Vessels of 100 Tons & Upwards for British Petrol, 10th September 1925 1925, Report on Oil Engine Machinery for British Petrol, 22nd September 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Memo for British Petrol, 2nd November 1928 1928, Plan of Main Engine Crankshaft for British Petrol, 19th May 1930 1930, Report of Surveys for freeboard for British Petrol, 7th April 1932 1932, Freeboard Verification Form for Tankers for British Petrol, 16th April 1932 1932, Report on Oil Engine Machinery for British Petrol, 25th June 1932 1932, Copy of a Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding British Petrol, 26th October 1937 1937, Main Propelling Oil Engines Shafting Endorsement for British Petrol, 25th October 1937 1937, Plan of Stern Tube & Propeller Shaft for British Petrol, 15th October 1937 1937, Plan of Double Bottom in Machinery Space for British Petrol, 18th September 1937 1937, Plan of Thrust & Intermediate Shafting for British Petrol, 15th October 1937 1937, Report of Survey for Repairs, &c for British Petrol, 19th February 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for British Petrol, 13th February 1938 1938, Report on Oil Engine Machinery for British Petrol, 13th February 1938 1938, Report of Total Loss, Casualty, &c for British Petrol, Undated no date, Freeboard & Draught Document for British Petrol, Undated no date, List of British Tanker Co Vessels Amended F W Allowance, including British Petrol, Undated no date, Copy of Freeboard Report for British Petrol, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Plan of Auxiliary & Waste Heat Boiler for British Petrol, 1924 1924, Plan of Crankshaft for British Petrol, 15th July 1924 1924, Plan of Flywheel Shaft for British Petrol, 12th August 1924 1924, Plan of Auxiliary Boiler for British Petrol, 1st August 1924 1924, Freeboard Verification Form for Steamers for British Petrol, 3rd July 1925 1925, Report of Surveys for Freeboard-Steam Ships for British Petrol, 16th June 1925 1925, Report on Electric Fittings for British Petrol, 22nd September 1925 1925, Memo from the Chief Ship Surveyor to the Classing Committee regarding proportions of sheerstrake & class of British Petrol, 9th October 1925 1925, Steel Motorship Report for British Petrol, 29th September 1925 1925, Form for Vessels of 100 Tons & Upwards for British Petrol, 10th September 1925 1925, Report on Oil Engine Machinery for British Petrol, 22nd September 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Memo for British Petrol, 2nd November 1928 1928, Plan of Main Engine Crankshaft for British Petrol, 19th May 1930 1930, Report of Surveys for freeboard for British Petrol, 7th April 1932 1932, Freeboard Verification Form for Tankers for British Petrol, 16th April 1932 1932, Report on Oil Engine Machinery for British Petrol, 25th June 1932 1932, Copy of a Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding British Petrol, 26th October 1937 1937, Main Propelling Oil Engines Shafting Endorsement for British Petrol, 25th October 1937 1937, Plan of Stern Tube & Propeller Shaft for British Petrol, 15th October 1937 1937, Plan of Double Bottom in Machinery Space for British Petrol, 18th September 1937 1937, Plan of Thrust & Intermediate Shafting for British Petrol, 15th October 1937 1937, Report of Survey for Repairs, &c for British Petrol, 19th February 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for British Petrol, 13th February 1938 1938, Report on Oil Engine Machinery for British Petrol, 13th February 1938 1938, Report of Total Loss, Casualty, &c for British Petrol, Undated no date, Freeboard & Draught Document for British Petrol, Undated no date, List of British Tanker Co Vessels Amended F W Allowance, including British Petrol, Undated no date, Copy of Freeboard Report for British Petrol, Undated no date )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sunk by Enemy Action ( Plan of Auxiliary & Waste Heat Boiler for British Petrol, 1924 1924, Plan of Crankshaft for British Petrol, 15th July 1924 1924, Plan of Flywheel Shaft for British Petrol, 12th August 1924 1924, Plan of Auxiliary Boiler for British Petrol, 1st August 1924 1924, Freeboard Verification Form for Steamers for British Petrol, 3rd July 1925 1925, Report of Surveys for Freeboard-Steam Ships for British Petrol, 16th June 1925 1925, Report on Electric Fittings for British Petrol, 22nd September 1925 1925, Memo from the Chief Ship Surveyor to the Classing Committee regarding proportions of sheerstrake & class of British Petrol, 9th October 1925 1925, Steel Motorship Report for British Petrol, 29th September 1925 1925, Form for Vessels of 100 Tons & Upwards for British Petrol, 10th September 1925 1925, Report on Oil Engine Machinery for British Petrol, 22nd September 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Memo for British Petrol, 2nd November 1928 1928, Plan of Main Engine Crankshaft for British Petrol, 19th May 1930 1930, Report of Surveys for freeboard for British Petrol, 7th April 1932 1932, Freeboard Verification Form for Tankers for British Petrol, 16th April 1932 1932, Report on Oil Engine Machinery for British Petrol, 25th June 1932 1932, Copy of a Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding British Petrol, 26th October 1937 1937, Main Propelling Oil Engines Shafting Endorsement for British Petrol, 25th October 1937 1937, Plan of Stern Tube & Propeller Shaft for British Petrol, 15th October 1937 1937, Plan of Double Bottom in Machinery Space for British Petrol, 18th September 1937 1937, Plan of Thrust & Intermediate Shafting for British Petrol, 15th October 1937 1937, Report of Survey for Repairs, &c for British Petrol, 19th February 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for British Petrol, 13th February 1938 1938, Report on Oil Engine Machinery for British Petrol, 13th February 1938 1938, Report of Total Loss, Casualty, &c for British Petrol, Undated no date, Freeboard & Draught Document for British Petrol, Undated no date, List of British Tanker Co Vessels Amended F W Allowance, including British Petrol, Undated no date, Copy of Freeboard Report for British Petrol, Undated no date )

