Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Stettin ( Certificate for vessels navigated by Steam for Stettin, 30 November 1864 1864, Iron Ship survey report for Stettin, 2 December 1864 1864, Letter from Glasgow surveyor to the Secretary sending the machinery certificate and Stettin's report of survey no. 4255, 8 July 1876 1876, Report of survey for repairs for Stettin, 8 July 1876 1876, Memo from Messrs Napier Ltd. stating that Stettin's boilers are fitted in accordance with the Committee requirements and should have the notification Lloyd's MC in the Register Book, 3 July 1876 1876, Details of main boilers of Stettin, 29 June 1876 1876, Engineer surveyor's report on machinery for Stettin, 26 June 1876 1876, Annual surveys for Stettin, 30 November 1876 1876, Report of survey for repairs for Stettin, 16 January 1879 1879, Report of survey for repairs of engines and boilers for Stettin, 16 January 1880 1880, Cover note for reports number 4308 and 57 of Stettin, 31 January 1880 1880, Report of survey for repairs for Stettin, 28 January 1880 1880, Report of survey for repairs for Stettin, 2 February 1881 1881, Report of survey for repairs for Stettin, 27 January 1882 1882, Annual surveys for Stettin, 6 January 1883 1883, Annual surveys for Stettin, 23 January 1884 1884, Report of survey for repairs for Stettin, 30 January 1885 1885, Report of survey for repairs of engines and boilers for Stettin, 30 January 1885 1885, Report of survey for repairs for Stettin, 27 January 1886 1886, Report of survey for repairs of engines and boilers for Stettin, 30 January 1886 1886, Report of survey for repairs for Stettin, 26 February 1887 1887, Report of survey for repairs of engines and boilers for Stettin, 15 March 1887 1887, Report of survey for repairs for Stettin, 21 May 1888 1888, Report of survey for repairs of engines and boilers for Stettin, 25 May 1888 1888, Report of survey for repairs for Stettin, 29 December 1888 1888, Particulars for record of double bottoms in Lloyd's Register for Stettin, 5 December 1889 1889, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 10 December 1889 1889, Report of Survey for Repairs for Stettin, 6 December 1889 1889, Report on Machinery for Stettin, 3 December 1889 1889, Report of Survey for Repairs for Stettin, 18 October 1890 1890, Report of Survey for Repairs for Stettin, 6 November 1891 1891, Report of Survey for Repairs for Stettin, 16 January 1893 1893, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 19 February 1894 1894, Report of survey for repairs for Stettin, 12 February 1894 1894, Report of survey for repairs of engines and boilers for Stettin, 13 February 1894 1894, Letter from the surveyor Jas Barclay to the Secretary in London enclosing a letter received from the Master of Stettin about the boiler survey to be held at Bergen, 9 June 1894 1894, Letter from the Master of Stettin Otto E Jacobsen to the surveyor James Barclay about the survey of boilers to take place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to E Rusten, owner of Stettin, stating he agrees with the survey of boilers taking place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to Bergen surveyor stating that Stettin will have the survey of boilers carried out in Bergen, 8 June 1894 1894, Note stating the boiler survey for Stettin is due to April and the owners state the ship will be at Bergen where the survey will take place, 8 June 1894 1894, Letter from Erik Rusten, owner of Stettin, to Lloyd's Register stating that he wishes the survey of boilers to take place in Bergen, 4 June 1894 1894, Report of Survey for repairs of engines and boilers for Stettin, 12 July 1894 1894, Report of survey for repairs for Stettin, 6 February 1895 1895, Report of survey for repairs of engines and boilers for Stettin, 6 February 1895 1895, Report of survey for repairs for Stettin, 19 March 1896 1896, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin about the survey of boilers, 23 March 1896 1896, Letter from Leith surveyor to the Secretary stating that the Stettin is under survey, 5 March 1896 1896, Letter from the Secretary to the Leith Surveyor questioning about the survey of Stettin, 3 March 1896 1896, Copy of Letter from the Secretary to the owner of Stettin stating that he agrees with the boiler survey of that ship being carried out when she is in dry dock in the following month, 29 January 1896 1896, Note stating the boiler survey for Stettin will be in dry dock in the following month, 29 January 1896 1896, Letter from the owner of Stettin to the Secretary stating the ship will be in dry dock next month for the survey, 27 January 1896 1896, Report of survey for repairs of engines and boilers for Stettin, 19 March 1896 1896, Report of survey for repairs for Stettin, 19 March 1897 1897, Letter from the Leith surveyor to the Secretary stating that Stettin is now employed in the emigrant trade and therefore the pressure of boiler has been reduced, 24 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 19 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 26 July 1897 1897, Remarks of the Chief Surveyor to the Classing Committee about the special survey of the ship Stettin, 4 March 1898 1898, Copy of letter from the Secretary to the owners of Stettin stating that the special survey will take place when the ship is placed in dry dock, 3 February 1898 1898, Note stating the ship Stettin will be soon in dry dock to be surveyed, 3 February 1898 1898, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating their intention to put the ship in dry dock to be surveyed, 1 February 1898 1898, Report of survey for repairs for Stettin, 3 March 1898 1898, Report of survey for repairs of engines and boilers for Stettin, 3 March 1898 1898, Remarks of the Chief Surveyor to the Classing Committee about the damage and temporary repairs suffered by Stettin, 31 March 1898 1898, Letter from the Bremerhaven surveyor about the repairs to Stettin, 29 March 1898 1898, Cover note for report number 534 of Stettin, 1 April 1898 1898, Report of survey for repairs for Stettin, 28 March 1898 1898, Remarks of the Ship Surveyor to the Classing Committee saying the damage to Stettin has been repaired and she should remain classed, 6 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1899 1899, Report of survey for repairs of engines and boilers for Stettin, 5 April 1899 1899, Report of survey for repairs for Stettin, 28 April 1900 1900, Report of survey for repairs of engines and boilers for Stettin, 28 April 1900 1900, Report of survey for repairs for Stettin, 2 May 1901 1901, Report of survey for repairs of engines and boilers for Stettin, 2 May 1901 1901, Remarks of the Ship Surveyor to the Classing Committee about the special survey of Stettin and the particulars of her plating, 7 April 1902 1902, Report of survey for repairs for Stettin, 4 April 1902 1902, Copy of letter from the Secretary to the owners of Stettin statin the Committee agreed with the special survey being carried out in the next two months, 31 January 1902 1902, Postponed survey form for Stettin, 30 January 1902 1902, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating they expect to attend the special survey within the next two months, 29 January 1902 1902, Report of survey for repairs of engines and boilers for Stettin, 4 April 1902 1902, Report of survey for repairs for Stettin, 11 May 1903 1903, Copy of letter from the Secretary to Leith Surveyors stating that the steamer Stettin has been booked for the annual boiler survey that will take place in a few days, 7 April 1903 1903, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the annual overhaul has been booked for that next few days, 4 April 1903 1903, Report of survey for repairs of engines and boilers for Stettin, 11 May 1903 1903, Report of survey for repairs for Stettin, 29 June 1904 1904, Report of survey for repairs of engines and boilers for Stettin, 29 June 1904 1904, Report of survey for repairs for Stettin, 11 July 1905 1905, Report of survey for repairs of engines and boilers for Stettin, 11 July 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the damage and repairs to Stettin, 24 August 1905 1905, Report of survey for repairs for Stettin, 22 August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the special survey no.1 of Stettin, 26 July 1906 1906, Copy of letter from the Secretary to Leith Surveyors stating that Stettin will be in dry dock on her arrival from Konigsberg when the special survey no.1 will be carried out, 22 June 1906 1906, Copy of letter from the Secretary to the owners of Stettin stating that the special survey no.1 will be carried out next week in Leith, 22 June 1906 1906, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the special survey no.1 will be carried out in the next week on her arrival from Konigsberg, 20 June 1906 1906, Report of survey for repairs for Stettin, 23 July 1906 1906, Report of survey for repairs of engines and boilers for Stettin, 24 July 1906 1906, Report of survey for repairs for Stettin, 16 July 1907 1906, Report of survey for repairs of engines and boilers for Stettin, 16 July 1907 1906, Report of survey for repairs for Stettin, 19 September 1908 1908, Copy of letter from the Secretary to Leith Surveyors stating that Stettin is laid up for overhaul and that the boiler survey should be carried out, 8 September 1908 1908, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the steamer is laid up for overhaul and that the special survey of boilers should take place next week, 5 September 1908 1908, Report of survey for repairs of engines and boilers for Stettin, 19 September 1908 1908, Report of survey for repairs for Stettin, 2 October 1909 1909, Report of survey for repairs of engines and boilers for Stettin, 2 October 1909 1909, Plan of Rudder of Stettin, 1910. Scale 1"=one foot. Details 3"= one foot, 19 September 1910 1910, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding the special survey no. 2 and boiler survey for Stettin, 29 October 1910 1910, Letter from Leith Surveyor to the Secretary stating that they met with the owners of Stettin and arranged the special survey no. 2 to be carried out after the New Year holidays, 28 November 1910 1910, Copy of letter from the Secretary to Leith Surveyors regarding the report no. 13106 for Stettin and asking when the ship's owners expect the special survey no.2 to be carried out, 25 November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee about damage and repairs made to Stettin after grounding, 7 October 1910 1910, Postponed survey form for Stettin, 27 June 1910 1910, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating the special survey no.2 will be carried out in Leith in September, 23 October 1910 1910, Report of survey for repairs for Stettin, 5 October 1910 1910, Report of survey for repairs of engines and boilers for Stettin, 21 October 1910 1910, Report of Ship forgings or castings for Stettin, 30 September 1910 1910, Note about the sketch of rudder for Stettin, 19 September 1910 1910, Letter from Leith surveyors to the Secretary regarding the plan of rudder for Stettin to be approved by the Committee, 16 September 1910 1910, Copy of letter from Secretary, Lloyd's Register London, to James Currie and Co, regarding agreement for date of carrying out special survey, 28 June 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the special survey no.2 for Stettin and the repairs made, 6 June 1911 1911, Report of survey for repairs for Stettin, 3 June 1911 1911, Report of survey for repairs of engines and boilers for Stettin, 3 June 1911 1911, Copy of letter from the Assistant to the Secretary to the owners of Stettin, James Currie & Co, regarding the boiler survey to take place in about two months' time, 12 July 1912 1912, Report of survey for repairs for Stettin, 17 August 1912 1912, Postponed survey form for Stettin, 11 July 1912 1912, Letter from the owners of Stettin to the Secretary regarding the ship special survey and boilers survey, 9 July 1912 1912, Report of survey for repairs of engines and boilers for Stettin, 17 August 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the conditions of Stettin after repair, 29 December 1913 1913, Report of survey for repairs for Stettin, 27 December 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of Stettin taking place in three weeks’ time, 14 November 1913 1913, Postponed survey form for Stettin, 13 November 1913 1913, Letter from Leith surveyors to the Secretary regarding the survey of Stettin, 8 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin, 7 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin being carried out after the strike of the boilers makers, 9 November 1913 1913, Postponed survey form for Stettin, 8 September 1913 1913, Letter from Leith surveyors to the Secretary regarding the postpone of survey of Stettin due to the boilers makers strike, 5 September 1913 1913, Copy of letter from the Secretary to Leith surveyors regarding the survey of screw shaft of Stettin, 3 September 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating the Committee has agreed with the survey being carried out next month, 4 September 1913 1913, Postponed survey form for Stettin, 3 September 1913 1913, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft, 2 July 1913 1913, Report of survey for repairs of engines and boilers for Stettin, 27 December 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with postponing the special survey, 9 June 1914 1914, Postponed survey form for Stettin, 8 June 1914 1914, Letter from Leith surveyors to the Secretary regarding the special survey of Stettin, 4 June 1914 1914, Copy of letter from the Secretary to Leith surveyors enclosing a letter sent by the owners of Stettin about her fourth special survey no. 3, 3 June 1914 1914, Postponed survey form for Stettin, 2 June 1914 1914, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding postponing the second special survey no. 3 of Stettin, 29 May 1914 1914, Report of survey for repairs of engines and boilers for Stettin, 2 July 1915 1915, Copy of letter from the Secretary to Newcastle-on-Tyne surveyors regarding the special survey of Stettin, 12 August 1913 1915, Letter from Aberdeen surveyors to the Secretary stating that Stettin has sailed to Newcastle-on-Tyne as she failed to obtain docking facilities at that port, 10 August 1915 1915, Remarks to the Chief Ship Surveyor regarding the fourth special survey no. 3 for Stettin, 13 July 1915 1915, Copy of letter from the Secretary to the Surveyors in Hull, Grimsby, Middlesbrough, Newcastle, Sunderland and Hartlepool, regarding the fourth special survey no. 3 of Stettin, which will be carried out at some East coast port, 19 July 1915 1915, Letter from Leith surveyors to the Secretary regarding the survey of Stettin to be carried out at some East coast port, 12 July 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the fourth special survey no. 3 for Stettin, 5 July 1915 1915, Report of survey for repairs for Stettin, 2 July 1915 1915, Letter from Leith surveyors to the Secretary stating that the special survey of Stettin is being carried out at that port, 22 May 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 for Stettin, 21 May 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding her survey, 20 April 1915 1915, Extract from a letter dated 15 April 1915 from James Currie & Co regarding surveying Stettin. Extract dated 16 April 1915 1915, Letter from Leith surveyors to the Secretary stating that they had spoken to the owners of Stettin and due to a shortage of labour it has been difficult to find a dry dock to carry out the special survey, 13 April 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the importance of carrying out the special survey due to the age of the ship, 13 April 1915 1915, Postponed survey form for Stettin, 12 April 1915 1915, Copy of letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding the survey of Stettin being postponed, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 of Stettin, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors enclosing information about the communication between the owners of Stettin, 26 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with the special survey being carried out in the next two or three months, 26 January 1915 1915, Postponed survey form for Stettin, 25 January 1915 1915, Letter from Leith surveyors to the Secretary regarding the special survey no.3 and boiler survey of Stettin, 23 January 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding postponing the survey of Stettin, 21 January 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the fourth special survey no.3 and special annual boiler survey of Stettin, 20 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the letter sent by the latter about the thrust shaft, 1 November 1915 1915, Letter from Lisbon surveyors to the Secretary about the repair of shaft of Stettin, 25 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 28 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 23 October 1915 1915, Copy of letter from the Assistant to the Secretary to Lisbon surveyors regarding the repair of Stettin's thrust shaft being not satisfactory, 18 October 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the new thrust shaft she received in Lisbon, 1916 1915, Letter reporting that the new thrust shaft for Stettin is not considered satisfactory, 14 October 1915 1915, London Office Copy of document certifying that surveyor has examined the machinery of Stettin and stating his recommendations, 4 October 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 6 October 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 67857, 19 August 1915 1915, Report of Survey for Repairs for Stettin, 18 August 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 August 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the thrust shaft supplied in Lisbon and if it will be approved by the Committee as a permanent repair, 29 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon and stating that it will be approved by the Committee as a permanent repair, 28 April 1916 1916, Letter reporting the results of the test carried out on Stettin's new thrust shaft that was made in Lisbon, 27 April 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the result of the tests carried out on the new thrust shaft, 14 April 1916 1916, Letter from Professor R Stanfield to James Currie & Co regarding the results of the test of the transverse section of the shaft of Stettin, 11 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Letter reporting that Stettin's new thrust shaft is not satisfactory to be recommended as a permanent repair, 22 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin stating that the repair of the thrust shaft is being looked at, 14 March 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary enclosing drawings and plans of the shaft of Stettin, 6 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the repair of the thrust shaft, 28 January 1916 1916, Postponed survey form for Stettin, 22 January 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft of Stettin, 24 January 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding when the ship will be in position to have the thrust shaft examined, 21 January 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to London Report 79106, 13 July 1917 1916, Report of Survey for Repairs for Stettin due to collision with ice, 1 July 1916 1916, Report of Survey for Repairs of Engines and Boilers for Stettin, 14 July 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70096, 27 July 1917 1917, London Office Copy of document certifying that surveyor has examined damage and transmitted the Report, and stating his Recommendations, 24 July 1917 1917, Report of Survey for Repairs for Stettin 1917, Letter from Newcastle surveyors informing Lloyd's Register London that Stettin is under survey at Newcastle, 21 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding whether Stettin has yet come under inspection, 20 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding their report 70069, and Stettin's owners' intention to make repairs at South Shields within the next couple of days, and calling attention to the need for the Annu 1917, Letter from James Currie & Co Managers, informing Lloyd's Register London that they have arranged for repairs of damage previously communicated by Smith's Dry Dock Co, South Shields, on the steamer's return there in the next day or two, 1 August 1917 1917, Copy of letter from Lloyd's Register's London Secretary to James Currie and Co, informing them of the damage done to Stettin when striking a quay wall, that temporary repairs have been effected but that for the vessel to remain in class permanent repairs 1917, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70306, 2 October 1917 1917, Report of Survey for Repairs for Stettin, 29 September 1917 1917, Report of Survey for Repairs of Engines and Boilers for Stettin, 1 October 1917 1917, Certificate of approval of a stockless anchor, with cancelled written across it, 4 September 1917 1917, Correspondence to Lloyd's Register's London Secretary regarding Stettin Report 71400, acknowledging remarks on the Rules for Engines and Boilers with a working pressure of less than 60lbs, 23 November 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 71400, 19 November 1918 1918, Report of survey for repairs of Stettin, 5 November 1918 1918, Memo to Newcastle surveyors regarding Rules for Engines and Boilers of a greater working pressure than 60lbs per square inch, 18 November 1918 1918, Report of Survey for Repairs of Boilers and Engines of Stettin, 13 November 1918 1918, Copy of letter from London Secretary to James Currie and Co regarding state or survey of Stettin, 17 October 1919 1919, Postponed Survey form for Stettin, October 1919 1919, Letter from James Currie and Co to Secretary, Lloyd's Register London, regarding postponing survey of Stettin, 10 October 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Leith Report 15769, 2 July 1920 1920, Report of Survey for Repairs of Stettin, 28 June 1920 1920, Copy of letter from Lloyd's Register London Secretary to Leith Surveyors, 30 March 1920 1920, Postponed Survey form for Stettin, 29 March 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 24 March 1920 1920, Copy of Letter from Lloyd's Register London Secretary to Leith Surveyors, 19 March 1920 1920, Letter from the Surveyors at Hull, per N Rowall, to London Secretary regarding state of survey of Stettin, 18 March 1920 1920, Copy of letter from the London Secretary to the Hull Surveyors regarding state of survey of Stettin, 17 March 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 10 February 1920 1920, Postponed Survey form for Stettin, 9 February 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 5 February 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 28 January 1920 1920, Report of Survey for Repairs of Engines and Boilers for Stettin, 28 June 1920 1920, Copy of letter from the Secretary to the owners of Stettin saying the Committee has agreed with postponing the boiler survey, 23 August 1921 1921, Report of Survey for Repairs of Stettin, 16 September 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London regarding Stettin now undergoing survey, 3 September 1921 1921, Postponed Surveys form for Stettin, 22 August 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London explaining why Stettin had not undergone survey, 18 August 1921 1921, Report of Survey for Repairs of Engines and Boilers for Stettin, 16 September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Stettin survey, with reference to Leith Report 16187, 6 October 1921 1922, Report of Survey for Repairs of Stettin, 3 October 1921 1922, Correspondence of Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding ongoing surveys on Stettin, 14 September 1922 1922, Copy of letter from Lloyd's Register London Assistant to the Secretary to Leith Surveyors regarding survey of Stettin's screwshaft, 21 July 1922 1922, Postponed Surveys form for Stettin, 20 July 1922 1922, Letter from Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding proposed survey date for Stettin's screw shaft, 17 July 1922 1922, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans of owners of Stettin for survey of screwshaft, 14 July 1922 1922, Report of Survey for Repairs of Boilers and Engines for Stettin, 26 September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding carrying out part of Stettin's Special Survey, with reference to Leith Report 16388, 30 October 1923 1923, Report of Survey for Repairs of Stettin, 24 October 1923 1923, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors, regarding Rule requirements for cables, 20 October 1923 1923, Remarks to the Chief Ship Surveyor regarding Rule requirements for cables, 19 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London requesting clarification on Rules for chains, 18 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London regarding proposed timeline for survey, 22 September 1923 1923, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding letter from Stettin's owners and requesting clarification of when the boiler survey shall be held, 21 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London, regarding carrying out a part survey, 18 September 1923 1923, Copy of letter from Assistant to the Secretary to James Currie and Co regarding schedule for surveys of Stettin, 14 September 1923 1923, Postponed Surveys form for Stettin, 13 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London querying survey schedule of Stettin, 10 September 1923 1923, Report of Survey for Repairs of Engines and Boilers for Stettin, 23 October 1923 1923, Letter from Leith Surveyor A T Thomas to James Currie and Co, informing them of future survey schedule for Stettin, 23 October 1923 1923, Plan of Main Boiler for Stettin, 24 May 1924 1924, Plan of Donkey Boiler for Stettin, 24 May 1924 1924, Hatch Plan of Stettin, 2 October 1924 1924, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Stettin, with reference to Leith Report 16388, 19 May 1924 1924, Letter from A T Thomas, Leith Surveyor, to J F Hill of London, regarding surveying Stettin, 16 May 1924 1924, Extract from a letter dated 14 May 1924 from Leith surveyors regarding examining Stettin. Extract dated 15 May 1924 1924, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans for survey of Stettin and expiry of year of grace, 14 May 1924 1924, Letter from Leith surveyor A T Thomas to Secretary, London, regarding proposed examination part of Stettin's combustion chamber, 18 April 1924 1924, Copy of letter from Assistant to the Secretary to the Leith surveyors questioning owners' arrangements to have Stettin's combustion chamber examined, 16 April 1924 1924, Report of Survey for Repairs of Engines and Boilers for Stettin, 12 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding fulfilment of special survey on Stettin, in reference to Leith Report 16611, 22 November 1924 1924, Report of Survey for Repairs of Stettin, 15 November 1924 1924, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 November 1924 1924, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding completion of reports on Stettin's new boilers, 31 October 1924 1924, Note submitting that certain reports be forwarded to the Leith Surveyors for their guidance and completion, 29 October 1924 1924, Note submitting that the amended plans of boilers for Stettin merit approval, 29 May 1924 1924, Correspondence accompanying boiler plans submitted for approval for Stettin from the Glasgow office to London, 26 May 1924 1924, Letter from Jas S Cairns submitting for approval plans for new boilers for the Stettin to the Glasgow Secretary, 26 May 1924 1924, Note submitting that plans for Stettin's boilers merit approval, 24 April 1924 1924, Letter from Leith Surveyors, per A T T[homas], to Secretary, London, noting they are forwarding plans of new boilers intended for Stettin, 14 April 1924 1924, Report on Main Boiler for Stettin, 11 October 1924 1924, Report on Donkey Boiler for Stettin, 11 October 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Delivery note for 3 furnaces from Forth Shipbuilding and Engineering, Glasgow, 4 July 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 27 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, LR stamp and signature J Barr, 2 July 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 14 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 28 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 26 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 17 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 16790, 28 August 1925 1925, Report of Survey for Repairs on Stettin, 25 August 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 August 1925 1925, Memo regarding approving a steel cylinder cover on Stettin, 5 October 1925 1925, Letter from Leith Surveyor to Secretary, London, regarding steel cover repair examined, 2 October 1925 1925, Letter from Hamburg Office to Secretary, London, regarding request by Leith Surveyors, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding Hamburg report on Stettin, 1 October 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding their request for the Hamburg report, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to A Chisholm, requesting a report for the Leith Surveyors, 30 September 1925 1925, Translation of Cablegram sent to Surveyors at Hamburg, 30 September 1925 1925, Copy of Cablegram from London Office to Hamburg Office, 30 September 1925 1925, Letter from Leith Surveyors, per A T T[homas], to London Office asking for a Hamburg report to be sent to them, 29 September 1925 1925, London Office Copy of document certifying that Hamburg surveyor has examined damage and transmitted the Report, and stating his Recommendations, 25 September 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 September 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 16897, March 1926 1926, Report of Survey for Repairs to Stettin, 30 March 1926 1926, Report of Survey for Repairs of Engines and Boilers to Stettin, 30 March 1926 1926, Report of Survey for Repairs to Stettin, 15 June 1927 1927, Report of Survey for Repairs of Engines and Boilers to Stettin, 15 June 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 17291, 8 December 1927 1927, Copy of Certificate of Survey after damage to Stettin by a breaker in heavy weather, 23 November 1927 1927, Report of Survey for Repairs to Stettin, 3 December 1927 1927, Question and Answer memo between London and Leith Offices regarding Hamburg Report 17858, 21 February 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 1 February 1928 1928, Correspondence memo with particulars from Leith Surveyors to Secretary, London, regarding return of report, 27 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 25 January 1928 1928, Copy of Certificate of Survey from Hamburg after collision damage suffered by Stettin, 22 January 1928 1928, Report of Survey for Repairs of Stettin, 23 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 17339, 15 March 1928 1928, Report of Survey for Repairs of Stettin, 5 March 1928 1928, Copy of letter from the Clerk of the Classification Committee to James Currie and Co, with a copy to the Leith Office, regarding 6th Special Survey of Stettin, 14 December 1928 1928, Postponed Survey form for Stettin's 6th Special Survey, 13 December 1928 1928, Letter from James Currie and Co to Lloyd's Register Secretary, London, regarding deferring Stettin's 6th Special Survey, 11 December 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage, in reference to Dundee Report 8638, 30 March 1928 1928, Copy of Certificate of Survey regarding damage and report of repairs to Stettin's port bow shell plating, Dundee, 23 March 1928 1928, Report of Survey for Repairs to Stettin, 23 March 1928 1928, Letter from Lloyd's Register Engineer Surveyor to James Currie and Co regarding schedule for survey of Stettin's propeller shaft, 5 March 1929 1929, Copy of letter from the Secretary, London, to the Secretary, Glasgow, returning Stettin boiler plans, 29 May 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin and 6th Special Survey, in reference to Leith Report 17540, 13 March 1929 1929, Report of Survey for Repairs of Stettin, 5 March 1929 1929, Report of Survey for Repairs of Engines and Boilers for Stettin, 5 March 1929 1929, Copy of letter from pro Secretary, London, to Leith Surveyors regarding examination of Stettin's screwshaft, 16 April 1930 1930, Postponed Survey form for Stettin's screwshaft, 14 April 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 9 April 1930 1930, Copy of letter from Secretary, London, to Leith Surveyors informing them Committee are agreeable to postponing Stettin's screwshaft survey, 25 February 1930 1930, Postponed Survey form for Stettin's screwshaft, 24 February 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 17 February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 17802, 22 May 1930 1930, Report of Survey for Repairs to Stettin, 15 May 1930 1930, Report on Engine Forgings for Stettin, 8 May 1930 1930, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 May 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 18082, 2 November 1931 1931, Form or memo from Secretary, Glasgow, to Secretary, London, regarding presence of Stettin, 16 October 1931 1931, Question and Answer memo from Secretary, London, to Leith Surveyors regarding Stettin Boiler Survey, 5 October 1931 1931, Copy of letter from pro Secretary, London, with copy to Leith, to James Currie and Co regarding postponing Stettin Boiler Survey, 26 June 1931 1931, Postponed Surveys form for Stettin's Boiler Survey, 25 June 1931 1931, Letter from James Currie and Co regarding postponing Boiler Survey due on Stettin, 20 June 1931 1931, Report of Survey for Repairs on Stettin, 26 October 1931 1931, Report of Survey for Repairs of Engines and Boilers on Stettin, 26 October 1931 1931, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of survey for Stettin, 23 December 1932 1932, Postponed Surveys form for Stettin, 22 December 1932 1932, Letter from Leith Surveyors per John Houston to the Secretary, London, regarding outstanding survey on Stettin, 17 December 1932 1932, Letter from James Currie and Co to Leith Surveyors regarding schedule of survey for Stettin, 16 December 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 14 December 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 24 November 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 September 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 21 June 1932 1932, Postponed Surveys form for Stettin, 20 June 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 June 1932 1932, Copy of letter from pro Secretary, London to Leith Surveyors regarding Stettin boiler survey schedule, 9 October 1931 1932, Postponed Surveys form for Stettin, 8 October 1931 1932, Report of Total Loss, Casualty, , for Stettin, which has been sold to be broken up, 4 December 1933 1933, Letter from Leith Surveyors, per John Houston, to Secretary, London, informing them Stettin is being broken up, 1 December 1933 1933, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of demolition for Stettin, 27 November 1933 1933, Copy of letter from Leith Surveyors, per John Houston, to the Secretary, London, regarding the firm to which Stettin was sold to be broken up, 24 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 23 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 31 August 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 15 June 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 16 March 1933 1933, Note related to Stettin stating SS no. 2 held now posting no date, Note regarding Stettin stating "Vessel left Lisbon Oct 3. + 3 mos from dats. of survey would expire 12/15" no date, Sketch or plan of steel cover part for Stettin no date )
The process of transferring a vessel to water, but not necessarily her completion.
