Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Oliphant ( Letter from A S Purdon, Managing Director, for Irvine's Shipbuilding & Dry Docks Co Ltd, to Lloyds Register, London, regarding Oliphant, 27th November 1915 1915, Copy of Letter from Assistant to the Secretary, to Irvine's Shipbuilding & Dry Docks Co Ltd, West Hartlepool, regarding Oliphant, 26th November 1915 1915, Memo regarding anchors & cables for Oliphant, 26th November 1915 1915, Plan of Water Ballast Tank for Oliphant, 27th January 1916 1916 )
Palmleaf ( Plan of Boilers for Palmleaf, 15th November 1915 1915, Profile, Deck & Inner Bottom Plan for Palmleaf, 15th November 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 9th December 1916 1916, Letter from D McAuslan, to T Warren Esq, London, regarding Palmleaf, 29th December 1916 1916, Letter from D McAuslan, to The Secretary, London, regarding Palmleaf, 8th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, West Hartlepool, regarding Palmleaf, 7th December 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 7th December 1916 1916, Freeboard Verification Form for Steamers for Palmleaf, 13th November 1916 1916, Steel Steamer Report for Palmleaf, 5th December 1916 1916, Form for Vessels of 100 Tons & Upwards for Palmleaf, 16th November 1916 1916, Report on Machinery for Palmleaf, 2nd December 1916 1916, Half Midship Section Plan for Palmleaf, 29th November 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Grounding of Palmleaf, 8th February 1917 1917, Report of Survey for Repairs, &c for Palmleaf, 29th January 1917 1917, Certificate of Survey of Damage for Palmleaf, 30th January 1917 1917, Report on Electric Lighting Installation for Palmleaf, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
15/08/1916 ( Letter from A S Purdon, Managing Director, for Irvine's Shipbuilding & Dry Docks Co Ltd, to Lloyds Register, London, regarding Oliphant, 27th November 1915 1915, Copy of Letter from Assistant to the Secretary, to Irvine's Shipbuilding & Dry Docks Co Ltd, West Hartlepool, regarding Oliphant, 26th November 1915 1915, Memo regarding anchors & cables for Oliphant, 26th November 1915 1915, Plan of Boilers for Palmleaf, 15th November 1915 1915, Profile, Deck & Inner Bottom Plan for Palmleaf, 15th November 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 9th December 1916 1916, Letter from D McAuslan, to T Warren Esq, London, regarding Palmleaf, 29th December 1916 1916, Letter from D McAuslan, to The Secretary, London, regarding Palmleaf, 8th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, West Hartlepool, regarding Palmleaf, 7th December 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 7th December 1916 1916, Freeboard Verification Form for Steamers for Palmleaf, 13th November 1916 1916, Steel Steamer Report for Palmleaf, 5th December 1916 1916, Form for Vessels of 100 Tons & Upwards for Palmleaf, 16th November 1916 1916, Report on Machinery for Palmleaf, 2nd December 1916 1916, Plan of Water Ballast Tank for Oliphant, 27th January 1916 1916, Half Midship Section Plan for Palmleaf, 29th November 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Grounding of Palmleaf, 8th February 1917 1917, Report of Survey for Repairs, &c for Palmleaf, 29th January 1917 1917, Certificate of Survey of Damage for Palmleaf, 30th January 1917 1917, Report on Electric Lighting Installation for Palmleaf, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
557 ( Letter from A S Purdon, Managing Director, for Irvine's Shipbuilding & Dry Docks Co Ltd, to Lloyds Register, London, regarding Oliphant, 27th November 1915 1915, Copy of Letter from Assistant to the Secretary, to Irvine's Shipbuilding & Dry Docks Co Ltd, West Hartlepool, regarding Oliphant, 26th November 1915 1915, Memo regarding anchors & cables for Oliphant, 26th November 1915 1915, Plan of Boilers for Palmleaf, 15th November 1915 1915, Profile, Deck & Inner Bottom Plan for Palmleaf, 15th November 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 9th December 1916 1916, Letter from D McAuslan, to T Warren Esq, London, regarding Palmleaf, 29th December 1916 1916, Letter from D McAuslan, to The Secretary, London, regarding Palmleaf, 8th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, West Hartlepool, regarding Palmleaf, 7th December 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 7th December 1916 1916, Freeboard Verification Form for Steamers for Palmleaf, 13th November 1916 1916, Steel Steamer Report for Palmleaf, 5th December 1916 1916, Form for Vessels of 100 Tons & Upwards for Palmleaf, 16th November 1916 1916, Report on Machinery for Palmleaf, 2nd December 1916 1916, Plan of Water Ballast Tank for Oliphant, 27th January 1916 1916, Half Midship Section Plan for Palmleaf, 29th November 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Grounding of Palmleaf, 8th February 1917 1917, Report of Survey for Repairs, &c for Palmleaf, 29th January 1917 1917, Certificate of Survey of Damage for Palmleaf, 30th January 1917 1917, Report on Electric Lighting Installation for Palmleaf, Undated no date )
Location where a vessel’s survey was undertaken.
