Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Fezara - 1923 ( Report on Engine Forgings for for vessel No 499, 28 April 1921 1921, Report on Ship Castings for Vessel No 499, 17 May 1921 1921, Receipt from The Steel Company of Scotland Ltd, Newton, to Alex Stephen & Sons Ltd, Linthouse, for steel castings, 14 May 1921 1921, Report on Engine Forgings for for vessel No 499, 1 June 1921 1921, Report on Engine Forgings for for vessel No 499, 21 November 1921 1921, Results of Tests of Steel for Turbines No 499, 22 November 1921 1921, Report on Ship Castings for Vessel No 499, December 1921 1921, Report on Ship Castings for Vessel No 499, November 1921 1921, Correspondence from Alexander Stephen & Sons Ltd to the Secretary, Lloyd's Register, regarding photo print No 794 of main steel pipes in vessels No 498 and 499, 17 December 1921 1921, Receipt from Springfield Steel Co Ltd to Alex Stephen & Sons Ltd, 31 May 1922 1922, Report on Engine Castings for Vessel No 499, 22 June 1922 1922, Report on Ship Forgings for Vessel No 499, 1 July 1922 1922, Report on Engine Castings for Vessel No 499, 18 July 1922 1922, Report on Engine Castings for Vessel No 499, 22 August 1922 1922, Report on Engine Forgings for Vessel No 499, 1 September 1922 1922, Results of Tests of Steel for No 499, 1 September 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 12 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 20 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 28 December 1922 1922, Copy of document certifying that the surveyor has tested superheater headers for contract No 499, 18 July 1922 1922, Memo from Surveyor, Lloyd's Register, to John Barr regarding hydraulic pressure tests, 9 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of iron pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 2 January 1923 1923, Letter from P L Warlow, Secretary to the Glasgow Committee,to the Secretary, Lloyd's Register London, regarding classification certificates for Fezara, 27 February 1923 1923, Remarks to the Chief Ship Surveyor regarding First Entry report for Fezara, February 1923 1923, First Entry Report for Steel Steamer Fezara, 8 February 1923 1923, Form for Vessels of 100 Tons and Upwards for Fezara, 2 February 1923 1923, Memo regarding the classification of Fezara, February 1923 1923, Report on Machinery for Fezara, 10 February 1923 1923, Report on Electric Fittings for Fezara, 20 March 1923 1923, Copy of document certifying that the surveyor has examined damage and repairs and stating his recommendations for Orungal, 30 December 1940 1940, Report of Total Loss for Orungal, 11 February 1941 1941, Report of Survey for Repairs to Orungal, 2 January 1941 1941 )
Orungal - 1927 ( Plan for Additional Stiffening to Engine Seating for Orungal no date )
The process of transferring a vessel to water, but not necessarily her completion.
12/05/1922 ( Report on Engine Forgings for for vessel No 499, 28 April 1921 1921, Report on Ship Castings for Vessel No 499, 17 May 1921 1921, Receipt from The Steel Company of Scotland Ltd, Newton, to Alex Stephen & Sons Ltd, Linthouse, for steel castings, 14 May 1921 1921, Report on Engine Forgings for for vessel No 499, 1 June 1921 1921, Report on Engine Forgings for for vessel No 499, 21 November 1921 1921, Results of Tests of Steel for Turbines No 499, 22 November 1921 1921, Report on Ship Castings for Vessel No 499, December 1921 1921, Report on Ship Castings for Vessel No 499, November 1921 1921, Correspondence from Alexander Stephen & Sons Ltd to the Secretary, Lloyd's Register, regarding photo print No 794 of main steel pipes in vessels No 498 and 499, 17 December 1921 1921, Receipt from Springfield Steel Co Ltd to Alex Stephen & Sons Ltd, 31 May 1922 1922, Report on Engine Castings for Vessel No 499, 22 June 1922 1922, Report on Ship Forgings for Vessel No 499, 1 July 1922 1922, Report on Engine Castings for Vessel No 499, 18 July 1922 1922, Report on Engine Castings for Vessel No 499, 22 August 1922 1922, Report on Engine Forgings for Vessel No 499, 1 September 1922 1922, Results of Tests of Steel for No 499, 1 September 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 12 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 20 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 28 December 1922 1922, Copy of document certifying that the surveyor has tested superheater headers for contract No 499, 18 July 1922 1922, Memo from Surveyor, Lloyd's Register, to John Barr regarding hydraulic pressure tests, 9 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of iron pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 2 January 1923 1923, Letter from P L Warlow, Secretary to the Glasgow Committee,to the Secretary, Lloyd's Register London, regarding classification certificates for Fezara, 27 February 1923 1923, Remarks to the Chief Ship Surveyor regarding First Entry report for Fezara, February 1923 1923, First Entry Report for Steel Steamer Fezara, 8 February 1923 1923, Form for Vessels of 100 Tons and Upwards for Fezara, 2 February 1923 1923, Memo regarding the classification of Fezara, February 1923 1923, Report on Machinery for Fezara, 10 February 1923 1923, Report on Electric Fittings for Fezara, 20 March 1923 1923, Copy of document certifying that the surveyor has examined damage and repairs and stating his recommendations for Orungal, 30 December 1940 1940, Report of Total Loss for Orungal, 11 February 1941 1941, Report of Survey for Repairs to Orungal, 2 January 1941 1941, Plan for Additional Stiffening to Engine Seating for Orungal no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Linthouse, Govan ( Report on Engine Forgings for for vessel No 499, 28 April 1921 1921, Report on Ship Castings for Vessel No 499, 17 May 1921 1921, Receipt from The Steel Company of Scotland Ltd, Newton, to Alex Stephen & Sons Ltd, Linthouse, for steel castings, 14 May 1921 1921, Report on Engine Forgings for for vessel No 499, 1 June 1921 1921, Report on Engine Forgings for for vessel No 499, 21 November 1921 1921, Results of Tests of Steel for Turbines No 499, 22 November 1921 1921, Report on Ship Castings for Vessel No 499, December 1921 1921, Report on Ship Castings for Vessel No 499, November 1921 1921, Correspondence from Alexander Stephen & Sons Ltd to the Secretary, Lloyd's Register, regarding photo print No 794 of main steel pipes in vessels No 498 and 499, 17 December 1921 1921, Receipt from Springfield Steel Co Ltd to Alex Stephen & Sons Ltd, 31 May 1922 1922, Report on Engine Castings for Vessel No 499, 22 June 1922 1922, Report on Ship Forgings for Vessel No 499, 1 July 1922 1922, Report on Engine Castings for Vessel No 499, 18 July 1922 1922, Report on Engine Castings for Vessel No 499, 22 August 1922 1922, Report on Engine Forgings for Vessel No 499, 1 September 1922 1922, Results of Tests of Steel for No 499, 1 September 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 12 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 20 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 28 December 1922 1922, Copy of document certifying that the surveyor has tested superheater headers for contract No 499, 18 July 1922 1922, Memo from Surveyor, Lloyd's Register, to John Barr regarding hydraulic pressure tests, 9 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of iron pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 2 January 1923 1923, Letter from P L Warlow, Secretary to the Glasgow Committee,to the Secretary, Lloyd's Register London, regarding classification certificates for Fezara, 27 February 1923 1923, Remarks to the Chief Ship Surveyor regarding First Entry report for Fezara, February 1923 1923, First Entry Report for Steel Steamer Fezara, 8 February 1923 1923, Form for Vessels of 100 Tons and Upwards for Fezara, 2 February 1923 1923, Memo regarding the classification of Fezara, February 1923 1923, Report on Machinery for Fezara, 10 February 1923 1923, Report on Electric Fittings for Fezara, 20 March 1923 1923, Copy of document certifying that the surveyor has examined damage and repairs and stating his recommendations for Orungal, 30 December 1940 1940, Report of Total Loss for Orungal, 11 February 1941 1941, Report of Survey for Repairs to Orungal, 2 January 1941 1941, Plan for Additional Stiffening to Engine Seating for Orungal no date )
Location where a vessel’s survey was undertaken.
