Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Malda ( Memo to the Chief Ship Surveyor regarding Malda, 30th March 1922 1922, Steel Steamer Report for Malda, 25th March 1922 1922, Form for Vessels of 100 Tons & Upwards for Malda, 21st March 1922 1922, Report on Machinery for Malda, 24th March 1922 1922, Report on Boilers for Malda, 24th March 1922 1922, Report on Electric Lighting Installation for Malda, 22nd March 1922 1922, Copy of Certificate of Survey of Temporary Repairs for Malda, 15th July 1926 1926, Report of Survey for Repairs, &c for Malda, 15th July 1926 1926, Memo for Malda, 31st May 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Malda, 16th March 1926 1926, Report of Survey for Repairs, &c for Malda, 11th March 1926 1926, Midship Section Plan for Malda, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
28/12/1921 ( Memo to the Chief Ship Surveyor regarding Malda, 30th March 1922 1922, Steel Steamer Report for Malda, 25th March 1922 1922, Form for Vessels of 100 Tons & Upwards for Malda, 21st March 1922 1922, Report on Machinery for Malda, 24th March 1922 1922, Report on Boilers for Malda, 24th March 1922 1922, Report on Electric Lighting Installation for Malda, 22nd March 1922 1922, Copy of Certificate of Survey of Temporary Repairs for Malda, 15th July 1926 1926, Report of Survey for Repairs, &c for Malda, 15th July 1926 1926, Memo for Malda, 31st May 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Malda, 16th March 1926 1926, Report of Survey for Repairs, &c for Malda, 11th March 1926 1926, Midship Section Plan for Malda, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
588 ( Memo to the Chief Ship Surveyor regarding Malda, 30th March 1922 1922, Steel Steamer Report for Malda, 25th March 1922 1922, Form for Vessels of 100 Tons & Upwards for Malda, 21st March 1922 1922, Report on Machinery for Malda, 24th March 1922 1922, Report on Boilers for Malda, 24th March 1922 1922, Report on Electric Lighting Installation for Malda, 22nd March 1922 1922, Copy of Certificate of Survey of Temporary Repairs for Malda, 15th July 1926 1926, Report of Survey for Repairs, &c for Malda, 15th July 1926 1926, Memo for Malda, 31st May 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Malda, 16th March 1926 1926, Report of Survey for Repairs, &c for Malda, 11th March 1926 1926, Midship Section Plan for Malda, Undated no date )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Memo to the Chief Ship Surveyor regarding Malda, 30th March 1922 1922, Report on Machinery for Malda, 24th March 1922 1922, Report on Boilers for Malda, 24th March 1922 1922, Report on Electric Lighting Installation for Malda, 22nd March 1922 1922, Copy of Certificate of Survey of Temporary Repairs for Malda, 15th July 1926 1926, Report of Survey for Repairs, &c for Malda, 15th July 1926 1926, Memo for Malda, 31st May 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Malda, 16th March 1926 1926, Report of Survey for Repairs, &c for Malda, 11th March 1926 1926, Midship Section Plan for Malda, Undated no date )
Twin Screw Steamer ( Steel Steamer Report for Malda, 25th March 1922 1922 )
Passenger; Cargo ( Form for Vessels of 100 Tons & Upwards for Malda, 21st March 1922 1922 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Memo to the Chief Ship Surveyor regarding Malda, 30th March 1922 1922, Steel Steamer Report for Malda, 25th March 1922 1922, Form for Vessels of 100 Tons & Upwards for Malda, 21st March 1922 1922, Report on Machinery for Malda, 24th March 1922 1922, Report on Boilers for Malda, 24th March 1922 1922, Report on Electric Lighting Installation for Malda, 22nd March 1922 1922, Copy of Certificate of Survey of Temporary Repairs for Malda, 15th July 1926 1926, Report of Survey for Repairs, &c for Malda, 15th July 1926 1926, Memo for Malda, 31st May 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Malda, 16th March 1926 1926, Report of Survey for Repairs, &c for Malda, 11th March 1926 1926, Midship Section Plan for Malda, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Memo to the Chief Ship Surveyor regarding Malda, 30th March 1922 1922, Steel Steamer Report for Malda, 25th March 1922 1922, Form for Vessels of 100 Tons & Upwards for Malda, 21st March 1922 1922, Report on Machinery for Malda, 24th March 1922 1922, Report on Boilers for Malda, 24th March 1922 1922, Report on Electric Lighting Installation for Malda, 22nd March 1922 1922, Copy of Certificate of Survey of Temporary Repairs for Malda, 15th July 1926 1926, Report of Survey for Repairs, &c for Malda, 15th July 1926 1926, Memo for Malda, 31st May 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Malda, 16th March 1926 1926, Report of Survey for Repairs, &c for Malda, 11th March 1926 1926, Midship Section Plan for Malda, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Memo to the Chief Ship Surveyor regarding Malda, 30th March 1922 1922, Steel Steamer Report for Malda, 25th March 1922 1922, Form for Vessels of 100 Tons & Upwards for Malda, 21st March 1922 1922, Report on Machinery for Malda, 24th March 1922 1922, Report on Boilers for Malda, 24th March 1922 1922, Report on Electric Lighting Installation for Malda, 22nd March 1922 1922, Copy of Certificate of Survey of Temporary Repairs for Malda, 15th July 1926 1926, Report of Survey for Repairs, &c for Malda, 15th July 1926 1926, Memo for Malda, 31st May 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Malda, 16th March 1926 1926, Report of Survey for Repairs, &c for Malda, 11th March 1926 1926, Midship Section Plan for Malda, Undated no date )
Is electric lighting fitted to the vessel?