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

30/05/1940 ( Plan of Auxiliary & Waste Heat Boiler for British Petrol, 1924 1924, Plan of Crankshaft for British Petrol, 15th July 1924 1924, Plan of Flywheel Shaft for British Petrol, 12th August 1924 1924, Plan of Auxiliary Boiler for British Petrol, 1st August 1924 1924, Freeboard Verification Form for Steamers for British Petrol, 3rd July 1925 1925, Report of Surveys for Freeboard-Steam Ships for British Petrol, 16th June 1925 1925, Report on Electric Fittings for British Petrol, 22nd September 1925 1925, Memo from the Chief Ship Surveyor to the Classing Committee regarding proportions of sheerstrake & class of British Petrol, 9th October 1925 1925, Steel Motorship Report for British Petrol, 29th September 1925 1925, Form for Vessels of 100 Tons & Upwards for British Petrol, 10th September 1925 1925, Report on Oil Engine Machinery for British Petrol, 22nd September 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Memo for British Petrol, 2nd November 1928 1928, Plan of Main Engine Crankshaft for British Petrol, 19th May 1930 1930, Report of Surveys for freeboard for British Petrol, 7th April 1932 1932, Freeboard Verification Form for Tankers for British Petrol, 16th April 1932 1932, Report on Oil Engine Machinery for British Petrol, 25th June 1932 1932, Copy of a Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding British Petrol, 26th October 1937 1937, Main Propelling Oil Engines Shafting Endorsement for British Petrol, 25th October 1937 1937, Plan of Stern Tube & Propeller Shaft for British Petrol, 15th October 1937 1937, Plan of Double Bottom in Machinery Space for British Petrol, 18th September 1937 1937, Plan of Thrust & Intermediate Shafting for British Petrol, 15th October 1937 1937, Report of Survey for Repairs, &c for British Petrol, 19th February 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for British Petrol, 13th February 1938 1938, Report on Oil Engine Machinery for British Petrol, 13th February 1938 1938, Report of Total Loss, Casualty, &c for British Petrol, Undated no date, Freeboard & Draught Document for British Petrol, Undated no date, List of British Tanker Co Vessels Amended F W Allowance, including British Petrol, Undated no date, Copy of Freeboard Report for British Petrol, Undated no date )

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

The year in which a vessel’s construction is completed.