Glasgow ( Report on Engine Forgings for for vessel No 499, 28 April 1921 1921, Report on Ship Castings for Vessel No 499, 17 May 1921 1921, Report on Engine Forgings for for vessel No 499, 1 June 1921 1921, Report on Engine Forgings for for vessel No 499, 21 November 1921 1921, Results of Tests of Steel for Turbines No 499, 22 November 1921 1921, Correspondence from Alexander Stephen & Sons Ltd to the Secretary, Lloyd's Register, regarding photo print No 794 of main steel pipes in vessels No 498 and 499, 17 December 1921 1921, Receipt from Springfield Steel Co Ltd to Alex Stephen & Sons Ltd, 31 May 1922 1922, Report on Engine Castings for Vessel No 499, 22 June 1922 1922, Report on Ship Forgings for Vessel No 499, 1 July 1922 1922, Report on Engine Castings for Vessel No 499, 18 July 1922 1922, Report on Engine Castings for Vessel No 499, 22 August 1922 1922, Report on Engine Forgings for Vessel No 499, 1 September 1922 1922, Results of Tests of Steel for No 499, 1 September 1922 1922, Memo from Surveyor, Lloyd's Register, to John Barr regarding hydraulic pressure tests, 9 January 1923 1923, Letter from P L Warlow, Secretary to the Glasgow Committee,to the Secretary, Lloyd's Register London, regarding classification certificates for Fezara, 27 February 1923 1923, Report on Machinery for Fezara, 10 February 1923 1923, Report on Electric Fittings for Fezara, 20 March 1923 1923 )
Middlesbrough ( Report on Ship Castings for Vessel No 499, December 1921 1921, Report on Ship Castings for Vessel No 499, November 1921 1921 )
Govan ( Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 12 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 20 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 28 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 2 January 1923 1923 )
Newcastle upon Tyne ( Copy of document certifying that the surveyor has tested superheater headers for contract No 499, 18 July 1922 1922 )
Linthouse, Govan; Glasgow ( First Entry Report for Steel Steamer Fezara, 8 February 1923 1923 )
Barwon Heads, Victoria; Melbourne ( Copy of document certifying that the surveyor has examined damage and repairs and stating his recommendations for Orungal, 30 December 1940 1940, Report of Survey for Repairs to Orungal, 2 January 1941 1941 )
A vessel’s means of propulsion.
Steam ( Report on Engine Forgings for for vessel No 499, 28 April 1921 1921, Report on Ship Castings for Vessel No 499, 17 May 1921 1921, Receipt from The Steel Company of Scotland Ltd, Newton, to Alex Stephen & Sons Ltd, Linthouse, for steel castings, 14 May 1921 1921, Report on Engine Forgings for for vessel No 499, 1 June 1921 1921, Report on Engine Forgings for for vessel No 499, 21 November 1921 1921, Results of Tests of Steel for Turbines No 499, 22 November 1921 1921, Report on Ship Castings for Vessel No 499, December 1921 1921, Report on Ship Castings for Vessel No 499, November 1921 1921, Correspondence from Alexander Stephen & Sons Ltd to the Secretary, Lloyd's Register, regarding photo print No 794 of main steel pipes in vessels No 498 and 499, 17 December 1921 1921, Receipt from Springfield Steel Co Ltd to Alex Stephen & Sons Ltd, 31 May 1922 1922, Report on Engine Castings for Vessel No 499, 22 June 1922 1922, Report on Ship Forgings for Vessel No 499, 1 July 1922 1922, Report on Engine Castings for Vessel No 499, 18 July 1922 1922, Report on Engine Castings for Vessel No 499, 22 August 1922 1922, Report on Engine Forgings for Vessel No 499, 1 September 1922 1922, Results of Tests of Steel for No 499, 1 September 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 12 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 20 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 28 December 1922 1922, Copy of document certifying that the surveyor has tested superheater headers for contract No 499, 18 July 1922 1922, Memo from Surveyor, Lloyd's Register, to John Barr regarding hydraulic pressure tests, 9 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of iron pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 2 January 1923 1923, Letter from P L Warlow, Secretary to the Glasgow Committee,to the Secretary, Lloyd's Register London, regarding classification certificates for Fezara, 27 February 1923 1923, Remarks to the Chief Ship Surveyor regarding First Entry report for Fezara, February 1923 1923, First Entry Report for Steel Steamer Fezara, 8 February 1923 1923, Form for Vessels of 100 Tons and Upwards for Fezara, 2 February 1923 1923, Memo regarding the classification of Fezara, February 1923 1923, Report on Machinery for Fezara, 10 February 1923 1923, Report on Electric Fittings for Fezara, 20 March 1923 1923, Copy of document certifying that the surveyor has examined damage and repairs and stating his recommendations for Orungal, 30 December 1940 1940, Report of Total Loss for Orungal, 11 February 1941 1941, Report of Survey for Repairs to Orungal, 2 January 1941 1941, Plan for Additional Stiffening to Engine Seating for Orungal no date )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Report on Engine Forgings for for vessel No 499, 28 April 1921 1921, Report on Ship Castings for Vessel No 499, 17 May 1921 1921, Receipt from The Steel Company of Scotland Ltd, Newton, to Alex Stephen & Sons Ltd, Linthouse, for steel castings, 14 May 1921 1921, Report on Engine Forgings for for vessel No 499, 1 June 1921 1921, Report on Engine Forgings for for vessel No 499, 21 November 1921 1921, Results of Tests of Steel for Turbines No 499, 22 November 1921 1921, Report on Ship Castings for Vessel No 499, December 1921 1921, Report on Ship Castings for Vessel No 499, November 1921 1921, Correspondence from Alexander Stephen & Sons Ltd to the Secretary, Lloyd's Register, regarding photo print No 794 of main steel pipes in vessels No 498 and 499, 17 December 1921 1921, Receipt from Springfield Steel Co Ltd to Alex Stephen & Sons Ltd, 31 May 1922 1922, Report on Engine Castings for Vessel No 499, 22 June 1922 1922, Report on Ship Forgings for Vessel No 499, 1 July 1922 1922, Report on Engine Castings for Vessel No 499, 18 July 1922 1922, Report on Engine Castings for Vessel No 499, 22 August 1922 1922, Report on Engine Forgings for Vessel No 499, 1 September 1922 1922, Results of Tests of Steel for No 499, 1 September 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 12 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 20 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 28 December 1922 1922, Copy of document certifying that the surveyor has tested superheater headers for contract No 499, 18 July 1922 1922, Memo from Surveyor, Lloyd's Register, to John Barr regarding hydraulic pressure tests, 9 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of iron pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 2 January 1923 1923, Letter from P L Warlow, Secretary to the Glasgow Committee,to the Secretary, Lloyd's Register London, regarding classification certificates for Fezara, 27 February 1923 1923, Remarks to the Chief Ship Surveyor regarding First Entry report for Fezara, February 1923 1923, First Entry