12/11/1864 ( Certificate for vessels navigated by Steam for Stettin, 30 November 1864 1864, Iron Ship survey report for Stettin, 2 December 1864 1864, Letter from Glasgow surveyor to the Secretary sending the machinery certificate and Stettin's report of survey no. 4255, 8 July 1876 1876, Report of survey for repairs for Stettin, 8 July 1876 1876, Memo from Messrs Napier Ltd. stating that Stettin's boilers are fitted in accordance with the Committee requirements and should have the notification Lloyd's MC in the Register Book, 3 July 1876 1876, Details of main boilers of Stettin, 29 June 1876 1876, Engineer surveyor's report on machinery for Stettin, 26 June 1876 1876, Annual surveys for Stettin, 30 November 1876 1876, Report of survey for repairs for Stettin, 16 January 1879 1879, Report of survey for repairs of engines and boilers for Stettin, 16 January 1880 1880, Cover note for reports number 4308 and 57 of Stettin, 31 January 1880 1880, Report of survey for repairs for Stettin, 28 January 1880 1880, Report of survey for repairs for Stettin, 2 February 1881 1881, Report of survey for repairs for Stettin, 27 January 1882 1882, Annual surveys for Stettin, 6 January 1883 1883, Annual surveys for Stettin, 23 January 1884 1884, Report of survey for repairs for Stettin, 30 January 1885 1885, Report of survey for repairs of engines and boilers for Stettin, 30 January 1885 1885, Report of survey for repairs for Stettin, 27 January 1886 1886, Report of survey for repairs of engines and boilers for Stettin, 30 January 1886 1886, Report of survey for repairs for Stettin, 26 February 1887 1887, Report of survey for repairs of engines and boilers for Stettin, 15 March 1887 1887, Report of survey for repairs for Stettin, 21 May 1888 1888, Report of survey for repairs of engines and boilers for Stettin, 25 May 1888 1888, Report of survey for repairs for Stettin, 29 December 1888 1888, Particulars for record of double bottoms in Lloyd's Register for Stettin, 5 December 1889 1889, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 10 December 1889 1889, Report of Survey for Repairs for Stettin, 6 December 1889 1889, Report on Machinery for Stettin, 3 December 1889 1889, Report of Survey for Repairs for Stettin, 18 October 1890 1890, Report of Survey for Repairs for Stettin, 6 November 1891 1891, Report of Survey for Repairs for Stettin, 16 January 1893 1893, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 19 February 1894 1894, Report of survey for repairs for Stettin, 12 February 1894 1894, Report of survey for repairs of engines and boilers for Stettin, 13 February 1894 1894, Letter from the surveyor Jas Barclay to the Secretary in London enclosing a letter received from the Master of Stettin about the boiler survey to be held at Bergen, 9 June 1894 1894, Letter from the Master of Stettin Otto E Jacobsen to the surveyor James Barclay about the survey of boilers to take place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to E Rusten, owner of Stettin, stating he agrees with the survey of boilers taking place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to Bergen surveyor stating that Stettin will have the survey of boilers carried out in Bergen, 8 June 1894 1894, Note stating the boiler survey for Stettin is due to April and the owners state the ship will be at Bergen where the survey will take place, 8 June 1894 1894, Letter from Erik Rusten, owner of Stettin, to Lloyd's Register stating that he wishes the survey of boilers to take place in Bergen, 4 June 1894 1894, Report of Survey for repairs of engines and boilers for Stettin, 12 July 1894 1894, Report of survey for repairs for Stettin, 6 February 1895 1895, Report of survey for repairs of engines and boilers for Stettin, 6 February 1895 1895, Report of survey for repairs for Stettin, 19 March 1896 1896, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin about the survey of boilers, 23 March 1896 1896, Letter from Leith surveyor to the Secretary stating that the Stettin is under survey, 5 March 1896 1896, Letter from the Secretary to the Leith Surveyor questioning about the survey of Stettin, 3 March 1896 1896, Copy of Letter from the Secretary to the owner of Stettin stating that he agrees with the boiler survey of that ship being carried out when she is in dry dock in the following month, 29 January 1896 1896, Note stating the boiler survey for Stettin will be in dry dock in the following month, 29 January 1896 1896, Letter from the owner of Stettin to the Secretary stating the ship will be in dry dock next month for the survey, 27 January 1896 1896, Report of survey for repairs of engines and boilers for Stettin, 19 March 1896 1896, Report of survey for repairs for Stettin, 19 March 1897 1897, Letter from the Leith surveyor to the Secretary stating that Stettin is now employed in the emigrant trade and therefore the pressure of boiler has been reduced, 24 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 19 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 26 July 1897 1897, Remarks of the Chief Surveyor to the Classing Committee about the special survey of the ship Stettin, 4 March 1898 1898, Copy of letter from the Secretary to the owners of Stettin stating that the special survey will take place when the ship is placed in dry dock, 3 February 1898 1898, Note stating the ship Stettin will be soon in dry dock to be surveyed, 3 February 1898 1898, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating their intention to put the ship in dry dock to be surveyed, 1 February 1898 1898, Report of survey for repairs for Stettin, 3 March 1898 1898, Report of survey for repairs of engines and boilers for Stettin, 3 March 1898 1898, Remarks of the Chief Surveyor to the Classing Committee about the damage and temporary repairs suffered by Stettin, 31 March 1898 1898, Letter from the Bremerhaven surveyor about the repairs to Stettin, 29 March 1898 1898, Cover note for report number 534 of Stettin, 1 April 1898 1898, Report of survey for repairs for Stettin, 28 March 1898 1898, Remarks of the Ship Surveyor to the Classing Committee saying the damage to Stettin has been repaired and she should remain classed, 6 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1899 1899, Report of survey for repairs of engines and boilers for Stettin, 5 April 1899 1899, Report of survey for repairs for Stettin, 28 April 1900 1900, Report of survey for repairs of engines and boilers for Stettin, 28 April 1900 1900, Report of survey for repairs for Stettin, 2 May 1901 1901, Report of survey for repairs of engines and boilers for Stettin, 2 May 1901 1901, Remarks of the Ship Surveyor to the Classing Committee about the special survey of Stettin and the particulars of her plating, 7 April 1902 1902, Report of survey for repairs for Stettin, 4 April 1902 1902, Copy of letter from the Secretary to the owners of Stettin statin the Committee agreed with the special survey being carried out in the next two months, 31 January 1902 1902, Postponed survey form for Stettin, 30 January 1902 1902, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating they expect to attend the special survey within the next two months, 29 January 1902 1902, Report of survey for repairs of engines and boilers for Stettin, 4 April 1902 1902, Report of survey for repairs for Stettin, 11 May 1903 1903, Copy of letter from the Secretary to Leith Surveyors stating that the steamer Stettin has been booked for the annual boiler survey that will take place in a few days, 7 April 1903 1903, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the annual overhaul has been booked for that next few days, 4 April 1903 1903, Report of survey for repairs of engines and boilers for Stettin, 11 May 1903 1903, Report of survey for repairs for Stettin, 29 June 1904 1904, Report of survey for repairs of engines and boilers for Stettin, 29 June 1904 1904, Report of survey for repairs for Stettin, 11 July 1905 1905, Report of survey for repairs of engines and boilers for Stettin, 11 July 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the damage and repairs to Stettin, 24 August 1905 1905, Report of survey for repairs for Stettin, 22 August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the special survey no.1 of Stettin, 26 July 1906 1906, Copy of letter from the Secretary to Leith Surveyors stating that Stettin will be in dry dock on her arrival from Konigsberg when the special survey no.1 will be carried out, 22 June 1906 1906, Copy of letter from the Secretary to the owners of Stettin stating that the special survey no.1 will be carried out next week in Leith, 22 June 1906 1906, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the special survey no.1 will be carried out in the next week on her arrival from Konigsberg, 20 June 1906 1906, Report of survey for repairs for Stettin, 23 July 1906 1906, Report of survey for repairs of engines and boilers for Stettin, 24 July 1906 1906, Report of survey for repairs for Stettin, 16 July 1907 1906, Report of survey for repairs of engines and boilers for Stettin, 16 July 1907 1906, Report of survey for repairs for Stettin, 19 September 1908 1908, Copy of letter from the Secretary to Leith Surveyors stating that Stettin is laid up for overhaul and that the boiler survey should be carried out, 8 September 1908 1908, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the steamer is laid up for overhaul and that the special survey of boilers should take place next week, 5 September 1908 1908, Report of survey for repairs of engines and boilers for Stettin, 19 September 1908 1908, Report of survey for repairs for Stettin, 2 October 1909 1909, Report of survey for repairs of engines and boilers for Stettin, 2 October 1909 1909, Plan of Rudder of Stettin, 1910. Scale 1"=one foot. Details 3"= one foot, 19 September 1910 1910, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding the special survey no. 2 and boiler survey for Stettin, 29 October 1910 1910, Letter from Leith Surveyor to the Secretary stating that they met with the owners of Stettin and arranged the special survey no. 2 to be carried out after the New Year holidays, 28 November 1910 1910, Copy of letter from the Secretary to Leith Surveyors regarding the report no. 13106 for Stettin and asking when the ship's owners expect the special survey no.2 to be carried out, 25 November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee about damage and repairs made to Stettin after grounding, 7 October 1910 1910, Postponed survey form for Stettin, 27 June 1910 1910, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating the special survey no.2 will be carried out in Leith in September, 23 October 1910 1910, Report of survey for repairs for Stettin, 5 October 1910 1910, Report of survey for repairs of engines and boilers for Stettin, 21 October 1910 1910, Report of Ship forgings or castings for Stettin, 30 September 1910 1910, Note about the sketch of rudder for Stettin, 19 September 1910 1910, Letter from Leith surveyors to the Secretary regarding the plan of rudder for Stettin to be approved by the Committee, 16 September 1910 1910, Copy of letter from Secretary, Lloyd's Register London, to James Currie and Co, regarding agreement for date of carrying out special survey, 28 June 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the special survey no.2 for Stettin and the repairs made, 6 June 1911 1911, Report of survey for repairs for Stettin, 3 June 1911 1911, Report of survey for repairs of engines and boilers for Stettin, 3 June 1911 1911, Copy of letter from the Assistant to the Secretary to the owners of Stettin, James Currie & Co, regarding the boiler survey to take place in about two months' time, 12 July 1912 1912, Report of survey for repairs for Stettin, 17 August 1912 1912, Postponed survey form for Stettin, 11 July 1912 1912, Letter from the owners of Stettin to the Secretary regarding the ship special survey and boilers survey, 9 July 1912 1912, Report of survey for repairs of engines and boilers for Stettin, 17 August 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the conditions of Stettin after repair, 29 December 1913 1913, Report of survey for repairs for Stettin, 27 December 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of Stettin taking place in three weeks’ time, 14 November 1913 1913, Postponed survey form for Stettin, 13 November 1913 1913, Letter from Leith surveyors to the Secretary regarding the survey of Stettin, 8 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin, 7 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin being carried out after the strike of the boilers makers, 9 November 1913 1913, Postponed survey form for Stettin, 8 September 1913 1913, Letter from Leith surveyors to the Secretary regarding the postpone of survey of Stettin due to the boilers makers strike, 5 September 1913 1913, Copy of letter from the Secretary to Leith surveyors regarding the survey of screw shaft of Stettin, 3 September 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating the Committee has agreed with the survey being carried out next month, 4 September 1913 1913, Postponed survey form for Stettin, 3 September 1913 1913, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft, 2 July 1913 1913, Report of survey for repairs of engines and boilers for Stettin, 27 December 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with postponing the special survey, 9 June 1914 1914, Postponed survey form for Stettin, 8 June 1914 1914, Letter from Leith surveyors to the Secretary regarding the special survey of Stettin, 4 June 1914 1914, Copy of letter from the Secretary to Leith surveyors enclosing a letter sent by the owners of Stettin about her fourth special survey no. 3, 3 June 1914 1914, Postponed survey form for Stettin, 2 June 1914 1914, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding postponing the second special survey no. 3 of Stettin, 29 May 1914 1914, Report of survey for repairs of engines and boilers for Stettin, 2 July 1915 1915, Copy of letter from the Secretary to Newcastle-on-Tyne surveyors regarding the special survey of Stettin, 12 August 1913 1915, Letter from Aberdeen surveyors to the Secretary stating that Stettin has sailed to Newcastle-on-Tyne as she failed to obtain docking facilities at that port, 10 August 1915 1915, Remarks to the Chief Ship Surveyor regarding the fourth special survey no. 3 for Stettin, 13 July 1915 1915, Copy of letter from the Secretary to the Surveyors in Hull, Grimsby, Middlesbrough, Newcastle, Sunderland and Hartlepool, regarding the fourth special survey no. 3 of Stettin, which will be carried out at some East coast port, 19 July 1915 1915, Letter from Leith surveyors to the Secretary regarding the survey of Stettin to be carried out at some East coast port, 12 July 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the fourth special survey no. 3 for Stettin, 5 July 1915 1915, Report of survey for repairs for Stettin, 2 July 1915 1915, Letter from Leith surveyors to the Secretary stating that the special survey of Stettin is being carried out at that port, 22 May 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 for Stettin, 21 May 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding her survey, 20 April 1915 1915, Extract from a letter dated 15 April 1915 from James Currie & Co regarding surveying Stettin. Extract dated 16 April 1915 1915, Letter from Leith surveyors to the Secretary stating that they had spoken to the owners of Stettin and due to a shortage of labour it has been difficult to find a dry dock to carry out the special survey, 13 April 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the importance of carrying out the special survey due to the age of the ship, 13 April 1915 1915, Postponed survey form for Stettin, 12 April 1915 1915, Copy of letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding the survey of Stettin being postponed, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 of Stettin, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors enclosing information about the communication between the owners of Stettin, 26 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with the special survey being carried out in the next two or three months, 26 January 1915 1915, Postponed survey form for Stettin, 25 January 1915 1915, Letter from Leith surveyors to the Secretary regarding the special survey no.3 and boiler survey of Stettin, 23 January 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding postponing the survey of Stettin, 21 January 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the fourth special survey no.3 and special annual boiler survey of Stettin, 20 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the letter sent by the latter about the thrust shaft, 1 November 1915 1915, Letter from Lisbon surveyors to the Secretary about the repair of shaft of Stettin, 25 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 28 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 23 October 1915 1915, Copy of letter from the Assistant to the Secretary to Lisbon surveyors regarding the repair of Stettin's thrust shaft being not satisfactory, 18 October 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the new thrust shaft she received in Lisbon, 1916 1915, Letter reporting that the new thrust shaft for Stettin is not considered satisfactory, 14 October 1915 1915, London Office Copy of document certifying that surveyor has examined the machinery of Stettin and stating his recommendations, 4 October 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 6 October 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 67857, 19 August 1915 1915, Report of Survey for Repairs for Stettin, 18 August 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 August 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the thrust shaft supplied in Lisbon and if it will be approved by the Committee as a permanent repair, 29 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon and stating that it will be approved by the Committee as a permanent repair, 28 April 1916 1916, Letter reporting the results of the test carried out on Stettin's new thrust shaft that was made in Lisbon, 27 April 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the result of the tests carried out on the new thrust shaft, 14 April 1916 1916, Letter from Professor R Stanfield to James Currie & Co regarding the results of the test of the transverse section of the shaft of Stettin, 11 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Letter reporting that Stettin's new thrust shaft is not satisfactory to be recommended as a permanent repair, 22 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin stating that the repair of the thrust shaft is being looked at, 14 March 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary enclosing drawings and plans of the shaft of Stettin, 6 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the repair of the thrust shaft, 28 January 1916 1916, Postponed survey form for Stettin, 22 January 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft of Stettin, 24 January 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding when the ship will be in position to have the thrust shaft examined, 21 January 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to London Report 79106, 13 July 1917 1916, Report of Survey for Repairs for Stettin due to collision with ice, 1 July 1916 1916, Report of Survey for Repairs of Engines and Boilers for Stettin, 14 July 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70096, 27 July 1917 1917, London Office Copy of document certifying that surveyor has examined damage and transmitted the Report, and stating his Recommendations, 24 July 1917 1917, Report of Survey for Repairs for Stettin 1917, Letter from Newcastle surveyors informing Lloyd's Register London that Stettin is under survey at Newcastle, 21 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding whether Stettin has yet come under inspection, 20 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding their report 70069, and Stettin's owners' intention to make repairs at South Shields within the next couple of days, and calling attention to the need for the Annu 1917, Letter from James Currie & Co Managers, informing Lloyd's Register London that they have arranged for repairs of damage previously communicated by Smith's Dry Dock Co, South Shields, on the steamer's return there in the next day or two, 1 August 1917 1917, Copy of letter from Lloyd's Register's London Secretary to James Currie and Co, informing them of the damage done to Stettin when striking a quay wall, that temporary repairs have been effected but that for the vessel to remain in class permanent repairs 1917, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70306, 2 October 1917 1917, Report of Survey for Repairs for Stettin, 29 September 1917 1917, Report of Survey for Repairs of Engines and Boilers for Stettin, 1 October 1917 1917, Certificate of approval of a stockless anchor, with cancelled written across it, 4 September 1917 1917, Correspondence to Lloyd's Register's London Secretary regarding Stettin Report 71400, acknowledging remarks on the Rules for Engines and Boilers with a working pressure of less than 60lbs, 23 November 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 71400, 19 November 1918 1918, Report of survey for repairs of Stettin, 5 November 1918 1918, Memo to Newcastle surveyors regarding Rules for Engines and Boilers of a greater working pressure than 60lbs per square inch, 18 November 1918 1918, Report of Survey for Repairs of Boilers and Engines of Stettin, 13 November 1918 1918, Copy of letter from London Secretary to James Currie and Co regarding state or survey of Stettin, 17 October 1919 1919, Postponed Survey form for Stettin, October 1919 1919, Letter from James Currie and Co to Secretary, Lloyd's Register London, regarding postponing survey of Stettin, 10 October 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Leith Report 15769, 2 July 1920 1920, Report of Survey for Repairs of Stettin, 28 June 1920 1920, Copy of letter from Lloyd's Register London Secretary to Leith Surveyors, 30 March 1920 1920, Postponed Survey form for Stettin, 29 March 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 24 March 1920 1920, Copy of Letter from Lloyd's Register London Secretary to Leith Surveyors, 19 March 1920 1920, Letter from the Surveyors at Hull, per N Rowall, to London Secretary regarding state of survey of Stettin, 18 March 1920 1920, Copy of letter from the London Secretary to the Hull Surveyors regarding state of survey of Stettin, 17 March 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 10 February 1920 1920, Postponed Survey form for Stettin, 9 February 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 5 February 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 28 January 1920 1920, Report of Survey for Repairs of Engines and Boilers for Stettin, 28 June 1920 1920, Copy of letter from the Secretary to the owners of Stettin saying the Committee has agreed with postponing the boiler survey, 23 August 1921 1921, Report of Survey for Repairs of Stettin, 16 September 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London regarding Stettin now undergoing survey, 3 September 1921 1921, Postponed Surveys form for Stettin, 22 August 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London explaining why Stettin had not undergone survey, 18 August 1921 1921, Report of Survey for Repairs of Engines and Boilers for Stettin, 16 September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Stettin survey, with reference to Leith Report 16187, 6 October 1921 1922, Report of Survey for Repairs of Stettin, 3 October 1921 1922, Correspondence of Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding ongoing surveys on Stettin, 14 September 1922 1922, Copy of letter from Lloyd's Register London Assistant to the Secretary to Leith Surveyors regarding survey of Stettin's screwshaft, 21 July 1922 1922, Postponed Surveys form for Stettin, 20 July 1922 1922, Letter from Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding proposed survey date for Stettin's screw shaft, 17 July 1922 1922, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans of owners of Stettin for survey of screwshaft, 14 July 1922 1922, Report of Survey for Repairs of Boilers and Engines for Stettin, 26 September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding carrying out part of Stettin's Special Survey, with reference to Leith Report 16388, 30 October 1923 1923, Report of Survey for Repairs of Stettin, 24 October 1923 1923, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors, regarding Rule requirements for cables, 20 October 1923 1923, Remarks to the Chief Ship Surveyor regarding Rule requirements for cables, 19 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London requesting clarification on Rules for chains, 18 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London regarding proposed timeline for survey, 22 September 1923 1923, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding letter from Stettin's owners and requesting clarification of when the boiler survey shall be held, 21 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London, regarding carrying out a part survey, 18 September 1923 1923, Copy of letter from Assistant to the Secretary to James Currie and Co regarding schedule for surveys of Stettin, 14 September 1923 1923, Postponed Surveys form for Stettin, 13 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London querying survey schedule of Stettin, 10 September 1923 1923, Report of Survey for Repairs of Engines and Boilers for Stettin, 23 October 1923 1923, Letter from Leith Surveyor A T Thomas to James Currie and Co, informing them of future survey schedule for Stettin, 23 October 1923 1923, Plan of Main Boiler for Stettin, 24 May 1924 1924, Plan of Donkey Boiler for Stettin, 24 May 1924 1924, Hatch Plan of Stettin, 2 October 1924 1924, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Stettin, with reference to Leith Report 16388, 19 May 1924 1924, Letter from A T Thomas, Leith Surveyor, to J F Hill of London, regarding surveying Stettin, 16 May 1924 1924, Extract from a letter dated 14 May 1924 from Leith surveyors regarding examining Stettin. Extract dated 15 May 1924 1924, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans for survey of Stettin and expiry of year of grace, 14 May 1924 1924, Letter from Leith surveyor A T Thomas to Secretary, London, regarding proposed examination part of Stettin's combustion chamber, 18 April 1924 1924, Copy of letter from Assistant to the Secretary to the Leith surveyors questioning owners' arrangements to have Stettin's combustion chamber examined, 16 April 1924 1924, Report of Survey for Repairs of Engines and Boilers for Stettin, 12 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding fulfilment of special survey on Stettin, in reference to Leith Report 16611, 22 November 1924 1924, Report of Survey for Repairs of Stettin, 15 November 1924 1924, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 November 1924 1924, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding completion of reports on Stettin's new boilers, 31 October 1924 1924, Note submitting that certain reports be forwarded to the Leith Surveyors for their guidance and completion, 29 October 1924 1924, Note submitting that the amended plans of boilers for Stettin merit approval, 29 May 1924 1924, Correspondence accompanying boiler plans submitted for approval for Stettin from the Glasgow office to London, 26 May 1924 1924, Letter from Jas S Cairns submitting for approval plans for new boilers for the Stettin to the Glasgow Secretary, 26 May 1924 1924, Note submitting that plans for Stettin's boilers merit approval, 24 April 1924 1924, Letter from Leith Surveyors, per A T T[homas], to Secretary, London, noting they are forwarding plans of new boilers intended for Stettin, 14 April 1924 1924, Report on Main Boiler for Stettin, 11 October 1924 1924, Report on Donkey Boiler for Stettin, 11 October 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Delivery note for 3 furnaces from Forth Shipbuilding and Engineering, Glasgow, 4 July 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 27 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, LR stamp and signature J Barr, 2 July 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 14 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 28 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 26 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 17 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 16790, 28 August 1925 1925, Report of Survey for Repairs on Stettin, 25 August 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 August 1925 1925, Memo regarding approving a steel cylinder cover on Stettin, 5 October 1925 1925, Letter from Leith Surveyor to Secretary, London, regarding steel cover repair examined, 2 October 1925 1925, Letter from Hamburg Office to Secretary, London, regarding request by Leith Surveyors, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding Hamburg report on Stettin, 1 October 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding their request for the Hamburg report, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to A Chisholm, requesting a report for the Leith Surveyors, 30 September 1925 1925, Translation of Cablegram sent to Surveyors at Hamburg, 30 September 1925 1925, Copy of Cablegram from London Office to Hamburg Office, 30 September 1925 1925, Letter from Leith Surveyors, per A T T[homas], to London Office asking for a Hamburg report to be sent to them, 29 September 1925 1925, London Office Copy of document certifying that Hamburg surveyor has examined damage and transmitted the Report, and stating his Recommendations, 25 September 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 September 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 16897, March 1926 1926, Report of Survey for Repairs to Stettin, 30 March 1926 1926, Report of Survey for Repairs of Engines and Boilers to Stettin, 30 March 1926 1926, Report of Survey for Repairs to Stettin, 15 June 1927 1927, Report of Survey for Repairs of Engines and Boilers to Stettin, 15 June 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 17291, 8 December 1927 1927, Copy of Certificate of Survey after damage to Stettin by a breaker in heavy weather, 23 November 1927 1927, Report of Survey for Repairs to Stettin, 3 December 1927 1927, Question and Answer memo between London and Leith Offices regarding Hamburg Report 17858, 21 February 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 1 February 1928 1928, Correspondence memo with particulars from Leith Surveyors to Secretary, London, regarding return of report, 27 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 25 January 1928 1928, Copy of Certificate of Survey from Hamburg after collision damage suffered by Stettin, 22 January 1928 1928, Report of Survey for Repairs of Stettin, 23 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 17339, 15 March 1928 1928, Report of Survey for Repairs of Stettin, 5 March 1928 1928, Copy of letter from the Clerk of the Classification Committee to James Currie and Co, with a copy to the Leith Office, regarding 6th Special Survey of Stettin, 14 December 1928 1928, Postponed Survey form for Stettin's 6th Special Survey, 13 December 1928 1928, Letter from James Currie and Co to Lloyd's Register Secretary, London, regarding deferring Stettin's 6th Special Survey, 11 December 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage, in reference to Dundee Report 8638, 30 March 1928 1928, Copy of Certificate of Survey regarding damage and report of repairs to Stettin's port bow shell plating, Dundee, 23 March 1928 1928, Report of Survey for Repairs to Stettin, 23 March 1928 1928, Letter from Lloyd's Register Engineer Surveyor to James Currie and Co regarding schedule for survey of Stettin's propeller shaft, 5 March 1929 1929, Copy of letter from the Secretary, London, to the Secretary, Glasgow, returning Stettin boiler plans, 29 May 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin and 6th Special Survey, in reference to Leith Report 17540, 13 March 1929 1929, Report of Survey for Repairs of Stettin, 5 March 1929 1929, Report of Survey for Repairs of Engines and Boilers for Stettin, 5 March 1929 1929, Copy of letter from pro Secretary, London, to Leith Surveyors regarding examination of Stettin's screwshaft, 16 April 1930 1930, Postponed Survey form for Stettin's screwshaft, 14 April 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 9 April 1930 1930, Copy of letter from Secretary, London, to Leith Surveyors informing them Committee are agreeable to postponing Stettin's screwshaft survey, 25 February 1930 1930, Postponed Survey form for Stettin's screwshaft, 24 February 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 17 February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 17802, 22 May 1930 1930, Report of Survey for Repairs to Stettin, 15 May 1930 1930, Report on Engine Forgings for Stettin, 8 May 1930 1930, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 May 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 18082, 2 November 1931 1931, Form or memo from Secretary, Glasgow, to Secretary, London, regarding presence of Stettin, 16 October 1931 1931, Question and Answer memo from Secretary, London, to Leith Surveyors regarding Stettin Boiler Survey, 5 October 1931 1931, Copy of letter from pro Secretary, London, with copy to Leith, to James Currie and Co regarding postponing Stettin Boiler Survey, 26 June 1931 1931, Postponed Surveys form for Stettin's Boiler Survey, 25 June 1931 1931, Letter from James Currie and Co regarding postponing Boiler Survey due on Stettin, 20 June 1931 1931, Report of Survey for Repairs on Stettin, 26 October 1931 1931, Report of Survey for Repairs of Engines and Boilers on Stettin, 26 October 1931 1931, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of survey for Stettin, 23 December 1932 1932, Postponed Surveys form for Stettin, 22 December 1932 1932, Letter from Leith Surveyors per John Houston to the Secretary, London, regarding outstanding survey on Stettin, 17 December 1932 1932, Letter from James Currie and Co to Leith Surveyors regarding schedule of survey for Stettin, 16 December 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 14 December 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 24 November 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 September 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 21 June 1932 1932, Postponed Surveys form for Stettin, 20 June 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 June 1932 1932, Copy of letter from pro Secretary, London to Leith Surveyors regarding Stettin boiler survey schedule, 9 October 1931 1932, Postponed Surveys form for Stettin, 8 October 1931 1932, Report of Total Loss, Casualty, , for Stettin, which has been sold to be broken up, 4 December 1933 1933, Letter from Leith Surveyors, per John Houston, to Secretary, London, informing them Stettin is being broken up, 1 December 1933 1933, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of demolition for Stettin, 27 November 1933 1933, Copy of letter from Leith Surveyors, per John Houston, to the Secretary, London, regarding the firm to which Stettin was sold to be broken up, 24 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 23 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 31 August 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 15 June 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 16 March 1933 1933, Note related to Stettin stating SS no. 2 held now posting no date, Note regarding Stettin stating "Vessel left Lisbon Oct 3. + 3 mos from dats. of survey would expire 12/15" no date, Sketch or plan of steel cover part for Stettin no date )
Unique identifier for a given ship, it is assigned by a builder.