Year of ship completion

1925 ( Plan of Auxiliary & Waste Heat Boiler for British Petrol, 1924 1924, Plan of Crankshaft for British Petrol, 15th July 1924 1924, Plan of Flywheel Shaft for British Petrol, 12th August 1924 1924, Plan of Auxiliary Boiler for British Petrol, 1st August 1924 1924, Freeboard Verification Form for Steamers for British Petrol, 3rd July 1925 1925, Report of Surveys for Freeboard-Steam Ships for British Petrol, 16th June 1925 1925, Report on Electric Fittings for British Petrol, 22nd September 1925 1925, Memo from the Chief Ship Surveyor to the Classing Committee regarding proportions of sheerstrake & class of British Petrol, 9th October 1925 1925, Steel Motorship Report for British Petrol, 29th September 1925 1925, Form for Vessels of 100 Tons & Upwards for British Petrol, 10th September 1925 1925, Report on Oil Engine Machinery for British Petrol, 22nd September 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Memo for British Petrol, 2nd November 1928 1928, Plan of Main Engine Crankshaft for British Petrol, 19th May 1930 1930, Report of Surveys for freeboard for British Petrol, 7th April 1932 1932, Freeboard Verification Form for Tankers for British Petrol, 16th April 1932 1932, Report on Oil Engine Machinery for British Petrol, 25th June 1932 1932, Copy of a Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding British Petrol, 26th October 1937 1937, Main Propelling Oil Engines Shafting Endorsement for British Petrol, 25th October 1937 1937, Plan of Stern Tube & Propeller Shaft for British Petrol, 15th October 1937 1937, Plan of Double Bottom in Machinery Space for British Petrol, 18th September 1937 1937, Plan of Thrust & Intermediate Shafting for British Petrol, 15th October 1937 1937, Report of Survey for Repairs, &c for British Petrol, 19th February 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for British Petrol, 13th February 1938 1938, Report on Oil Engine Machinery for British Petrol, 13th February 1938 1938, Report of Total Loss, Casualty, &c for British Petrol, Undated no date, Freeboard & Draught Document for British Petrol, Undated no date, List of British Tanker Co Vessels Amended F W Allowance, including British Petrol, Undated no date, Copy of Freeboard Report for British Petrol, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Swan, Hunter & Wigham Richardson Ltd ( Plan of Auxiliary & Waste Heat Boiler for British Petrol, 1924 1924, Plan of Crankshaft for British Petrol, 15th July 1924 1924, Plan of Flywheel Shaft for British Petrol, 12th August 1924 1924, Plan of Auxiliary Boiler for British Petrol, 1st August 1924 1924, Freeboard Verification Form for Steamers for British Petrol, 3rd July 1925 1925, Report of Surveys for Freeboard-Steam Ships for British Petrol, 16th June 1925 1925, Report on Electric Fittings for British Petrol, 22nd September 1925 1925, Memo from the Chief Ship Surveyor to the Classing Committee regarding proportions of sheerstrake & class of British Petrol, 9th October 1925 1925, Steel Motorship Report for British Petrol, 29th September 1925 1925, Form for Vessels of 100 Tons & Upwards for British Petrol, 10th September 1925 1925, Report on Oil Engine Machinery for British Petrol, 22nd September 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Memo for British Petrol, 2nd November 1928 1928, Plan of Main Engine Crankshaft for British Petrol, 19th May 1930 1930, Report of Surveys for freeboard for British Petrol, 7th April 1932 1932, Freeboard Verification Form for Tankers for British Petrol, 16th April 1932 1932, Report on Oil Engine Machinery for British Petrol, 25th June 1932 1932, Copy of a Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding British Petrol, 26th October 1937 1937, Main Propelling Oil Engines Shafting Endorsement for British Petrol, 25th October 1937 1937, Plan of Stern Tube & Propeller Shaft for British Petrol, 15th October 1937 1937, Plan of Double Bottom in Machinery Space for British Petrol, 18th September 1937 1937, Plan of Thrust & Intermediate Shafting for British Petrol, 15th October 1937 1937, Report of Survey for Repairs, &c for British Petrol, 19th February 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for British Petrol, 13th February 1938 1938, Report on Oil Engine Machinery for British Petrol, 13th February 1938 1938, Report of Total Loss, Casualty, &c for British Petrol, Undated no date, Freeboard & Draught Document for British Petrol, Undated no date, List of British Tanker Co Vessels Amended F W Allowance, including British Petrol, Undated no date, Copy of Freeboard Report for British Petrol, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Walker on Tyne ( Plan of Auxiliary & Waste Heat Boiler for British Petrol, 1924 1924, Plan of Crankshaft for British Petrol, 15th July 1924 1924, Plan of Flywheel Shaft for British Petrol, 12th August 1924 1924, Plan of Auxiliary Boiler for British Petrol, 1st August 1924 1924, Freeboard Verification Form for Steamers for British Petrol, 3rd July 1925 1925, Report of Surveys for Freeboard-Steam Ships for British Petrol, 16th June 1925 1925, Report on Electric Fittings for British Petrol, 22nd September 1925 1925, Form for Vessels of 100 Tons & Upwards for British Petrol, 10th September 1925 1925, Memo for British Petrol, 2nd November 1928 1928, Plan of Main Engine Crankshaft for British Petrol, 19th May 1930 1930, Report of Surveys for freeboard for British Petrol, 7th April 1932 1932, Freeboard Verification Form for Tankers for British Petrol, 16th April 1932 1932, Copy of a Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding British Petrol, 26th October 1937 1937, Main Propelling Oil Engines Shafting Endorsement for British Petrol, 25th October 1937 1937, Plan of Stern Tube & Propeller Shaft for British Petrol, 15th October 1937 1937, Plan of Double Bottom in Machinery Space for British Petrol, 18th September 1937 1937, Plan of Thrust & Intermediate Shafting for British Petrol, 15th October 1937 1937, Report of Total Loss, Casualty, &c for British Petrol, Undated no date, Freeboard & Draught Document for British Petrol, Undated no date, List of British Tanker Co Vessels Amended F W Allowance, including British Petrol, Undated no date, Copy of Freeboard Report for British Petrol, Undated no date )