West Hartlepool ( Letter from A S Purdon, Managing Director, for Irvine's Shipbuilding & Dry Docks Co Ltd, to Lloyds Register, London, regarding Oliphant, 27th November 1915 1915, Profile, Deck & Inner Bottom Plan for Palmleaf, 15th November 1915 1915, Letter from D McAuslan, to T Warren Esq, London, regarding Palmleaf, 29th December 1916 1916, Letter from D McAuslan, to The Secretary, London, regarding Palmleaf, 8th December 1916 1916, Freeboard Verification Form for Steamers for Palmleaf, 13th November 1916 1916, Steel Steamer Report for Palmleaf, 5th December 1916 1916, Report on Machinery for Palmleaf, 2nd December 1916 1916, Plan of Water Ballast Tank for Oliphant, 27th January 1916 1916, Half Midship Section Plan for Palmleaf, 29th November 1916 1916, Report on Electric Lighting Installation for Palmleaf, Undated no date )
London ( Copy of Letter from Assistant to the Secretary, to Irvine's Shipbuilding & Dry Docks Co Ltd, West Hartlepool, regarding Oliphant, 26th November 1915 1915, Copy of Letter from Secretary, to The Surveyors, West Hartlepool, regarding Palmleaf, 7th December 1916 1916, Form for Vessels of 100 Tons & Upwards for Palmleaf, 16th November 1916 1916 )
Hartlepool ( Plan of Boilers for Palmleaf, 15th November 1915 1915 )
Turnchapel; Plymouth ( Report of Survey for Repairs, &c for Palmleaf, 29th January 1917 1917 )
Plymouth ( Certificate of Survey of Damage for Palmleaf, 30th January 1917 1917 )
A vessel’s means of propulsion.
Steam ( Letter from A S Purdon, Managing Director, for Irvine's Shipbuilding & Dry Docks Co Ltd, to Lloyds Register, London, regarding Oliphant, 27th November 1915 1915, Copy of Letter from Assistant to the Secretary, to Irvine's Shipbuilding & Dry Docks Co Ltd, West Hartlepool, regarding Oliphant, 26th November 1915 1915, Memo regarding anchors & cables for Oliphant, 26th November 1915 1915, Plan of Boilers for Palmleaf, 15th November 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 9th December 1916 1916, Letter from D McAuslan, to T Warren Esq, London, regarding Palmleaf, 29th December 1916 1916, Letter from D McAuslan, to The Secretary, London, regarding Palmleaf, 8th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, West Hartlepool, regarding Palmleaf, 7th December 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 7th December 1916 1916, Freeboard Verification Form for Steamers for Palmleaf, 13th November 1916 1916, Steel Steamer Report for Palmleaf, 5th December 1916 1916, Form for Vessels of 100 Tons & Upwards for Palmleaf, 16th November 1916 1916, Report on Machinery for Palmleaf, 2nd December 1916 1916, Plan of Water Ballast Tank for Oliphant, 27th January 1916 1916, Half Midship Section Plan for Palmleaf, 29th November 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Grounding of Palmleaf, 8th February 1917 1917, Certificate of Survey of Damage for Palmleaf, 30th January 1917 1917, Report on Electric Lighting Installation for Palmleaf, Undated no date )
undefined ( Profile, Deck & Inner Bottom Plan for Palmleaf, 15th November 1915 1915, Report of Survey for Repairs, &c for Palmleaf, 29th January 1917 1917 )
Is the steamer assisted by sail?