No ( Memo to the Chief Ship Surveyor regarding Malda, 30th March 1922 1922, Steel Steamer Report for Malda, 25th March 1922 1922, Form for Vessels of 100 Tons & Upwards for Malda, 21st March 1922 1922, Report on Machinery for Malda, 24th March 1922 1922, Report on Boilers for Malda, 24th March 1922 1922, Report on Electric Lighting Installation for Malda, 22nd March 1922 1922, Copy of Certificate of Survey of Temporary Repairs for Malda, 15th July 1926 1926, Report of Survey for Repairs, &c for Malda, 15th July 1926 1926, Memo for Malda, 31st May 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Malda, 16th March 1926 1926, Report of Survey for Repairs, &c for Malda, 11th March 1926 1926, Midship Section Plan for Malda, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls ( Steel Steamer Report for Malda, 25th March 1922 1922, Report on Machinery for Malda, 24th March 1922 1922, Report on Boilers for Malda, 24th March 1922 1922, Report on Electric Lighting Installation for Malda, 22nd March 1922 1922 )
Ant ( Report of Survey for Repairs, &c for Malda, 15th July 1926 1926, Report of Survey for Repairs, &c for Malda, 11th March 1926 1926 )
The individual and/or organisation listed
The British India Steam Navigation Co Ltd ( Steel Steamer Report for Malda, 25th March 1922 1922, Report on Machinery for Malda, 24th March 1922 1922, Report on Boilers for Malda, 24th March 1922 1922, Report on Electric Lighting Installation for Malda, 22nd March 1922 1922, Report of Survey for Repairs, &c for Malda, 15th July 1926 1926, Report of Survey for Repairs, &c for Malda, 11th March 1926 1926 )
British India Steam Navigation Co Ltd ( Form for Vessels of 100 Tons & Upwards for Malda, 21st March 1922 1922 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 3,22; Lloyd\'s A & CP; +LMC 3,22; FD; Fitted for Oil Fuel 3,22 FP above 150 F ( Steel Steamer Report for Malda, 25th March 1922 1922 )
+LMC 3,22; FD; Fitted for Oil Fuel 3,22 FP above 150 F ( Report on Machinery for Malda, 24th March 1922 1922 )
See Accompanying Machy Report ( Report on Boilers for Malda, 24th March 1922 1922 )
Elec Light ( Report on Electric Lighting Installation for Malda, 22nd March 1922 1922 )
Not for Classing Committee ( Report of Survey for Repairs, &c for Malda, 15th July 1926 1926 )
+100A1 7,25; +LMC 3,22; TS 1,25 CL; Fitted for Oil Fuel 3,22 FP above 150 F ( Report of Survey for Repairs, &c for Malda, 11th March 1926 1926 )
The name of the port/place of destination given.
Middlesbrough ( Steel Steamer Report for Malda, 25th March 1922 1922 )
India ( Report of Survey for Repairs, &c for Malda, 15th July 1926 1926 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
8965 ( Steel Steamer Report for Malda, 25th March 1922 1922, Form for Vessels of 100 Tons & Upwards for Malda, 21st March 1922 1922, Report on Machinery for Malda, 24th March 1922 1922, Report on Boilers for Malda, 24th March 1922 1922, Report of Survey for Repairs, &c for Malda, 15th July 1926 1926, Report of Survey for Repairs, &c for Malda, 11th March 1926 1926 )
The port in which a vessel is registered or permanently based.