Newcastle ( Memo from the Chief Ship Surveyor to the Classing Committee regarding proportions of sheerstrake & class of British Petrol, 9th October 1925 1925, Steel Motorship Report for British Petrol, 29th September 1925 1925, Report on Oil Engine Machinery for British Petrol, 22nd September 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Report on Oil Engine Machinery for British Petrol, 25th June 1932 1932, Report of Survey for Repairs, &c for British Petrol, 19th February 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for British Petrol, 13th February 1938 1938, Report on Oil Engine Machinery for British Petrol, 13th February 1938 1938 )

A vessel’s means of propulsion.

Propulsion

Motor (internal combustion) ( Plan of Auxiliary & Waste Heat Boiler for British Petrol, 1924 1924, Plan of Crankshaft for British Petrol, 15th July 1924 1924, Plan of Flywheel Shaft for British Petrol, 12th August 1924 1924, Plan of Auxiliary Boiler for British Petrol, 1st August 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding proportions of sheerstrake & class of British Petrol, 9th October 1925 1925, Steel Motorship Report for British Petrol, 29th September 1925 1925, Report on Oil Engine Machinery for British Petrol, 22nd September 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Plan of Main Engine Crankshaft for British Petrol, 19th May 1930 1930, Copy of a Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding British Petrol, 26th October 1937 1937, Main Propelling Oil Engines Shafting Endorsement for British Petrol, 25th October 1937 1937, Plan of Stern Tube & Propeller Shaft for British Petrol, 15th October 1937 1937, Plan of Double Bottom in Machinery Space for British Petrol, 18th September 1937 1937, Plan of Thrust & Intermediate Shafting for British Petrol, 15th October 1937 1937, Report of Survey for Repairs, &c for British Petrol, 19th February 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for British Petrol, 13th February 1938 1938, Report of Total Loss, Casualty, &c for British Petrol, Undated no date )