No ( Letter from A S Purdon, Managing Director, for Irvine's Shipbuilding & Dry Docks Co Ltd, to Lloyds Register, London, regarding Oliphant, 27th November 1915 1915, Copy of Letter from Assistant to the Secretary, to Irvine's Shipbuilding & Dry Docks Co Ltd, West Hartlepool, regarding Oliphant, 26th November 1915 1915, Memo regarding anchors & cables for Oliphant, 26th November 1915 1915, Plan of Boilers for Palmleaf, 15th November 1915 1915, Profile, Deck & Inner Bottom Plan for Palmleaf, 15th November 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 9th December 1916 1916, Letter from D McAuslan, to T Warren Esq, London, regarding Palmleaf, 29th December 1916 1916, Letter from D McAuslan, to The Secretary, London, regarding Palmleaf, 8th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, West Hartlepool, regarding Palmleaf, 7th December 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 7th December 1916 1916, Freeboard Verification Form for Steamers for Palmleaf, 13th November 1916 1916, Steel Steamer Report for Palmleaf, 5th December 1916 1916, Form for Vessels of 100 Tons & Upwards for Palmleaf, 16th November 1916 1916, Report on Machinery for Palmleaf, 2nd December 1916 1916, Plan of Water Ballast Tank for Oliphant, 27th January 1916 1916, Half Midship Section Plan for Palmleaf, 29th November 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Grounding of Palmleaf, 8th February 1917 1917, Report of Survey for Repairs, &c for Palmleaf, 29th January 1917 1917, Certificate of Survey of Damage for Palmleaf, 30th January 1917 1917, Report on Electric Lighting Installation for Palmleaf, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Letter from A S Purdon, Managing Director, for Irvine's Shipbuilding & Dry Docks Co Ltd, to Lloyds Register, London, regarding Oliphant, 27th November 1915 1915, Copy of Letter from Assistant to the Secretary, to Irvine's Shipbuilding & Dry Docks Co Ltd, West Hartlepool, regarding Oliphant, 26th November 1915 1915, Memo regarding anchors & cables for Oliphant, 26th November 1915 1915, Plan of Boilers for Palmleaf, 15th November 1915 1915, Profile, Deck & Inner Bottom Plan for Palmleaf, 15th November 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 9th December 1916 1916, Letter from D McAuslan, to T Warren Esq, London, regarding Palmleaf, 29th December 1916 1916, Letter from D McAuslan, to The Secretary, London, regarding Palmleaf, 8th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, West Hartlepool, regarding Palmleaf, 7th December 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 7th December 1916 1916, Freeboard Verification Form for Steamers for Palmleaf, 13th November 1916 1916, Steel Steamer Report for Palmleaf, 5th December 1916 1916, Form for Vessels of 100 Tons & Upwards for Palmleaf, 16th November 1916 1916, Report on Machinery for Palmleaf, 2nd December 1916 1916, Plan of Water Ballast Tank for Oliphant, 27th January 1916 1916, Half Midship Section Plan for Palmleaf, 29th November 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Grounding of Palmleaf, 8th February 1917 1917, Report of Survey for Repairs, &c for Palmleaf, 29th January 1917 1917, Certificate of Survey of Damage for Palmleaf, 30th January 1917 1917, Report on Electric Lighting Installation for Palmleaf, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Letter from A S Purdon, Managing Director, for Irvine's Shipbuilding & Dry Docks Co Ltd, to Lloyds Register, London, regarding Oliphant, 27th November 1915 1915, Copy of Letter from Assistant to the Secretary, to Irvine's Shipbuilding & Dry Docks Co Ltd, West Hartlepool, regarding Oliphant, 26th November 1915 1915, Memo regarding anchors & cables for Oliphant, 26th November 1915 1915, Plan of Boilers for Palmleaf, 15th November 1915 1915, Profile, Deck & Inner Bottom Plan for Palmleaf, 15th November 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 9th December 1916 1916, Letter from D McAuslan, to T Warren