Report for Steel Steamer Fezara, 8 February 1923 1923, Form for Vessels of 100 Tons and Upwards for Fezara, 2 February 1923 1923, Memo regarding the classification of Fezara, February 1923 1923, Report on Machinery for Fezara, 10 February 1923 1923, Report on Electric Fittings for Fezara, 20 March 1923 1923, Copy of document certifying that the surveyor has examined damage and repairs and stating his recommendations for Orungal, 30 December 1940 1940, Report of Total Loss for Orungal, 11 February 1941 1941, Report of Survey for Repairs to Orungal, 2 January 1941 1941, Plan for Additional Stiffening to Engine Seating for Orungal no date )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5809 ( Report on Engine Forgings for for vessel No 499, 28 April 1921 1921, Report on Ship Castings for Vessel No 499, 17 May 1921 1921, Receipt from The Steel Company of Scotland Ltd, Newton, to Alex Stephen & Sons Ltd, Linthouse, for steel castings, 14 May 1921 1921, Report on Engine Forgings for for vessel No 499, 1 June 1921 1921, Report on Engine Forgings for for vessel No 499, 21 November 1921 1921, Results of Tests of Steel for Turbines No 499, 22 November 1921 1921, Report on Ship Castings for Vessel No 499, December 1921 1921, Report on Ship Castings for Vessel No 499, November 1921 1921, Correspondence from Alexander Stephen & Sons Ltd to the Secretary, Lloyd's Register, regarding photo print No 794 of main steel pipes in vessels No 498 and 499, 17 December 1921 1921, Receipt from Springfield Steel Co Ltd to Alex Stephen & Sons Ltd, 31 May 1922 1922, Report on Engine Castings for Vessel No 499, 22 June 1922 1922, Report on Ship Forgings for Vessel No 499, 1 July 1922 1922, Report on Engine Castings for Vessel No 499, 18 July 1922 1922, Report on Engine Castings for Vessel No 499, 22 August 1922 1922, Report on Engine Forgings for Vessel No 499, 1 September 1922 1922, Results of Tests of Steel for No 499, 1 September 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 12 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 20 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 28 December 1922 1922, Memo from Surveyor, Lloyd's Register, to John Barr regarding hydraulic pressure tests, 9 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of iron pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 2 January 1923 1923, Letter from P L Warlow, Secretary to the Glasgow Committee,to the Secretary, Lloyd's Register London, regarding classification certificates for Fezara, 27 February 1923 1923, Remarks to the Chief Ship Surveyor regarding First Entry report for Fezara, February 1923 1923, First Entry Report for Steel Steamer Fezara, 8 February 1923 1923, Form for Vessels of 100 Tons and Upwards for Fezara, 2 February 1923 1923, Report on Machinery for Fezara, 10 February 1923 1923, Report on Electric Fittings for Fezara, 20 March 1923 1923, Plan for Additional Stiffening to Engine Seating for Orungal no date )
5826 ( Report of Total Loss for Orungal, 11 February 1941 1941, Report of Survey for Repairs to Orungal, 2 January 1941 1941 )
Is machinery fitted at the aft of the vessel?
No ( Report on Engine Forgings for for vessel No 499, 28 April 1921 1921, Report on Ship Castings for Vessel No 499, 17 May 1921 1921, Receipt from The Steel Company of Scotland Ltd, Newton, to Alex Stephen & Sons Ltd, Linthouse, for steel castings, 14 May 1921 1921, Report on Engine Forgings for for vessel No 499, 1 June 1921 1921, Report on Engine Forgings for for vessel No 499, 21 November 1921 1921, Results of Tests of Steel for Turbines No 499, 22 November 1921 1921, Report on Ship Castings for Vessel No 499, December 1921 1921, Report on Ship Castings for Vessel No 499, November 1921 1921, Correspondence from Alexander Stephen & Sons Ltd to the Secretary, Lloyd's Register, regarding photo print No 794 of main steel pipes in vessels No 498 and 499, 17 December 1921 1921, Receipt from Springfield Steel Co Ltd to Alex Stephen & Sons Ltd, 31 May 1922 1922, Report on Engine Castings for Vessel No 499, 22 June 1922 1922, Report on Ship Forgings for Vessel No 499, 1 July 1922 1922, Report on Engine Castings for Vessel No 499, 18 July 1922 1922, Report on Engine Castings for Vessel No 499, 22 August 1922 1922, Report on Engine Forgings for Vessel No 499, 1 September 1922 1922, Results of Tests of Steel for No 499, 1 September 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 12 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 20 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 28 December 1922 1922, Copy of document certifying that the surveyor has tested superheater headers for contract No 499, 18 July 1922 1922, Memo from Surveyor, Lloyd's Register, to John Barr regarding hydraulic pressure tests, 9 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of iron pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 2 January 1923 1923, Letter from P L Warlow, Secretary to the Glasgow Committee,to the Secretary, Lloyd's Register London, regarding classification certificates for Fezara, 27 February 1923 1923, Remarks to the Chief Ship Surveyor regarding First Entry report for Fezara, February 1923 1923, First Entry Report for Steel Steamer Fezara, 8 February 1923 1923, Form for Vessels of 100 Tons and Upwards for Fezara, 2 February 1923 1923, Memo regarding the classification of Fezara, February 1923 1923, Report on Machinery for Fezara, 10 February 1923 1923, Report on Electric Fittings for Fezara, 20 March 1923 1923, Copy of document certifying that the surveyor has examined damage and repairs and stating his recommendations for Orungal, 30 December 1940 1940, Report of Total Loss for Orungal, 11 February 1941 1941, Report of Survey for Repairs to Orungal, 2 January 1941 1941, Plan for Additional Stiffening to Engine Seating for Orungal no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Report on Engine Forgings for for vessel No 499, 28 April 1921 1921, Report on Ship Castings for Vessel No 499, 17 May 1921 1921, Receipt from The Steel Company of Scotland Ltd, Newton, to Alex Stephen & Sons Ltd, Linthouse, for steel castings, 14 May 1921 1921, Report on Engine Forgings for for vessel No 499, 1 June 1921 1921, Report on Engine Forgings for for vessel No 499, 21 November 1921 1921, Results of Tests of Steel for Turbines No 499, 22 November 1921 1921, Report on Ship Castings for Vessel No 499, December 1921 1921, Report on Ship Castings for Vessel No 499, November 1921 1921, Correspondence from Alexander Stephen & Sons Ltd to the Secretary, Lloyd's Register, regarding photo print No 794 of main steel pipes in vessels No 498 and 499, 17 December 1921 1921, Receipt from Springfield Steel Co Ltd to Alex Stephen & Sons Ltd, 31 May 1922 1922, Report on Engine Castings for Vessel No 499, 22 June 1922 1922, Report on Ship Forgings for Vessel No 499, 1 July 1922 1922, Report on Engine Castings for Vessel No 499, 18 July 1922 1922, Report on Engine Castings for Vessel No 499, 22 August 1922 1922, Report on Engine Forgings for Vessel No 499, 1 September 1922 1922, Results of Tests of Steel for No 499, 1 September 