Steam ( Freeboard Verification Form for Steamers for British Petrol, 3rd July 1925 1925, Report of Surveys for Freeboard-Steam Ships for British Petrol, 16th June 1925 1925, Form for Vessels of 100 Tons & Upwards for British Petrol, 10th September 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Memo for British Petrol, 2nd November 1928 1928, Report on Oil Engine Machinery for British Petrol, 25th June 1932 1932, Report on Oil Engine Machinery for British Petrol, 13th February 1938 1938, Freeboard & Draught Document for British Petrol, Undated no date )

undefined ( Report on Electric Fittings for British Petrol, 22nd September 1925 1925, Report of Surveys for freeboard for British Petrol, 7th April 1932 1932, Freeboard Verification Form for Tankers for British Petrol, 16th April 1932 1932, List of British Tanker Co Vessels Amended F W Allowance, including British Petrol, Undated no date, Copy of Freeboard Report for British Petrol, Undated no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Plan of Auxiliary & Waste Heat Boiler for British Petrol, 1924 1924, Plan of Crankshaft for British Petrol, 15th July 1924 1924, Plan of Flywheel Shaft for British Petrol, 12th August 1924 1924, Plan of Auxiliary Boiler for British Petrol, 1st August 1924 1924, Freeboard Verification Form for Steamers for British Petrol, 3rd July 1925 1925, Report of Surveys for Freeboard-Steam Ships for British Petrol, 16th June 1925 1925, Report on Electric Fittings for British Petrol, 22nd September 1925 1925, Memo from the Chief Ship Surveyor to the Classing Committee regarding proportions of sheerstrake & class of British Petrol, 9th October 1925 1925, Steel Motorship Report for British Petrol, 29th September 1925 1925, Form for Vessels of 100 Tons & Upwards for British Petrol, 10th September 1925 1925, Report on Oil Engine Machinery for British Petrol, 22nd September 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Memo for British Petrol, 2nd November 1928 1928, Plan of Main Engine Crankshaft for British Petrol, 19th May 1930 1930, Report of Surveys for freeboard for British Petrol, 7th April 1932 1932, Freeboard Verification Form for Tankers for British Petrol, 16th April 1932 1932, Report on Oil Engine Machinery for British Petrol, 25th June 1932 1932, Copy of a Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding British Petrol, 26th October 1937 1937, Main Propelling Oil Engines Shafting Endorsement for British Petrol, 25th October 1937 1937, Plan of Stern Tube & Propeller Shaft for British Petrol, 15th October 1937 1937, Plan of Double Bottom in Machinery Space for British Petrol, 18th September 1937 1937, Plan of Thrust & Intermediate Shafting for British Petrol, 15th October 1937 1937, Report of Survey for Repairs, &c for British Petrol, 19th February 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for British Petrol, 13th February 1938 1938, Report on Oil Engine Machinery for British Petrol, 13th February 1938 1938, Report of Total Loss, Casualty, &c for British Petrol, Undated no date, Freeboard & Draught Document for British Petrol, Undated no date, List of British Tanker Co Vessels Amended F W Allowance, including British Petrol, Undated no date, Copy of Freeboard Report for British Petrol, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Plan of Auxiliary & Waste Heat Boiler for British Petrol, 1924 1924, Plan of Crankshaft for British Petrol, 15th July 1924 1924, Plan of Flywheel Shaft for British Petrol, 12th August 1924 1924, Plan of Auxiliary Boiler for British Petrol, 1st August 1924 1924, Freeboard Verification Form for Steamers for British Petrol, 3rd July 1925 1925, Report of Surveys for Freeboard-Steam Ships for British Petrol, 16th June 1925 1925, Report on Electric Fittings for British Petrol, 22nd September 1925 1925, Memo from the Chief Ship Surveyor to the Classing Committee regarding proportions of sheerstrake & class of British Petrol, 9th October 1925 1925, Steel Motorship Report for British Petrol, 29th September 1925 1925, Form for Vessels of 100 Tons & Upwards for British Petrol, 10th September 1925 1925, Report on Oil Engine Machinery for British Petrol, 22nd September 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Memo for British Petrol, 2nd November 1928 1928, Plan of Main Engine Crankshaft for British Petrol, 19th May 1930 1930, Report of Surveys for freeboard for British Petrol, 7th April 1932 1932, Freeboard Verification Form for Tankers for British Petrol, 16th April 1932 1932, Report on Oil Engine Machinery for British Petrol, 25th June 1932 1932, Copy of a Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding British Petrol, 26th October 1937 1937, Main Propelling Oil Engines Shafting Endorsement for British Petrol, 25th October 1937 1937, Plan of Stern Tube & Propeller Shaft for British Petrol, 15th October 1937 1937, Plan of Double Bottom in Machinery Space for British Petrol, 18th September 1937 1937, Plan of Thrust & Intermediate Shafting for British Petrol, 15th October 1937 1937, Report of Survey for Repairs, &c for British Petrol, 