Esq, London, regarding Palmleaf, 29th December 1916 1916, Letter from D McAuslan, to The Secretary, London, regarding Palmleaf, 8th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, West Hartlepool, regarding Palmleaf, 7th December 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 7th December 1916 1916, Freeboard Verification Form for Steamers for Palmleaf, 13th November 1916 1916, Steel Steamer Report for Palmleaf, 5th December 1916 1916, Form for Vessels of 100 Tons & Upwards for Palmleaf, 16th November 1916 1916, Report on Machinery for Palmleaf, 2nd December 1916 1916, Plan of Water Ballast Tank for Oliphant, 27th January 1916 1916, Half Midship Section Plan for Palmleaf, 29th November 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Grounding of Palmleaf, 8th February 1917 1917, Report of Survey for Repairs, &c for Palmleaf, 29th January 1917 1917, Certificate of Survey of Damage for Palmleaf, 30th January 1917 1917, Report on Electric Lighting Installation for Palmleaf, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Letter from A S Purdon, Managing Director, for Irvine's Shipbuilding & Dry Docks Co Ltd, to Lloyds Register, London, regarding Oliphant, 27th November 1915 1915, Copy of Letter from Assistant to the Secretary, to Irvine's Shipbuilding & Dry Docks Co Ltd, West Hartlepool, regarding Oliphant, 26th November 1915 1915, Memo regarding anchors & cables for Oliphant, 26th November 1915 1915, Plan of Boilers for Palmleaf, 15th November 1915 1915, Profile, Deck & Inner Bottom Plan for Palmleaf, 15th November 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 9th December 1916 1916, Letter from D McAuslan, to T Warren Esq, London, regarding Palmleaf, 29th December 1916 1916, Letter from D McAuslan, to The Secretary, London, regarding Palmleaf, 8th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, West Hartlepool, regarding Palmleaf, 7th December 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 7th December 1916 1916, Freeboard Verification Form for Steamers for Palmleaf, 13th November 1916 1916, Steel Steamer Report for Palmleaf, 5th December 1916 1916, Form for Vessels of 100 Tons & Upwards for Palmleaf, 16th November 1916 1916, Report on Machinery for Palmleaf, 2nd December 1916 1916, Plan of Water Ballast Tank for Oliphant, 27th January 1916 1916, Half Midship Section Plan for Palmleaf, 29th November 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Grounding of Palmleaf, 8th February 1917 1917, Report of Survey for Repairs, &c for Palmleaf, 29th January 1917 1917, Certificate of Survey of Damage for Palmleaf, 30th January 1917 1917, Report on Electric Lighting Installation for Palmleaf, Undated no date )
The individual and/or organisation listed
Admiralty ( Freeboard Verification Form for Steamers for Palmleaf, 13th November 1916 1916 )
Lane & MacAndrew Ltd ( Steel Steamer Report for Palmleaf, 5th December 1916 1916, Form for Vessels of 100 Tons & Upwards for Palmleaf, 16th November 1916 1916, Report on Machinery for Palmleaf, 2nd December 1916 1916, Report on Electric Lighting Installation for Palmleaf, Undated no date )
The listed port to which a given vessel belongs.
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Shelter dk with fbd; Carrying petrolm in bulk; +LMC 11,16; Fitted for oil fuel 11,16; FP above 150°F; Lloyds A & CP ( Steel Steamer Report for Palmleaf, 5th December 1916 1916 )
+LMC 11,16; Fitted for oil fuel 11,16; FP above 150°F ( Report on Machinery for Palmleaf, 2nd December 1916 1916 )
+100A1 ( Report of Survey for Repairs, &c for Palmleaf, 29th January 1917 1917 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5489 ( Steel Steamer Report for Palmleaf, 5th December 1916 1916, Form for Vessels of 100 Tons & Upwards for Palmleaf, 16th November 1916 1916, Report on Machinery for Palmleaf, 2nd December 1916 1916 )
5488 ( Report of Survey for Repairs, &c for Palmleaf, 29th January 1917 1917 )
The port in which a vessel is registered or permanently based.