122 ( Certificate for vessels navigated by Steam for Stettin, 30 November 1864 1864, Iron Ship survey report for Stettin, 2 December 1864 1864, Letter from Glasgow surveyor to the Secretary sending the machinery certificate and Stettin's report of survey no. 4255, 8 July 1876 1876, Report of survey for repairs for Stettin, 8 July 1876 1876, Memo from Messrs Napier Ltd. stating that Stettin's boilers are fitted in accordance with the Committee requirements and should have the notification Lloyd's MC in the Register Book, 3 July 1876 1876, Details of main boilers of Stettin, 29 June 1876 1876, Engineer surveyor's report on machinery for Stettin, 26 June 1876 1876, Annual surveys for Stettin, 30 November 1876 1876, Report of survey for repairs for Stettin, 16 January 1879 1879, Report of survey for repairs of engines and boilers for Stettin, 16 January 1880 1880, Cover note for reports number 4308 and 57 of Stettin, 31 January 1880 1880, Report of survey for repairs for Stettin, 28 January 1880 1880, Report of survey for repairs for Stettin, 2 February 1881 1881, Report of survey for repairs for Stettin, 27 January 1882 1882, Annual surveys for Stettin, 6 January 1883 1883, Annual surveys for Stettin, 23 January 1884 1884, Report of survey for repairs for Stettin, 30 January 1885 1885, Report of survey for repairs of engines and boilers for Stettin, 30 January 1885 1885, Report of survey for repairs for Stettin, 27 January 1886 1886, Report of survey for repairs of engines and boilers for Stettin, 30 January 1886 1886, Report of survey for repairs for Stettin, 26 February 1887 1887, Report of survey for repairs of engines and boilers for Stettin, 15 March 1887 1887, Report of survey for repairs for Stettin, 21 May 1888 1888, Report of survey for repairs of engines and boilers for Stettin, 25 May 1888 1888, Report of survey for repairs for Stettin, 29 December 1888 1888, Particulars for record of double bottoms in Lloyd's Register for Stettin, 5 December 1889 1889, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 10 December 1889 1889, Report of Survey for Repairs for Stettin, 6 December 1889 1889, Report on Machinery for Stettin, 3 December 1889 1889, Report of Survey for Repairs for Stettin, 18 October 1890 1890, Report of Survey for Repairs for Stettin, 6 November 1891 1891, Report of Survey for Repairs for Stettin, 16 January 1893 1893, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 19 February 1894 1894, Report of survey for repairs for Stettin, 12 February 1894 1894, Report of survey for repairs of engines and boilers for Stettin, 13 February 1894 1894, Letter from the surveyor Jas Barclay to the Secretary in London enclosing a letter received from the Master of Stettin about the boiler survey to be held at Bergen, 9 June 1894 1894, Letter from the Master of Stettin Otto E Jacobsen to the surveyor James Barclay about the survey of boilers to take place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to E Rusten, owner of Stettin, stating he agrees with the survey of boilers taking place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to Bergen surveyor stating that Stettin will have the survey of boilers carried out in Bergen, 8 June 1894 1894, Note stating the boiler survey for Stettin is due to April and the owners state the ship will be at Bergen where the survey will take place, 8 June 1894 1894, Letter from Erik Rusten, owner of Stettin, to Lloyd's Register stating that he wishes the survey of boilers to take place in Bergen, 4 June 1894 1894, Report of Survey for repairs of engines and boilers for Stettin, 12 July 1894 1894, Report of survey for repairs for Stettin, 6 February 1895 1895, Report of survey for repairs of engines and boilers for Stettin, 6 February 1895 1895, Report of survey for repairs for Stettin, 19 March 1896 1896, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin about the survey of boilers, 23 March 1896 1896, Letter from Leith surveyor to the Secretary stating that the Stettin is under survey, 5 March 1896 1896, Letter from the Secretary to the Leith Surveyor questioning about the survey of Stettin, 3 March 1896 1896, Copy of Letter from the Secretary to the owner of Stettin stating that he agrees with the boiler survey of that ship being carried out when she is in dry dock in the following month, 29 January 1896 1896, Note stating the boiler survey for Stettin will be in dry dock in the following month, 29 January 1896 1896, Letter from the owner of Stettin to the Secretary stating the ship will be in dry dock next month for the survey, 27 January 1896 1896, Report of survey for repairs of engines and boilers for Stettin, 19 March 1896 1896, Report of survey for repairs for Stettin, 19 March 1897 1897, Letter from the Leith surveyor to the Secretary stating that Stettin is now employed in the emigrant trade and therefore the pressure of boiler has been reduced, 24 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 19 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 26 July 1897 1897, Remarks of the Chief Surveyor to the Classing Committee about the special survey of the ship Stettin, 4 March 1898 1898, Copy of letter from the Secretary to the owners of Stettin stating that the special survey will take place when the ship is placed in dry dock, 3 February 1898 1898, Note stating the ship Stettin will be soon in dry dock to be surveyed, 3 February 1898 1898, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating their intention to put the ship in dry dock to be surveyed, 1 February 1898 1898, Report of survey for repairs for Stettin, 3 March 1898 1898, Report of survey for repairs of engines and boilers for Stettin, 3 March 1898 1898, Remarks of the Chief Surveyor to the Classing Committee about the damage and temporary repairs suffered by Stettin, 31 March 1898 1898, Letter from the Bremerhaven surveyor about the repairs to Stettin, 29 March 1898 1898, Cover note for report number 534 of Stettin, 1 April 1898 1898, Report of survey for repairs for Stettin, 28 March 1898 1898, Remarks of the Ship Surveyor to the Classing Committee saying the damage to Stettin has been repaired and she should remain classed, 6 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1899 1899, Report of survey for repairs of engines and boilers for Stettin, 5 April 1899 1899, Report of survey for repairs for Stettin, 28 April 1900 1900, Report of survey for repairs of engines and boilers for Stettin, 28 April 1900 1900, Report of survey for repairs for Stettin, 2 May 1901 1901, Report of survey for repairs of engines and boilers for Stettin, 2 May 1901 1901, Remarks of the Ship Surveyor to the Classing Committee about the special survey of Stettin and the particulars of her plating, 7 April 1902 1902, Report of survey for repairs for Stettin, 4 April 1902 1902, Copy of letter from the Secretary to the owners of Stettin statin the Committee agreed with the special survey being carried out in the next two months, 31 January 1902 1902, Postponed survey form for Stettin, 30 January 1902 1902, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating they expect to attend the special survey within the next two months, 29 January 1902 1902, Report of survey for repairs of engines and boilers for Stettin, 4 April 1902 1902, Report of survey for repairs for Stettin, 11 May 1903 1903, Copy of letter from the Secretary to Leith Surveyors stating that the steamer Stettin has been booked for the annual boiler survey that will take place in a few days, 7 April 1903 1903, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the annual overhaul has been booked for that next few days, 4 April 1903 1903, Report of survey for repairs of engines and boilers for Stettin, 11 May 1903 1903, Report of survey for repairs for Stettin, 29 June 1904 1904, Report of survey for repairs of engines and boilers for Stettin, 29 June 1904 1904, Report of survey for repairs for Stettin, 11 July 1905 1905, Report of survey for repairs of engines and boilers for Stettin, 11 July 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the damage and repairs to Stettin, 24 August 1905 1905, Report of survey for repairs for Stettin, 22 August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the special survey no.1 of Stettin, 26 July 1906 1906, Copy of letter from the Secretary to Leith Surveyors stating that Stettin will be in dry dock on her arrival from Konigsberg when the special survey no.1 will be carried out, 22 June 1906 1906, Copy of letter from the Secretary to the owners of Stettin stating that the special survey no.1 will be carried out next week in Leith, 22 June 1906 1906, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the special survey no.1 will be carried out in the next week on her arrival from Konigsberg, 20 June 1906 1906, Report of survey for repairs for Stettin, 23 July 1906 1906, Report of survey for repairs of engines and boilers for Stettin, 24 July 1906 1906, Report of survey for repairs for Stettin, 16 July 1907 1906, Report of survey for repairs of engines and boilers for Stettin, 16 July 1907 1906, Report of survey for repairs for Stettin, 19 September 1908 1908, Copy of letter from the Secretary to Leith Surveyors stating that Stettin is laid up for overhaul and that the boiler survey should be carried out, 8 September 1908 1908, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the steamer is laid up for overhaul and that the special survey of boilers should take place next week, 5 September 1908 1908, Report of survey for repairs of engines and boilers for Stettin, 19 September 1908 1908, Report of survey for repairs for Stettin, 2 October 1909 1909, Report of survey for repairs of engines and boilers for Stettin, 2 October 1909 1909, Plan of Rudder of Stettin, 1910. Scale 1"=one foot. Details 3"= one foot, 19 September 1910 1910, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding the special survey no. 2 and boiler survey for Stettin, 29 October 1910 1910, Letter from Leith Surveyor to the Secretary stating that they met with the owners of Stettin and arranged the special survey no. 2 to be carried out after the New Year holidays, 28 November 1910 1910, Copy of letter from the Secretary to Leith Surveyors regarding the report no. 13106 for Stettin and asking when the ship's owners expect the special survey no.2 to be carried out, 25 November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee about damage and repairs made to Stettin after grounding, 7 October 1910 1910, Postponed survey form for Stettin, 27 June 1910 1910, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating the special survey no.2 will be carried out in Leith in September, 23 October 1910 1910, Report of survey for repairs for Stettin, 5 October 1910 1910, Report of survey for repairs of engines and boilers for Stettin, 21 October 1910 1910, Report of Ship forgings or castings for Stettin, 30 September 1910 1910, Note about the sketch of rudder for Stettin, 19 September 1910 1910, Letter from Leith surveyors to the Secretary regarding the plan of rudder for Stettin to be approved by the Committee, 16 September 1910 1910, Copy of letter from Secretary, Lloyd's Register London, to James Currie and Co, regarding agreement for date of carrying out special survey, 28 June 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the special survey no.2 for Stettin and the repairs made, 6 June 1911 1911, Report of survey for repairs for Stettin, 3 June 1911 1911, Report of survey for repairs of engines and boilers for Stettin, 3 June 1911 1911, Copy of letter from the Assistant to the Secretary to the owners of Stettin, James Currie & Co, regarding the boiler survey to take place in about two months' time, 12 July 1912 1912, Report of survey for repairs for Stettin, 17 August 1912 1912, Postponed survey form for Stettin, 11 July 1912 1912, Letter from the owners of Stettin to the Secretary regarding the ship special survey and boilers survey, 9 July 1912 1912, Report of survey for repairs of engines and boilers for Stettin, 17 August 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the conditions of Stettin after repair, 29 December 1913 1913, Report of survey for repairs for Stettin, 27 December 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of Stettin taking place in three weeks’ time, 14 November 1913 1913, Postponed survey form for Stettin, 13 November 1913 1913, Letter from Leith surveyors to the Secretary regarding the survey of Stettin, 8 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin, 7 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin being carried out after the strike of the boilers makers, 9 November 1913 1913, Postponed survey form for Stettin, 8 September 1913 1913, Letter from Leith surveyors to the Secretary regarding the postpone of survey of Stettin due to the boilers makers strike, 5 September 1913 1913, Copy of letter from the Secretary to Leith surveyors regarding the survey of screw shaft of Stettin, 3 September 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating the Committee has agreed with the survey being carried out next month, 4 September 1913 1913, Postponed survey form for Stettin, 3 September 1913 1913, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft, 2 July 1913 1913, Report of survey for repairs of engines and boilers for Stettin, 27 December 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with postponing the special survey, 9 June 1914 1914, Postponed survey form for Stettin, 8 June 1914 1914, Letter from Leith surveyors to the Secretary regarding the special survey of Stettin, 4 June 1914 1914, Copy of letter from the Secretary to Leith surveyors enclosing a letter sent by the owners of Stettin about her fourth special survey no. 3, 3 June 1914 1914, Postponed survey form for Stettin, 2 June 1914 1914, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding postponing the second special survey no. 3 of Stettin, 29 May 1914 1914, Report of survey for repairs of engines and boilers for Stettin, 2 July 1915 1915, Copy of letter from the Secretary to Newcastle-on-Tyne surveyors regarding the special survey of Stettin, 12 August 1913 1915, Letter from Aberdeen surveyors to the Secretary stating that Stettin has sailed to Newcastle-on-Tyne as she failed to obtain docking facilities at that port, 10 August 1915 1915, Remarks to the Chief Ship Surveyor regarding the fourth special survey no. 3 for Stettin, 13 July 1915 1915, Copy of letter from the Secretary to the Surveyors in Hull, Grimsby, Middlesbrough, Newcastle, Sunderland and Hartlepool, regarding the fourth special survey no. 3 of Stettin, which will be carried out at some East coast port, 19 July 1915 1915, Letter from Leith surveyors to the Secretary regarding the survey of Stettin to be carried out at some East coast port, 12 July 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the fourth special survey no. 3 for Stettin, 5 July 1915 1915, Report of survey for repairs for Stettin, 2 July 1915 1915, Letter from Leith surveyors to the Secretary stating that the special survey of Stettin is being carried out at that port, 22 May 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 for Stettin, 21 May 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding her survey, 20 April 1915 1915, Extract from a letter dated 15 April 1915 from James Currie & Co regarding surveying Stettin. Extract dated 16 April 1915 1915, Letter from Leith surveyors to the Secretary stating that they had spoken to the owners of Stettin and due to a shortage of labour it has been difficult to find a dry dock to carry out the special survey, 13 April 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the importance of carrying out the special survey due to the age of the ship, 13 April 1915 1915, Postponed survey form for Stettin, 12 April 1915 1915, Copy of letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding the survey of Stettin being postponed, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 of Stettin, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors enclosing information about the communication between the owners of Stettin, 26 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with the special survey being carried out in the next two or three months, 26 January 1915 1915, Postponed survey form for Stettin, 25 January 1915 1915, Letter from Leith surveyors to the Secretary regarding the special survey no.3 and boiler survey of Stettin, 23 January 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding postponing the survey of Stettin, 21 January 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the fourth special survey no.3 and special annual boiler survey of Stettin, 20 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the letter sent by the latter about the thrust shaft, 1 November 1915 1915, Letter from Lisbon surveyors to the Secretary about the repair of shaft of Stettin, 25 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 28 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 23 October 1915 1915, Copy of letter from the Assistant to the Secretary to Lisbon surveyors regarding the repair of Stettin's thrust shaft being not satisfactory, 18 October 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the new thrust shaft she received in Lisbon, 1916 1915, Letter reporting that the new thrust shaft for Stettin is not considered satisfactory, 14 October 1915 1915, London Office Copy of document certifying that surveyor has examined the machinery of Stettin and stating his recommendations, 4 October 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 6 October 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 67857, 19 August 1915 1915, Report of Survey for Repairs for Stettin, 18 August 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 August 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the thrust shaft supplied in Lisbon and if it will be approved by the Committee as a permanent repair, 29 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon and stating that it will be approved by the Committee as a permanent repair, 28 April 1916 1916, Letter reporting the results of the test carried out on Stettin's new thrust shaft that was made in Lisbon, 27 April 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the result of the tests carried out on the new thrust shaft, 14 April 1916 1916, Letter from Professor R Stanfield to James Currie & Co regarding the results of the test of the transverse section of the shaft of Stettin, 11 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Letter reporting that Stettin's new thrust shaft is not satisfactory to be recommended as a permanent repair, 22 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin stating that the repair of the thrust shaft is being looked at, 14 March 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary enclosing drawings and plans of the shaft of Stettin, 6 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the repair of the thrust shaft, 28 January 1916 1916, Postponed survey form for Stettin, 22 January 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft of Stettin, 24 January 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding when the ship will be in position to have the thrust shaft examined, 21 January 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to London Report 79106, 13 July 1917 1916, Report of Survey for Repairs for Stettin due to collision with ice, 1 July 1916 1916, Report of Survey for Repairs of Engines and Boilers for Stettin, 14 July 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70096, 27 July 1917 1917, London Office Copy of document certifying that surveyor has examined damage and transmitted the Report, and stating his Recommendations, 24 July 1917 1917, Report of Survey for Repairs for Stettin 1917, Letter from Newcastle surveyors informing Lloyd's Register London that Stettin is under survey at Newcastle, 21 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding whether Stettin has yet come under inspection, 20 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding their report 70069, and Stettin's owners' intention to make repairs at South Shields within the next couple of days, and calling attention to the need for the Annu 1917, Letter from James Currie & Co Managers, informing Lloyd's Register London that they have arranged for repairs of damage previously communicated by Smith's Dry Dock Co, South Shields, on the steamer's return there in the next day or two, 1 August 1917 1917, Copy of letter from Lloyd's Register's London Secretary to James Currie and Co, informing them of the damage done to Stettin when striking a quay wall, that temporary repairs have been effected but that for the vessel to remain in class permanent repairs 1917, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70306, 2 October 1917 1917, Report of Survey for Repairs for Stettin, 29 September 1917 1917, Report of Survey for Repairs of Engines and Boilers for Stettin, 1 October 1917 1917, Certificate of approval of a stockless anchor, with cancelled written across it, 4 September 1917 1917, Correspondence to Lloyd's Register's London Secretary regarding Stettin Report 71400, acknowledging remarks on the Rules for Engines and Boilers with a working pressure of less than 60lbs, 23 November 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 71400, 19 November 1918 1918, Report of survey for repairs of Stettin, 5 November 1918 1918, Memo to Newcastle surveyors regarding Rules for Engines and Boilers of a greater working pressure than 60lbs per square inch, 18 November 1918 1918, Report of Survey for Repairs of Boilers and Engines of Stettin, 13 November 1918 1918, Copy of letter from London Secretary to James Currie and Co regarding state or survey of Stettin, 17 October 1919 1919, Postponed Survey form for Stettin, October 1919 1919, Letter from James Currie and Co to Secretary, Lloyd's Register London, regarding postponing survey of Stettin, 10 October 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Leith Report 15769, 2 July 1920 1920, Report of Survey for Repairs of Stettin, 28 June 1920 1920, Copy of letter from Lloyd's Register London Secretary to Leith Surveyors, 30 March 1920 1920, Postponed Survey form for Stettin, 29 March 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 24 March 1920 1920, Copy of Letter from Lloyd's Register London Secretary to Leith Surveyors, 19 March 1920 1920, Letter from the Surveyors at Hull, per N Rowall, to London Secretary regarding state of survey of Stettin, 18 March 1920 1920, Copy of letter from the London Secretary to the Hull Surveyors regarding state of survey of Stettin, 17 March 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 10 February 1920 1920, Postponed Survey form for Stettin, 9 February 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 5 February 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 28 January 1920 1920, Report of Survey for Repairs of Engines and Boilers for Stettin, 28 June 1920 1920, Copy of letter from the Secretary to the owners of Stettin saying the Committee has agreed with postponing the boiler survey, 23 August 1921 1921, Report of Survey for Repairs of Stettin, 16 September 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London regarding Stettin now undergoing survey, 3 September 1921 1921, Postponed Surveys form for Stettin, 22 August 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London explaining why Stettin had not undergone survey, 18 August 1921 1921, Report of Survey for Repairs of Engines and Boilers for Stettin, 16 September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Stettin survey, with reference to Leith Report 16187, 6 October 1921 1922, Report of Survey for Repairs of Stettin, 3 October 1921 1922, Correspondence of Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding ongoing surveys on Stettin, 14 September 1922 1922, Copy of letter from Lloyd's Register London Assistant to the Secretary to Leith Surveyors regarding survey of Stettin's screwshaft, 21 July 1922 1922, Postponed Surveys form for Stettin, 20 July 1922 1922, Letter from Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding proposed survey date for Stettin's screw shaft, 17 July 1922 1922, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans of owners of Stettin for survey of screwshaft, 14 July 1922 1922, Report of Survey for Repairs of Boilers and Engines for Stettin, 26 September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding carrying out part of Stettin's Special Survey, with reference to Leith Report 16388, 30 October 1923 1923, Report of Survey for Repairs of Stettin, 24 October 1923 1923, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors, regarding Rule requirements for cables, 20 October 1923 1923, Remarks to the Chief Ship Surveyor regarding Rule requirements for cables, 19 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London requesting clarification on Rules for chains, 18 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London regarding proposed timeline for survey, 22 September 1923 1923, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding letter from Stettin's owners and requesting clarification of when the boiler survey shall be held, 21 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London, regarding carrying out a part survey, 18 September 1923 1923, Copy of letter from Assistant to the Secretary to James Currie and Co regarding schedule for surveys of Stettin, 14 September 1923 1923, Postponed Surveys form for Stettin, 13 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London querying survey schedule of Stettin, 10 September 1923 1923, Report of Survey for Repairs of Engines and Boilers for Stettin, 23 October 1923 1923, Letter from Leith Surveyor A T Thomas to James Currie and Co, informing them of future survey schedule for Stettin, 23 October 1923 1923, Plan of Main Boiler for Stettin, 24 May 1924 1924, Plan of Donkey Boiler for Stettin, 24 May 1924 1924, Hatch Plan of Stettin, 2 October 1924 1924, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Stettin, with reference to Leith Report 16388, 19 May 1924 1924, Letter from A T Thomas, Leith Surveyor, to J F Hill of London, regarding surveying Stettin, 16 May 1924 1924, Extract from a letter dated 14 May 1924 from Leith surveyors regarding examining Stettin. Extract dated 15 May 1924 1924, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans for survey of Stettin and expiry of year of grace, 14 May 1924 1924, Letter from Leith surveyor A T Thomas to Secretary, London, regarding proposed examination part of Stettin's combustion chamber, 18 April 1924 1924, Copy of letter from Assistant to the Secretary to the Leith surveyors questioning owners' arrangements to have Stettin's combustion chamber examined, 16 April 1924 1924, Report of Survey for Repairs of Engines and Boilers for Stettin, 12 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding fulfilment of special survey on Stettin, in reference to Leith Report 16611, 22 November 1924 1924, Report of Survey for Repairs of Stettin, 15 November 1924 1924, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 November 1924 1924, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding completion of reports on Stettin's new boilers, 31 October 1924 1924, Note submitting that certain reports be forwarded to the Leith Surveyors for their guidance and completion, 29 October 1924 1924, Note submitting that the amended plans of boilers for Stettin merit approval, 29 May 1924 1924, Correspondence accompanying boiler plans submitted for approval for Stettin from the Glasgow office to London, 26 May 1924 1924, Letter from Jas S Cairns submitting for approval plans for new boilers for the Stettin to the Glasgow Secretary, 26 May 1924 1924, Note submitting that plans for Stettin's boilers merit approval, 24 April 1924 1924, Letter from Leith Surveyors, per A T T[homas], to Secretary, London, noting they are forwarding plans of new boilers intended for Stettin, 14 April 1924 1924, Report on Main Boiler for Stettin, 11 October 1924 1924, Report on Donkey Boiler for Stettin, 11 October 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Delivery note for 3 furnaces from Forth Shipbuilding and Engineering, Glasgow, 4 July 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 27 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, LR stamp and signature J Barr, 2 July 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 14 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 28 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 26 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 17 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 16790, 28 August 1925 1925, Report of Survey for Repairs on Stettin, 25 August 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 August 1925 1925, Memo regarding approving a steel cylinder cover on Stettin, 5 October 1925 1925, Letter from Leith Surveyor to Secretary, London, regarding steel cover repair examined, 2 October 1925 1925, Letter from Hamburg Office to Secretary, London, regarding request by Leith Surveyors, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding Hamburg report on Stettin, 1 October 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding their request for the Hamburg report, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to A Chisholm, requesting a report for the Leith Surveyors, 30 September 1925 1925, Translation of Cablegram sent to Surveyors at Hamburg, 30 September 1925 1925, Copy of Cablegram from London Office to Hamburg Office, 30 September 1925 1925, Letter from Leith Surveyors, per A T T[homas], to London Office asking for a Hamburg report to be sent to them, 29 September 1925 1925, London Office Copy of document certifying that Hamburg surveyor has examined damage and transmitted the Report, and stating his Recommendations, 25 September 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 September 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 16897, March 1926 1926, Report of Survey for Repairs to Stettin, 30 March 1926 1926, Report of Survey for Repairs of Engines and Boilers to Stettin, 30 March 1926 1926, Report of Survey for Repairs to Stettin, 15 June 1927 1927, Report of Survey for Repairs of Engines and Boilers to Stettin, 15 June 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 17291, 8 December 1927 1927, Copy of Certificate of Survey after damage to Stettin by a breaker in heavy weather, 23 November 1927 1927, Report of Survey for Repairs to Stettin, 3 December 1927 1927, Question and Answer memo between London and Leith Offices regarding Hamburg Report 17858, 21 February 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 1 February 1928 1928, Correspondence memo with particulars from Leith Surveyors to Secretary, London, regarding return of report, 27 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 25 January 1928 1928, Copy of Certificate of Survey from Hamburg after collision damage suffered by Stettin, 22 January 1928 1928, Report of Survey for Repairs of Stettin, 23 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 17339, 15 March 1928 1928, Report of Survey for Repairs of Stettin, 5 March 1928 1928, Copy of letter from the Clerk of the Classification Committee to James Currie and Co, with a copy to the Leith Office, regarding 6th Special Survey of Stettin, 14 December 1928 1928, Postponed Survey form for Stettin's 6th Special Survey, 13 December 1928 1928, Letter from James Currie and Co to Lloyd's Register Secretary, London, regarding deferring Stettin's 6th Special Survey, 11 December 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage, in reference to Dundee Report 8638, 30 March 1928 1928, Copy of Certificate of Survey regarding damage and report of repairs to Stettin's port bow shell plating, Dundee, 23 March 1928 1928, Report of Survey for Repairs to Stettin, 23 March 1928 1928, Letter from Lloyd's Register Engineer Surveyor to James Currie and Co regarding schedule for survey of Stettin's propeller shaft, 5 March 1929 1929, Copy of letter from the Secretary, London, to the Secretary, Glasgow, returning Stettin boiler plans, 29 May 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin and 6th Special Survey, in reference to Leith Report 17540, 13 March 1929 1929, Report of Survey for Repairs of Stettin, 5 March 1929 1929, Report of Survey for Repairs of Engines and Boilers for Stettin, 5 March 1929 1929, Copy of letter from pro Secretary, London, to Leith Surveyors regarding examination of Stettin's screwshaft, 16 April 1930 1930, Postponed Survey form for Stettin's screwshaft, 14 April 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 9 April 1930 1930, Copy of letter from Secretary, London, to Leith Surveyors informing them Committee are agreeable to postponing Stettin's screwshaft survey, 25 February 1930 1930, Postponed Survey form for Stettin's screwshaft, 24 February 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 17 February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 17802, 22 May 1930 1930, Report of Survey for Repairs to Stettin, 15 May 1930 1930, Report on Engine Forgings for Stettin, 8 May 1930 1930, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 May 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 18082, 2 November 1931 1931, Form or memo from Secretary, Glasgow, to Secretary, London, regarding presence of Stettin, 16 October 1931 1931, Question and Answer memo from Secretary, London, to Leith Surveyors regarding Stettin Boiler Survey, 5 October 1931 1931, Copy of letter from pro Secretary, London, with copy to Leith, to James Currie and Co regarding postponing Stettin Boiler Survey, 26 June 1931 1931, Postponed Surveys form for Stettin's Boiler Survey, 25 June 1931 1931, Letter from James Currie and Co regarding postponing Boiler Survey due on Stettin, 20 June 1931 1931, Report of Survey for Repairs on Stettin, 26 October 1931 1931, Report of Survey for Repairs of Engines and Boilers on Stettin, 26 October 1931 1931, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of survey for Stettin, 23 December 1932 1932, Postponed Surveys form for Stettin, 22 December 1932 1932, Letter from Leith Surveyors per John Houston to the Secretary, London, regarding outstanding survey on Stettin, 17 December 1932 1932, Letter from James Currie and Co to Leith Surveyors regarding schedule of survey for Stettin, 16 December 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 14 December 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 24 November 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 September 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 21 June 1932 1932, Postponed Surveys form for Stettin, 20 June 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 June 1932 1932, Copy of letter from pro Secretary, London to Leith Surveyors regarding Stettin boiler survey schedule, 9 October 1931 1932, Postponed Surveys form for Stettin, 8 October 1931 1932, Report of Total Loss, Casualty, , for Stettin, which has been sold to be broken up, 4 December 1933 1933, Letter from Leith Surveyors, per John Houston, to Secretary, London, informing them Stettin is being broken up, 1 December 1933 1933, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of demolition for Stettin, 27 November 1933 1933, Copy of letter from Leith Surveyors, per John Houston, to the Secretary, London, regarding the firm to which Stettin was sold to be broken up, 24 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 23 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 31 August 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 15 June 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 16 March 1933 1933, Note related to Stettin stating SS no. 2 held now posting no date, Note regarding Stettin stating "Vessel left Lisbon Oct 3. + 3 mos from dats. of survey would expire 12/15" no date, Sketch or plan of steel cover part for Stettin no date )
The country in which the vessel’s construction took place, at the time of writing.