19th February 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for British Petrol, 13th February 1938 1938, Report on Oil Engine Machinery for British Petrol, 13th February 1938 1938, Report of Total Loss, Casualty, &c for British Petrol, Undated no date, Freeboard & Draught Document for British Petrol, Undated no date, List of British Tanker Co Vessels Amended F W Allowance, including British Petrol, Undated no date, Copy of Freeboard Report for British Petrol, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Plan of Auxiliary & Waste Heat Boiler for British Petrol, 1924 1924, Plan of Crankshaft for British Petrol, 15th July 1924 1924, Plan of Flywheel Shaft for British Petrol, 12th August 1924 1924, Plan of Auxiliary Boiler for British Petrol, 1st August 1924 1924, Freeboard Verification Form for Steamers for British Petrol, 3rd July 1925 1925, Report of Surveys for Freeboard-Steam Ships for British Petrol, 16th June 1925 1925, Report on Electric Fittings for British Petrol, 22nd September 1925 1925, Memo from the Chief Ship Surveyor to the Classing Committee regarding proportions of sheerstrake & class of British Petrol, 9th October 1925 1925, Steel Motorship Report for British Petrol, 29th September 1925 1925, Form for Vessels of 100 Tons & Upwards for British Petrol, 10th September 1925 1925, Report on Oil Engine Machinery for British Petrol, 22nd September 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Memo for British Petrol, 2nd November 1928 1928, Plan of Main Engine Crankshaft for British Petrol, 19th May 1930 1930, Report of Surveys for freeboard for British Petrol, 7th April 1932 1932, Freeboard Verification Form for Tankers for British Petrol, 16th April 1932 1932, Report on Oil Engine Machinery for British Petrol, 25th June 1932 1932, Copy of a Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding British Petrol, 26th October 1937 1937, Main Propelling Oil Engines Shafting Endorsement for British Petrol, 25th October 1937 1937, Plan of Stern Tube & Propeller Shaft for British Petrol, 15th October 1937 1937, Plan of Double Bottom in Machinery Space for British Petrol, 18th September 1937 1937, Plan of Thrust & Intermediate Shafting for British Petrol, 15th October 1937 1937, Report of Survey for Repairs, &c for British Petrol, 19th February 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for British Petrol, 13th February 1938 1938, Report on Oil Engine Machinery for British Petrol, 13th February 1938 1938, Report of Total Loss, Casualty, &c for British Petrol, Undated no date, Freeboard & Draught Document for British Petrol, Undated no date, List of British Tanker Co Vessels Amended F W Allowance, including British Petrol, Undated no date, Copy of Freeboard Report for British Petrol, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Plan of Auxiliary & Waste Heat Boiler for British Petrol, 1924 1924, Plan of Crankshaft for British Petrol, 15th July 1924 1924, Plan of Flywheel Shaft for British Petrol, 12th August 1924 1924, Plan of Auxiliary Boiler for British Petrol, 1st August 1924 1924, Freeboard Verification Form for Steamers for British Petrol, 3rd July 1925 1925, Report of Surveys for Freeboard-Steam Ships for British Petrol, 16th June 1925 1925, Report on Electric Fittings for British Petrol, 22nd September 1925 1925, Memo from the Chief Ship Surveyor to the Classing Committee regarding proportions of sheerstrake & class of British Petrol, 9th October 1925 1925, Steel Motorship Report for British Petrol, 29th September 1925 1925, Form for Vessels of 100 Tons & Upwards for British Petrol, 10th September 1925 1925, Report on Oil Engine Machinery for British Petrol, 22nd September 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Memo for British Petrol, 2nd November 1928 1928, Plan of Main Engine Crankshaft for British Petrol, 19th May 1930 1930, Report of Surveys for freeboard for British Petrol, 7th April 1932 1932, Freeboard Verification Form for Tankers for British Petrol, 16th April 1932 1932, Report on Oil Engine Machinery for British Petrol, 25th June 1932 1932, Copy of a Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding British Petrol, 26th October 1937 1937, Main Propelling Oil Engines Shafting Endorsement for British Petrol, 25th October 1937 1937, Plan of Stern Tube & Propeller Shaft for British Petrol, 15th October 1937 1937, Plan of Double Bottom in Machinery Space for British Petrol, 18th September 1937 1937, Plan of Thrust & Intermediate Shafting for British Petrol, 15th October 1937 1937, Report of Survey for Repairs, &c for British Petrol, 19th February 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for British Petrol, 13th February 1938 1938, Report on Oil Engine Machinery for British Petrol, 13th February 1938 1938, Report of Total Loss, Casualty, &c for British Petrol, Undated no date, Freeboard & Draught Document for British Petrol, Undated no date, List of British Tanker Co Vessels Amended F W Allowance, including British Petrol, Undated no date, Copy of Freeboard Report for British Petrol, Undated no date )