London ( Form for Vessels of 100 Tons & Upwards for Palmleaf, 16th November 1916 1916 )
Location of construction for a vessel’s engines.
Hartlepool ( Form for Vessels of 100 Tons & Upwards for Palmleaf, 16th November 1916 1916, Report on Machinery for Palmleaf, 2nd December 1916 1916 )
Recorded information related to a vessel’s movements.
Turnchapel; Under Admiralty Orders ( Report of Survey for Repairs, &c for Palmleaf, 29th January 1917 1917 )
The year in which a vessel’s construction is completed.
1916 ( Letter from A S Purdon, Managing Director, for Irvine's Shipbuilding & Dry Docks Co Ltd, to Lloyds Register, London, regarding Oliphant, 27th November 1915 1915, Copy of Letter from Assistant to the Secretary, to Irvine's Shipbuilding & Dry Docks Co Ltd, West Hartlepool, regarding Oliphant, 26th November 1915 1915, Memo regarding anchors & cables for Oliphant, 26th November 1915 1915, Plan of Boilers for Palmleaf, 15th November 1915 1915, Profile, Deck & Inner Bottom Plan for Palmleaf, 15th November 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 9th December 1916 1916, Letter from D McAuslan, to T Warren Esq, London, regarding Palmleaf, 29th December 1916 1916, Letter from D McAuslan, to The Secretary, London, regarding Palmleaf, 8th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, West Hartlepool, regarding Palmleaf, 7th December 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 7th December 1916 1916, Freeboard Verification Form for Steamers for Palmleaf, 13th November 1916 1916, Steel Steamer Report for Palmleaf, 5th December 1916 1916, Form for Vessels of 100 Tons & Upwards for Palmleaf, 16th November 1916 1916, Report on Machinery for Palmleaf, 2nd December 1916 1916, Plan of Water Ballast Tank for Oliphant, 27th January 1916 1916, Half Midship Section Plan for Palmleaf, 29th November 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Grounding of Palmleaf, 8th February 1917 1917, Report of Survey for Repairs, &c for Palmleaf, 29th January 1917 1917, Certificate of Survey of Damage for Palmleaf, 30th January 1917 1917, Report on Electric Lighting Installation for Palmleaf, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Irvine's Shipbuilding & Dry Docks Co Ltd ( Letter from A S Purdon, Managing Director, for Irvine's Shipbuilding & Dry Docks Co Ltd, to Lloyds Register, London, regarding Oliphant, 27th November 1915 1915, Copy of Letter from Assistant to the Secretary, to Irvine's Shipbuilding & Dry Docks Co Ltd, West Hartlepool, regarding Oliphant, 26th November 1915 1915, Memo regarding anchors & cables for Oliphant, 26th November 1915 1915, Plan of Boilers for Palmleaf, 15th November 1915 1915, Profile, Deck & Inner Bottom Plan for Palmleaf, 15th November 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 9th December 1916 1916, Letter from D McAuslan, to T Warren Esq, London, regarding Palmleaf, 29th December 1916 1916, Letter from D McAuslan, to The Secretary, London, regarding Palmleaf, 8th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, West Hartlepool, regarding Palmleaf, 7th December 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 7th December 1916 1916, Freeboard Verification Form for Steamers for Palmleaf, 13th November 1916 1916, Steel Steamer Report for Palmleaf, 5th December 1916 1916, Form for Vessels of 100 Tons & Upwards for Palmleaf, 16th November 1916 1916, Report on Machinery for Palmleaf, 2nd December 1916 1916, Plan of Water Ballast Tank for Oliphant, 27th January 1916 1916, Half Midship Section Plan for Palmleaf, 29th November 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Grounding of Palmleaf, 8th February 1917 1917, Report of Survey for Repairs, &c for Palmleaf, 29th January 1917 1917, Certificate of Survey of Damage for Palmleaf, 30th January 1917 1917, Report on Electric Lighting Installation for Palmleaf, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