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 12 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 20 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 28 December 1922 1922, Copy of document certifying that the surveyor has tested superheater headers for contract No 499, 18 July 1922 1922, Memo from Surveyor, Lloyd's Register, to John Barr regarding hydraulic pressure tests, 9 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of iron pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 2 January 1923 1923, Letter from P L Warlow, Secretary to the Glasgow Committee,to the Secretary, Lloyd's Register London, regarding classification certificates for Fezara, 27 February 1923 1923, Remarks to the Chief Ship Surveyor regarding First Entry report for Fezara, February 1923 1923, First Entry Report for Steel Steamer Fezara, 8 February 1923 1923, Form for Vessels of 100 Tons and Upwards for Fezara, 2 February 1923 1923, Memo regarding the classification of Fezara, February 1923 1923, Report on Machinery for Fezara, 10 February 1923 1923, Report on Electric Fittings for Fezara, 20 March 1923 1923, Copy of document certifying that the surveyor has examined damage and repairs and stating his recommendations for Orungal, 30 December 1940 1940, Report of Total Loss for Orungal, 11 February 1941 1941, Report of Survey for Repairs to Orungal, 2 January 1941 1941, Plan for Additional Stiffening to Engine Seating for Orungal no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Report on Engine Forgings for for vessel No 499, 28 April 1921 1921, Report on Ship Castings for Vessel No 499, 17 May 1921 1921, Receipt from The Steel Company of Scotland Ltd, Newton, to Alex Stephen & Sons Ltd, Linthouse, for steel castings, 14 May 1921 1921, Report on Engine Forgings for for vessel No 499, 1 June 1921 1921, Report on Engine Forgings for for vessel No 499, 21 November 1921 1921, Results of Tests of Steel for Turbines No 499, 22 November 1921 1921, Report on Ship Castings for Vessel No 499, December 1921 1921, Report on Ship Castings for Vessel No 499, November 1921 1921, Correspondence from Alexander Stephen & Sons Ltd to the Secretary, Lloyd's Register, regarding photo print No 794 of main steel pipes in vessels No 498 and 499, 17 December 1921 1921, Receipt from Springfield Steel Co Ltd to Alex Stephen & Sons Ltd, 31 May 1922 1922, Report on Engine Castings for Vessel No 499, 22 June 1922 1922, Report on Ship Forgings for Vessel No 499, 1 July 1922 1922, Report on Engine Castings for Vessel No 499, 18 July 1922 1922, Report on Engine Castings for Vessel No 499, 22 August 1922 1922, Report on Engine Forgings for Vessel No 499, 1 September 1922 1922, Results of Tests of Steel for No 499, 1 September 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 12 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 20 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 28 December 1922 1922, Copy of document certifying that the surveyor has tested superheater headers for contract No 499, 18 July 1922 1922, Memo from Surveyor, Lloyd's Register, to John Barr regarding hydraulic pressure tests, 9 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of iron pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 2 January 1923 1923, Letter from P L Warlow, Secretary to the Glasgow Committee,to the Secretary, Lloyd's Register London, regarding classification certificates for Fezara, 27 February 1923 1923, Remarks to the Chief Ship Surveyor regarding First Entry report for Fezara, February 1923 1923, First Entry Report for Steel Steamer Fezara, 8 February 1923 1923, Form for Vessels of 100 Tons and Upwards for Fezara, 2 February 1923 1923, Memo regarding the classification of Fezara, February 1923 1923, Report on Machinery for Fezara, 10 February 1923 1923, Report on Electric Fittings for Fezara, 20 March 1923 1923, Copy of document certifying that the surveyor has examined damage and repairs and stating his recommendations for Orungal, 30 December 1940 1940, Report of Total Loss for Orungal, 11 February 1941 1941, Report of Survey for Repairs to Orungal, 2 January 1941 1941, Plan for Additional Stiffening to Engine Seating for Orungal no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls ( First Entry Report for Steel Steamer Fezara, 8 February 1923 1923, Report on Machinery for Fezara, 10 February 1923 1923, Report on Electric Fittings for Fezara, 20 March 1923 1923 )
Mel ( Copy of document certifying that the surveyor has examined damage and repairs and stating his recommendations for Orungal, 30 December 1940 1940, Report of Survey for Repairs to Orungal, 2 January 1941 1941 )
The listed port to which a given vessel belongs.
London ( First Entry Report for Steel Steamer Fezara, 8 February 1923 1923, Form for Vessels of 100 Tons and Upwards for Fezara, 2 February 1923 1923, Report on Machinery for Fezara, 10 February 1923 1923, Report on Electric Fittings for Fezara, 20 March 1923 1923 )
Melbourne ( Report of Total Loss for Orungal, 11 February 1941 1941, Report of Survey for Repairs to Orungal, 2 January 1941 1941 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
J R Ryall ( First Entry Report for Steel Steamer Fezara, 8 February 1923 1923 )
Recorded information related to a vessel’s movements.
Glasgow ( First Entry Report for Steel Steamer Fezara, 8 February 1923 1923, Report on Machinery for Fezara, 10 February 1923 1923, Report on Electric Fittings for Fezara, 20 March 1923 1923 )
Victoria, Australia ( Copy of document certifying that the surveyor has examined damage and repairs and stating his recommendations for Orungal, 30 December 1940 1940, Report of Total Loss for Orungal, 11 February 1941 1941, Report of Survey for Repairs to Orungal, 2 January 1941 1941 )
A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.
Prescribed by flag/registration authorities, and usually excludes a small part of the stern. It is measured from the foreside of the stern at the extreme top to the afterside of the stern post.
Measurement from the underside of the upper deck on the centre line to the upper side of the bottom plating.
Description/specifications listed of the vessel’s engines and machinery. (The engines/machinery may have been surveyed separately before being assigned to a vessel).
Single Geared Turbines Rotary ( Form for Vessels of 100 Tons and Upwards for Fezara, 2 February 1923 1923 )
Single reduction geared turbine ( Report on Machinery for Fezara, 10 February 1923 1923 )
The country, at the time of writing, where a vessel’s engines were constructed.
United Kingdom ( Form for Vessels of 100 Tons and Upwards for Fezara, 2 February 1923 1923, Report on Machinery for Fezara, 10 February 1923 1923 )
Contextual information related to the reasons of the vessel’s loss or disposal.
Became stranded during heavy gale of Barwon Head, Victoria, on 21 November 1940; during salvage operations an explosion occurred in the boiler room on 13 December 1940 and salvage operations were abandoned ( Report of Total Loss for Orungal, 11 February 1941 1941 )
Vessel’s area of loss or disposal/last known recorded location.