Vessel’s area of loss or disposal/last known recorded location.

Area of ship loss

Atlantic ( Plan of Auxiliary & Waste Heat Boiler for British Petrol, 1924 1924, Plan of Crankshaft for British Petrol, 15th July 1924 1924, Plan of Flywheel Shaft for British Petrol, 12th August 1924 1924, Plan of Auxiliary Boiler for British Petrol, 1st August 1924 1924, Freeboard Verification Form for Steamers for British Petrol, 3rd July 1925 1925, Report of Surveys for Freeboard-Steam Ships for British Petrol, 16th June 1925 1925, Report on Electric Fittings for British Petrol, 22nd September 1925 1925, Memo from the Chief Ship Surveyor to the Classing Committee regarding proportions of sheerstrake & class of British Petrol, 9th October 1925 1925, Steel Motorship Report for British Petrol, 29th September 1925 1925, Form for Vessels of 100 Tons & Upwards for British Petrol, 10th September 1925 1925, Report on Oil Engine Machinery for British Petrol, 22nd September 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Memo for British Petrol, 2nd November 1928 1928, Plan of Main Engine Crankshaft for British Petrol, 19th May 1930 1930, Report of Surveys for freeboard for British Petrol, 7th April 1932 1932, Freeboard Verification Form for Tankers for British Petrol, 16th April 1932 1932, Report on Oil Engine Machinery for British Petrol, 25th June 1932 1932, Copy of a Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding British Petrol, 26th October 1937 1937, Main Propelling Oil Engines Shafting Endorsement for British Petrol, 25th October 1937 1937, Plan of Stern Tube & Propeller Shaft for British Petrol, 15th October 1937 1937, Plan of Double Bottom in Machinery Space for British Petrol, 18th September 1937 1937, Plan of Thrust & Intermediate Shafting for British Petrol, 15th October 1937 1937, Report of Survey for Repairs, &c for British Petrol, 19th February 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for British Petrol, 13th February 1938 1938, Report on Oil Engine Machinery for British Petrol, 13th February 1938 1938, Report of Total Loss, Casualty, &c for British Petrol, Undated no date, Freeboard & Draught Document for British Petrol, Undated no date, List of British Tanker Co Vessels Amended F W Allowance, including British Petrol, Undated no date, Copy of Freeboard Report for British Petrol, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Newcastle on Tyne ( Plan of Crankshaft for British Petrol, 15th July 1924 1924, Plan of Flywheel Shaft for British Petrol, 12th August 1924 1924, Plan of Auxiliary Boiler for British Petrol, 1st August 1924 1924, Report of Surveys for Freeboard-Steam Ships for British Petrol, 16th June 1925 1925, Report on Electric Fittings for British Petrol, 22nd September 1925 1925, Plan of Stern Tube & Propeller Shaft for British Petrol, 15th October 1937 1937, Plan of Double Bottom in Machinery Space for British Petrol, 18th September 1937 1937, Plan of Thrust & Intermediate Shafting for British Petrol, 15th October 1937 1937 )