West Hartlepool ( Letter from A S Purdon, Managing Director, for Irvine's Shipbuilding & Dry Docks Co Ltd, to Lloyds Register, London, regarding Oliphant, 27th November 1915 1915, Copy of Letter from Assistant to the Secretary, to Irvine's Shipbuilding & Dry Docks Co Ltd, West Hartlepool, regarding Oliphant, 26th November 1915 1915, Memo regarding anchors & cables for Oliphant, 26th November 1915 1915, Plan of Boilers for Palmleaf, 15th November 1915 1915, Profile, Deck & Inner Bottom Plan for Palmleaf, 15th November 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 9th December 1916 1916, Letter from D McAuslan, to T Warren Esq, London, regarding Palmleaf, 29th December 1916 1916, Letter from D McAuslan, to The Secretary, London, regarding Palmleaf, 8th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, West Hartlepool, regarding Palmleaf, 7th December 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 7th December 1916 1916, Freeboard Verification Form for Steamers for Palmleaf, 13th November 1916 1916, Steel Steamer Report for Palmleaf, 5th December 1916 1916, Form for Vessels of 100 Tons & Upwards for Palmleaf, 16th November 1916 1916, Report on Machinery for Palmleaf, 2nd December 1916 1916, Plan of Water Ballast Tank for Oliphant, 27th January 1916 1916, Half Midship Section Plan for Palmleaf, 29th November 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Grounding of Palmleaf, 8th February 1917 1917, Report of Survey for Repairs, &c for Palmleaf, 29th January 1917 1917, Certificate of Survey of Damage for Palmleaf, 30th January 1917 1917, Report on Electric Lighting Installation for Palmleaf, Undated no date )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Letter from A S Purdon, Managing Director, for Irvine's Shipbuilding & Dry Docks Co Ltd, to Lloyds Register, London, regarding Oliphant, 27th November 1915 1915, Copy of Letter from Assistant to the Secretary, to Irvine's Shipbuilding & Dry Docks Co Ltd, West Hartlepool, regarding Oliphant, 26th November 1915 1915, Plan of Boilers for Palmleaf, 15th November 1915 1915, Profile, Deck & Inner Bottom Plan for Palmleaf, 15th November 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 9th December 1916 1916, Letter from D McAuslan, to T Warren Esq, London, regarding Palmleaf, 29th December 1916 1916, Letter from D McAuslan, to The Secretary, London, regarding Palmleaf, 8th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, West Hartlepool, regarding Palmleaf, 7th December 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 7th December 1916 1916, Freeboard Verification Form for Steamers for Palmleaf, 13th November 1916 1916, Half Midship Section Plan for Palmleaf, 29th November 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Grounding of Palmleaf, 8th February 1917 1917, Report of Survey for Repairs, &c for Palmleaf, 29th January 1917 1917, Certificate of Survey of Damage for Palmleaf, 30th January 1917 1917, Report on Electric Lighting Installation for Palmleaf, Undated no date )
Screw Steamer ( Memo regarding anchors & cables for Oliphant, 26th November 1915 1915, Steel Steamer Report for Palmleaf, 5th December 1916 1916, Report on Machinery for Palmleaf, 2nd December 1916 1916, Plan of Water Ballast Tank for Oliphant, 27th January 1916 1916 )
Cargo ( Form for Vessels of 100 Tons & Upwards for Palmleaf, 16th November 1916 1916 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Letter from A S Purdon, Managing Director, for Irvine's Shipbuilding & Dry Docks Co Ltd, to Lloyds Register, London, regarding Oliphant, 27th November 1915 1915, Copy of Letter from Assistant to the Secretary, to Irvine's Shipbuilding & Dry Docks Co Ltd, West Hartlepool, regarding Oliphant, 26th November 1915 1915, Memo regarding anchors & cables for Oliphant, 26th November 1915 1915, Plan of Boilers for Palmleaf, 15th November 1915 1915, Profile, Deck & Inner Bottom Plan for Palmleaf, 15th November 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 9th December 1916 1916, Letter from D McAuslan, to T Warren Esq, London, regarding Palmleaf, 29th December 1916 1916, Letter from D McAuslan, to The Secretary, London, regarding Palmleaf, 8th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, West Hartlepool, regarding Palmleaf, 7th December 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 