Bass Strait ( Report of Total Loss for Orungal, 11 February 1941 1941 )
Recorded date for the vessel’s loss or disposal.
12/01/1941 ( Report of Total Loss for Orungal, 11 February 1941 1941 )
The year in which a vessel’s construction is completed.
1923 ( Report on Engine Forgings for for vessel No 499, 28 April 1921 1921, Report on Ship Castings for Vessel No 499, 17 May 1921 1921, Receipt from The Steel Company of Scotland Ltd, Newton, to Alex Stephen & Sons Ltd, Linthouse, for steel castings, 14 May 1921 1921, Report on Engine Forgings for for vessel No 499, 1 June 1921 1921, Report on Engine Forgings for for vessel No 499, 21 November 1921 1921, Results of Tests of Steel for Turbines No 499, 22 November 1921 1921, Report on Ship Castings for Vessel No 499, December 1921 1921, Report on Ship Castings for Vessel No 499, November 1921 1921, Correspondence from Alexander Stephen & Sons Ltd to the Secretary, Lloyd's Register, regarding photo print No 794 of main steel pipes in vessels No 498 and 499, 17 December 1921 1921, Receipt from Springfield Steel Co Ltd to Alex Stephen & Sons Ltd, 31 May 1922 1922, Report on Engine Castings for Vessel No 499, 22 June 1922 1922, Report on Ship Forgings for Vessel No 499, 1 July 1922 1922, Report on Engine Castings for Vessel No 499, 18 July 1922 1922, Report on Engine Castings for Vessel No 499, 22 August 1922 1922, Report on Engine Forgings for Vessel No 499, 1 September 1922 1922, Results of Tests of Steel for No 499, 1 September 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 12 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 20 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 28 December 1922 1922, Copy of document certifying that the surveyor has tested superheater headers for contract No 499, 18 July 1922 1922, Memo from Surveyor, Lloyd's Register, to John Barr regarding hydraulic pressure tests, 9 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of iron pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 2 January 1923 1923, Letter from P L Warlow, Secretary to the Glasgow Committee,to the Secretary, Lloyd's Register London, regarding classification certificates for Fezara, 27 February 1923 1923, Remarks to the Chief Ship Surveyor regarding First Entry report for Fezara, February 1923 1923, First Entry Report for Steel Steamer Fezara, 8 February 1923 1923, Form for Vessels of 100 Tons and Upwards for Fezara, 2 February 1923 1923, Memo regarding the classification of Fezara, February 1923 1923, Report on Machinery for Fezara, 10 February 1923 1923, Report on Electric Fittings for Fezara, 20 March 1923 1923, Copy of document certifying that the surveyor has examined damage and repairs and stating his recommendations for Orungal, 30 December 1940 1940, Report of Total Loss for Orungal, 11 February 1941 1941, Report of Survey for Repairs to Orungal, 2 January 1941 1941, Plan for Additional Stiffening to Engine Seating for Orungal no date )
Unique identifier for a given ship, it is assigned by a builder.
499 ( Report on Engine Forgings for for vessel No 499, 28 April 1921 1921, Report on Ship Castings for Vessel No 499, 17 May 1921 1921, Receipt from The Steel Company of Scotland Ltd, Newton, to Alex Stephen & Sons Ltd, Linthouse, for steel castings, 14 May 1921 1921, Report on Engine Forgings for for vessel No 499, 1 June 1921 1921, Report on Engine Forgings for for vessel No 499, 21 November 1921 1921, Results of Tests of Steel for Turbines No 499, 22 November 1921 1921, Report on Ship Castings for Vessel No 499, December 1921 1921, Report on Ship Castings for Vessel No 499, November 1921 1921, Correspondence from Alexander Stephen & Sons Ltd to the Secretary, Lloyd's Register, regarding photo print No 794 of main steel pipes in vessels No 498 and 499, 17 December 1921 1921, Receipt from Springfield Steel Co Ltd to Alex Stephen & Sons Ltd, 31 May 1922 1922, Report on Engine Castings for Vessel No 499, 22 June 1922 1922, Report on Ship Forgings for Vessel No 499, 1 July 1922 1922, Report on Engine Castings for Vessel No 499, 18 July 1922 1922, Report on Engine Castings for Vessel No 499, 22 August 1922 1922, Report on Engine Forgings for Vessel No 499, 1 September 1922 1922, Results of Tests of Steel for No 499, 1 September 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 12 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 20 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 28 December 1922 1922, Copy of document certifying that the surveyor has tested superheater headers for contract No 499, 18 July 1922 1922, Memo from Surveyor, Lloyd's Register, to John Barr regarding hydraulic pressure tests, 9 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of iron pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 2 January 1923 1923, Letter from P L Warlow, Secretary to the Glasgow Committee,to the Secretary, Lloyd's Register London, regarding classification certificates for Fezara, 27 February 1923 1923, Remarks to the Chief Ship Surveyor regarding First Entry report for Fezara, February 1923 1923, First Entry Report for Steel Steamer Fezara, 8 February 1923 1923, Form for Vessels of 100 Tons and Upwards for Fezara, 2 February 1923 1923, Memo regarding the classification of Fezara, February 1923 1923, Report on Machinery for Fezara, 10 February 1923 1923, Report on Electric Fittings for Fezara, 20 March 1923 1923, Copy of document certifying that the surveyor has examined damage and repairs and stating his recommendations for Orungal, 30 December 1940 1940, Report of Total Loss for Orungal, 11 February 1941 1941, Report of Survey for Repairs to Orungal, 2 January 1941 1941, Plan for Additional Stiffening to Engine Seating for Orungal no date )
The country in which the vessel’s construction took place, at the time of writing.
United Kingdom ( Report on Engine Forgings for for vessel No 499, 28 April 1921 1921, Report on Ship Castings for Vessel No 499, 17 May 1921 1921, Receipt from The Steel Company of Scotland Ltd, Newton, to Alex Stephen & Sons Ltd, Linthouse, for steel castings, 14 May 1921 1921, Report on Engine Forgings for for vessel No 499, 1 June 1921 1921, Report on Engine Forgings for for vessel No 499, 21 November 1921 1921, Results of Tests of Steel for Turbines No 499, 22 November 1921 1921, Report on Ship Castings for Vessel No 499, December 1921 1921, Report on Ship Castings for Vessel No 499, November 1921 1921, Correspondence from Alexander Stephen & Sons Ltd to the Secretary, Lloyd's Register, regarding photo print No 794 of main steel pipes in vessels No 498 and 499, 17 December 1921 1921, Receipt from Springfield Steel Co Ltd to Alex Stephen & Sons Ltd, 31 May 1922 1922, Report on Engine Castings for Vessel No 499, 22 June 1922 1922, Report on Ship Forgings for Vessel No 499, 1 July 1922 1922, Report on Engine Castings for Vessel No 499, 18 July 1922 1922, Report on Engine Castings for Vessel No 499, 22 August 1922 1922, Report on Engine Forgings for Vessel No 499, 1 September 1922 1922, Results of Tests of Steel for No 499, 1 September 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 12 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 20 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 28 December 1922 1922, Copy of document certifying that the surveyor has tested superheater headers for contract No 499, 18 July 1922 1922, Memo from Surveyor, Lloyd's Register, to John Barr regarding hydraulic pressure tests, 9 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of iron pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 2 January 1923 1923, Letter from P L Warlow, Secretary to the Glasgow Committee,to the Secretary, Lloyd's Register London, regarding classification certificates for Fezara, 27 February 1923 1923, Remarks to the Chief Ship Surveyor regarding First Entry report for Fezara, February 1923 1923, First Entry Report for Steel Steamer Fezara, 8 February 1923 1923, Form for Vessels of 100 Tons and Upwards for Fezara, 2 February 1923 1923, Memo regarding the classification of Fezara, February 1923 1923, Report on Machinery for Fezara, 10 February 1923 1923, Report on Electric Fittings for Fezara, 20 March 1923 1923, Copy of document certifying that the surveyor has examined damage and repairs and stating his recommendations for Orungal, 30 December 1940 1940, Report of Total Loss for Orungal, 11 February 1941 1941, Report of Survey for Repairs to Orungal, 2 January 1941 1941, Plan for Additional Stiffening to Engine Seating for Orungal no date )
Broad categories and subdivisions of vessels related to their purpose or function.