United Kingdom ( Certificate for vessels navigated by Steam for Stettin, 30 November 1864 1864, Iron Ship survey report for Stettin, 2 December 1864 1864, Letter from Glasgow surveyor to the Secretary sending the machinery certificate and Stettin's report of survey no. 4255, 8 July 1876 1876, Report of survey for repairs for Stettin, 8 July 1876 1876, Memo from Messrs Napier Ltd. stating that Stettin's boilers are fitted in accordance with the Committee requirements and should have the notification Lloyd's MC in the Register Book, 3 July 1876 1876, Details of main boilers of Stettin, 29 June 1876 1876, Engineer surveyor's report on machinery for Stettin, 26 June 1876 1876, Annual surveys for Stettin, 30 November 1876 1876, Report of survey for repairs for Stettin, 16 January 1879 1879, Report of survey for repairs of engines and boilers for Stettin, 16 January 1880 1880, Cover note for reports number 4308 and 57 of Stettin, 31 January 1880 1880, Report of survey for repairs for Stettin, 28 January 1880 1880, Report of survey for repairs for Stettin, 2 February 1881 1881, Report of survey for repairs for Stettin, 27 January 1882 1882, Annual surveys for Stettin, 6 January 1883 1883, Annual surveys for Stettin, 23 January 1884 1884, Report of survey for repairs for Stettin, 30 January 1885 1885, Report of survey for repairs of engines and boilers for Stettin, 30 January 1885 1885, Report of survey for repairs for Stettin, 27 January 1886 1886, Report of survey for repairs of engines and boilers for Stettin, 30 January 1886 1886, Report of survey for repairs for Stettin, 26 February 1887 1887, Report of survey for repairs of engines and boilers for Stettin, 15 March 1887 1887, Report of survey for repairs for Stettin, 21 May 1888 1888, Report of survey for repairs of engines and boilers for Stettin, 25 May 1888 1888, Report of survey for repairs for Stettin, 29 December 1888 1888, Particulars for record of double bottoms in Lloyd's Register for Stettin, 5 December 1889 1889, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 10 December 1889 1889, Report of Survey for Repairs for Stettin, 6 December 1889 1889, Report on Machinery for Stettin, 3 December 1889 1889, Report of Survey for Repairs for Stettin, 18 October 1890 1890, Report of Survey for Repairs for Stettin, 6 November 1891 1891, Report of Survey for Repairs for Stettin, 16 January 1893 1893, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 19 February 1894 1894, Report of survey for repairs for Stettin, 12 February 1894 1894, Report of survey for repairs of engines and boilers for Stettin, 13 February 1894 1894, Letter from the surveyor Jas Barclay to the Secretary in London enclosing a letter received from the Master of Stettin about the boiler survey to be held at Bergen, 9 June 1894 1894, Letter from the Master of Stettin Otto E Jacobsen to the surveyor James Barclay about the survey of boilers to take place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to E Rusten, owner of Stettin, stating he agrees with the survey of boilers taking place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to Bergen surveyor stating that Stettin will have the survey of boilers carried out in Bergen, 8 June 1894 1894, Note stating the boiler survey for Stettin is due to April and the owners state the ship will be at Bergen where the survey will take place, 8 June 1894 1894, Letter from Erik Rusten, owner of Stettin, to Lloyd's Register stating that he wishes the survey of boilers to take place in Bergen, 4 June 1894 1894, Report of Survey for repairs of engines and boilers for Stettin, 12 July 1894 1894, Report of survey for repairs for Stettin, 6 February 1895 1895, Report of survey for repairs of engines and boilers for Stettin, 6 February 1895 1895, Report of survey for repairs for Stettin, 19 March 1896 1896, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin about the survey of boilers, 23 March 1896 1896, Letter from Leith surveyor to the Secretary stating that the Stettin is under survey, 5 March 1896 1896, Letter from the Secretary to the Leith Surveyor questioning about the survey of Stettin, 3 March 1896 1896, Copy of Letter from the Secretary to the owner of Stettin stating that he agrees with the boiler survey of that ship being carried out when she is in dry dock in the following month, 29 January 1896 1896, Note stating the boiler survey for Stettin will be in dry dock in the following month, 29 January 1896 1896, Letter from the owner of Stettin to the Secretary stating the ship will be in dry dock next month for the survey, 27 January 1896 1896, Report of survey for repairs of engines and boilers for Stettin, 19 March 1896 1896, Report of survey for repairs for Stettin, 19 March 1897 1897, Letter from the Leith surveyor to the Secretary stating that Stettin is now employed in the emigrant trade and therefore the pressure of boiler has been reduced, 24 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 19 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 26 July 1897 1897, Remarks of the Chief Surveyor to the Classing Committee about the special survey of the ship Stettin, 4 March 1898 1898, Copy of letter from the Secretary to the owners of Stettin stating that the special survey will take place when the ship is placed in dry dock, 3 February 1898 1898, Note stating the ship Stettin will be soon in dry dock to be surveyed, 3 February 1898 1898, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating their intention to put the ship in dry dock to be surveyed, 1 February 1898 1898, Report of survey for repairs for Stettin, 3 March 1898 1898, Report of survey for repairs of engines and boilers for Stettin, 3 March 1898 1898, Remarks of the Chief Surveyor to the Classing Committee about the damage and temporary repairs suffered by Stettin, 31 March 1898 1898, Letter from the Bremerhaven surveyor about the repairs to Stettin, 29 March 1898 1898, Cover note for report number 534 of Stettin, 1 April 1898 1898, Report of survey for repairs for Stettin, 28 March 1898 1898, Remarks of the Ship Surveyor to the Classing Committee saying the damage to Stettin has been repaired and she should remain classed, 6 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1899 1899, Report of survey for repairs of engines and boilers for Stettin, 5 April 1899 1899, Report of survey for repairs for Stettin, 28 April 1900 1900, Report of survey for repairs of engines and boilers for Stettin, 28 April 1900 1900, Report of survey for repairs for Stettin, 2 May 1901 1901, Report of survey for repairs of engines and boilers for Stettin, 2 May 1901 1901, Remarks of the Ship Surveyor to the Classing Committee about the special survey of Stettin and the particulars of her plating, 7 April 1902 1902, Report of survey for repairs for Stettin, 4 April 1902 1902, Copy of letter from the Secretary to the owners of Stettin statin the Committee agreed with the special survey being carried out in the next two months, 31 January 1902 1902, Postponed survey form for Stettin, 30 January 1902 1902, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating they expect to attend the special survey within the next two months, 29 January 1902 1902, Report of survey for repairs of engines and boilers for Stettin, 4 April 1902 1902, Report of survey for repairs for Stettin, 11 May 1903 1903, Copy of letter from the Secretary to Leith Surveyors stating that the steamer Stettin has been booked for the annual boiler survey that will take place in a few days, 7 April 1903 1903, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the annual overhaul has been booked for that next few days, 4 April 1903 1903, Report of survey for repairs of engines and boilers for Stettin, 11 May 1903 1903, Report of survey for repairs for Stettin, 29 June 1904 1904, Report of survey for repairs of engines and boilers for Stettin, 29 June 1904 1904, Report of survey for repairs for Stettin, 11 July 1905 1905, Report of survey for repairs of engines and boilers for Stettin, 11 July 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the damage and repairs to Stettin, 24 August 1905 1905, Report of survey for repairs for Stettin, 22 August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the special survey no.1 of Stettin, 26 July 1906 1906, Copy of letter from the Secretary to Leith Surveyors stating that Stettin will be in dry dock on her arrival from Konigsberg when the special survey no.1 will be carried out, 22 June 1906 1906, Copy of letter from the Secretary to the owners of Stettin stating that the special survey no.1 will be carried out next week in Leith, 22 June 1906 1906, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the special survey no.1 will be carried out in the next week on her arrival from Konigsberg, 20 June 1906 1906, Report of survey for repairs for Stettin, 23 July 1906 1906, Report of survey for repairs of engines and boilers for Stettin, 24 July 1906 1906, Report of survey for repairs for Stettin, 16 July 1907 1906, Report of survey for repairs of engines and boilers for Stettin, 16 July 1907 1906, Report of survey for repairs for Stettin, 19 September 1908 1908, Copy of letter from the Secretary to Leith Surveyors stating that Stettin is laid up for overhaul and that the boiler survey should be carried out, 8 September 1908 1908, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the steamer is laid up for overhaul and that the special survey of boilers should take place next week, 5 September 1908 1908, Report of survey for repairs of engines and boilers for Stettin, 19 September 1908 1908, Report of survey for repairs for Stettin, 2 October 1909 1909, Report of survey for repairs of engines and boilers for Stettin, 2 October 1909 1909, Plan of Rudder of Stettin, 1910. Scale 1"=one foot. Details 3"= one foot, 19 September 1910 1910, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding the special survey no. 2 and boiler survey for Stettin, 29 October 1910 1910, Letter from Leith Surveyor to the Secretary stating that they met with the owners of Stettin and arranged the special survey no. 2 to be carried out after the New Year holidays, 28 November 1910 1910, Copy of letter from the Secretary to Leith Surveyors regarding the report no. 13106 for Stettin and asking when the ship's owners expect the special survey no.2 to be carried out, 25 November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee about damage and repairs made to Stettin after grounding, 7 October 1910 1910, Postponed survey form for Stettin, 27 June 1910 1910, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating the special survey no.2 will be carried out in Leith in September, 23 October 1910 1910, Report of survey for repairs for Stettin, 5 October 1910 1910, Report of survey for repairs of engines and boilers for Stettin, 21 October 1910 1910, Report of Ship forgings or castings for Stettin, 30 September 1910 1910, Note about the sketch of rudder for Stettin, 19 September 1910 1910, Letter from Leith surveyors to the Secretary regarding the plan of rudder for Stettin to be approved by the Committee, 16 September 1910 1910, Copy of letter from Secretary, Lloyd's Register London, to James Currie and Co, regarding agreement for date of carrying out special survey, 28 June 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the special survey no.2 for Stettin and the repairs made, 6 June 1911 1911, Report of survey for repairs for Stettin, 3 June 1911 1911, Report of survey for repairs of engines and boilers for Stettin, 3 June 1911 1911, Copy of letter from the Assistant to the Secretary to the owners of Stettin, James Currie & Co, regarding the boiler survey to take place in about two months' time, 12 July 1912 1912, Report of survey for repairs for Stettin, 17 August 1912 1912, Postponed survey form for Stettin, 11 July 1912 1912, Letter from the owners of Stettin to the Secretary regarding the ship special survey and boilers survey, 9 July 1912 1912, Report of survey for repairs of engines and boilers for Stettin, 17 August 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the conditions of Stettin after repair, 29 December 1913 1913, Report of survey for repairs for Stettin, 27 December 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of Stettin taking place in three weeks’ time, 14 November 1913 1913, Postponed survey form for Stettin, 13 November 1913 1913, Letter from Leith surveyors to the Secretary regarding the survey of Stettin, 8 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin, 7 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin being carried out after the strike of the boilers makers, 9 November 1913 1913, Postponed survey form for Stettin, 8 September 1913 1913, Letter from Leith surveyors to the Secretary regarding the postpone of survey of Stettin due to the boilers makers strike, 5 September 1913 1913, Copy of letter from the Secretary to Leith surveyors regarding the survey of screw shaft of Stettin, 3 September 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating the Committee has agreed with the survey being carried out next month, 4 September 1913 1913, Postponed survey form for Stettin, 3 September 1913 1913, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft, 2 July 1913 1913, Report of survey for repairs of engines and boilers for Stettin, 27 December 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with postponing the special survey, 9 June 1914 1914, Postponed survey form for Stettin, 8 June 1914 1914, Letter from Leith surveyors to the Secretary regarding the special survey of Stettin, 4 June 1914 1914, Copy of letter from the Secretary to Leith surveyors enclosing a letter sent by the owners of Stettin about her fourth special survey no. 3, 3 June 1914 1914, Postponed survey form for Stettin, 2 June 1914 1914, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding postponing the second special survey no. 3 of Stettin, 29 May 1914 1914, Report of survey for repairs of engines and boilers for Stettin, 2 July 1915 1915, Copy of letter from the Secretary to Newcastle-on-Tyne surveyors regarding the special survey of Stettin, 12 August 1913 1915, Letter from Aberdeen surveyors to the Secretary stating that Stettin has sailed to Newcastle-on-Tyne as she failed to obtain docking facilities at that port, 10 August 1915 1915, Remarks to the Chief Ship Surveyor regarding the fourth special survey no. 3 for Stettin, 13 July 1915 1915, Copy of letter from the Secretary to the Surveyors in Hull, Grimsby, Middlesbrough, Newcastle, Sunderland and Hartlepool, regarding the fourth special survey no. 3 of Stettin, which will be carried out at some East coast port, 19 July 1915 1915, Letter from Leith surveyors to the Secretary regarding the survey of Stettin to be carried out at some East coast port, 12 July 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the fourth special survey no. 3 for Stettin, 5 July 1915 1915, Report of survey for repairs for Stettin, 2 July 1915 1915, Letter from Leith surveyors to the Secretary stating that the special survey of Stettin is being carried out at that port, 22 May 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 for Stettin, 21 May 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding her survey, 20 April 1915 1915, Extract from a letter dated 15 April 1915 from James Currie & Co regarding surveying Stettin. Extract dated 16 April 1915 1915, Letter from Leith surveyors to the Secretary stating that they had spoken to the owners of Stettin and due to a shortage of labour it has been difficult to find a dry dock to carry out the special survey, 13 April 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the importance of carrying out the special survey due to the age of the ship, 13 April 1915 1915, Postponed survey form for Stettin, 12 April 1915 1915, Copy of letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding the survey of Stettin being postponed, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 of Stettin, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors enclosing information about the communication between the owners of Stettin, 26 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with the special survey being carried out in the next two or three months, 26 January 1915 1915, Postponed survey form for Stettin, 25 January 1915 1915, Letter from Leith surveyors to the Secretary regarding the special survey no.3 and boiler survey of Stettin, 23 January 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding postponing the survey of Stettin, 21 January 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the fourth special survey no.3 and special annual boiler survey of Stettin, 20 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the letter sent by the latter about the thrust shaft, 1 November 1915 1915, Letter from Lisbon surveyors to the Secretary about the repair of shaft of Stettin, 25 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 28 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 23 October 1915 1915, Copy of letter from the Assistant to the Secretary to Lisbon surveyors regarding the repair of Stettin's thrust shaft being not satisfactory, 18 October 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the new thrust shaft she received in Lisbon, 1916 1915, Letter reporting that the new thrust shaft for Stettin is not considered satisfactory, 14 October 1915 1915, London Office Copy of document certifying that surveyor has examined the machinery of Stettin and stating his recommendations, 4 October 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 6 October 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 67857, 19 August 1915 1915, Report of Survey for Repairs for Stettin, 18 August 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 August 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the thrust shaft supplied in Lisbon and if it will be approved by the Committee as a permanent repair, 29 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon and stating that it will be approved by the Committee as a permanent repair, 28 April 1916 1916, Letter reporting the results of the test carried out on Stettin's new thrust shaft that was made in Lisbon, 27 April 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the result of the tests carried out on the new thrust shaft, 14 April 1916 1916, Letter from Professor R Stanfield to James Currie & Co regarding the results of the test of the transverse section of the shaft of Stettin, 11 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Letter reporting that Stettin's new thrust shaft is not satisfactory to be recommended as a permanent repair, 22 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin stating that the repair of the thrust shaft is being looked at, 14 March 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary enclosing drawings and plans of the shaft of Stettin, 6 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the repair of the thrust shaft, 28 January 1916 1916, Postponed survey form for Stettin, 22 January 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft of Stettin, 24 January 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding when the ship will be in position to have the thrust shaft examined, 21 January 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to London Report 79106, 13 July 1917 1916, Report of Survey for Repairs for Stettin due to collision with ice, 1 July 1916 1916, Report of Survey for Repairs of Engines and Boilers for Stettin, 14 July 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70096, 27 July 1917 1917, London Office Copy of document certifying that surveyor has examined damage and transmitted the Report, and stating his Recommendations, 24 July 1917 1917, Report of Survey for Repairs for Stettin 1917, Letter from Newcastle surveyors informing Lloyd's Register London that Stettin is under survey at Newcastle, 21 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding whether Stettin has yet come under inspection, 20 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding their report 70069, and Stettin's owners' intention to make repairs at South Shields within the next couple of days, and calling attention to the need for the Annu 1917, Letter from James Currie & Co Managers, informing Lloyd's Register London that they have arranged for repairs of damage previously communicated by Smith's Dry Dock Co, South Shields, on the steamer's return there in the next day or two, 1 August 1917 1917, Copy of letter from Lloyd's Register's London Secretary to James Currie and Co, informing them of the damage done to Stettin when striking a quay wall, that temporary repairs have been effected but that for the vessel to remain in class permanent repairs 1917, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70306, 2 October 1917 1917, Report of Survey for Repairs for Stettin, 29 September 1917 1917, Report of Survey for Repairs of Engines and Boilers for Stettin, 1 October 1917 1917, Certificate of approval of a stockless anchor, with cancelled written across it, 4 September 1917 1917, Correspondence to Lloyd's Register's London Secretary regarding Stettin Report 71400, acknowledging remarks on the Rules for Engines and Boilers with a working pressure of less than 60lbs, 23 November 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 71400, 19 November 1918 1918, Report of survey for repairs of Stettin, 5 November 1918 1918, Memo to Newcastle surveyors regarding Rules for Engines and Boilers of a greater working pressure than 60lbs per square inch, 18 November 1918 1918, Report of Survey for Repairs of Boilers and Engines of Stettin, 13 November 1918 1918, Copy of letter from London Secretary to James Currie and Co regarding state or survey of Stettin, 17 October 1919 1919, Postponed Survey form for Stettin, October 1919 1919, Letter from James Currie and Co to Secretary, Lloyd's Register London, regarding postponing survey of Stettin, 10 October 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Leith Report 15769, 2 July 1920 1920, Report of Survey for Repairs of Stettin, 28 June 1920 1920, Copy of letter from Lloyd's Register London Secretary to Leith Surveyors, 30 March 1920 1920, Postponed Survey form for Stettin, 29 March 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 24 March 1920 1920, Copy of Letter from Lloyd's Register London Secretary to Leith Surveyors, 19 March 1920 1920, Letter from the Surveyors at Hull, per N Rowall, to London Secretary regarding state of survey of Stettin, 18 March 1920 1920, Copy of letter from the London Secretary to the Hull Surveyors regarding state of survey of Stettin, 17 March 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 10 February 1920 1920, Postponed Survey form for Stettin, 9 February 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 5 February 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 28 January 1920 1920, Report of Survey for Repairs of Engines and Boilers for Stettin, 28 June 1920 1920, Copy of letter from the Secretary to the owners of Stettin saying the Committee has agreed with postponing the boiler survey, 23 August 1921 1921, Report of Survey for Repairs of Stettin, 16 September 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London regarding Stettin now undergoing survey, 3 September 1921 1921, Postponed Surveys form for Stettin, 22 August 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London explaining why Stettin had not undergone survey, 18 August 1921 1921, Report of Survey for Repairs of Engines and Boilers for Stettin, 16 September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Stettin survey, with reference to Leith Report 16187, 6 October 1921 1922, Report of Survey for Repairs of Stettin, 3 October 1921 1922, Correspondence of Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding ongoing surveys on Stettin, 14 September 1922 1922, Copy of letter from Lloyd's Register London Assistant to the Secretary to Leith Surveyors regarding survey of Stettin's screwshaft, 21 July 1922 1922, Postponed Surveys form for Stettin, 20 July 1922 1922, Letter from Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding proposed survey date for Stettin's screw shaft, 17 July 1922 1922, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans of owners of Stettin for survey of screwshaft, 14 July 1922 1922, Report of Survey for Repairs of Boilers and Engines for Stettin, 26 September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding carrying out part of Stettin's Special Survey, with reference to Leith Report 16388, 30 October 1923 1923, Report of Survey for Repairs of Stettin, 24 October 1923 1923, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors, regarding Rule requirements for cables, 20 October 1923 1923, Remarks to the Chief Ship Surveyor regarding Rule requirements for cables, 19 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London requesting clarification on Rules for chains, 18 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London regarding proposed timeline for survey, 22 September 1923 1923, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding letter from Stettin's owners and requesting clarification of when the boiler survey shall be held, 21 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London, regarding carrying out a part survey, 18 September 1923 1923, Copy of letter from Assistant to the Secretary to James Currie and Co regarding schedule for surveys of Stettin, 14 September 1923 1923, Postponed Surveys form for Stettin, 13 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London querying survey schedule of Stettin, 10 September 1923 1923, Report of Survey for Repairs of Engines and Boilers for Stettin, 23 October 1923 1923, Letter from Leith Surveyor A T Thomas to James Currie and Co, informing them of future survey schedule for Stettin, 23 October 1923 1923, Plan of Main Boiler for Stettin, 24 May 1924 1924, Plan of Donkey Boiler for Stettin, 24 May 1924 1924, Hatch Plan of Stettin, 2 October 1924 1924, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Stettin, with reference to Leith Report 16388, 19 May 1924 1924, Letter from A T Thomas, Leith Surveyor, to J F Hill of London, regarding surveying Stettin, 16 May 1924 1924, Extract from a letter dated 14 May 1924 from Leith surveyors regarding examining Stettin. Extract dated 15 May 1924 1924, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans for survey of Stettin and expiry of year of grace, 14 May 1924 1924, Letter from Leith surveyor A T Thomas to Secretary, London, regarding proposed examination part of Stettin's combustion chamber, 18 April 1924 1924, Copy of letter from Assistant to the Secretary to the Leith surveyors questioning owners' arrangements to have Stettin's combustion chamber examined, 16 April 1924 1924, Report of Survey for Repairs of Engines and Boilers for Stettin, 12 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding fulfilment of special survey on Stettin, in reference to Leith Report 16611, 22 November 1924 1924, Report of Survey for Repairs of Stettin, 15 November 1924 1924, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 November 1924 1924, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding completion of reports on Stettin's new boilers, 31 October 1924 1924, Note submitting that certain reports be forwarded to the Leith Surveyors for their guidance and completion, 29 October 1924 1924, Note submitting that the amended plans of boilers for Stettin merit approval, 29 May 1924 1924, Correspondence accompanying boiler plans submitted for approval for Stettin from the Glasgow office to London, 26 May 1924 1924, Letter from Jas S Cairns submitting for approval plans for new boilers for the Stettin to the Glasgow Secretary, 26 May 1924 1924, Note submitting that plans for Stettin's boilers merit approval, 24 April 1924 1924, Letter from Leith Surveyors, per A T T[homas], to Secretary, London, noting they are forwarding plans of new boilers intended for Stettin, 14 April 1924 1924, Report on Main Boiler for Stettin, 11 October 1924 1924, Report on Donkey Boiler for Stettin, 11 October 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Delivery note for 3 furnaces from Forth Shipbuilding and Engineering, Glasgow, 4 July 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 27 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, LR stamp and signature J Barr, 2 July 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 14 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 28 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 26 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 17 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 16790, 28 August 1925 1925, Report of Survey for Repairs on Stettin, 25 August 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 August 1925 1925, Memo regarding approving a steel cylinder cover on Stettin, 5 October 1925 1925, Letter from Leith Surveyor to Secretary, London, regarding steel cover repair examined, 2 October 1925 1925, Letter from Hamburg Office to Secretary, London, regarding request by Leith Surveyors, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding Hamburg report on Stettin, 1 October 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding their request for the Hamburg report, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to A Chisholm, requesting a report for the Leith Surveyors, 30 September 1925 1925, Translation of Cablegram sent to Surveyors at Hamburg, 30 September 1925 1925, Copy of Cablegram from London Office to Hamburg Office, 30 September 1925 1925, Letter from Leith Surveyors, per A T T[homas], to London Office asking for a Hamburg report to be sent to them, 29 September 1925 1925, London Office Copy of document certifying that Hamburg surveyor has examined damage and transmitted the Report, and stating his Recommendations, 25 September 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 September 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 16897, March 1926 1926, Report of Survey for Repairs to Stettin, 30 March 1926 1926, Report of Survey for Repairs of Engines and Boilers to Stettin, 30 March 1926 1926, Report of Survey for Repairs to Stettin, 15 June 1927 1927, Report of Survey for Repairs of Engines and Boilers to Stettin, 15 June 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 17291, 8 December 1927 1927, Copy of Certificate of Survey after damage to Stettin by a breaker in heavy weather, 23 November 1927 1927, Report of Survey for Repairs to Stettin, 3 December 1927 1927, Question and Answer memo between London and Leith Offices regarding Hamburg Report 17858, 21 February 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 1 February 1928 1928, Correspondence memo with particulars from Leith Surveyors to Secretary, London, regarding return of report, 27 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 25 January 1928 1928, Copy of Certificate of Survey from Hamburg after collision damage suffered by Stettin, 22 January 1928 1928, Report of Survey for Repairs of Stettin, 23 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 17339, 15 March 1928 1928, Report of Survey for Repairs of Stettin, 5 March 1928 1928, Copy of letter from the Clerk of the Classification Committee to James Currie and Co, with a copy to the Leith Office, regarding 6th Special Survey of Stettin, 14 December 1928 1928, Postponed Survey form for Stettin's 6th Special Survey, 13 December 1928 1928, Letter from James Currie and Co to Lloyd's Register Secretary, London, regarding deferring Stettin's 6th Special Survey, 11 December 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage, in reference to Dundee Report 8638, 30 March 1928 1928, Copy of Certificate of Survey regarding damage and report of repairs to Stettin's port bow shell plating, Dundee, 23 March 1928 1928, Report of Survey for Repairs to Stettin, 23 March 1928 1928, Letter from Lloyd's Register Engineer Surveyor to James Currie and Co regarding schedule for survey of Stettin's propeller shaft, 5 March 1929 1929, Copy of letter from the Secretary, London, to the Secretary, Glasgow, returning Stettin boiler plans, 29 May 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin and 6th Special Survey, in reference to Leith Report 17540, 13 March 1929 1929, Report of Survey for Repairs of Stettin, 5 March 1929 1929, Report of Survey for Repairs of Engines and Boilers for Stettin, 5 March 1929 1929, Copy of letter from pro Secretary, London, to Leith Surveyors regarding examination of Stettin's screwshaft, 16 April 1930 1930, Postponed Survey form for Stettin's screwshaft, 14 April 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 9 April 1930 1930, Copy of letter from Secretary, London, to Leith Surveyors informing them Committee are agreeable to postponing Stettin's screwshaft survey, 25 February 1930 1930, Postponed Survey form for Stettin's screwshaft, 24 February 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 17 February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 17802, 22 May 1930 1930, Report of Survey for Repairs to Stettin, 15 May 1930 1930, Report on Engine Forgings for Stettin, 8 May 1930 1930, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 May 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 18082, 2 November 1931 1931, Form or memo from Secretary, Glasgow, to Secretary, London, regarding presence of Stettin, 16 October 1931 1931, Question and Answer memo from Secretary, London, to Leith Surveyors regarding Stettin Boiler Survey, 5 October 1931 1931, Copy of letter from pro Secretary, London, with copy to Leith, to James Currie and Co regarding postponing Stettin Boiler Survey, 26 June 1931 1931, Postponed Surveys form for Stettin's Boiler Survey, 25 June 1931 1931, Letter from James Currie and Co regarding postponing Boiler Survey due on Stettin, 20 June 1931 1931, Report of Survey for Repairs on Stettin, 26 October 1931 1931, Report of Survey for Repairs of Engines and Boilers on Stettin, 26 October 1931 1931, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of survey for Stettin, 23 December 1932 1932, Postponed Surveys form for Stettin, 22 December 1932 1932, Letter from Leith Surveyors per John Houston to the Secretary, London, regarding outstanding survey on Stettin, 17 December 1932 1932, Letter from James Currie and Co to Leith Surveyors regarding schedule of survey for Stettin, 16 December 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 14 December 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 24 November 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 September 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 21 June 1932 1932, Postponed Surveys form for Stettin, 20 June 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 June 1932 1932, Copy of letter from pro Secretary, London to Leith Surveyors regarding Stettin boiler survey schedule, 9 October 1931 1932, Postponed Surveys form for Stettin, 8 October 1931 1932, Report of Total Loss, Casualty, , for Stettin, which has been sold to be broken up, 4 December 1933 1933, Letter from Leith Surveyors, per John Houston, to Secretary, London, informing them Stettin is being broken up, 1 December 1933 1933, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of demolition for Stettin, 27 November 1933 1933, Copy of letter from Leith Surveyors, per John Houston, to the Secretary, London, regarding the firm to which Stettin was sold to be broken up, 24 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 23 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 31 August 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 15 June 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 16 March 1933 1933, Note related to Stettin stating SS no. 2 held now posting no date, Note regarding Stettin stating "Vessel left Lisbon Oct 3. + 3 mos from dats. of survey would expire 12/15" no date, Sketch or plan of steel cover part for Stettin no date )
The listed port to which a given vessel belongs.