7th December 1916 1916, Freeboard Verification Form for Steamers for Palmleaf, 13th November 1916 1916, Steel Steamer Report for Palmleaf, 5th December 1916 1916, Form for Vessels of 100 Tons & Upwards for Palmleaf, 16th November 1916 1916, Report on Machinery for Palmleaf, 2nd December 1916 1916, Plan of Water Ballast Tank for Oliphant, 27th January 1916 1916, Half Midship Section Plan for Palmleaf, 29th November 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Grounding of Palmleaf, 8th February 1917 1917, Report of Survey for Repairs, &c for Palmleaf, 29th January 1917 1917, Certificate of Survey of Damage for Palmleaf, 30th January 1917 1917, Report on Electric Lighting Installation for Palmleaf, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Letter from A S Purdon, Managing Director, for Irvine's Shipbuilding & Dry Docks Co Ltd, to Lloyds Register, London, regarding Oliphant, 27th November 1915 1915, Copy of Letter from Assistant to the Secretary, to Irvine's Shipbuilding & Dry Docks Co Ltd, West Hartlepool, regarding Oliphant, 26th November 1915 1915, Memo regarding anchors & cables for Oliphant, 26th November 1915 1915, Plan of Boilers for Palmleaf, 15th November 1915 1915, Profile, Deck & Inner Bottom Plan for Palmleaf, 15th November 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 9th December 1916 1916, Letter from D McAuslan, to T Warren Esq, London, regarding Palmleaf, 29th December 1916 1916, Letter from D McAuslan, to The Secretary, London, regarding Palmleaf, 8th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, West Hartlepool, regarding Palmleaf, 7th December 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 7th December 1916 1916, Freeboard Verification Form for Steamers for Palmleaf, 13th November 1916 1916, Steel Steamer Report for Palmleaf, 5th December 1916 1916, Form for Vessels of 100 Tons & Upwards for Palmleaf, 16th November 1916 1916, Report on Machinery for Palmleaf, 2nd December 1916 1916, Plan of Water Ballast Tank for Oliphant, 27th January 1916 1916, Half Midship Section Plan for Palmleaf, 29th November 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Grounding of Palmleaf, 8th February 1917 1917, Report of Survey for Repairs, &c for Palmleaf, 29th January 1917 1917, Certificate of Survey of Damage for Palmleaf, 30th January 1917 1917, Report on Electric Lighting Installation for Palmleaf, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Letter from A S Purdon, Managing Director, for Irvine's Shipbuilding & Dry Docks Co Ltd, to Lloyds Register, London, regarding Oliphant, 27th November 1915 1915, Copy of Letter from Assistant to the Secretary, to Irvine's Shipbuilding & Dry Docks Co Ltd, West Hartlepool, regarding Oliphant, 26th November 1915 1915, Memo regarding anchors & cables for Oliphant, 26th November 1915 1915, Plan of Boilers for Palmleaf, 15th November 1915 1915, Profile, Deck & Inner Bottom Plan for Palmleaf, 15th November 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 9th December 1916 1916, Letter from D McAuslan, to T Warren Esq, London, regarding Palmleaf, 29th December 1916 1916, Letter from D McAuslan, to The Secretary, London, regarding Palmleaf, 8th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, West Hartlepool, regarding Palmleaf, 7th December 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 7th December 1916 1916, Freeboard Verification Form for Steamers for Palmleaf, 13th November 1916 1916, Steel Steamer Report for Palmleaf, 5th December 1916 1916, Form for Vessels of 100 Tons & Upwards for Palmleaf, 16th November 1916 1916, Report on Machinery for Palmleaf, 2nd December 1916 1916, Plan of Water Ballast Tank for Oliphant, 27th January 1916 1916, Half Midship Section Plan for Palmleaf, 29th November 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Grounding of Palmleaf, 8th February 1917 1917, Report of Survey for Repairs, &c for Palmleaf, 29th January 1917 1917, Certificate of Survey of Damage for Palmleaf, 30th January 1917 1917, Report on Electric Lighting Installation for Palmleaf, Undated no date )
Is electric lighting fitted to the vessel?