Passenger cargo ( Report on Engine Forgings for for vessel No 499, 28 April 1921 1921, Report on Ship Castings for Vessel No 499, 17 May 1921 1921, Receipt from The Steel Company of Scotland Ltd, Newton, to Alex Stephen & Sons Ltd, Linthouse, for steel castings, 14 May 1921 1921, Report on Engine Forgings for for vessel No 499, 1 June 1921 1921, Report on Engine Forgings for for vessel No 499, 21 November 1921 1921, Results of Tests of Steel for Turbines No 499, 22 November 1921 1921, Report on Ship Castings for Vessel No 499, December 1921 1921, Report on Ship Castings for Vessel No 499, November 1921 1921, Correspondence from Alexander Stephen & Sons Ltd to the Secretary, Lloyd's Register, regarding photo print No 794 of main steel pipes in vessels No 498 and 499, 17 December 1921 1921, Receipt from Springfield Steel Co Ltd to Alex Stephen & Sons Ltd, 31 May 1922 1922, Report on Engine Castings for Vessel No 499, 22 June 1922 1922, Report on Ship Forgings for Vessel No 499, 1 July 1922 1922, Report on Engine Castings for Vessel No 499, 18 July 1922 1922, Report on Engine Castings for Vessel No 499, 22 August 1922 1922, Report on Engine Forgings for Vessel No 499, 1 September 1922 1922, Results of Tests of Steel for No 499, 1 September 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 12 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 20 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 28 December 1922 1922, Copy of document certifying that the surveyor has tested superheater headers for contract No 499, 18 July 1922 1922, Memo from Surveyor, Lloyd's Register, to John Barr regarding hydraulic pressure tests, 9 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of iron pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 2 January 1923 1923, Letter from P L Warlow, Secretary to the Glasgow Committee,to the Secretary, Lloyd's Register London, regarding classification certificates for Fezara, 27 February 1923 1923, Remarks to the Chief Ship Surveyor regarding First Entry report for Fezara, February 1923 1923, First Entry Report for Steel Steamer Fezara, 8 February 1923 1923, Form for Vessels of 100 Tons and Upwards for Fezara, 2 February 1923 1923, Memo regarding the classification of Fezara, February 1923 1923, Report on Machinery for Fezara, 10 February 1923 1923, Report on Electric Fittings for Fezara, 20 March 1923 1923, Copy of document certifying that the surveyor has examined damage and repairs and stating his recommendations for Orungal, 30 December 1940 1940, Report of Total Loss for Orungal, 11 February 1941 1941, Report of Survey for Repairs to Orungal, 2 January 1941 1941, Plan for Additional Stiffening to Engine Seating for Orungal no date )
Type of fuel used onboard a vessel.
Steam - Oil ( Report on Engine Forgings for for vessel No 499, 28 April 1921 1921, Report on Ship Castings for Vessel No 499, 17 May 1921 1921, Receipt from The Steel Company of Scotland Ltd, Newton, to Alex Stephen & Sons Ltd, Linthouse, for steel castings, 14 May 1921 1921, Report on Engine Forgings for for vessel No 499, 1 June 1921 1921, Report on Engine Forgings for for vessel No 499, 21 November 1921 1921, Results of Tests of Steel for Turbines No 499, 22 November 1921 1921, Report on Ship Castings for Vessel No 499, December 1921 1921, Report on Ship Castings for Vessel No 499, November 1921 1921, Correspondence from Alexander Stephen & Sons Ltd to the Secretary, Lloyd's Register, regarding photo print No 794 of main steel pipes in vessels No 498 and 499, 17 December 1921 1921, Receipt from Springfield Steel Co Ltd to Alex Stephen & Sons Ltd, 31 May 1922 1922, Report on Engine Castings for Vessel No 499, 22 June 1922 1922, Report on Ship Forgings for Vessel No 499, 1 July 1922 1922, Report on Engine Castings for Vessel No 499, 18 July 1922 1922, Report on Engine Castings for Vessel No 499, 22 August 1922 1922, Report on Engine Forgings for Vessel No 499, 1 September 1922 1922, Results of Tests of Steel for No 499, 1 September 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 12 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 20 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 28 December 1922 1922, Copy of document certifying that the surveyor has tested superheater headers for contract No 499, 18 July 1922 1922, Memo from Surveyor, Lloyd's Register, to John Barr regarding hydraulic pressure tests, 9 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of iron pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 2 January 1923 1923, Letter from P L Warlow, Secretary to the Glasgow Committee,to the Secretary, Lloyd's Register London, regarding classification certificates for Fezara, 27 February 1923 1923, Remarks to the Chief Ship Surveyor regarding First Entry report for Fezara, February 1923 1923, First Entry Report for Steel Steamer Fezara, 8 February 1923 1923, Form for Vessels of 100 Tons and Upwards for Fezara, 2 February 1923 1923, Memo regarding the classification of Fezara, February 1923 1923, Report on Machinery for Fezara, 10 February 1923 1923, Report on Electric Fittings for Fezara, 20 March 1923 1923, Copy of document certifying that the surveyor has examined damage and repairs and stating his recommendations for Orungal, 30 December 1940 1940, Report of Total Loss for Orungal, 11 February 1941 1941, Report of Survey for Repairs to Orungal, 2 January 1941 1941, Plan for Additional Stiffening to Engine Seating for Orungal no date )
Is the steamer assisted by sail?