Leith ( Certificate for vessels navigated by Steam for Stettin, 30 November 1864 1864, Iron Ship survey report for Stettin, 2 December 1864 1864, Letter from Glasgow surveyor to the Secretary sending the machinery certificate and Stettin's report of survey no. 4255, 8 July 1876 1876, Report of survey for repairs for Stettin, 8 July 1876 1876, Memo from Messrs Napier Ltd. stating that Stettin's boilers are fitted in accordance with the Committee requirements and should have the notification Lloyd's MC in the Register Book, 3 July 1876 1876, Details of main boilers of Stettin, 29 June 1876 1876, Engineer surveyor's report on machinery for Stettin, 26 June 1876 1876, Annual surveys for Stettin, 30 November 1876 1876, Report of survey for repairs for Stettin, 16 January 1879 1879, Report of survey for repairs of engines and boilers for Stettin, 16 January 1880 1880, Cover note for reports number 4308 and 57 of Stettin, 31 January 1880 1880, Report of survey for repairs for Stettin, 28 January 1880 1880, Report of survey for repairs for Stettin, 2 February 1881 1881, Report of survey for repairs for Stettin, 27 January 1882 1882, Annual surveys for Stettin, 6 January 1883 1883, Annual surveys for Stettin, 23 January 1884 1884, Report of survey for repairs for Stettin, 30 January 1885 1885, Report of survey for repairs of engines and boilers for Stettin, 30 January 1885 1885, Report of survey for repairs for Stettin, 27 January 1886 1886, Report of survey for repairs of engines and boilers for Stettin, 30 January 1886 1886, Report of survey for repairs for Stettin, 26 February 1887 1887, Report of survey for repairs of engines and boilers for Stettin, 15 March 1887 1887, Report of survey for repairs for Stettin, 21 May 1888 1888, Report of survey for repairs of engines and boilers for Stettin, 25 May 1888 1888, Report of survey for repairs for Stettin, 29 December 1888 1888, Particulars for record of double bottoms in Lloyd's Register for Stettin, 5 December 1889 1889, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 10 December 1889 1889, Report of Survey for Repairs for Stettin, 6 December 1889 1889, Report on Machinery for Stettin, 3 December 1889 1889, Report of Survey for Repairs for Stettin, 18 October 1890 1890, Report of Survey for Repairs for Stettin, 6 November 1891 1891, Report of Survey for Repairs for Stettin, 16 January 1893 1893, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 19 February 1894 1894, Report of survey for repairs for Stettin, 12 February 1894 1894, Report of survey for repairs of engines and boilers for Stettin, 13 February 1894 1894, Letter from the surveyor Jas Barclay to the Secretary in London enclosing a letter received from the Master of Stettin about the boiler survey to be held at Bergen, 9 June 1894 1894, Letter from the Master of Stettin Otto E Jacobsen to the surveyor James Barclay about the survey of boilers to take place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to E Rusten, owner of Stettin, stating he agrees with the survey of boilers taking place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to Bergen surveyor stating that Stettin will have the survey of boilers carried out in Bergen, 8 June 1894 1894, Note stating the boiler survey for Stettin is due to April and the owners state the ship will be at Bergen where the survey will take place, 8 June 1894 1894, Letter from Erik Rusten, owner of Stettin, to Lloyd's Register stating that he wishes the survey of boilers to take place in Bergen, 4 June 1894 1894, Report of Survey for repairs of engines and boilers for Stettin, 12 July 1894 1894, Report of survey for repairs for Stettin, 6 February 1895 1895, Report of survey for repairs of engines and boilers for Stettin, 6 February 1895 1895, Report of survey for repairs for Stettin, 19 March 1896 1896, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin about the survey of boilers, 23 March 1896 1896, Letter from Leith surveyor to the Secretary stating that the Stettin is under survey, 5 March 1896 1896, Letter from the Secretary to the Leith Surveyor questioning about the survey of Stettin, 3 March 1896 1896, Copy of Letter from the Secretary to the owner of Stettin stating that he agrees with the boiler survey of that ship being carried out when she is in dry dock in the following month, 29 January 1896 1896, Note stating the boiler survey for Stettin will be in dry dock in the following month, 29 January 1896 1896, Letter from the owner of Stettin to the Secretary stating the ship will be in dry dock next month for the survey, 27 January 1896 1896, Report of survey for repairs of engines and boilers for Stettin, 19 March 1896 1896, Report of survey for repairs for Stettin, 19 March 1897 1897, Letter from the Leith surveyor to the Secretary stating that Stettin is now employed in the emigrant trade and therefore the pressure of boiler has been reduced, 24 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 19 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 26 July 1897 1897, Remarks of the Chief Surveyor to the Classing Committee about the special survey of the ship Stettin, 4 March 1898 1898, Copy of letter from the Secretary to the owners of Stettin stating that the special survey will take place when the ship is placed in dry dock, 3 February 1898 1898, Note stating the ship Stettin will be soon in dry dock to be surveyed, 3 February 1898 1898, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating their intention to put the ship in dry dock to be surveyed, 1 February 1898 1898, Report of survey for repairs for Stettin, 3 March 1898 1898, Report of survey for repairs of engines and boilers for Stettin, 3 March 1898 1898, Remarks of the Chief Surveyor to the Classing Committee about the damage and temporary repairs suffered by Stettin, 31 March 1898 1898, Letter from the Bremerhaven surveyor about the repairs to Stettin, 29 March 1898 1898, Cover note for report number 534 of Stettin, 1 April 1898 1898, Report of survey for repairs for Stettin, 28 March 1898 1898, Remarks of the Ship Surveyor to the Classing Committee saying the damage to Stettin has been repaired and she should remain classed, 6 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1899 1899, Report of survey for repairs of engines and boilers for Stettin, 5 April 1899 1899, Report of survey for repairs for Stettin, 28 April 1900 1900, Report of survey for repairs of engines and boilers for Stettin, 28 April 1900 1900, Report of survey for repairs for Stettin, 2 May 1901 1901, Report of survey for repairs of engines and boilers for Stettin, 2 May 1901 1901, Remarks of the Ship Surveyor to the Classing Committee about the special survey of Stettin and the particulars of her plating, 7 April 1902 1902, Report of survey for repairs for Stettin, 4 April 1902 1902, Copy of letter from the Secretary to the owners of Stettin statin the Committee agreed with the special survey being carried out in the next two months, 31 January 1902 1902, Postponed survey form for Stettin, 30 January 1902 1902, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating they expect to attend the special survey within the next two months, 29 January 1902 1902, Report of survey for repairs of engines and boilers for Stettin, 4 April 1902 1902, Report of survey for repairs for Stettin, 11 May 1903 1903, Copy of letter from the Secretary to Leith Surveyors stating that the steamer Stettin has been booked for the annual boiler survey that will take place in a few days, 7 April 1903 1903, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the annual overhaul has been booked for that next few days, 4 April 1903 1903, Report of survey for repairs of engines and boilers for Stettin, 11 May 1903 1903, Report of survey for repairs for Stettin, 29 June 1904 1904, Report of survey for repairs of engines and boilers for Stettin, 29 June 1904 1904, Report of survey for repairs for Stettin, 11 July 1905 1905, Report of survey for repairs of engines and boilers for Stettin, 11 July 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the damage and repairs to Stettin, 24 August 1905 1905, Report of survey for repairs for Stettin, 22 August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the special survey no.1 of Stettin, 26 July 1906 1906, Copy of letter from the Secretary to Leith Surveyors stating that Stettin will be in dry dock on her arrival from Konigsberg when the special survey no.1 will be carried out, 22 June 1906 1906, Copy of letter from the Secretary to the owners of Stettin stating that the special survey no.1 will be carried out next week in Leith, 22 June 1906 1906, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the special survey no.1 will be carried out in the next week on her arrival from Konigsberg, 20 June 1906 1906, Report of survey for repairs for Stettin, 23 July 1906 1906, Report of survey for repairs of engines and boilers for Stettin, 24 July 1906 1906, Report of survey for repairs for Stettin, 16 July 1907 1906, Report of survey for repairs of engines and boilers for Stettin, 16 July 1907 1906, Report of survey for repairs for Stettin, 19 September 1908 1908, Copy of letter from the Secretary to Leith Surveyors stating that Stettin is laid up for overhaul and that the boiler survey should be carried out, 8 September 1908 1908, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the steamer is laid up for overhaul and that the special survey of boilers should take place next week, 5 September 1908 1908, Report of survey for repairs of engines and boilers for Stettin, 19 September 1908 1908, Report of survey for repairs for Stettin, 2 October 1909 1909, Report of survey for repairs of engines and boilers for Stettin, 2 October 1909 1909, Plan of Rudder of Stettin, 1910. Scale 1"=one foot. Details 3"= one foot, 19 September 1910 1910, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding the special survey no. 2 and boiler survey for Stettin, 29 October 1910 1910, Letter from Leith Surveyor to the Secretary stating that they met with the owners of Stettin and arranged the special survey no. 2 to be carried out after the New Year holidays, 28 November 1910 1910, Copy of letter from the Secretary to Leith Surveyors regarding the report no. 13106 for Stettin and asking when the ship's owners expect the special survey no.2 to be carried out, 25 November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee about damage and repairs made to Stettin after grounding, 7 October 1910 1910, Postponed survey form for Stettin, 27 June 1910 1910, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating the special survey no.2 will be carried out in Leith in September, 23 October 1910 1910, Report of survey for repairs for Stettin, 5 October 1910 1910, Report of survey for repairs of engines and boilers for Stettin, 21 October 1910 1910, Report of Ship forgings or castings for Stettin, 30 September 1910 1910, Note about the sketch of rudder for Stettin, 19 September 1910 1910, Letter from Leith surveyors to the Secretary regarding the plan of rudder for Stettin to be approved by the Committee, 16 September 1910 1910, Copy of letter from Secretary, Lloyd's Register London, to James Currie and Co, regarding agreement for date of carrying out special survey, 28 June 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the special survey no.2 for Stettin and the repairs made, 6 June 1911 1911, Report of survey for repairs for Stettin, 3 June 1911 1911, Report of survey for repairs of engines and boilers for Stettin, 3 June 1911 1911, Copy of letter from the Assistant to the Secretary to the owners of Stettin, James Currie & Co, regarding the boiler survey to take place in about two months' time, 12 July 1912 1912, Report of survey for repairs for Stettin, 17 August 1912 1912, Postponed survey form for Stettin, 11 July 1912 1912, Letter from the owners of Stettin to the Secretary regarding the ship special survey and boilers survey, 9 July 1912 1912, Report of survey for repairs of engines and boilers for Stettin, 17 August 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the conditions of Stettin after repair, 29 December 1913 1913, Report of survey for repairs for Stettin, 27 December 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of Stettin taking place in three weeks’ time, 14 November 1913 1913, Postponed survey form for Stettin, 13 November 1913 1913, Letter from Leith surveyors to the Secretary regarding the survey of Stettin, 8 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin, 7 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin being carried out after the strike of the boilers makers, 9 November 1913 1913, Postponed survey form for Stettin, 8 September 1913 1913, Letter from Leith surveyors to the Secretary regarding the postpone of survey of Stettin due to the boilers makers strike, 5 September 1913 1913, Copy of letter from the Secretary to Leith surveyors regarding the survey of screw shaft of Stettin, 3 September 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating the Committee has agreed with the survey being carried out next month, 4 September 1913 1913, Postponed survey form for Stettin, 3 September 1913 1913, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft, 2 July 1913 1913, Report of survey for repairs of engines and boilers for Stettin, 27 December 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with postponing the special survey, 9 June 1914 1914, Postponed survey form for Stettin, 8 June 1914 1914, Letter from Leith surveyors to the Secretary regarding the special survey of Stettin, 4 June 1914 1914, Copy of letter from the Secretary to Leith surveyors enclosing a letter sent by the owners of Stettin about her fourth special survey no. 3, 3 June 1914 1914, Postponed survey form for Stettin, 2 June 1914 1914, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding postponing the second special survey no. 3 of Stettin, 29 May 1914 1914, Report of survey for repairs of engines and boilers for Stettin, 2 July 1915 1915, Copy of letter from the Secretary to Newcastle-on-Tyne surveyors regarding the special survey of Stettin, 12 August 1913 1915, Letter from Aberdeen surveyors to the Secretary stating that Stettin has sailed to Newcastle-on-Tyne as she failed to obtain docking facilities at that port, 10 August 1915 1915, Remarks to the Chief Ship Surveyor regarding the fourth special survey no. 3 for Stettin, 13 July 1915 1915, Copy of letter from the Secretary to the Surveyors in Hull, Grimsby, Middlesbrough, Newcastle, Sunderland and Hartlepool, regarding the fourth special survey no. 3 of Stettin, which will be carried out at some East coast port, 19 July 1915 1915, Letter from Leith surveyors to the Secretary regarding the survey of Stettin to be carried out at some East coast port, 12 July 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the fourth special survey no. 3 for Stettin, 5 July 1915 1915, Report of survey for repairs for Stettin, 2 July 1915 1915, Letter from Leith surveyors to the Secretary stating that the special survey of Stettin is being carried out at that port, 22 May 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 for Stettin, 21 May 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding her survey, 20 April 1915 1915, Extract from a letter dated 15 April 1915 from James Currie & Co regarding surveying Stettin. Extract dated 16 April 1915 1915, Letter from Leith surveyors to the Secretary stating that they had spoken to the owners of Stettin and due to a shortage of labour it has been difficult to find a dry dock to carry out the special survey, 13 April 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the importance of carrying out the special survey due to the age of the ship, 13 April 1915 1915, Postponed survey form for Stettin, 12 April 1915 1915, Copy of letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding the survey of Stettin being postponed, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 of Stettin, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors enclosing information about the communication between the owners of Stettin, 26 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with the special survey being carried out in the next two or three months, 26 January 1915 1915, Postponed survey form for Stettin, 25 January 1915 1915, Letter from Leith surveyors to the Secretary regarding the special survey no.3 and boiler survey of Stettin, 23 January 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding postponing the survey of Stettin, 21 January 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the fourth special survey no.3 and special annual boiler survey of Stettin, 20 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the letter sent by the latter about the thrust shaft, 1 November 1915 1915, Letter from Lisbon surveyors to the Secretary about the repair of shaft of Stettin, 25 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 28 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 23 October 1915 1915, Copy of letter from the Assistant to the Secretary to Lisbon surveyors regarding the repair of Stettin's thrust shaft being not satisfactory, 18 October 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the new thrust shaft she received in Lisbon, 1916 1915, Letter reporting that the new thrust shaft for Stettin is not considered satisfactory, 14 October 1915 1915, London Office Copy of document certifying that surveyor has examined the machinery of Stettin and stating his recommendations, 4 October 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 6 October 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 67857, 19 August 1915 1915, Report of Survey for Repairs for Stettin, 18 August 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 August 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the thrust shaft supplied in Lisbon and if it will be approved by the Committee as a permanent repair, 29 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon and stating that it will be approved by the Committee as a permanent repair, 28 April 1916 1916, Letter reporting the results of the test carried out on Stettin's new thrust shaft that was made in Lisbon, 27 April 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the result of the tests carried out on the new thrust shaft, 14 April 1916 1916, Letter from Professor R Stanfield to James Currie & Co regarding the results of the test of the transverse section of the shaft of Stettin, 11 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Letter reporting that Stettin's new thrust shaft is not satisfactory to be recommended as a permanent repair, 22 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin stating that the repair of the thrust shaft is being looked at, 14 March 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary enclosing drawings and plans of the shaft of Stettin, 6 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the repair of the thrust shaft, 28 January 1916 1916, Postponed survey form for Stettin, 22 January 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft of Stettin, 24 January 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding when the ship will be in position to have the thrust shaft examined, 21 January 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to London Report 79106, 13 July 1917 1916, Report of Survey for Repairs for Stettin due to collision with ice, 1 July 1916 1916, Report of Survey for Repairs of Engines and Boilers for Stettin, 14 July 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70096, 27 July 1917 1917, London Office Copy of document certifying that surveyor has examined damage and transmitted the Report, and stating his Recommendations, 24 July 1917 1917, Report of Survey for Repairs for Stettin 1917, Letter from Newcastle surveyors informing Lloyd's Register London that Stettin is under survey at Newcastle, 21 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding whether Stettin has yet come under inspection, 20 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding their report 70069, and Stettin's owners' intention to make repairs at South Shields within the next couple of days, and calling attention to the need for the Annu 1917, Letter from James Currie & Co Managers, informing Lloyd's Register London that they have arranged for repairs of damage previously communicated by Smith's Dry Dock Co, South Shields, on the steamer's return there in the next day or two, 1 August 1917 1917, Copy of letter from Lloyd's Register's London Secretary to James Currie and Co, informing them of the damage done to Stettin when striking a quay wall, that temporary repairs have been effected but that for the vessel to remain in class permanent repairs 1917, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70306, 2 October 1917 1917, Report of Survey for Repairs for Stettin, 29 September 1917 1917, Report of Survey for Repairs of Engines and Boilers for Stettin, 1 October 1917 1917, Certificate of approval of a stockless anchor, with cancelled written across it, 4 September 1917 1917, Correspondence to Lloyd's Register's London Secretary regarding Stettin Report 71400, acknowledging remarks on the Rules for Engines and Boilers with a working pressure of less than 60lbs, 23 November 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 71400, 19 November 1918 1918, Report of survey for repairs of Stettin, 5 November 1918 1918, Memo to Newcastle surveyors regarding Rules for Engines and Boilers of a greater working pressure than 60lbs per square inch, 18 November 1918 1918, Report of Survey for Repairs of Boilers and Engines of Stettin, 13 November 1918 1918, Copy of letter from London Secretary to James Currie and Co regarding state or survey of Stettin, 17 October 1919 1919, Postponed Survey form for Stettin, October 1919 1919, Letter from James Currie and Co to Secretary, Lloyd's Register London, regarding postponing survey of Stettin, 10 October 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Leith Report 15769, 2 July 1920 1920, Report of Survey for Repairs of Stettin, 28 June 1920 1920, Copy of letter from Lloyd's Register London Secretary to Leith Surveyors, 30 March 1920 1920, Postponed Survey form for Stettin, 29 March 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 24 March 1920 1920, Copy of Letter from Lloyd's Register London Secretary to Leith Surveyors, 19 March 1920 1920, Letter from the Surveyors at Hull, per N Rowall, to London Secretary regarding state of survey of Stettin, 18 March 1920 1920, Copy of letter from the London Secretary to the Hull Surveyors regarding state of survey of Stettin, 17 March 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 10 February 1920 1920, Postponed Survey form for Stettin, 9 February 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 5 February 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 28 January 1920 1920, Report of Survey for Repairs of Engines and Boilers for Stettin, 28 June 1920 1920, Copy of letter from the Secretary to the owners of Stettin saying the Committee has agreed with postponing the boiler survey, 23 August 1921 1921, Report of Survey for Repairs of Stettin, 16 September 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London regarding Stettin now undergoing survey, 3 September 1921 1921, Postponed Surveys form for Stettin, 22 August 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London explaining why Stettin had not undergone survey, 18 August 1921 1921, Report of Survey for Repairs of Engines and Boilers for Stettin, 16 September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Stettin survey, with reference to Leith Report 16187, 6 October 1921 1922, Report of Survey for Repairs of Stettin, 3 October 1921 1922, Correspondence of Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding ongoing surveys on Stettin, 14 September 1922 1922, Copy of letter from Lloyd's Register London Assistant to the Secretary to Leith Surveyors regarding survey of Stettin's screwshaft, 21 July 1922 1922, Postponed Surveys form for Stettin, 20 July 1922 1922, Letter from Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding proposed survey date for Stettin's screw shaft, 17 July 1922 1922, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans of owners of Stettin for survey of screwshaft, 14 July 1922 1922, Report of Survey for Repairs of Boilers and Engines for Stettin, 26 September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding carrying out part of Stettin's Special Survey, with reference to Leith Report 16388, 30 October 1923 1923, Report of Survey for Repairs of Stettin, 24 October 1923 1923, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors, regarding Rule requirements for cables, 20 October 1923 1923, Remarks to the Chief Ship Surveyor regarding Rule requirements for cables, 19 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London requesting clarification on Rules for chains, 18 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London regarding proposed timeline for survey, 22 September 1923 1923, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding letter from Stettin's owners and requesting clarification of when the boiler survey shall be held, 21 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London, regarding carrying out a part survey, 18 September 1923 1923, Copy of letter from Assistant to the Secretary to James Currie and Co regarding schedule for surveys of Stettin, 14 September 1923 1923, Postponed Surveys form for Stettin, 13 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London querying survey schedule of Stettin, 10 September 1923 1923, Report of Survey for Repairs of Engines and Boilers for Stettin, 23 October 1923 1923, Letter from Leith Surveyor A T Thomas to James Currie and Co, informing them of future survey schedule for Stettin, 23 October 1923 1923, Plan of Main Boiler for Stettin, 24 May 1924 1924, Plan of Donkey Boiler for Stettin, 24 May 1924 1924, Hatch Plan of Stettin, 2 October 1924 1924, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Stettin, with reference to Leith Report 16388, 19 May 1924 1924, Letter from A T Thomas, Leith Surveyor, to J F Hill of London, regarding surveying Stettin, 16 May 1924 1924, Extract from a letter dated 14 May 1924 from Leith surveyors regarding examining Stettin. Extract dated 15 May 1924 1924, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans for survey of Stettin and expiry of year of grace, 14 May 1924 1924, Letter from Leith surveyor A T Thomas to Secretary, London, regarding proposed examination part of Stettin's combustion chamber, 18 April 1924 1924, Copy of letter from Assistant to the Secretary to the Leith surveyors questioning owners' arrangements to have Stettin's combustion chamber examined, 16 April 1924 1924, Report of Survey for Repairs of Engines and Boilers for Stettin, 12 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding fulfilment of special survey on Stettin, in reference to Leith Report 16611, 22 November 1924 1924, Report of Survey for Repairs of Stettin, 15 November 1924 1924, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 November 1924 1924, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding completion of reports on Stettin's new boilers, 31 October 1924 1924, Note submitting that certain reports be forwarded to the Leith Surveyors for their guidance and completion, 29 October 1924 1924, Note submitting that the amended plans of boilers for Stettin merit approval, 29 May 1924 1924, Correspondence accompanying boiler plans submitted for approval for Stettin from the Glasgow office to London, 26 May 1924 1924, Letter from Jas S Cairns submitting for approval plans for new boilers for the Stettin to the Glasgow Secretary, 26 May 1924 1924, Note submitting that plans for Stettin's boilers merit approval, 24 April 1924 1924, Letter from Leith Surveyors, per A T T[homas], to Secretary, London, noting they are forwarding plans of new boilers intended for Stettin, 14 April 1924 1924, Report on Main Boiler for Stettin, 11 October 1924 1924, Report on Donkey Boiler for Stettin, 11 October 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Delivery note for 3 furnaces from Forth Shipbuilding and Engineering, Glasgow, 4 July 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 27 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, LR stamp and signature J Barr, 2 July 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 14 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 28 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 26 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 17 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 16790, 28 August 1925 1925, Report of Survey for Repairs on Stettin, 25 August 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 August 1925 1925, Memo regarding approving a steel cylinder cover on Stettin, 5 October 1925 1925, Letter from Leith Surveyor to Secretary, London, regarding steel cover repair examined, 2 October 1925 1925, Letter from Hamburg Office to Secretary, London, regarding request by Leith Surveyors, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding Hamburg report on Stettin, 1 October 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding their request for the Hamburg report, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to A Chisholm, requesting a report for the Leith Surveyors, 30 September 1925 1925, Translation of Cablegram sent to Surveyors at Hamburg, 30 September 1925 1925, Copy of Cablegram from London Office to Hamburg Office, 30 September 1925 1925, Letter from Leith Surveyors, per A T T[homas], to London Office asking for a Hamburg report to be sent to them, 29 September 1925 1925, London Office Copy of document certifying that Hamburg surveyor has examined damage and transmitted the Report, and stating his Recommendations, 25 September 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 September 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 16897, March 1926 1926, Report of Survey for Repairs to Stettin, 30 March 1926 1926, Report of Survey for Repairs of Engines and Boilers to Stettin, 30 March 1926 1926, Report of Survey for Repairs to Stettin, 15 June 1927 1927, Report of Survey for Repairs of Engines and Boilers to Stettin, 15 June 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 17291, 8 December 1927 1927, Copy of Certificate of Survey after damage to Stettin by a breaker in heavy weather, 23 November 1927 1927, Report of Survey for Repairs to Stettin, 3 December 1927 1927, Question and Answer memo between London and Leith Offices regarding Hamburg Report 17858, 21 February 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 1 February 1928 1928, Correspondence memo with particulars from Leith Surveyors to Secretary, London, regarding return of report, 27 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 25 January 1928 1928, Copy of Certificate of Survey from Hamburg after collision damage suffered by Stettin, 22 January 1928 1928, Report of Survey for Repairs of Stettin, 23 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 17339, 15 March 1928 1928, Report of Survey for Repairs of Stettin, 5 March 1928 1928, Copy of letter from the Clerk of the Classification Committee to James Currie and Co, with a copy to the Leith Office, regarding 6th Special Survey of Stettin, 14 December 1928 1928, Postponed Survey form for Stettin's 6th Special Survey, 13 December 1928 1928, Letter from James Currie and Co to Lloyd's Register Secretary, London, regarding deferring Stettin's 6th Special Survey, 11 December 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage, in reference to Dundee Report 8638, 30 March 1928 1928, Copy of Certificate of Survey regarding damage and report of repairs to Stettin's port bow shell plating, Dundee, 23 March 1928 1928, Report of Survey for Repairs to Stettin, 23 March 1928 1928, Letter from Lloyd's Register Engineer Surveyor to James Currie and Co regarding schedule for survey of Stettin's propeller shaft, 5 March 1929 1929, Copy of letter from the Secretary, London, to the Secretary, Glasgow, returning Stettin boiler plans, 29 May 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin and 6th Special Survey, in reference to Leith Report 17540, 13 March 1929 1929, Report of Survey for Repairs of Stettin, 5 March 1929 1929, Report of Survey for Repairs of Engines and Boilers for Stettin, 5 March 1929 1929, Copy of letter from pro Secretary, London, to Leith Surveyors regarding examination of Stettin's screwshaft, 16 April 1930 1930, Postponed Survey form for Stettin's screwshaft, 14 April 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 9 April 1930 1930, Copy of letter from Secretary, London, to Leith Surveyors informing them Committee are agreeable to postponing Stettin's screwshaft survey, 25 February 1930 1930, Postponed Survey form for Stettin's screwshaft, 24 February 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 17 February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 17802, 22 May 1930 1930, Report of Survey for Repairs to Stettin, 15 May 1930 1930, Report on Engine Forgings for Stettin, 8 May 1930 1930, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 May 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 18082, 2 November 1931 1931, Form or memo from Secretary, Glasgow, to Secretary, London, regarding presence of Stettin, 16 October 1931 1931, Question and Answer memo from Secretary, London, to Leith Surveyors regarding Stettin Boiler Survey, 5 October 1931 1931, Copy of letter from pro Secretary, London, with copy to Leith, to James Currie and Co regarding postponing Stettin Boiler Survey, 26 June 1931 1931, Postponed Surveys form for Stettin's Boiler Survey, 25 June 1931 1931, Letter from James Currie and Co regarding postponing Boiler Survey due on Stettin, 20 June 1931 1931, Report of Survey for Repairs on Stettin, 26 October 1931 1931, Report of Survey for Repairs of Engines and Boilers on Stettin, 26 October 1931 1931, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of survey for Stettin, 23 December 1932 1932, Postponed Surveys form for Stettin, 22 December 1932 1932, Letter from Leith Surveyors per John Houston to the Secretary, London, regarding outstanding survey on Stettin, 17 December 1932 1932, Letter from James Currie and Co to Leith Surveyors regarding schedule of survey for Stettin, 16 December 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 14 December 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 24 November 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 September 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 21 June 1932 1932, Postponed Surveys form for Stettin, 20 June 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 June 1932 1932, Copy of letter from pro Secretary, London to Leith Surveyors regarding Stettin boiler survey schedule, 9 October 1931 1932, Postponed Surveys form for Stettin, 8 October 1931 1932, Report of Total Loss, Casualty, , for Stettin, which has been sold to be broken up, 4 December 1933 1933, Letter from Leith Surveyors, per John Houston, to Secretary, London, informing them Stettin is being broken up, 1 December 1933 1933, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of demolition for Stettin, 27 November 1933 1933, Copy of letter from Leith Surveyors, per John Houston, to the Secretary, London, regarding the firm to which Stettin was sold to be broken up, 24 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 23 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 31 August 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 15 June 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 16 March 1933 1933, Note related to Stettin stating SS no. 2 held now posting no date, Note regarding Stettin stating "Vessel left Lisbon Oct 3. + 3 mos from dats. of survey would expire 12/15" no date, Sketch or plan of steel cover part for Stettin no date )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
William Paulin ( Certificate for vessels navigated by Steam for Stettin, 30 November 1864 1864, Iron Ship survey report for Stettin, 2 December 1864 1864, Annual surveys for Stettin, 30 November 1876 1876 )
John Parker ( Report of survey for repairs for Stettin, 16 January 1879 1879, Report of survey for repairs for Stettin, 2 February 1881 1881, Report of survey for repairs for Stettin, 27 January 1882 1882, Annual surveys for Stettin, 6 January 1883 1883, Annual surveys for Stettin, 23 January 1884 1884 )
J Ritchie ( Report of survey for repairs of engines and boilers for Stettin, 16 January 1880 1880, Report of survey for repairs for Stettin, 28 January 1880 1880 )
M Pherson ( Report of survey for repairs for Stettin, 30 January 1885 1885, Report of survey for repairs for Stettin, 27 January 1886 1886 )
Tait ( Report of survey for repairs for Stettin, 26 February 1887 1887, Report of survey for repairs for Stettin, 21 May 1888 1888, Report of survey for repairs for Stettin, 29 December 1888 1888 )
L Robertson ( Report of Survey for Repairs for Stettin, 6 December 1889 1889, Report of Survey for Repairs for Stettin, 18 October 1890 1890, Report of Survey for Repairs for Stettin, 6 November 1891 1891, Report of Survey for Repairs for Stettin, 16 January 1893 1893, Report of survey for repairs for Stettin, 12 February 1894 1894, Report of survey for repairs of engines and boilers for Stettin, 13 February 1894 1894, Report of survey for repairs for Stettin, 6 February 1895 1895, Report of survey for repairs of engines and boilers for Stettin, 6 February 1895 1895, Report of survey for repairs for Stettin, 19 March 1896 1896, Report of survey for repairs of engines and boilers for Stettin, 19 March 1896 1896, Report of survey for repairs of engines and boilers for Stettin, 26 July 1897 1897, Report of survey for repairs for Stettin, 3 March 1898 1898, Report of survey for repairs of engines and boilers for Stettin, 3 March 1898 1898, Report of survey for repairs for Stettin, 28 March 1898 1898, Report of survey for repairs for Stettin, 5 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1899 1899, Report of survey for repairs of engines and boilers for Stettin, 5 April 1899 1899, Report of survey for repairs for Stettin, 16 July 1907 1906, Report of survey for repairs of engines and boilers for Stettin, 16 July 1907 1906, Report of survey for repairs for Stettin, 19 September 1908 1908, Report of survey for repairs of engines and boilers for Stettin, 19 September 1908 1908, Report of survey for repairs for Stettin, 5 October 1910 1910, Report of survey for repairs of engines and boilers for Stettin, 21 October 1910 1910, Report of survey for repairs for Stettin, 3 June 1911 1911, Report of survey for repairs of engines and boilers for Stettin, 3 June 1911 1911, Report of survey for repairs for Stettin, 17 August 1912 1912, Report of survey for repairs of engines and boilers for Stettin, 17 August 1912 1912, Report of survey for repairs for Stettin, 27 December 1913 1913, Report of survey for repairs of engines and boilers for Stettin, 27 December 1913 1913, Report of survey for repairs of engines and boilers for Stettin, 2 July 1915 1915, Report of survey for repairs for Stettin, 2 July 1915 1915 )
Otto E Jacobsen ( Letter from the Master of Stettin Otto E Jacobsen to the surveyor James Barclay about the survey of boilers to take place in Bergen, 8 June 1894 1894, Report of Survey for repairs of engines and boilers for Stettin, 12 July 1894 1894 )
A K Watson ( Report of survey for repairs for Stettin, 19 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 19 March 1897 1897 )
J L Taylor ( Report of survey for repairs for Stettin, 28 April 1900 1900, Report of survey for repairs of engines and boilers for Stettin, 28 April 1900 1900, Report of survey for repairs for Stettin, 2 May 1901 1901, Report of survey for repairs of engines and boilers for Stettin, 2 May 1901 1901, Report of survey for repairs for Stettin, 4 April 1902 1902, Report of survey for repairs of engines and boilers for Stettin, 4 April 1902 1902, Report of survey for repairs for Stettin, 11 May 1903 1903, Report of survey for repairs of engines and boilers for Stettin, 11 May 1903 1903, Report of survey for repairs for Stettin, 29 June 1904 1904, Report of survey for repairs of engines and boilers for Stettin, 29 June 1904 1904 )
J Halcrow ( Report of survey for repairs for Stettin, 11 July 1905 1905, Report of survey for repairs of engines and boilers for Stettin, 11 July 1905 1905, Report of survey for repairs for Stettin, 22 August 1905 1905, Report of survey for repairs for Stettin, 23 July 1906 1906, Report of survey for repairs of engines and boilers for Stettin, 24 July 1906 1906 )
J W Rose ( Report of Survey for Repairs of Engines and Boilers of Stettin, 6 October 1915 1915, Report of Survey for Repairs for Stettin, 18 August 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 August 1915 1915, Report of Survey for Repairs for Stettin due to collision with ice, 1 July 1916 1916, Report of Survey for Repairs of Engines and Boilers for Stettin, 14 July 1916 1916, Report of Survey for Repairs for Stettin 1917, Report of Survey for Repairs for Stettin, 29 September 1917 1917, Report of Survey for Repairs of Engines and Boilers for Stettin, 1 October 1917 1917 )
Recorded information related to a vessel’s movements.