Glasgow ( Form for Vessels of 100 Tons & Upwards for Malda, 21st March 1922 1922 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Tennant Nelson Gray ( Form for Vessels of 100 Tons & Upwards for Malda, 21st March 1922 1922 )
Location of construction for a vessel’s engines.
Name of surveyor.
William Gordon Minchin ( Report on Machinery for Malda, 24th March 1922 1922, Report on Boilers for Malda, 24th March 1922 1922 )
J S Rankin ( Report on Electric Lighting Installation for Malda, 22nd March 1922 1922 )
The year in which a vessel’s construction is completed.
1922 ( Memo to the Chief Ship Surveyor regarding Malda, 30th March 1922 1922, Steel Steamer Report for Malda, 25th March 1922 1922, Form for Vessels of 100 Tons & Upwards for Malda, 21st March 1922 1922, Report on Machinery for Malda, 24th March 1922 1922, Report on Boilers for Malda, 24th March 1922 1922, Report on Electric Lighting Installation for Malda, 22nd March 1922 1922, Copy of Certificate of Survey of Temporary Repairs for Malda, 15th July 1926 1926, Report of Survey for Repairs, &c for Malda, 15th July 1926 1926, Memo for Malda, 31st May 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Malda, 16th March 1926 1926, Report of Survey for Repairs, &c for Malda, 11th March 1926 1926, Midship Section Plan for Malda, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Barclay Curle & Co ( Memo to the Chief Ship Surveyor regarding Malda, 30th March 1922 1922, Steel Steamer Report for Malda, 25th March 1922 1922, Form for Vessels of 100 Tons & Upwards for Malda, 21st March 1922 1922, Report on Machinery for Malda, 24th March 1922 1922, Report on Boilers for Malda, 24th March 1922 1922, Report on Electric Lighting Installation for Malda, 22nd March 1922 1922, Copy of Certificate of Survey of Temporary Repairs for Malda, 15th July 1926 1926, Report of Survey for Repairs, &c for Malda, 15th July 1926 1926, Memo for Malda, 31st May 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Malda, 16th March 1926 1926, Report of Survey for Repairs, &c for Malda, 11th March 1926 1926, Midship Section Plan for Malda, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Glasgow ( Memo to the Chief Ship Surveyor regarding Malda, 30th March 1922 1922, Steel Steamer Report for Malda, 25th March 1922 1922, Form for Vessels of 100 Tons & Upwards for Malda, 21st March 1922 1922, Report on Machinery for Malda, 24th March 1922 1922, Report on Boilers for Malda, 24th March 1922 1922, Report on Electric Lighting Installation for Malda, 22nd March 1922 1922, Copy of Certificate of Survey of Temporary Repairs for Malda, 15th July 1926 1926, Report of Survey for Repairs, &c for Malda, 15th July 1926 1926, Memo for Malda, 31st May 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Malda, 16th March 1926 1926, Report of Survey for Repairs, &c for Malda, 11th March 1926 1926, Midship Section Plan for Malda, Undated no date )
A vessel’s means of propulsion.
Steam ( Memo to the Chief Ship Surveyor regarding Malda, 30th March 1922 1922, Steel Steamer Report for Malda, 25th March 1922 1922, Form for Vessels of 100 Tons & Upwards for Malda, 21st March 1922 1922, Report on Machinery for Malda, 24th March 1922 1922, Report on Boilers for Malda, 24th March 1922 1922, Report on Electric Lighting Installation for Malda, 22nd March 1922 1922, Memo for Malda, 31st May 1926 1926, Midship Section Plan for Malda, Undated no date )
undefined ( Copy of Certificate of Survey of Temporary Repairs for Malda, 15th July 1926 1926, Report of Survey for Repairs, &c for Malda, 15th July 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Malda, 16th March 1926 1926, Report of Survey for Repairs, &c for Malda, 11th March 1926 1926 )
Is the steamer assisted by sail?