Newcastle Upon Tyne ( Freeboard Verification Form for Steamers for British Petrol, 3rd July 1925 1925 )

Walker on Tyne; Newcastle; Newcastle on Tyne ( Steel Motorship Report for British Petrol, 29th September 1925 1925, Report on Oil Engine Machinery for British Petrol, 22nd September 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925 )

London ( Form for Vessels of 100 Tons & Upwards for British Petrol, 10th September 1925 1925, Copy of a Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding British Petrol, 26th October 1937 1937 )

Sickla Stockholm; Stockholm ( Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925 )

Barrow in Furness ( Plan of Main Engine Crankshaft for British Petrol, 19th May 1930 1930 )

Manchester ( Report of Surveys for freeboard for British Petrol, 7th April 1932 1932 )

Liverpool ( Freeboard Verification Form for Tankers for British Petrol, 16th April 1932 1932 )

Barrow ( Report on Oil Engine Machinery for British Petrol, 25th June 1932 1932 )

Newcastle on Tyne; Newcastle ( Report of Survey for Repairs, &c for British Petrol, 19th February 1938 1938, Report of Survey for Repairs, &c, of Engines & Boilers for British Petrol, 13th February 1938 1938, Report on Oil Engine Machinery for British Petrol, 13th February 1938 1938 )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1; Carrying Petroleum in bulk; Longitudinal Framing (Contemplated) ( Report of Surveys for Freeboard-Steam Ships for British Petrol, 16th June 1925 1925 )

+100A1 (Steel) Carrying Petroleum in Bulk ( Memo from the Chief Ship Surveyor to the Classing Committee regarding proportions of sheerstrake & class of British Petrol, 9th October 1925 1925 )

+100A1; Carrying Petroleum in bulk; Lloyd's A & CP; +LMC 9,25 CL; Oil Engines 2 DB-150 lbs; Write Nwc ( Steel Motorship Report for British Petrol, 29th September 1925 1925 )

+LMC 9,25 CL; Oil Engines 2 DB 150 lbs ( Report on Oil Engine Machinery for British Petrol, 22nd September 1925 1925 )

See Nwc FE 79675 ( Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925, Report on Oil Engine Machinery for British Petrol, 9th March 1925 1925 )

See other report ( Report on Boilers for British Petrol, 22nd September 1925 1925, Report on Boilers for British Petrol, 22nd September 1925 1925 )

+100A1; Carrying Petroleum in bulk ( Report of Surveys for freeboard for British Petrol, 7th April 1932 1932 )

Not for Classing Committee ( Report on Oil Engine Machinery for British Petrol, 25th June 1932 1932 )

+100A1 Carrying petroleum in bulk; S S No 3-2,38; DB S 2,38; +LMC 2,38; +NE made 32 fitted 2,38 ( Report of Survey for Repairs, &c for British Petrol, 19th February 1938 1938 )

+LMC 2,38; +NE made 32 fitted 2,38; DB S 2,38 ( Report of Survey for Repairs, &c, of Engines & Boilers for British Petrol, 13th February 1938 1938 )

See Other Nwc Rpt 95970 ( Report on Oil Engine Machinery for British Petrol, 13th February 1938 1938 )

+100A1 5,40; S S Nwc No 3-2,38; +LMC 2,38; +NE 32 fitted 2,38; DB S 4,40; TSN 1,38 CL; Oil Engine; Carrying Petroleum in bulk ( Report of Total Loss, Casualty, &c for British Petrol, Undated no date )

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

Physical arrangement of a ship’s masts, sails and rigging.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.