Leith; Hull; Hamburg ( Certificate for vessels navigated by Steam for Stettin, 30 November 1864 1864 )
Leith ( Iron Ship survey report for Stettin, 2 December 1864 1864, Report of survey for repairs for Stettin, 8 July 1876 1876, Annual surveys for Stettin, 30 November 1876 1876, Report of survey for repairs for Stettin, 16 January 1879 1879, Report of survey for repairs of engines and boilers for Stettin, 16 January 1880 1880, Report of survey for repairs for Stettin, 28 January 1880 1880, Report of survey for repairs for Stettin, 2 February 1881 1881, Report of survey for repairs for Stettin, 27 January 1882 1882, Annual surveys for Stettin, 6 January 1883 1883, Annual surveys for Stettin, 23 January 1884 1884, Report of survey for repairs for Stettin, 30 January 1885 1885, Report of survey for repairs of engines and boilers for Stettin, 30 January 1885 1885, Report of survey for repairs for Stettin, 27 January 1886 1886, Report of survey for repairs of engines and boilers for Stettin, 30 January 1886 1886, Report of survey for repairs for Stettin, 26 February 1887 1887, Report of survey for repairs of engines and boilers for Stettin, 15 March 1887 1887, Report of survey for repairs for Stettin, 21 May 1888 1888, Report of survey for repairs of engines and boilers for Stettin, 25 May 1888 1888, Report of survey for repairs for Stettin, 29 December 1888 1888, Report of Survey for Repairs for Stettin, 6 December 1889 1889, Report on Machinery for Stettin, 3 December 1889 1889, Report of Survey for Repairs for Stettin, 18 October 1890 1890, Report of Survey for Repairs for Stettin, 6 November 1891 1891, Report of Survey for Repairs for Stettin, 16 January 1893 1893, Report of survey for repairs for Stettin, 12 February 1894 1894, Report of survey for repairs of engines and boilers for Stettin, 13 February 1894 1894, Report of survey for repairs for Stettin, 6 February 1895 1895, Report of survey for repairs of engines and boilers for Stettin, 6 February 1895 1895, Report of survey for repairs for Stettin, 19 March 1896 1896, Report of survey for repairs of engines and boilers for Stettin, 19 March 1896 1896, Report of survey for repairs for Stettin, 19 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 19 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 26 July 1897 1897, Report of survey for repairs for Stettin, 3 March 1898 1898, Report of survey for repairs of engines and boilers for Stettin, 3 March 1898 1898, Report of survey for repairs for Stettin, 28 March 1898 1898, Report of survey for repairs for Stettin, 5 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1899 1899, Report of survey for repairs of engines and boilers for Stettin, 5 April 1899 1899, Report of survey for repairs for Stettin, 28 April 1900 1900, Report of survey for repairs of engines and boilers for Stettin, 28 April 1900 1900, Report of survey for repairs for Stettin, 2 May 1901 1901, Report of survey for repairs of engines and boilers for Stettin, 2 May 1901 1901, Report of survey for repairs for Stettin, 4 April 1902 1902, Report of survey for repairs of engines and boilers for Stettin, 4 April 1902 1902, Report of survey for repairs for Stettin, 11 May 1903 1903, Report of survey for repairs of engines and boilers for Stettin, 11 May 1903 1903, Report of survey for repairs for Stettin, 29 June 1904 1904, Report of survey for repairs of engines and boilers for Stettin, 29 June 1904 1904, Report of survey for repairs for Stettin, 11 July 1905 1905, Report of survey for repairs of engines and boilers for Stettin, 11 July 1905 1905, Report of survey for repairs for Stettin, 22 August 1905 1905, Report of survey for repairs for Stettin, 23 July 1906 1906, Report of survey for repairs of engines and boilers for Stettin, 24 July 1906 1906, Report of survey for repairs for Stettin, 16 July 1907 1906, Report of survey for repairs of engines and boilers for Stettin, 16 July 1907 1906, Report of survey for repairs for Stettin, 19 September 1908 1908, Report of survey for repairs of engines and boilers for Stettin, 19 September 1908 1908, Report of survey for repairs for Stettin, 2 October 1909 1909, Report of survey for repairs of engines and boilers for Stettin, 2 October 1909 1909, Report of survey for repairs for Stettin, 5 October 1910 1910, Report of survey for repairs of engines and boilers for Stettin, 21 October 1910 1910, Report of Ship forgings or castings for Stettin, 30 September 1910 1910, Report of survey for repairs for Stettin, 3 June 1911 1911, Report of survey for repairs of engines and boilers for Stettin, 3 June 1911 1911, Report of survey for repairs for Stettin, 17 August 1912 1912, Report of survey for repairs of engines and boilers for Stettin, 17 August 1912 1912, Report of survey for repairs for Stettin, 27 December 1913 1913, Report of survey for repairs of engines and boilers for Stettin, 27 December 1913 1913, Report of survey for repairs of engines and boilers for Stettin, 2 July 1915 1915, Report of survey for repairs for Stettin, 2 July 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 67857, 19 August 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Leith Report 15769, 2 July 1920 1920, Report of Survey for Repairs of Stettin, 28 June 1920 1920, Report of Survey for Repairs of Engines and Boilers for Stettin, 28 June 1920 1920, Report of Survey for Repairs of Stettin, 16 September 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London regarding Stettin now undergoing survey, 3 September 1921 1921, Report of Survey for Repairs of Engines and Boilers for Stettin, 16 September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Stettin survey, with reference to Leith Report 16187, 6 October 1921 1922, Report of Survey for Repairs of Stettin, 3 October 1921 1922, Correspondence of Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding ongoing surveys on Stettin, 14 September 1922 1922, Report of Survey for Repairs of Boilers and Engines for Stettin, 26 September 1922 1922, Report of Survey for Repairs of Stettin, 24 October 1923 1923, Report of Survey for Repairs of Engines and Boilers for Stettin, 23 October 1923 1923, Report of Survey for Repairs of Engines and Boilers for Stettin, 12 June 1924 1924, Report of Survey for Repairs of Stettin, 15 November 1924 1924, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 November 1924 1924, Report of Survey for Repairs on Stettin, 25 August 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 August 1925 1925, Report of Survey for Repairs to Stettin, 30 March 1926 1926, Report of Survey for Repairs of Engines and Boilers to Stettin, 30 March 1926 1926, Report of Survey for Repairs to Stettin, 15 June 1927 1927, Report of Survey for Repairs of Engines and Boilers to Stettin, 15 June 1927 1927, Copy of Certificate of Survey after damage to Stettin by a breaker in heavy weather, 23 November 1927 1927, Report of Survey for Repairs to Stettin, 3 December 1927 1927, Report of Survey for Repairs of Stettin, 5 March 1928 1928, Report of Survey for Repairs of Stettin, 5 March 1929 1929, Report of Survey for Repairs of Engines and Boilers for Stettin, 5 March 1929 1929, Report of Survey for Repairs to Stettin, 15 May 1930 1930, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 May 1930 1930, Report of Survey for Repairs on Stettin, 26 October 1931 1931, Report of Survey for Repairs of Engines and Boilers on Stettin, 26 October 1931 1931 )
Bergen ( Report of Survey for repairs of engines and boilers for Stettin, 12 July 1894 1894 )
Lisbon ( Report of Survey for Repairs of Engines and Boilers of Stettin, 6 October 1915 1915 )
South Shields ( Report of Survey for Repairs for Stettin, 18 August 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 August 1915 1915, Report of survey for repairs of Stettin, 5 November 1918 1918, Report of Survey for Repairs of Boilers and Engines of Stettin, 13 November 1918 1918 )
London ( Remarks of the Chief Ship Surveyor to the Classing Committee with reference to London Report 79106, 13 July 1917 1916, Report of Survey for Repairs for Stettin due to collision with ice, 1 July 1916 1916, Report of Survey for Repairs of Engines and Boilers for Stettin, 14 July 1916 1916 )
Newcastle upon Tyne ( Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70096, 27 July 1917 1917, London Office Copy of document certifying that surveyor has examined damage and transmitted the Report, and stating his Recommendations, 24 July 1917 1917, Report of Survey for Repairs for Stettin 1917, Letter from Newcastle surveyors informing Lloyd's Register London that Stettin is under survey at Newcastle, 21 September 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70306, 2 October 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 71400, 19 November 1918 1918 )
North Shields ( Report of Survey for Repairs for Stettin, 29 September 1917 1917, Report of Survey for Repairs of Engines and Boilers for Stettin, 1 October 1917 1917 )
Hamburg ( London Office Copy of document certifying that Hamburg surveyor has examined damage and transmitted the Report, and stating his Recommendations, 25 September 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 September 1925 1925, Copy of Certificate of Survey from Hamburg after collision damage suffered by Stettin, 22 January 1928 1928, Report of Survey for Repairs of Stettin, 23 January 1928 1928 )
Dundee ( Copy of Certificate of Survey regarding damage and report of repairs to Stettin's port bow shell plating, Dundee, 23 March 1928 1928, Report of Survey for Repairs to Stettin, 23 March 1928 1928 )
Broad categories and subdivisions of vessels related to their purpose or function.
Cargo ( Certificate for vessels navigated by Steam for Stettin, 30 November 1864 1864, Iron Ship survey report for Stettin, 2 December 1864 1864, Letter from Glasgow surveyor to the Secretary sending the machinery certificate and Stettin's report of survey no. 4255, 8 July 1876 1876, Report of survey for repairs for Stettin, 8 July 1876 1876, Memo from Messrs Napier Ltd. stating that Stettin's boilers are fitted in accordance with the Committee requirements and should have the notification Lloyd's MC in the Register Book, 3 July 1876 1876, Details of main boilers of Stettin, 29 June 1876 1876, Engineer surveyor's report on machinery for Stettin, 26 June 1876 1876, Annual surveys for Stettin, 30 November 1876 1876, Report of survey for repairs for Stettin, 16 January 1879 1879, Report of survey for repairs of engines and boilers for Stettin, 16 January 1880 1880, Cover note for reports number 4308 and 57 of Stettin, 31 January 1880 1880, Report of survey for repairs for Stettin, 28 January 1880 1880, Report of survey for repairs for Stettin, 2 February 1881 1881, Report of survey for repairs for Stettin, 27 January 1882 1882, Annual surveys for Stettin, 6 January 1883 1883, Annual surveys for Stettin, 23 January 1884 1884, Report of survey for repairs for Stettin, 30 January 1885 1885, Report of survey for repairs of engines and boilers for Stettin, 30 January 1885 1885, Report of survey for repairs for Stettin, 27 January 1886 1886, Report of survey for repairs of engines and boilers for Stettin, 30 January 1886 1886, Report of survey for repairs for Stettin, 26 February 1887 1887, Report of survey for repairs of engines and boilers for Stettin, 15 March 1887 1887, Report of survey for repairs for Stettin, 21 May 1888 1888, Report of survey for repairs of engines and boilers for Stettin, 25 May 1888 1888, Report of survey for repairs for Stettin, 29 December 1888 1888, Particulars for record of double bottoms in Lloyd's Register for Stettin, 5 December 1889 1889, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 10 December 1889 1889, Report of Survey for Repairs for Stettin, 6 December 1889 1889, Report on Machinery for Stettin, 3 December 1889 1889, Report of Survey for Repairs for Stettin, 18 October 1890 1890, Report of Survey for Repairs for Stettin, 6 November 1891 1891, Report of Survey for Repairs for Stettin, 16 January 1893 1893, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 19 February 1894 1894, Report of survey for repairs for Stettin, 12 February 1894 1894, Report of survey for repairs of engines and boilers for Stettin, 13 February 1894 1894, Letter from the surveyor Jas Barclay to the Secretary in London enclosing a letter received from the Master of Stettin about the boiler survey to be held at Bergen, 9 June 1894 1894, Letter from the Master of Stettin Otto E Jacobsen to the surveyor James Barclay about the survey of boilers to take place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to E Rusten, owner of Stettin, stating he agrees with the survey of boilers taking place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to Bergen surveyor stating that Stettin will have the survey of boilers carried out in Bergen, 8 June 1894 1894, Note stating the boiler survey for Stettin is due to April and the owners state the ship will be at Bergen where the survey will take place, 8 June 1894 1894, Letter from Erik Rusten, owner of Stettin, to Lloyd's Register stating that he wishes the survey of boilers to take place in Bergen, 4 June 1894 1894, Report of Survey for repairs of engines and boilers for Stettin, 12 July 1894 1894, Report of survey for repairs for Stettin, 6 February 1895 1895, Report of survey for repairs of engines and boilers for Stettin, 6 February 1895 1895, Report of survey for repairs for Stettin, 19 March 1896 1896, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin about the survey of boilers, 23 March 1896 1896, Letter from Leith surveyor to the Secretary stating that the Stettin is under survey, 5 March 1896 1896, Letter from the Secretary to the Leith Surveyor questioning about the survey of Stettin, 3 March 1896 1896, Copy of Letter from the Secretary to the owner of Stettin stating that he agrees with the boiler survey of that ship being carried out when she is in dry dock in the following month, 29 January 1896 1896, Note stating the boiler survey for Stettin will be in dry dock in the following month, 29 January 1896 1896, Letter from the owner of Stettin to the Secretary stating the ship will be in dry dock next month for the survey, 27 January 1896 1896, Report of survey for repairs of engines and boilers for Stettin, 19 March 1896 1896, Report of survey for repairs for Stettin, 19 March 1897 1897, Letter from the Leith surveyor to the Secretary stating that Stettin is now employed in the emigrant trade and therefore the pressure of boiler has been reduced, 24 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 19 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 26 July 1897 1897, Remarks of the Chief Surveyor to the Classing Committee about the special survey of the ship Stettin, 4 March 1898 1898, Copy of letter from the Secretary to the owners of Stettin stating that the special survey will take place when the ship is placed in dry dock, 3 February 1898 1898, Note stating the ship Stettin will be soon in dry dock to be surveyed, 3 February 1898 1898, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating their intention to put the ship in dry dock to be surveyed, 1 February 1898 1898, Report of survey for repairs for Stettin, 3 March 1898 1898, Report of survey for repairs of engines and boilers for Stettin, 3 March 1898 1898, Remarks of the Chief Surveyor to the Classing Committee about the damage and temporary repairs suffered by Stettin, 31 March 1898 1898, Letter from the Bremerhaven surveyor about the repairs to Stettin, 29 March 1898 1898, Cover note for report number 534 of Stettin, 1 April 1898 1898, Report of survey for repairs for Stettin, 28 March 1898 1898, Remarks of the Ship Surveyor to the Classing Committee saying the damage to Stettin has been repaired and she should remain classed, 6 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1899 1899, Report of survey for repairs of engines and boilers for Stettin, 5 April 1899 1899, Report of survey for repairs for Stettin, 28 April 1900 1900, Report of survey for repairs of engines and boilers for Stettin, 28 April 1900 1900, Report of survey for repairs for Stettin, 2 May 1901 1901, Report of survey for repairs of engines and boilers for Stettin, 2 May 1901 1901, Remarks of the Ship Surveyor to the Classing Committee about the special survey of Stettin and the particulars of her plating, 7 April 1902 1902, Report of survey for repairs for Stettin, 4 April 1902 1902, Copy of letter from the Secretary to the owners of Stettin statin the Committee agreed with the special survey being carried out in the next two months, 31 January 1902 1902, Postponed survey form for Stettin, 30 January 1902 1902, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating they expect to attend the special survey within the next two months, 29 January 1902 1902, Report of survey for repairs of engines and boilers for Stettin, 4 April 1902 1902, Report of survey for repairs for Stettin, 11 May 1903 1903, Copy of letter from the Secretary to Leith Surveyors stating that the steamer Stettin has been booked for the annual boiler survey that will take place in a few days, 7 April 1903 1903, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the annual overhaul has been booked for that next few days, 4 April 1903 1903, Report of survey for repairs of engines and boilers for Stettin, 11 May 1903 1903, Report of survey for repairs for Stettin, 29 June 1904 1904, Report of survey for repairs of engines and boilers for Stettin, 29 June 1904 1904, Report of survey for repairs for Stettin, 11 July 1905 1905, Report of survey for repairs of engines and boilers for Stettin, 11 July 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the damage and repairs to Stettin, 24 August 1905 1905, Report of survey for repairs for Stettin, 22 August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the special survey no.1 of Stettin, 26 July 1906 1906, Copy of letter from the Secretary to Leith Surveyors stating that Stettin will be in dry dock on her arrival from Konigsberg when the special survey no.1 will be carried out, 22 June 1906 1906, Copy of letter from the Secretary to the owners of Stettin stating that the special survey no.1 will be carried out next week in Leith, 22 June 1906 1906, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the special survey no.1 will be carried out in the next week on her arrival from Konigsberg, 20 June 1906 1906, Report of survey for repairs for Stettin, 23 July 1906 1906, Report of survey for repairs of engines and boilers for Stettin, 24 July 1906 1906, Report of survey for repairs for Stettin, 16 July 1907 1906, Report of survey for repairs of engines and boilers for Stettin, 16 July 1907 1906, Report of survey for repairs for Stettin, 19 September 1908 1908, Copy of letter from the Secretary to Leith Surveyors stating that Stettin is laid up for overhaul and that the boiler survey should be carried out, 8 September 1908 1908, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the steamer is laid up for overhaul and that the special survey of boilers should take place next week, 5 September 1908 1908, Report of survey for repairs of engines and boilers for Stettin, 19 September 1908 1908, Report of survey for repairs for Stettin, 2 October 1909 1909, Report of survey for repairs of engines and boilers for Stettin, 2 October 1909 1909, Plan of Rudder of Stettin, 1910. Scale 1"=one foot. Details 3"= one foot, 19 September 1910 1910, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding the special survey no. 2 and boiler survey for Stettin, 29 October 1910 1910, Letter from Leith Surveyor to the Secretary stating that they met with the owners of Stettin and arranged the special survey no. 2 to be carried out after the New Year holidays, 28 November 1910 1910, Copy of letter from the Secretary to Leith Surveyors regarding the report no. 13106 for Stettin and asking when the ship's owners expect the special survey no.2 to be carried out, 25 November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee about damage and repairs made to Stettin after grounding, 7 October 1910 1910, Postponed survey form for Stettin, 27 June 1910 1910, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating the special survey no.2 will be carried out in Leith in September, 23 October 1910 1910, Report of survey for repairs for Stettin, 5 October 1910 1910, Report of survey for repairs of engines and boilers for Stettin, 21 October 1910 1910, Report of Ship forgings or castings for Stettin, 30 September 1910 1910, Note about the sketch of rudder for Stettin, 19 September 1910 1910, Letter from Leith surveyors to the Secretary regarding the plan of rudder for Stettin to be approved by the Committee, 16 September 1910 1910, Copy of letter from Secretary, Lloyd's Register London, to James Currie and Co, regarding agreement for date of carrying out special survey, 28 June 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the special survey no.2 for Stettin and the repairs made, 6 June 1911 1911, Report of survey for repairs for Stettin, 3 June 1911 1911, Report of survey for repairs of engines and boilers for Stettin, 3 June 1911 1911, Copy of letter from the Assistant to the Secretary to the owners of Stettin, James Currie & Co, regarding the boiler survey to take place in about two months' time, 12 July 1912 1912, Report of survey for repairs for Stettin, 17 August 1912 1912, Postponed survey form for Stettin, 11 July 1912 1912, Letter from the owners of Stettin to the Secretary regarding the ship special survey and boilers survey, 9 July 1912 1912, Report of survey for repairs of engines and boilers for Stettin, 17 August 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the conditions of Stettin after repair, 29 December 1913 1913, Report of survey for repairs for Stettin, 27 December 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of Stettin taking place in three weeks’ time, 14 November 1913 1913, Postponed survey form for Stettin, 13 November 1913 1913, Letter from Leith surveyors to the Secretary regarding the survey of Stettin, 8 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin, 7 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin being carried out after the strike of the boilers makers, 9 November 1913 1913, Postponed survey form for Stettin, 8 September 1913 1913, Letter from Leith surveyors to the Secretary regarding the postpone of survey of Stettin due to the boilers makers strike, 5 September 1913 1913, Copy of letter from the Secretary to Leith surveyors regarding the survey of screw shaft of Stettin, 3 September 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating the Committee has agreed with the survey being carried out next month, 4 September 1913 1913, Postponed survey form for Stettin, 3 September 1913 1913, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft, 2 July 1913 1913, Report of survey for repairs of engines and boilers for Stettin, 27 December 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with postponing the special survey, 9 June 1914 1914, Postponed survey form for Stettin, 8 June 1914 1914, Letter from Leith surveyors to the Secretary regarding the special survey of Stettin, 4 June 1914 1914, Copy of letter from the Secretary to Leith surveyors enclosing a letter sent by the owners of Stettin about her fourth special survey no. 3, 3 June 1914 1914, Postponed survey form for Stettin, 2 June 1914 1914, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding postponing the second special survey no. 3 of Stettin, 29 May 1914 1914, Report of survey for repairs of engines and boilers for Stettin, 2 July 1915 1915, Copy of letter from the Secretary to Newcastle-on-Tyne surveyors regarding the special survey of Stettin, 12 August 1913 1915, Letter from Aberdeen surveyors to the Secretary stating that Stettin has sailed to Newcastle-on-Tyne as she failed to obtain docking facilities at that port, 10 August 1915 1915, Remarks to the Chief Ship Surveyor regarding the fourth special survey no. 3 for Stettin, 13 July 1915 1915, Copy of letter from the Secretary to the Surveyors in Hull, Grimsby, Middlesbrough, Newcastle, Sunderland and Hartlepool, regarding the fourth special survey no. 3 of Stettin, which will be carried out at some East coast port, 19 July 1915 1915, Letter from Leith surveyors to the Secretary regarding the survey of Stettin to be carried out at some East coast port, 12 July 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the fourth special survey no. 3 for Stettin, 5 July 1915 1915, Report of survey for repairs for Stettin, 2 July 1915 1915, Letter from Leith surveyors to the Secretary stating that the special survey of Stettin is being carried out at that port, 22 May 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 for Stettin, 21 May 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding her survey, 20 April 1915 1915, Extract from a letter dated 15 April 1915 from James Currie & Co regarding surveying Stettin. Extract dated 16 April 1915 1915, Letter from Leith surveyors to the Secretary stating that they had spoken to the owners of Stettin and due to a shortage of labour it has been difficult to find a dry dock to carry out the special survey, 13 April 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the importance of carrying out the special survey due to the age of the ship, 13 April 1915 1915, Postponed survey form for Stettin, 12 April 1915 1915, Copy of letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding the survey of Stettin being postponed, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 of Stettin, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors enclosing information about the communication between the owners of Stettin, 26 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with the special survey being carried out in the next two or three months, 26 January 1915 1915, Postponed survey form for Stettin, 25 January 1915 1915, Letter from Leith surveyors to the Secretary regarding the special survey no.3 and boiler survey of Stettin, 23 January 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding postponing the survey of Stettin, 21 January 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the fourth special survey no.3 and special annual boiler survey of Stettin, 20 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the letter sent by the latter about the thrust shaft, 1 November 1915 1915, Letter from Lisbon surveyors to the Secretary about the repair of shaft of Stettin, 25 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 28 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 23 October 1915 1915, Copy of letter from the Assistant to the Secretary to Lisbon surveyors regarding the repair of Stettin's thrust shaft being not satisfactory, 18 October 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the new thrust shaft she received in Lisbon, 1916 1915, Letter reporting that the new thrust shaft for Stettin is not considered satisfactory, 14 October 1915 1915, London Office Copy of document certifying that surveyor has examined the machinery of Stettin and stating his recommendations, 4 October 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 6 October 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 67857, 19 August 1915 1915, Report of Survey for Repairs for Stettin, 18 August 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 August 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the thrust shaft supplied in Lisbon and if it will be approved by the Committee as a permanent repair, 29 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon and stating that it will be approved by the Committee as a permanent repair, 28 April 1916 1916, Letter reporting the results of the test carried out on Stettin's new thrust shaft that was made in Lisbon, 27 April 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the result of the tests carried out on the new thrust shaft, 14 April 1916 1916, Letter from Professor R Stanfield to James Currie & Co regarding the results of the test of the transverse section of the shaft of Stettin, 11 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Letter reporting that Stettin's new thrust shaft is not satisfactory to be recommended as a permanent repair, 22 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin stating that the repair of the thrust shaft is being looked at, 14 March 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary enclosing drawings and plans of the shaft of Stettin, 6 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the repair of the thrust shaft, 28 January 1916 1916, Postponed survey form for Stettin, 22 January 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft of Stettin, 24 January 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding when the ship will be in position to have the thrust shaft examined, 21 January 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to London Report 79106, 13 July 1917 1916, Report of Survey for Repairs for Stettin due to collision with ice, 1 July 1916 1916, Report of Survey for Repairs of Engines and Boilers for Stettin, 14 July 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70096, 27 July 1917 1917, London Office Copy of document certifying that surveyor has examined damage and transmitted the Report, and stating his Recommendations, 24 July 1917 1917, Report of Survey for Repairs for Stettin 1917, Letter from Newcastle surveyors informing Lloyd's Register London that Stettin is under survey at Newcastle, 21 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding whether Stettin has yet come under inspection, 20 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding their report 70069, and Stettin's owners' intention to make repairs at South Shields within the next couple of days, and calling attention to the need for the Annu 1917, Letter from James Currie & Co Managers, informing Lloyd's Register London that they have arranged for repairs of damage previously communicated by Smith's Dry Dock Co, South Shields, on the steamer's return there in the next day or two, 1 August 1917 1917, Copy of letter from Lloyd's Register's London Secretary to James Currie and Co, informing them of the damage done to Stettin when striking a quay wall, that temporary repairs have been effected but that for the vessel to remain in class permanent repairs 1917, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70306, 2 October 1917 1917, Report of Survey for Repairs for Stettin, 29 September 1917 1917, Report of Survey for Repairs of Engines and Boilers for Stettin, 1 October 1917 1917, Certificate of approval of a stockless anchor, with cancelled written across it, 4 September 1917 1917, Correspondence to Lloyd's Register's London Secretary regarding Stettin Report 71400, acknowledging remarks on the Rules for Engines and Boilers with a working pressure of less than 60lbs, 23 November 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 71400, 19 November 1918 1918, Report of survey for repairs of Stettin, 5 November 1918 1918, Memo to Newcastle surveyors regarding Rules for Engines and Boilers of a greater working pressure than 60lbs per square inch, 18 November 1918 1918, Report of Survey for Repairs of Boilers and Engines of Stettin, 13 November 1918 1918, Copy of letter from London Secretary to James Currie and Co regarding state or survey of Stettin, 17 October 1919 1919, Postponed Survey form for Stettin, October 1919 1919, Letter from James Currie and Co to Secretary, Lloyd's Register London, regarding postponing survey of Stettin, 10 October 