No ( Memo to the Chief Ship Surveyor regarding Malda, 30th March 1922 1922, Steel Steamer Report for Malda, 25th March 1922 1922, Form for Vessels of 100 Tons & Upwards for Malda, 21st March 1922 1922, Report on Machinery for Malda, 24th March 1922 1922, Report on Boilers for Malda, 24th March 1922 1922, Report on Electric Lighting Installation for Malda, 22nd March 1922 1922, Copy of Certificate of Survey of Temporary Repairs for Malda, 15th July 1926 1926, Report of Survey for Repairs, &c for Malda, 15th July 1926 1926, Memo for Malda, 31st May 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Malda, 16th March 1926 1926, Report of Survey for Repairs, &c for Malda, 11th March 1926 1926, Midship Section Plan for Malda, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Memo to the Chief Ship Surveyor regarding Malda, 30th March 1922 1922, Steel Steamer Report for Malda, 25th March 1922 1922, Form for Vessels of 100 Tons & Upwards for Malda, 21st March 1922 1922, Report on Machinery for Malda, 24th March 1922 1922, Report on Boilers for Malda, 24th March 1922 1922, Report on Electric Lighting Installation for Malda, 22nd March 1922 1922, Copy of Certificate of Survey of Temporary Repairs for Malda, 15th July 1926 1926, Report of Survey for Repairs, &c for Malda, 15th July 1926 1926, Memo for Malda, 31st May 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Malda, 16th March 1926 1926, Report of Survey for Repairs, &c for Malda, 11th March 1926 1926, Midship Section Plan for Malda, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Memo to the Chief Ship Surveyor regarding Malda, 30th March 1922 1922, Steel Steamer Report for Malda, 25th March 1922 1922, Form for Vessels of 100 Tons & Upwards for Malda, 21st March 1922 1922, Report on Machinery for Malda, 24th March 1922 1922, Report on Boilers for Malda, 24th March 1922 1922, Report on Electric Lighting Installation for Malda, 22nd March 1922 1922, Copy of Certificate of Survey of Temporary Repairs for Malda, 15th July 1926 1926, Report of Survey for Repairs, &c for Malda, 15th July 1926 1926, Memo for Malda, 31st May 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Malda, 16th March 1926 1926, Report of Survey for Repairs, &c for Malda, 11th March 1926 1926, Midship Section Plan for Malda, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Memo to the Chief Ship Surveyor regarding Malda, 30th March 1922 1922, Steel Steamer Report for Malda, 25th March 1922 1922, Form for Vessels of 100 Tons & Upwards for Malda, 21st March 1922 1922, Report on Machinery for Malda, 24th March 1922 1922, Report on Boilers for Malda, 24th March 1922 1922, Report on Electric Lighting Installation for Malda, 22nd March 1922 1922, Copy of Certificate of Survey of Temporary Repairs for Malda, 15th July 1926 1926, Report of Survey for Repairs, &c for Malda, 15th July 1926 1926, Memo for Malda, 31st May 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Malda, 16th March 1926 1926, Report of Survey for Repairs, &c for Malda, 11th March 1926 1926, Midship Section Plan for Malda, Undated no date )
The listed port to which a given vessel belongs.
Glasgow ( Steel Steamer Report for Malda, 25th March 1922 1922, Report on Machinery for Malda, 24th March 1922 1922, Report on Boilers for Malda, 24th March 1922 1922, Report on Electric Lighting Installation for Malda, 22nd March 1922 1922, Report of Survey for Repairs, &c for Malda, 15th July 1926 1926, Report of Survey for Repairs, &c for Malda, 11th March 1926 1926 )
Location where a vessel’s survey was undertaken.
Glasgow ( Steel Steamer Report for Malda, 25th March 1922 1922, Form for Vessels of 100 Tons & Upwards for Malda, 21st March 1922 1922, Report on Machinery for Malda, 24th March 1922 1922, Report on Boilers for Malda, 24th March 1922 1922, Report on Electric Lighting Installation for Malda, 22nd March 1922 1922 )
Antwerp ( Copy of Certificate of Survey of Temporary Repairs for Malda, 15th July 1926 1926, Report of Survey for Repairs, &c for Malda, 15th July 1926 1926, Report of Survey for Repairs, &c for Malda, 11th March 1926 1926 )
Recorded information related to a vessel’s movements.
Glasgow; Middlesbrough ( Steel Steamer Report for Malda, 25th March 1922 1922 )
Antwerp; Middlesbrough; India ( Report of Survey for Repairs, &c for Malda, 15th July 1926 1926 )
Physical arrangement of a ship’s masts, sails and rigging.
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
KLVF ( Form for Vessels of 100 Tons & Upwards for Malda, 21st March 1922 1922 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Duncan Carmichel ( Form for Vessels of 100 Tons & Upwards for Malda, 21st March 1922 1922 )
Type and configuration of the engine(s) supplied for a vessel.
Double Reductioin Geared Turbines ( Form for Vessels of 100 Tons & Upwards for Malda, 21st March 1922 1922 )
6 Turbines Geared to 2 Shafts ( Report on Machinery for Malda, 24th March 1922 1922 )
Date in which construction of a vessel’s engines were completed.
The name of the port/place from which a vessel’s voyage originated.
Antwerp ( Report of Survey for Repairs, &c for Malda, 15th July 1926 1926 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.