No ( Letter from A S Purdon, Managing Director, for Irvine's Shipbuilding & Dry Docks Co Ltd, to Lloyds Register, London, regarding Oliphant, 27th November 1915 1915, Copy of Letter from Assistant to the Secretary, to Irvine's Shipbuilding & Dry Docks Co Ltd, West Hartlepool, regarding Oliphant, 26th November 1915 1915, Memo regarding anchors & cables for Oliphant, 26th November 1915 1915, Plan of Boilers for Palmleaf, 15th November 1915 1915, Profile, Deck & Inner Bottom Plan for Palmleaf, 15th November 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 9th December 1916 1916, Letter from D McAuslan, to T Warren Esq, London, regarding Palmleaf, 29th December 1916 1916, Letter from D McAuslan, to The Secretary, London, regarding Palmleaf, 8th December 1916 1916, Copy of Letter from Secretary, to The Surveyors, West Hartlepool, regarding Palmleaf, 7th December 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 7th December 1916 1916, Freeboard Verification Form for Steamers for Palmleaf, 13th November 1916 1916, Steel Steamer Report for Palmleaf, 5th December 1916 1916, Form for Vessels of 100 Tons & Upwards for Palmleaf, 16th November 1916 1916, Report on Machinery for Palmleaf, 2nd December 1916 1916, Plan of Water Ballast Tank for Oliphant, 27th January 1916 1916, Half Midship Section Plan for Palmleaf, 29th November 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Grounding of Palmleaf, 8th February 1917 1917, Report of Survey for Repairs, &c for Palmleaf, 29th January 1917 1917, Certificate of Survey of Damage for Palmleaf, 30th January 1917 1917, Report on Electric Lighting Installation for Palmleaf, Undated no date )
Recorded information relating the specific cargo being conveyed.
Petroleum in bulk ( Memo regarding anchors & cables for Oliphant, 26th November 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Palmleaf, 9th December 1916 1916, Freeboard Verification Form for Steamers for Palmleaf, 13th November 1916 1916, Steel Steamer Report for Palmleaf, 5th December 1916 1916 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Hpl ( Steel Steamer Report for Palmleaf, 5th December 1916 1916, Report on Machinery for Palmleaf, 2nd December 1916 1916, Report on Electric Lighting Installation for Palmleaf, Undated no date )
Ply ( Report of Survey for Repairs, &c for Palmleaf, 29th January 1917 1917 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Lane & MacAndrew Ltd ( Steel Steamer Report for Palmleaf, 5th December 1916 1916 )
William Davies ( Form for Vessels of 100 Tons & Upwards for Palmleaf, 16th November 1916 1916 )
Name of surveyor.
Physical arrangement of a ship’s masts, sails and rigging.
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
JNPB ( Form for Vessels of 100 Tons & Upwards for Palmleaf, 16th November 1916 1916 )
Type and configuration of the engine(s) supplied for a vessel.
Inverted Direct acting Triple Expansion Condensing ( Form for Vessels of 100 Tons & Upwards for Palmleaf, 16th November 1916 1916 )
Triple Expansion (Inverted Cylinders) ( Report on Machinery for Palmleaf, 2nd December 1916 1916 )
Date in which construction of a vessel’s engines were completed.
The name of the port/place of destination given.
Under Admiralty Orders ( Report of Survey for Repairs, &c for Palmleaf, 29th January 1917 1917 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.