No ( Report on Engine Forgings for for vessel No 499, 28 April 1921 1921, Report on Ship Castings for Vessel No 499, 17 May 1921 1921, Receipt from The Steel Company of Scotland Ltd, Newton, to Alex Stephen & Sons Ltd, Linthouse, for steel castings, 14 May 1921 1921, Report on Engine Forgings for for vessel No 499, 1 June 1921 1921, Report on Engine Forgings for for vessel No 499, 21 November 1921 1921, Results of Tests of Steel for Turbines No 499, 22 November 1921 1921, Report on Ship Castings for Vessel No 499, December 1921 1921, Report on Ship Castings for Vessel No 499, November 1921 1921, Correspondence from Alexander Stephen & Sons Ltd to the Secretary, Lloyd's Register, regarding photo print No 794 of main steel pipes in vessels No 498 and 499, 17 December 1921 1921, Receipt from Springfield Steel Co Ltd to Alex Stephen & Sons Ltd, 31 May 1922 1922, Report on Engine Castings for Vessel No 499, 22 June 1922 1922, Report on Ship Forgings for Vessel No 499, 1 July 1922 1922, Report on Engine Castings for Vessel No 499, 18 July 1922 1922, Report on Engine Castings for Vessel No 499, 22 August 1922 1922, Report on Engine Forgings for Vessel No 499, 1 September 1922 1922, Results of Tests of Steel for No 499, 1 September 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 12 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 20 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 28 December 1922 1922, Copy of document certifying that the surveyor has tested superheater headers for contract No 499, 18 July 1922 1922, Memo from Surveyor, Lloyd's Register, to John Barr regarding hydraulic pressure tests, 9 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of iron pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 2 January 1923 1923, Letter from P L Warlow, Secretary to the Glasgow Committee,to the Secretary, Lloyd's Register London, regarding classification certificates for Fezara, 27 February 1923 1923, Remarks to the Chief Ship Surveyor regarding First Entry report for Fezara, February 1923 1923, First Entry Report for Steel Steamer Fezara, 8 February 1923 1923, Form for Vessels of 100 Tons and Upwards for Fezara, 2 February 1923 1923, Memo regarding the classification of Fezara, February 1923 1923, Report on Machinery for Fezara, 10 February 1923 1923, Report on Electric Fittings for Fezara, 20 March 1923 1923, Copy of document certifying that the surveyor has examined damage and repairs and stating his recommendations for Orungal, 30 December 1940 1940, Report of Total Loss for Orungal, 11 February 1941 1941, Report of Survey for Repairs to Orungal, 2 January 1941 1941, Plan for Additional Stiffening to Engine Seating for Orungal no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Report on Engine Forgings for for vessel No 499, 28 April 1921 1921, Report on Ship Castings for Vessel No 499, 17 May 1921 1921, Receipt from The Steel Company of Scotland Ltd, Newton, to Alex Stephen & Sons Ltd, Linthouse, for steel castings, 14 May 1921 1921, Report on Engine Forgings for for vessel No 499, 1 June 1921 1921, Report on Engine Forgings for for vessel No 499, 21 November 1921 1921, Results of Tests of Steel for Turbines No 499, 22 November 1921 1921, Report on Ship Castings for Vessel No 499, December 1921 1921, Report on Ship Castings for Vessel No 499, November 1921 1921, Correspondence from Alexander Stephen & Sons Ltd to the Secretary, Lloyd's Register, regarding photo print No 794 of main steel pipes in vessels No 498 and 499, 17 December 1921 1921, Receipt from Springfield Steel Co Ltd to Alex Stephen & Sons Ltd, 31 May 1922 1922, Report on Engine Castings for Vessel No 499, 22 June 1922 1922, Report on Ship Forgings for Vessel No 499, 1 July 1922 1922, Report on Engine Castings for Vessel No 499, 18 July 1922 1922, Report on Engine Castings for Vessel No 499, 22 August 1922 1922, Report on Engine Forgings for Vessel No 499, 1 September 1922 1922, Results of Tests of Steel for No 499, 1 September 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 12 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 20 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 28 December 1922 1922, Copy of document certifying that the surveyor has tested superheater headers for contract No 499, 18 July 1922 1922, Memo from Surveyor, Lloyd's Register, to John Barr regarding hydraulic pressure tests, 9 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of iron pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 2 January 1923 1923, Letter from P L Warlow, Secretary to the Glasgow Committee,to the Secretary, Lloyd's Register London, regarding classification certificates for Fezara, 27 February 1923 1923, Remarks to the Chief Ship Surveyor regarding First Entry report for Fezara, February 1923 1923, First Entry Report for Steel Steamer Fezara, 8 February 1923 1923, Form for Vessels of 100 Tons and Upwards for Fezara, 2 February 1923 1923, Memo regarding the classification of Fezara, February 1923 1923, Report on Machinery for Fezara, 10 February 1923 1923, Report on Electric Fittings for Fezara, 20 March 1923 1923, Copy of document certifying that the surveyor has examined damage and repairs and stating his recommendations for Orungal, 30 December 1940 1940, Report of Total Loss for Orungal, 11 February 1941 1941, Report of Survey for Repairs to Orungal, 2 January 1941 1941, Plan for Additional Stiffening to Engine Seating for Orungal no date )
Does the vessel possess an auxiliary power source?
No ( Report on Engine Forgings for for vessel No 499, 28 April 1921 1921, Report on Ship Castings for Vessel No 499, 17 May 1921 1921, Receipt from The Steel Company of Scotland Ltd, Newton, to Alex Stephen & Sons Ltd, Linthouse, for steel castings, 14 May 1921 1921, Report on Engine Forgings for for vessel No 499, 1 June 1921 1921, Report on Engine Forgings for for vessel No 499, 21 November 1921 1921, Results of Tests of Steel for Turbines No 499, 22 November 1921 1921, Report on Ship Castings for Vessel No 499, December 1921 1921, Report on Ship Castings for Vessel No 499, November 1921 1921, Correspondence from Alexander Stephen & Sons Ltd to the Secretary, Lloyd's Register, regarding photo print No 794 of main steel pipes in vessels No 498 and 499, 17 December 1921 1921, Receipt from Springfield Steel Co Ltd to Alex Stephen & Sons Ltd, 31 May 1922 1922, Report on Engine Castings for Vessel No 499, 22 June 1922 1922, Report on Ship Forgings for Vessel No 499, 1 July 1922 1922, Report on Engine Castings for Vessel No 499, 18 July 1922 1922, Report on Engine Castings for Vessel No 499, 22 August 1922 1922, Report on Engine Forgings for Vessel No 499, 1 September 1922 1922, Results of Tests of Steel for No 499, 1 September 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 12 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 20 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 28 December 1922 1922, Copy of document certifying that the surveyor has tested superheater headers for contract No 499, 18 July 1922 1922, Memo from Surveyor, Lloyd's Register, to John Barr regarding hydraulic pressure tests, 9 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of iron pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 2 January 1923 1923, Letter from P L Warlow, Secretary to the Glasgow Committee,to the Secretary, Lloyd's Register London, regarding classification certificates for Fezara, 27 February 1923 1923, Remarks to the Chief Ship Surveyor regarding First Entry report for Fezara, February 1923 1923, First Entry Report for Steel Steamer Fezara, 8 February 1923 1923, Form for Vessels of 100 Tons and Upwards for Fezara, 2 February 1923 1923, Memo regarding the classification of Fezara, February 1923 1923, Report on Machinery for Fezara, 10 February 1923 1923, Report on Electric Fittings for Fezara, 20 March 1923 1923, Copy of document certifying that the surveyor has examined damage and repairs and stating his recommendations for Orungal, 30 December 1940 1940, Report of Total Loss for Orungal, 11 February 1941 1941, Report of Survey for Repairs to Orungal, 2 January 1941 1941, Plan for Additional Stiffening to Engine Seating for Orungal no date )
Is electric lighting fitted to the vessel?