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Leith Report 15769, 2 July 1920 1920, Report of Survey for Repairs of Stettin, 28 June 1920 1920, Copy of letter from Lloyd's Register London Secretary to Leith Surveyors, 30 March 1920 1920, Postponed Survey form for Stettin, 29 March 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 24 March 1920 1920, Copy of Letter from Lloyd's Register London Secretary to Leith Surveyors, 19 March 1920 1920, Letter from the Surveyors at Hull, per N Rowall, to London Secretary regarding state of survey of Stettin, 18 March 1920 1920, Copy of letter from the London Secretary to the Hull Surveyors regarding state of survey of Stettin, 17 March 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 10 February 1920 1920, Postponed Survey form for Stettin, 9 February 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 5 February 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 28 January 1920 1920, Report of Survey for Repairs of Engines and Boilers for Stettin, 28 June 1920 1920, Copy of letter from the Secretary to the owners of Stettin saying the Committee has agreed with postponing the boiler survey, 23 August 1921 1921, Report of Survey for Repairs of Stettin, 16 September 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London regarding Stettin now undergoing survey, 3 September 1921 1921, Postponed Surveys form for Stettin, 22 August 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London explaining why Stettin had not undergone survey, 18 August 1921 1921, Report of Survey for Repairs of Engines and Boilers for Stettin, 16 September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Stettin survey, with reference to Leith Report 16187, 6 October 1921 1922, Report of Survey for Repairs of Stettin, 3 October 1921 1922, Correspondence of Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding ongoing surveys on Stettin, 14 September 1922 1922, Copy of letter from Lloyd's Register London Assistant to the Secretary to Leith Surveyors regarding survey of Stettin's screwshaft, 21 July 1922 1922, Postponed Surveys form for Stettin, 20 July 1922 1922, Letter from Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding proposed survey date for Stettin's screw shaft, 17 July 1922 1922, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans of owners of Stettin for survey of screwshaft, 14 July 1922 1922, Report of Survey for Repairs of Boilers and Engines for Stettin, 26 September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding carrying out part of Stettin's Special Survey, with reference to Leith Report 16388, 30 October 1923 1923, Report of Survey for Repairs of Stettin, 24 October 1923 1923, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors, regarding Rule requirements for cables, 20 October 1923 1923, Remarks to the Chief Ship Surveyor regarding Rule requirements for cables, 19 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London requesting clarification on Rules for chains, 18 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London regarding proposed timeline for survey, 22 September 1923 1923, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding letter from Stettin's owners and requesting clarification of when the boiler survey shall be held, 21 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London, regarding carrying out a part survey, 18 September 1923 1923, Copy of letter from Assistant to the Secretary to James Currie and Co regarding schedule for surveys of Stettin, 14 September 1923 1923, Postponed Surveys form for Stettin, 13 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London querying survey schedule of Stettin, 10 September 1923 1923, Report of Survey for Repairs of Engines and Boilers for Stettin, 23 October 1923 1923, Letter from Leith Surveyor A T Thomas to James Currie and Co, informing them of future survey schedule for Stettin, 23 October 1923 1923, Plan of Main Boiler for Stettin, 24 May 1924 1924, Plan of Donkey Boiler for Stettin, 24 May 1924 1924, Hatch Plan of Stettin, 2 October 1924 1924, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Stettin, with reference to Leith Report 16388, 19 May 1924 1924, Letter from A T Thomas, Leith Surveyor, to J F Hill of London, regarding surveying Stettin, 16 May 1924 1924, Extract from a letter dated 14 May 1924 from Leith surveyors regarding examining Stettin. Extract dated 15 May 1924 1924, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans for survey of Stettin and expiry of year of grace, 14 May 1924 1924, Letter from Leith surveyor A T Thomas to Secretary, London, regarding proposed examination part of Stettin's combustion chamber, 18 April 1924 1924, Copy of letter from Assistant to the Secretary to the Leith surveyors questioning owners' arrangements to have Stettin's combustion chamber examined, 16 April 1924 1924, Report of Survey for Repairs of Engines and Boilers for Stettin, 12 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding fulfilment of special survey on Stettin, in reference to Leith Report 16611, 22 November 1924 1924, Report of Survey for Repairs of Stettin, 15 November 1924 1924, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 November 1924 1924, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding completion of reports on Stettin's new boilers, 31 October 1924 1924, Note submitting that certain reports be forwarded to the Leith Surveyors for their guidance and completion, 29 October 1924 1924, Note submitting that the amended plans of boilers for Stettin merit approval, 29 May 1924 1924, Correspondence accompanying boiler plans submitted for approval for Stettin from the Glasgow office to London, 26 May 1924 1924, Letter from Jas S Cairns submitting for approval plans for new boilers for the Stettin to the Glasgow Secretary, 26 May 1924 1924, Note submitting that plans for Stettin's boilers merit approval, 24 April 1924 1924, Letter from Leith Surveyors, per A T T[homas], to Secretary, London, noting they are forwarding plans of new boilers intended for Stettin, 14 April 1924 1924, Report on Main Boiler for Stettin, 11 October 1924 1924, Report on Donkey Boiler for Stettin, 11 October 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Delivery note for 3 furnaces from Forth Shipbuilding and Engineering, Glasgow, 4 July 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 27 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, LR stamp and signature J Barr, 2 July 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 14 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 28 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 26 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 17 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 16790, 28 August 1925 1925, Report of Survey for Repairs on Stettin, 25 August 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 August 1925 1925, Memo regarding approving a steel cylinder cover on Stettin, 5 October 1925 1925, Letter from Leith Surveyor to Secretary, London, regarding steel cover repair examined, 2 October 1925 1925, Letter from Hamburg Office to Secretary, London, regarding request by Leith Surveyors, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding Hamburg report on Stettin, 1 October 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding their request for the Hamburg report, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to A Chisholm, requesting a report for the Leith Surveyors, 30 September 1925 1925, Translation of Cablegram sent to Surveyors at Hamburg, 30 September 1925 1925, Copy of Cablegram from London Office to Hamburg Office, 30 September 1925 1925, Letter from Leith Surveyors, per A T T[homas], to London Office asking for a Hamburg report to be sent to them, 29 September 1925 1925, London Office Copy of document certifying that Hamburg surveyor has examined damage and transmitted the Report, and stating his Recommendations, 25 September 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 September 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 16897, March 1926 1926, Report of Survey for Repairs to Stettin, 30 March 1926 1926, Report of Survey for Repairs of Engines and Boilers to Stettin, 30 March 1926 1926, Report of Survey for Repairs to Stettin, 15 June 1927 1927, Report of Survey for Repairs of Engines and Boilers to Stettin, 15 June 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 17291, 8 December 1927 1927, Copy of Certificate of Survey after damage to Stettin by a breaker in heavy weather, 23 November 1927 1927, Report of Survey for Repairs to Stettin, 3 December 1927 1927, Question and Answer memo between London and Leith Offices regarding Hamburg Report 17858, 21 February 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 1 February 1928 1928, Correspondence memo with particulars from Leith Surveyors to Secretary, London, regarding return of report, 27 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 25 January 1928 1928, Copy of Certificate of Survey from Hamburg after collision damage suffered by Stettin, 22 January 1928 1928, Report of Survey for Repairs of Stettin, 23 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 17339, 15 March 1928 1928, Report of Survey for Repairs of Stettin, 5 March 1928 1928, Copy of letter from the Clerk of the Classification Committee to James Currie and Co, with a copy to the Leith Office, regarding 6th Special Survey of Stettin, 14 December 1928 1928, Postponed Survey form for Stettin's 6th Special Survey, 13 December 1928 1928, Letter from James Currie and Co to Lloyd's Register Secretary, London, regarding deferring Stettin's 6th Special Survey, 11 December 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage, in reference to Dundee Report 8638, 30 March 1928 1928, Copy of Certificate of Survey regarding damage and report of repairs to Stettin's port bow shell plating, Dundee, 23 March 1928 1928, Report of Survey for Repairs to Stettin, 23 March 1928 1928, Letter from Lloyd's Register Engineer Surveyor to James Currie and Co regarding schedule for survey of Stettin's propeller shaft, 5 March 1929 1929, Copy of letter from the Secretary, London, to the Secretary, Glasgow, returning Stettin boiler plans, 29 May 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin and 6th Special Survey, in reference to Leith Report 17540, 13 March 1929 1929, Report of Survey for Repairs of Stettin, 5 March 1929 1929, Report of Survey for Repairs of Engines and Boilers for Stettin, 5 March 1929 1929, Copy of letter from pro Secretary, London, to Leith Surveyors regarding examination of Stettin's screwshaft, 16 April 1930 1930, Postponed Survey form for Stettin's screwshaft, 14 April 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 9 April 1930 1930, Copy of letter from Secretary, London, to Leith Surveyors informing them Committee are agreeable to postponing Stettin's screwshaft survey, 25 February 1930 1930, Postponed Survey form for Stettin's screwshaft, 24 February 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 17 February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 17802, 22 May 1930 1930, Report of Survey for Repairs to Stettin, 15 May 1930 1930, Report on Engine Forgings for Stettin, 8 May 1930 1930, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 May 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 18082, 2 November 1931 1931, Form or memo from Secretary, Glasgow, to Secretary, London, regarding presence of Stettin, 16 October 1931 1931, Question and Answer memo from Secretary, London, to Leith Surveyors regarding Stettin Boiler Survey, 5 October 1931 1931, Copy of letter from pro Secretary, London, with copy to Leith, to James Currie and Co regarding postponing Stettin Boiler Survey, 26 June 1931 1931, Postponed Surveys form for Stettin's Boiler Survey, 25 June 1931 1931, Letter from James Currie and Co regarding postponing Boiler Survey due on Stettin, 20 June 1931 1931, Report of Survey for Repairs on Stettin, 26 October 1931 1931, Report of Survey for Repairs of Engines and Boilers on Stettin, 26 October 1931 1931, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of survey for Stettin, 23 December 1932 1932, Postponed Surveys form for Stettin, 22 December 1932 1932, Letter from Leith Surveyors per John Houston to the Secretary, London, regarding outstanding survey on Stettin, 17 December 1932 1932, Letter from James Currie and Co to Leith Surveyors regarding schedule of survey for Stettin, 16 December 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 14 December 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 24 November 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 September 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 21 June 1932 1932, Postponed Surveys form for Stettin, 20 June 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 June 1932 1932, Copy of letter from pro Secretary, London to Leith Surveyors regarding Stettin boiler survey schedule, 9 October 1931 1932, Postponed Surveys form for Stettin, 8 October 1931 1932, Report of Total Loss, Casualty, , for Stettin, which has been sold to be broken up, 4 December 1933 1933, Letter from Leith Surveyors, per John Houston, to Secretary, London, informing them Stettin is being broken up, 1 December 1933 1933, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of demolition for Stettin, 27 November 1933 1933, Copy of letter from Leith Surveyors, per John Houston, to the Secretary, London, regarding the firm to which Stettin was sold to be broken up, 24 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 23 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 31 August 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 15 June 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 16 March 1933 1933, Note related to Stettin stating SS no. 2 held now posting no date, Note regarding Stettin stating "Vessel left Lisbon Oct 3. + 3 mos from dats. of survey would expire 12/15" no date, Sketch or plan of steel cover part for Stettin no date )
Type of fuel used onboard a vessel.
Steam - Coal ( Certificate for vessels navigated by Steam for Stettin, 30 November 1864 1864, Iron Ship survey report for Stettin, 2 December 1864 1864, Letter from Glasgow surveyor to the Secretary sending the machinery certificate and Stettin's report of survey no. 4255, 8 July 1876 1876, Report of survey for repairs for Stettin, 8 July 1876 1876, Memo from Messrs Napier Ltd. stating that Stettin's boilers are fitted in accordance with the Committee requirements and should have the notification Lloyd's MC in the Register Book, 3 July 1876 1876, Details of main boilers of Stettin, 29 June 1876 1876, Engineer surveyor's report on machinery for Stettin, 26 June 1876 1876, Annual surveys for Stettin, 30 November 1876 1876, Report of survey for repairs for Stettin, 16 January 1879 1879, Report of survey for repairs of engines and boilers for Stettin, 16 January 1880 1880, Cover note for reports number 4308 and 57 of Stettin, 31 January 1880 1880, Report of survey for repairs for Stettin, 28 January 1880 1880, Report of survey for repairs for Stettin, 2 February 1881 1881, Report of survey for repairs for Stettin, 27 January 1882 1882, Annual surveys for Stettin, 6 January 1883 1883, Annual surveys for Stettin, 23 January 1884 1884, Report of survey for repairs for Stettin, 30 January 1885 1885, Report of survey for repairs of engines and boilers for Stettin, 30 January 1885 1885, Report of survey for repairs for Stettin, 27 January 1886 1886, Report of survey for repairs of engines and boilers for Stettin, 30 January 1886 1886, Report of survey for repairs for Stettin, 26 February 1887 1887, Report of survey for repairs of engines and boilers for Stettin, 15 March 1887 1887, Report of survey for repairs for Stettin, 21 May 1888 1888, Report of survey for repairs of engines and boilers for Stettin, 25 May 1888 1888, Report of survey for repairs for Stettin, 29 December 1888 1888, Particulars for record of double bottoms in Lloyd's Register for Stettin, 5 December 1889 1889, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 10 December 1889 1889, Report of Survey for Repairs for Stettin, 6 December 1889 1889, Report on Machinery for Stettin, 3 December 1889 1889, Report of Survey for Repairs for Stettin, 18 October 1890 1890, Report of Survey for Repairs for Stettin, 6 November 1891 1891, Report of Survey for Repairs for Stettin, 16 January 1893 1893, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 19 February 1894 1894, Report of survey for repairs for Stettin, 12 February 1894 1894, Report of survey for repairs of engines and boilers for Stettin, 13 February 1894 1894, Letter from the surveyor Jas Barclay to the Secretary in London enclosing a letter received from the Master of Stettin about the boiler survey to be held at Bergen, 9 June 1894 1894, Letter from the Master of Stettin Otto E Jacobsen to the surveyor James Barclay about the survey of boilers to take place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to E Rusten, owner of Stettin, stating he agrees with the survey of boilers taking place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to Bergen surveyor stating that Stettin will have the survey of boilers carried out in Bergen, 8 June 1894 1894, Note stating the boiler survey for Stettin is due to April and the owners state the ship will be at Bergen where the survey will take place, 8 June 1894 1894, Letter from Erik Rusten, owner of Stettin, to Lloyd's Register stating that he wishes the survey of boilers to take place in Bergen, 4 June 1894 1894, Report of Survey for repairs of engines and boilers for Stettin, 12 July 1894 1894, Report of survey for repairs for Stettin, 6 February 1895 1895, Report of survey for repairs of engines and boilers for Stettin, 6 February 1895 1895, Report of survey for repairs for Stettin, 19 March 1896 1896, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin about the survey of boilers, 23 March 1896 1896, Letter from Leith surveyor to the Secretary stating that the Stettin is under survey, 5 March 1896 1896, Letter from the Secretary to the Leith Surveyor questioning about the survey of Stettin, 3 March 1896 1896, Copy of Letter from the Secretary to the owner of Stettin stating that he agrees with the boiler survey of that ship being carried out when she is in dry dock in the following month, 29 January 1896 1896, Note stating the boiler survey for Stettin will be in dry dock in the following month, 29 January 1896 1896, Letter from the owner of Stettin to the Secretary stating the ship will be in dry dock next month for the survey, 27 January 1896 1896, Report of survey for repairs of engines and boilers for Stettin, 19 March 1896 1896, Report of survey for repairs for Stettin, 19 March 1897 1897, Letter from the Leith surveyor to the Secretary stating that Stettin is now employed in the emigrant trade and therefore the pressure of boiler has been reduced, 24 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 19 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 26 July 1897 1897, Remarks of the Chief Surveyor to the Classing Committee about the special survey of the ship Stettin, 4 March 1898 1898, Copy of letter from the Secretary to the owners of Stettin stating that the special survey will take place when the ship is placed in dry dock, 3 February 1898 1898, Note stating the ship Stettin will be soon in dry dock to be surveyed, 3 February 1898 1898, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating their intention to put the ship in dry dock to be surveyed, 1 February 1898 1898, Report of survey for repairs for Stettin, 3 March 1898 1898, Report of survey for repairs of engines and boilers for Stettin, 3 March 1898 1898, Remarks of the Chief Surveyor to the Classing Committee about the damage and temporary repairs suffered by Stettin, 31 March 1898 1898, Letter from the Bremerhaven surveyor about the repairs to Stettin, 29 March 1898 1898, Cover note for report number 534 of Stettin, 1 April 1898 1898, Report of survey for repairs for Stettin, 28 March 1898 1898, Remarks of the Ship Surveyor to the Classing Committee saying the damage to Stettin has been repaired and she should remain classed, 6 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1899 1899, Report of survey for repairs of engines and boilers for Stettin, 5 April 1899 1899, Report of survey for repairs for Stettin, 28 April 1900 1900, Report of survey for repairs of engines and boilers for Stettin, 28 April 1900 1900, Report of survey for repairs for Stettin, 2 May 1901 1901, Report of survey for repairs of engines and boilers for Stettin, 2 May 1901 1901, Remarks of the Ship Surveyor to the Classing Committee about the special survey of Stettin and the particulars of her plating, 7 April 1902 1902, Report of survey for repairs for Stettin, 4 April 1902 1902, Copy of letter from the Secretary to the owners of Stettin statin the Committee agreed with the special survey being carried out in the next two months, 31 January 1902 1902, Postponed survey form for Stettin, 30 January 1902 1902, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating they expect to attend the special survey within the next two months, 29 January 1902 1902, Report of survey for repairs of engines and boilers for Stettin, 4 April 1902 1902, Report of survey for repairs for Stettin, 11 May 1903 1903, Copy of letter from the Secretary to Leith Surveyors stating that the steamer Stettin has been booked for the annual boiler survey that will take place in a few days, 7 April 1903 1903, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the annual overhaul has been booked for that next few days, 4 April 1903 1903, Report of survey for repairs of engines and boilers for Stettin, 11 May 1903 1903, Report of survey for repairs for Stettin, 29 June 1904 1904, Report of survey for repairs of engines and boilers for Stettin, 29 June 1904 1904, Report of survey for repairs for Stettin, 11 July 1905 1905, Report of survey for repairs of engines and boilers for Stettin, 11 July 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the damage and repairs to Stettin, 24 August 1905 1905, Report of survey for repairs for Stettin, 22 August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the special survey no.1 of Stettin, 26 July 1906 1906, Copy of letter from the Secretary to Leith Surveyors stating that Stettin will be in dry dock on her arrival from Konigsberg when the special survey no.1 will be carried out, 22 June 1906 1906, Copy of letter from the Secretary to the owners of Stettin stating that the special survey no.1 will be carried out next week in Leith, 22 June 1906 1906, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the special survey no.1 will be carried out in the next week on her arrival from Konigsberg, 20 June 1906 1906, Report of survey for repairs for Stettin, 23 July 1906 1906, Report of survey for repairs of engines and boilers for Stettin, 24 July 1906 1906, Report of survey for repairs for Stettin, 16 July 1907 1906, Report of survey for repairs of engines and boilers for Stettin, 16 July 1907 1906, Report of survey for repairs for Stettin, 19 September 1908 1908, Copy of letter from the Secretary to Leith Surveyors stating that Stettin is laid up for overhaul and that the boiler survey should be carried out, 8 September 1908 1908, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the steamer is laid up for overhaul and that the special survey of boilers should take place next week, 5 September 1908 1908, Report of survey for repairs of engines and boilers for Stettin, 19 September 1908 1908, Report of survey for repairs for Stettin, 2 October 1909 1909, Report of survey for repairs of engines and boilers for Stettin, 2 October 1909 1909, Plan of Rudder of Stettin, 1910. Scale 1"=one foot. Details 3"= one foot, 19 September 1910 1910, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding the special survey no. 2 and boiler survey for Stettin, 29 October 1910 1910, Letter from Leith Surveyor to the Secretary stating that they met with the owners of Stettin and arranged the special survey no. 2 to be carried out after the New Year holidays, 28 November 1910 1910, Copy of letter from the Secretary to Leith Surveyors regarding the report no. 13106 for Stettin and asking when the ship's owners expect the special survey no.2 to be carried out, 25 November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee about damage and repairs made to Stettin after grounding, 7 October 1910 1910, Postponed survey form for Stettin, 27 June 1910 1910, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating the special survey no.2 will be carried out in Leith in September, 23 October 1910 1910, Report of survey for repairs for Stettin, 5 October 1910 1910, Report of survey for repairs of engines and boilers for Stettin, 21 October 1910 1910, Report of Ship forgings or castings for Stettin, 30 September 1910 1910, Note about the sketch of rudder for Stettin, 19 September 1910 1910, Letter from Leith surveyors to the Secretary regarding the plan of rudder for Stettin to be approved by the Committee, 16 September 1910 1910, Copy of letter from Secretary, Lloyd's Register London, to James Currie and Co, regarding agreement for date of carrying out special survey, 28 June 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the special survey no.2 for Stettin and the repairs made, 6 June 1911 1911, Report of survey for repairs for Stettin, 3 June 1911 1911, Report of survey for repairs of engines and boilers for Stettin, 3 June 1911 1911, Copy of letter from the Assistant to the Secretary to the owners of Stettin, James Currie & Co, regarding the boiler survey to take place in about two months' time, 12 July 1912 1912, Report of survey for repairs for Stettin, 17 August 1912 1912, Postponed survey form for Stettin, 11 July 1912 1912, Letter from the owners of Stettin to the Secretary regarding the ship special survey and boilers survey, 9 July 1912 1912, Report of survey for repairs of engines and boilers for Stettin, 17 August 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the conditions of Stettin after repair, 29 December 1913 1913, Report of survey for repairs for Stettin, 27 December 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of Stettin taking place in three weeks’ time, 14 November 1913 1913, Postponed survey form for Stettin, 13 November 1913 1913, Letter from Leith surveyors to the Secretary regarding the survey of Stettin, 8 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin, 7 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin being carried out after the strike of the boilers makers, 9 November 1913 1913, Postponed survey form for Stettin, 8 September 1913 1913, Letter from Leith surveyors to the Secretary regarding the postpone of survey of Stettin due to the boilers makers strike, 5 September 1913 1913, Copy of letter from the Secretary to Leith surveyors regarding the survey of screw shaft of Stettin, 3 September 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating the Committee has agreed with the survey being carried out next month, 4 September 1913 1913, Postponed survey form for Stettin, 3 September 1913 1913, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft, 2 July 1913 1913, Report of survey for repairs of engines and boilers for Stettin, 27 December 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with postponing the special survey, 9 June 1914 1914, Postponed survey form for Stettin, 8 June 1914 1914, Letter from Leith surveyors to the Secretary regarding the special survey of Stettin, 4 June 1914 1914, Copy of letter from the Secretary to Leith surveyors enclosing a letter sent by the owners of Stettin about her fourth special survey no. 3, 3 June 1914 1914, Postponed survey form for Stettin, 2 June 1914 1914, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding postponing the second special survey no. 3 of Stettin, 29 May 1914 1914, Report of survey for repairs of engines and boilers for Stettin, 2 July 1915 1915, Copy of letter from the Secretary to Newcastle-on-Tyne surveyors regarding the special survey of Stettin, 12 August 1913 1915, Letter from Aberdeen surveyors to the Secretary stating that Stettin has sailed to Newcastle-on-Tyne as she failed to obtain docking facilities at that port, 10 August 1915 1915, Remarks to the Chief Ship Surveyor regarding the fourth special survey no. 3 for Stettin, 13 July 1915 1915, Copy of letter from the Secretary to the Surveyors in Hull, Grimsby, Middlesbrough, Newcastle, Sunderland and Hartlepool, regarding the fourth special survey no. 3 of Stettin, which will be carried out at some East coast port, 19 July 1915 1915, Letter from Leith surveyors to the Secretary regarding the survey of Stettin to be carried out at some East coast port, 12 July 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the fourth special survey no. 3 for Stettin, 5 July 1915 1915, Report of survey for repairs for Stettin, 2 July 1915 1915, Letter from Leith surveyors to the Secretary stating that the special survey of Stettin is being carried out at that port, 22 May 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 for Stettin, 21 May 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding her survey, 20 April 1915 1915, Extract from a letter dated 15 April 1915 from James Currie & Co regarding surveying Stettin. Extract dated 16 April 1915 1915, Letter from Leith surveyors to the Secretary stating that they had spoken to the owners of Stettin and due to a shortage of labour it has been difficult to find a dry dock to carry out the special survey, 13 April 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the importance of carrying out the special survey due to the age of the ship, 13 April 1915 1915, Postponed survey form for Stettin, 12 April 1915 1915, Copy of letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding the survey of Stettin being postponed, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 of Stettin, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors enclosing information about the communication between the owners of Stettin, 26 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with the special survey being carried out in the next two or three months, 26 January 1915 1915, Postponed survey form for Stettin, 25 January 1915 1915, Letter from Leith surveyors to the Secretary regarding the special survey no.3 and boiler survey of Stettin, 23 January 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding postponing the survey of Stettin, 21 January 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the fourth special survey no.3 and special annual boiler survey of Stettin, 20 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the letter sent by the latter about the thrust shaft, 1 November 1915 1915, Letter from Lisbon surveyors to the Secretary about the repair of shaft of Stettin, 25 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 28 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 23 October 1915 1915, Copy of letter from the Assistant to the Secretary to Lisbon surveyors regarding the repair of Stettin's thrust shaft being not satisfactory, 18 October 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the new thrust shaft she received in Lisbon, 1916 1915, Letter reporting that the new thrust shaft for Stettin is not considered satisfactory, 14 October 1915 1915, London Office Copy of document certifying that surveyor has examined the machinery of Stettin and stating his recommendations, 4 October 