No ( Report on Engine Forgings for for vessel No 499, 28 April 1921 1921, Report on Ship Castings for Vessel No 499, 17 May 1921 1921, Receipt from The Steel Company of Scotland Ltd, Newton, to Alex Stephen & Sons Ltd, Linthouse, for steel castings, 14 May 1921 1921, Report on Engine Forgings for for vessel No 499, 1 June 1921 1921, Report on Engine Forgings for for vessel No 499, 21 November 1921 1921, Results of Tests of Steel for Turbines No 499, 22 November 1921 1921, Report on Ship Castings for Vessel No 499, December 1921 1921, Report on Ship Castings for Vessel No 499, November 1921 1921, Correspondence from Alexander Stephen & Sons Ltd to the Secretary, Lloyd's Register, regarding photo print No 794 of main steel pipes in vessels No 498 and 499, 17 December 1921 1921, Receipt from Springfield Steel Co Ltd to Alex Stephen & Sons Ltd, 31 May 1922 1922, Report on Engine Castings for Vessel No 499, 22 June 1922 1922, Report on Ship Forgings for Vessel No 499, 1 July 1922 1922, Report on Engine Castings for Vessel No 499, 18 July 1922 1922, Report on Engine Castings for Vessel No 499, 22 August 1922 1922, Report on Engine Forgings for Vessel No 499, 1 September 1922 1922, Results of Tests of Steel for No 499, 1 September 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 12 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 20 December 1922 1922, Memo from Scottish Tube Co Ltd, regarding specification of iron tubes for Alex Stephen & Sons, contract No 499, 28 December 1922 1922, Copy of document certifying that the surveyor has tested superheater headers for contract No 499, 18 July 1922 1922, Memo from Surveyor, Lloyd's Register, to John Barr regarding hydraulic pressure tests, 9 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of iron pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 15 January 1923 1923, Memo from Scottish Tube Co Ltd, regarding specification of pipes for Alex Stephen & Sons, contract No 499, 2 January 1923 1923, Letter from P L Warlow, Secretary to the Glasgow Committee,to the Secretary, Lloyd's Register London, regarding classification certificates for Fezara, 27 February 1923 1923, Remarks to the Chief Ship Surveyor regarding First Entry report for Fezara, February 1923 1923, First Entry Report for Steel Steamer Fezara, 8 February 1923 1923, Form for Vessels of 100 Tons and Upwards for Fezara, 2 February 1923 1923, Memo regarding the classification of Fezara, February 1923 1923, Report on Machinery for Fezara, 10 February 1923 1923, Copy of document certifying that the surveyor has examined damage and repairs and stating his recommendations for Orungal, 30 December 1940 1940, Report of Total Loss for Orungal, 11 February 1941 1941, Report of Survey for Repairs to Orungal, 2 January 1941 1941, Plan for Additional Stiffening to Engine Seating for Orungal no date )
Yes ( Report on Electric Fittings for Fezara, 20 March 1923 1923 )
Name of surveyor.
Alexander Fletcher ( Report on Engine Forgings for for vessel No 499, 1 June 1921 1921 )
James Stirling; Alexander Fletcher ( Report on Engine Forgings for for vessel No 499, 21 November 1921 1921, Results of Tests of Steel for Turbines No 499, 22 November 1921 1921 )
Maurice Ritson; Charles Norman Stuart; William Thomas Badger ( Copy of document certifying that the surveyor has tested superheater headers for contract No 499, 18 July 1922 1922 )
George McIntosh Shaw; Alexander Chisholm ( First Entry Report for Steel Steamer Fezara, 8 February 1923 1923 )
William Gordon Minchin; James Edward Sellex; James Shaw Cairns ( Report on Machinery for Fezara, 10 February 1923 1923 )
J S Rankin ( Report on Electric Fittings for Fezara, 20 March 1923 1923 )
P A McIntyre ( Copy of document certifying that the surveyor has examined damage and repairs and stating his recommendations for Orungal, 30 December 1940 1940, Report of Survey for Repairs to Orungal, 2 January 1941 1941 )
The country (flag) that a vessel is registered to, at the time of writing.
United Kingdom ( First Entry Report for Steel Steamer Fezara, 8 February 1923 1923, Form for Vessels of 100 Tons and Upwards for Fezara, 2 February 1923 1923, Report on Machinery for Fezara, 10 February 1923 1923, Report on Electric Fittings for Fezara, 20 March 1923 1923 )
Australia ( Report of Total Loss for Orungal, 11 February 1941 1941, Report of Survey for Repairs to Orungal, 2 January 1941 1941 )
The individual and/or organisation listed
Khedivial Mail Steamship & Graving Dock Co Ltd ( First Entry Report for Steel Steamer Fezara, 8 February 1923 1923, Form for Vessels of 100 Tons and Upwards for Fezara, 2 February 1923 1923, Report on Machinery for Fezara, 10 February 1923 1923, Report on Electric Fittings for Fezara, 20 March 1923 1923 )
Australasian United Steam Navigation Co Ltd ( Report of Total Loss for Orungal, 11 February 1941 1941, Report of Survey for Repairs to Orungal, 2 January 1941 1941 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; +LMC 2,23 ( First Entry Report for Steel Steamer Fezara, 8 February 1923 1923 )
+LMC 2,23 ( Report on Machinery for Fezara, 10 February 1923 1923 )
Elec Light ( Report on Electric Fittings for Fezara, 20 March 1923 1923 )
+100A1 5,40 ( Report of Total Loss for Orungal, 11 February 1941 1941 )
No action ( Report of Survey for Repairs to Orungal, 2 January 1941 1941 )
The name of the port/place of destination given.
Alexandria ( First Entry Report for Steel Steamer Fezara, 8 February 1923 1923 )
Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.
3518 ( First Entry Report for Steel Steamer Fezara, 8 February 1923 1923, Form for Vessels of 100 Tons and Upwards for Fezara, 2 February 1923 1923 )
3519 ( Report on Machinery for Fezara, 10 February 1923 1923, Report on Electric Fittings for Fezara, 20 March 1923 1923 )
3448 ( Report of Survey for Repairs to Orungal, 2 January 1941 1941 )
Also referred to as extreme breadth. The distance from the extreme starboard side to the extreme port side.
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Lord Ernest Hamilton ( Form for Vessels of 100 Tons and Upwards for Fezara, 2 February 1923 1923 )
Location of construction for a vessel’s engines.
Linthouse ( Form for Vessels of 100 Tons and Upwards for Fezara, 2 February 1923 1923, Report on Machinery for Fezara, 10 February 1923 1923 )
Date in which construction of a vessel’s engines were completed.
The official record pronounced by the Committee
Fire/Explosion ( Report of Total Loss for Orungal, 11 February 1941 1941 )
Vessel’s place of loss or disposal/last known recorded location.
Barwon Head, Victoria ( Report of Total Loss for Orungal, 11 February 1941 1941 )
The country or national waters where a vessel is lost/disposed of, or last recorded.
Australia ( Report of Total Loss for Orungal, 11 February 1941 1941 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.