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 6 October 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 67857, 19 August 1915 1915, Report of Survey for Repairs for Stettin, 18 August 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 August 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the thrust shaft supplied in Lisbon and if it will be approved by the Committee as a permanent repair, 29 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon and stating that it will be approved by the Committee as a permanent repair, 28 April 1916 1916, Letter reporting the results of the test carried out on Stettin's new thrust shaft that was made in Lisbon, 27 April 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the result of the tests carried out on the new thrust shaft, 14 April 1916 1916, Letter from Professor R Stanfield to James Currie & Co regarding the results of the test of the transverse section of the shaft of Stettin, 11 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Letter reporting that Stettin's new thrust shaft is not satisfactory to be recommended as a permanent repair, 22 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin stating that the repair of the thrust shaft is being looked at, 14 March 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary enclosing drawings and plans of the shaft of Stettin, 6 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the repair of the thrust shaft, 28 January 1916 1916, Postponed survey form for Stettin, 22 January 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft of Stettin, 24 January 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding when the ship will be in position to have the thrust shaft examined, 21 January 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to London Report 79106, 13 July 1917 1916, Report of Survey for Repairs for Stettin due to collision with ice, 1 July 1916 1916, Report of Survey for Repairs of Engines and Boilers for Stettin, 14 July 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70096, 27 July 1917 1917, London Office Copy of document certifying that surveyor has examined damage and transmitted the Report, and stating his Recommendations, 24 July 1917 1917, Report of Survey for Repairs for Stettin 1917, Letter from Newcastle surveyors informing Lloyd's Register London that Stettin is under survey at Newcastle, 21 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding whether Stettin has yet come under inspection, 20 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding their report 70069, and Stettin's owners' intention to make repairs at South Shields within the next couple of days, and calling attention to the need for the Annu 1917, Letter from James Currie & Co Managers, informing Lloyd's Register London that they have arranged for repairs of damage previously communicated by Smith's Dry Dock Co, South Shields, on the steamer's return there in the next day or two, 1 August 1917 1917, Copy of letter from Lloyd's Register's London Secretary to James Currie and Co, informing them of the damage done to Stettin when striking a quay wall, that temporary repairs have been effected but that for the vessel to remain in class permanent repairs 1917, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70306, 2 October 1917 1917, Report of Survey for Repairs for Stettin, 29 September 1917 1917, Report of Survey for Repairs of Engines and Boilers for Stettin, 1 October 1917 1917, Certificate of approval of a stockless anchor, with cancelled written across it, 4 September 1917 1917, Correspondence to Lloyd's Register's London Secretary regarding Stettin Report 71400, acknowledging remarks on the Rules for Engines and Boilers with a working pressure of less than 60lbs, 23 November 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 71400, 19 November 1918 1918, Report of survey for repairs of Stettin, 5 November 1918 1918, Memo to Newcastle surveyors regarding Rules for Engines and Boilers of a greater working pressure than 60lbs per square inch, 18 November 1918 1918, Report of Survey for Repairs of Boilers and Engines of Stettin, 13 November 1918 1918, Copy of letter from London Secretary to James Currie and Co regarding state or survey of Stettin, 17 October 1919 1919, Postponed Survey form for Stettin, October 1919 1919, Letter from James Currie and Co to Secretary, Lloyd's Register London, regarding postponing survey of Stettin, 10 October 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Leith Report 15769, 2 July 1920 1920, Report of Survey for Repairs of Stettin, 28 June 1920 1920, Copy of letter from Lloyd's Register London Secretary to Leith Surveyors, 30 March 1920 1920, Postponed Survey form for Stettin, 29 March 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 24 March 1920 1920, Copy of Letter from Lloyd's Register London Secretary to Leith Surveyors, 19 March 1920 1920, Letter from the Surveyors at Hull, per N Rowall, to London Secretary regarding state of survey of Stettin, 18 March 1920 1920, Copy of letter from the London Secretary to the Hull Surveyors regarding state of survey of Stettin, 17 March 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 10 February 1920 1920, Postponed Survey form for Stettin, 9 February 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 5 February 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 28 January 1920 1920, Report of Survey for Repairs of Engines and Boilers for Stettin, 28 June 1920 1920, Copy of letter from the Secretary to the owners of Stettin saying the Committee has agreed with postponing the boiler survey, 23 August 1921 1921, Report of Survey for Repairs of Stettin, 16 September 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London regarding Stettin now undergoing survey, 3 September 1921 1921, Postponed Surveys form for Stettin, 22 August 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London explaining why Stettin had not undergone survey, 18 August 1921 1921, Report of Survey for Repairs of Engines and Boilers for Stettin, 16 September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Stettin survey, with reference to Leith Report 16187, 6 October 1921 1922, Report of Survey for Repairs of Stettin, 3 October 1921 1922, Correspondence of Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding ongoing surveys on Stettin, 14 September 1922 1922, Copy of letter from Lloyd's Register London Assistant to the Secretary to Leith Surveyors regarding survey of Stettin's screwshaft, 21 July 1922 1922, Postponed Surveys form for Stettin, 20 July 1922 1922, Letter from Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding proposed survey date for Stettin's screw shaft, 17 July 1922 1922, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans of owners of Stettin for survey of screwshaft, 14 July 1922 1922, Report of Survey for Repairs of Boilers and Engines for Stettin, 26 September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding carrying out part of Stettin's Special Survey, with reference to Leith Report 16388, 30 October 1923 1923, Report of Survey for Repairs of Stettin, 24 October 1923 1923, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors, regarding Rule requirements for cables, 20 October 1923 1923, Remarks to the Chief Ship Surveyor regarding Rule requirements for cables, 19 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London requesting clarification on Rules for chains, 18 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London regarding proposed timeline for survey, 22 September 1923 1923, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding letter from Stettin's owners and requesting clarification of when the boiler survey shall be held, 21 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London, regarding carrying out a part survey, 18 September 1923 1923, Copy of letter from Assistant to the Secretary to James Currie and Co regarding schedule for surveys of Stettin, 14 September 1923 1923, Postponed Surveys form for Stettin, 13 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London querying survey schedule of Stettin, 10 September 1923 1923, Report of Survey for Repairs of Engines and Boilers for Stettin, 23 October 1923 1923, Letter from Leith Surveyor A T Thomas to James Currie and Co, informing them of future survey schedule for Stettin, 23 October 1923 1923, Plan of Main Boiler for Stettin, 24 May 1924 1924, Plan of Donkey Boiler for Stettin, 24 May 1924 1924, Hatch Plan of Stettin, 2 October 1924 1924, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Stettin, with reference to Leith Report 16388, 19 May 1924 1924, Letter from A T Thomas, Leith Surveyor, to J F Hill of London, regarding surveying Stettin, 16 May 1924 1924, Extract from a letter dated 14 May 1924 from Leith surveyors regarding examining Stettin. Extract dated 15 May 1924 1924, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans for survey of Stettin and expiry of year of grace, 14 May 1924 1924, Letter from Leith surveyor A T Thomas to Secretary, London, regarding proposed examination part of Stettin's combustion chamber, 18 April 1924 1924, Copy of letter from Assistant to the Secretary to the Leith surveyors questioning owners' arrangements to have Stettin's combustion chamber examined, 16 April 1924 1924, Report of Survey for Repairs of Engines and Boilers for Stettin, 12 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding fulfilment of special survey on Stettin, in reference to Leith Report 16611, 22 November 1924 1924, Report of Survey for Repairs of Stettin, 15 November 1924 1924, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 November 1924 1924, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding completion of reports on Stettin's new boilers, 31 October 1924 1924, Note submitting that certain reports be forwarded to the Leith Surveyors for their guidance and completion, 29 October 1924 1924, Note submitting that the amended plans of boilers for Stettin merit approval, 29 May 1924 1924, Correspondence accompanying boiler plans submitted for approval for Stettin from the Glasgow office to London, 26 May 1924 1924, Letter from Jas S Cairns submitting for approval plans for new boilers for the Stettin to the Glasgow Secretary, 26 May 1924 1924, Note submitting that plans for Stettin's boilers merit approval, 24 April 1924 1924, Letter from Leith Surveyors, per A T T[homas], to Secretary, London, noting they are forwarding plans of new boilers intended for Stettin, 14 April 1924 1924, Report on Main Boiler for Stettin, 11 October 1924 1924, Report on Donkey Boiler for Stettin, 11 October 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Delivery note for 3 furnaces from Forth Shipbuilding and Engineering, Glasgow, 4 July 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 27 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, LR stamp and signature J Barr, 2 July 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 14 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 28 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 26 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 17 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 16790, 28 August 1925 1925, Report of Survey for Repairs on Stettin, 25 August 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 August 1925 1925, Memo regarding approving a steel cylinder cover on Stettin, 5 October 1925 1925, Letter from Leith Surveyor to Secretary, London, regarding steel cover repair examined, 2 October 1925 1925, Letter from Hamburg Office to Secretary, London, regarding request by Leith Surveyors, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding Hamburg report on Stettin, 1 October 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding their request for the Hamburg report, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to A Chisholm, requesting a report for the Leith Surveyors, 30 September 1925 1925, Translation of Cablegram sent to Surveyors at Hamburg, 30 September 1925 1925, Copy of Cablegram from London Office to Hamburg Office, 30 September 1925 1925, Letter from Leith Surveyors, per A T T[homas], to London Office asking for a Hamburg report to be sent to them, 29 September 1925 1925, London Office Copy of document certifying that Hamburg surveyor has examined damage and transmitted the Report, and stating his Recommendations, 25 September 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 September 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 16897, March 1926 1926, Report of Survey for Repairs to Stettin, 30 March 1926 1926, Report of Survey for Repairs of Engines and Boilers to Stettin, 30 March 1926 1926, Report of Survey for Repairs to Stettin, 15 June 1927 1927, Report of Survey for Repairs of Engines and Boilers to Stettin, 15 June 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 17291, 8 December 1927 1927, Copy of Certificate of Survey after damage to Stettin by a breaker in heavy weather, 23 November 1927 1927, Report of Survey for Repairs to Stettin, 3 December 1927 1927, Question and Answer memo between London and Leith Offices regarding Hamburg Report 17858, 21 February 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 1 February 1928 1928, Correspondence memo with particulars from Leith Surveyors to Secretary, London, regarding return of report, 27 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 25 January 1928 1928, Copy of Certificate of Survey from Hamburg after collision damage suffered by Stettin, 22 January 1928 1928, Report of Survey for Repairs of Stettin, 23 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 17339, 15 March 1928 1928, Report of Survey for Repairs of Stettin, 5 March 1928 1928, Copy of letter from the Clerk of the Classification Committee to James Currie and Co, with a copy to the Leith Office, regarding 6th Special Survey of Stettin, 14 December 1928 1928, Postponed Survey form for Stettin's 6th Special Survey, 13 December 1928 1928, Letter from James Currie and Co to Lloyd's Register Secretary, London, regarding deferring Stettin's 6th Special Survey, 11 December 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage, in reference to Dundee Report 8638, 30 March 1928 1928, Copy of Certificate of Survey regarding damage and report of repairs to Stettin's port bow shell plating, Dundee, 23 March 1928 1928, Report of Survey for Repairs to Stettin, 23 March 1928 1928, Letter from Lloyd's Register Engineer Surveyor to James Currie and Co regarding schedule for survey of Stettin's propeller shaft, 5 March 1929 1929, Copy of letter from the Secretary, London, to the Secretary, Glasgow, returning Stettin boiler plans, 29 May 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin and 6th Special Survey, in reference to Leith Report 17540, 13 March 1929 1929, Report of Survey for Repairs of Stettin, 5 March 1929 1929, Report of Survey for Repairs of Engines and Boilers for Stettin, 5 March 1929 1929, Copy of letter from pro Secretary, London, to Leith Surveyors regarding examination of Stettin's screwshaft, 16 April 1930 1930, Postponed Survey form for Stettin's screwshaft, 14 April 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 9 April 1930 1930, Copy of letter from Secretary, London, to Leith Surveyors informing them Committee are agreeable to postponing Stettin's screwshaft survey, 25 February 1930 1930, Postponed Survey form for Stettin's screwshaft, 24 February 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 17 February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 17802, 22 May 1930 1930, Report of Survey for Repairs to Stettin, 15 May 1930 1930, Report on Engine Forgings for Stettin, 8 May 1930 1930, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 May 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 18082, 2 November 1931 1931, Form or memo from Secretary, Glasgow, to Secretary, London, regarding presence of Stettin, 16 October 1931 1931, Question and Answer memo from Secretary, London, to Leith Surveyors regarding Stettin Boiler Survey, 5 October 1931 1931, Copy of letter from pro Secretary, London, with copy to Leith, to James Currie and Co regarding postponing Stettin Boiler Survey, 26 June 1931 1931, Postponed Surveys form for Stettin's Boiler Survey, 25 June 1931 1931, Letter from James Currie and Co regarding postponing Boiler Survey due on Stettin, 20 June 1931 1931, Report of Survey for Repairs on Stettin, 26 October 1931 1931, Report of Survey for Repairs of Engines and Boilers on Stettin, 26 October 1931 1931, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of survey for Stettin, 23 December 1932 1932, Postponed Surveys form for Stettin, 22 December 1932 1932, Letter from Leith Surveyors per John Houston to the Secretary, London, regarding outstanding survey on Stettin, 17 December 1932 1932, Letter from James Currie and Co to Leith Surveyors regarding schedule of survey for Stettin, 16 December 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 14 December 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 24 November 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 September 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 21 June 1932 1932, Postponed Surveys form for Stettin, 20 June 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 June 1932 1932, Copy of letter from pro Secretary, London to Leith Surveyors regarding Stettin boiler survey schedule, 9 October 1931 1932, Postponed Surveys form for Stettin, 8 October 1931 1932, Report of Total Loss, Casualty, , for Stettin, which has been sold to be broken up, 4 December 1933 1933, Letter from Leith Surveyors, per John Houston, to Secretary, London, informing them Stettin is being broken up, 1 December 1933 1933, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of demolition for Stettin, 27 November 1933 1933, Copy of letter from Leith Surveyors, per John Houston, to the Secretary, London, regarding the firm to which Stettin was sold to be broken up, 24 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 23 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 31 August 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 15 June 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 16 March 1933 1933, Note related to Stettin stating SS no. 2 held now posting no date, Note regarding Stettin stating "Vessel left Lisbon Oct 3. + 3 mos from dats. of survey would expire 12/15" no date, Sketch or plan of steel cover part for Stettin no date )
Is the steamer assisted by sail?
No ( Certificate for vessels navigated by Steam for Stettin, 30 November 1864 1864, Iron Ship survey report for Stettin, 2 December 1864 1864, Letter from Glasgow surveyor to the Secretary sending the machinery certificate and Stettin's report of survey no. 4255, 8 July 1876 1876, Report of survey for repairs for Stettin, 8 July 1876 1876, Memo from Messrs Napier Ltd. stating that Stettin's boilers are fitted in accordance with the Committee requirements and should have the notification Lloyd's MC in the Register Book, 3 July 1876 1876, Details of main boilers of Stettin, 29 June 1876 1876, Engineer surveyor's report on machinery for Stettin, 26 June 1876 1876, Annual surveys for Stettin, 30 November 1876 1876, Report of survey for repairs for Stettin, 16 January 1879 1879, Report of survey for repairs of engines and boilers for Stettin, 16 January 1880 1880, Cover note for reports number 4308 and 57 of Stettin, 31 January 1880 1880, Report of survey for repairs for Stettin, 28 January 1880 1880, Report of survey for repairs for Stettin, 2 February 1881 1881, Report of survey for repairs for Stettin, 27 January 1882 1882, Annual surveys for Stettin, 6 January 1883 1883, Annual surveys for Stettin, 23 January 1884 1884, Report of survey for repairs for Stettin, 30 January 1885 1885, Report of survey for repairs of engines and boilers for Stettin, 30 January 1885 1885, Report of survey for repairs for Stettin, 27 January 1886 1886, Report of survey for repairs of engines and boilers for Stettin, 30 January 1886 1886, Report of survey for repairs for Stettin, 26 February 1887 1887, Report of survey for repairs of engines and boilers for Stettin, 15 March 1887 1887, Report of survey for repairs for Stettin, 21 May 1888 1888, Report of survey for repairs of engines and boilers for Stettin, 25 May 1888 1888, Report of survey for repairs for Stettin, 29 December 1888 1888, Particulars for record of double bottoms in Lloyd's Register for Stettin, 5 December 1889 1889, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 10 December 1889 1889, Report of Survey for Repairs for Stettin, 6 December 1889 1889, Report on Machinery for Stettin, 3 December 1889 1889, Report of Survey for Repairs for Stettin, 18 October 1890 1890, Report of Survey for Repairs for Stettin, 6 November 1891 1891, Report of Survey for Repairs for Stettin, 16 January 1893 1893, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 19 February 1894 1894, Report of survey for repairs for Stettin, 12 February 1894 1894, Report of survey for repairs of engines and boilers for Stettin, 13 February 1894 1894, Letter from the surveyor Jas Barclay to the Secretary in London enclosing a letter received from the Master of Stettin about the boiler survey to be held at Bergen, 9 June 1894 1894, Letter from the Master of Stettin Otto E Jacobsen to the surveyor James Barclay about the survey of boilers to take place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to E Rusten, owner of Stettin, stating he agrees with the survey of boilers taking place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to Bergen surveyor stating that Stettin will have the survey of boilers carried out in Bergen, 8 June 1894 1894, Note stating the boiler survey for Stettin is due to April and the owners state the ship will be at Bergen where the survey will take place, 8 June 1894 1894, Letter from Erik Rusten, owner of Stettin, to Lloyd's Register stating that he wishes the survey of boilers to take place in Bergen, 4 June 1894 1894, Report of Survey for repairs of engines and boilers for Stettin, 12 July 1894 1894, Report of survey for repairs for Stettin, 6 February 1895 1895, Report of survey for repairs of engines and boilers for Stettin, 6 February 1895 1895, Report of survey for repairs for Stettin, 19 March 1896 1896, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin about the survey of boilers, 23 March 1896 1896, Letter from Leith surveyor to the Secretary stating that the Stettin is under survey, 5 March 1896 1896, Letter from the Secretary to the Leith Surveyor questioning about the survey of Stettin, 3 March 1896 1896, Copy of Letter from the Secretary to the owner of Stettin stating that he agrees with the boiler survey of that ship being carried out when she is in dry dock in the following month, 29 January 1896 1896, Note stating the boiler survey for Stettin will be in dry dock in the following month, 29 January 1896 1896, Letter from the owner of Stettin to the Secretary stating the ship will be in dry dock next month for the survey, 27 January 1896 1896, Report of survey for repairs of engines and boilers for Stettin, 19 March 1896 1896, Report of survey for repairs for Stettin, 19 March 1897 1897, Letter from the Leith surveyor to the Secretary stating that Stettin is now employed in the emigrant trade and therefore the pressure of boiler has been reduced, 24 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 19 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 26 July 1897 1897, Remarks of the Chief Surveyor to the Classing Committee about the special survey of the ship Stettin, 4 March 1898 1898, Copy of letter from the Secretary to the owners of Stettin stating that the special survey will take place when the ship is placed in dry dock, 3 February 1898 1898, Note stating the ship Stettin will be soon in dry dock to be surveyed, 3 February 1898 1898, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating their intention to put the ship in dry dock to be surveyed, 1 February 1898 1898, Report of survey for repairs for Stettin, 3 March 1898 1898, Report of survey for repairs of engines and boilers for Stettin, 3 March 1898 1898, Remarks of the Chief Surveyor to the Classing Committee about the damage and temporary repairs suffered by Stettin, 31 March 1898 1898, Letter from the Bremerhaven surveyor about the repairs to Stettin, 29 March 1898 1898, Cover note for report number 534 of Stettin, 1 April 1898 1898, Report of survey for repairs for Stettin, 28 March 1898 1898, Remarks of the Ship Surveyor to the Classing Committee saying the damage to Stettin has been repaired and she should remain classed, 6 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1899 1899, Report of survey for repairs of engines and boilers for Stettin, 5 April 1899 1899, Report of survey for repairs for Stettin, 28 April 1900 1900, Report of survey for repairs of engines and boilers for Stettin, 28 April 1900 1900, Report of survey for repairs for Stettin, 2 May 1901 1901, Report of survey for repairs of engines and boilers for Stettin, 2 May 1901 1901, Remarks of the Ship Surveyor to the Classing Committee about the special survey of Stettin and the particulars of her plating, 7 April 1902 1902, Report of survey for repairs for Stettin, 4 April 1902 1902, Copy of letter from the Secretary to the owners of Stettin statin the Committee agreed with the special survey being carried out in the next two months, 31 January 1902 1902, Postponed survey form for Stettin, 30 January 1902 1902, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating they expect to attend the special survey within the next two months, 29 January 1902 1902, Report of survey for repairs of engines and boilers for Stettin, 4 April 1902 1902, Report of survey for repairs for Stettin, 11 May 1903 1903, Copy of letter from the Secretary to Leith Surveyors stating that the steamer Stettin has been booked for the annual boiler survey that will take place in a few days, 7 April 1903 1903, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the annual overhaul has been booked for that next few days, 4 April 1903 1903, Report of survey for repairs of engines and boilers for Stettin, 11 May 1903 1903, Report of survey for repairs for Stettin, 29 June 1904 1904, Report of survey for repairs of engines and boilers for Stettin, 29 June 1904 1904, Report of survey for repairs for Stettin, 11 July 1905 1905, Report of survey for repairs of engines and boilers for Stettin, 11 July 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the damage and repairs to Stettin, 24 August 1905 1905, Report of survey for repairs for Stettin, 22 August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the special survey no.1 of Stettin, 26 July 1906 1906, Copy of letter from the Secretary to Leith Surveyors stating that Stettin will be in dry dock on her arrival from Konigsberg when the special survey no.1 will be carried out, 22 June 1906 1906, Copy of letter from the Secretary to the owners of Stettin stating that the special survey no.1 will be carried out next week in Leith, 22 June 1906 1906, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the special survey no.1 will be carried out in the next week on her arrival from Konigsberg, 20 June 1906 1906, Report of survey for repairs for Stettin, 23 July 1906 1906, Report of survey for repairs of engines and boilers for Stettin, 24 July 1906 1906, Report of survey for repairs for Stettin, 16 July 1907 1906, Report of survey for repairs of engines and boilers for Stettin, 16 July 1907 1906, Report of survey for repairs for Stettin, 19 September 1908 1908, Copy of letter from the Secretary to Leith Surveyors stating that Stettin is laid up for overhaul and that the boiler survey should be carried out, 8 September 1908 1908, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the steamer is laid up for overhaul and that the special survey of boilers should take place next week, 5 September 1908 1908, Report of survey for repairs of engines and boilers for Stettin, 19 September 1908 1908, Report of survey for repairs for Stettin, 2 October 1909 1909, Report of survey for repairs of engines and boilers for Stettin, 2 October 1909 1909, Plan of Rudder of Stettin, 1910. Scale 1"=one foot. Details 3"= one foot, 19 September 1910 1910, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding the special survey no. 2 and boiler survey for Stettin, 29 October 1910 1910, Letter from Leith Surveyor to the Secretary stating that they met with the owners of Stettin and arranged the special survey no. 2 to be carried out after the New Year holidays, 28 November 1910 1910, Copy of letter from the Secretary to Leith Surveyors regarding the report no. 13106 for Stettin and asking when the ship's owners expect the special survey no.2 to be carried out, 25 November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee about damage and repairs made to Stettin after grounding, 7 October 1910 1910, Postponed survey form for Stettin, 27 June 1910 1910, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating the special survey no.2 will be carried out in Leith in September, 23 October 1910 1910, Report of survey for repairs for Stettin, 5 October 1910 1910, Report of survey for repairs of engines and boilers for Stettin, 21 October 1910 1910, Report of Ship forgings or castings for Stettin, 30 September 1910 1910, Note about the sketch of rudder for Stettin, 19 September 1910 1910, Letter from Leith surveyors to the Secretary regarding the plan of rudder for Stettin to be approved by the Committee, 16 September 1910 1910, Copy of letter from Secretary, Lloyd's Register London, to James Currie and Co, regarding agreement for date of carrying out special survey, 28 June 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the special survey no.2 for Stettin and the repairs made, 6 June 1911 1911, Report of survey for repairs for Stettin, 3 June 1911 1911, Report of survey for repairs of engines and boilers for Stettin, 3 June 1911 1911, Copy of letter from the Assistant to the Secretary to the owners of Stettin, James Currie & Co, regarding the boiler survey to take place in about two months' time, 12 July 1912 1912, Report of survey for repairs for Stettin, 17 August 1912 1912, Postponed survey form for Stettin, 11 July 1912 1912, Letter from the owners of Stettin to the Secretary regarding the ship special survey and boilers survey, 9 July 1912 1912, Report of survey for repairs of engines and boilers for Stettin, 17 August 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the conditions of Stettin after repair, 29 December 1913 1913, Report of survey for repairs for Stettin, 27 December 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of Stettin taking place in three weeks’ time, 14 November 1913 1913, Postponed survey form for Stettin, 13 November 1913 1913, Letter from Leith surveyors to the Secretary regarding the survey of Stettin, 8 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin, 7 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin being carried out after the strike of the boilers makers, 9 November 1913 1913, Postponed survey form for Stettin, 8 September 1913 1913, Letter from Leith surveyors to the Secretary regarding the postpone of survey of Stettin due to the boilers makers strike, 5 September 1913 1913, Copy of letter from the Secretary to Leith surveyors regarding the survey of screw shaft of Stettin, 3 September 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating the Committee has agreed with the survey being carried out next month, 4 September 1913 1913, Postponed survey form for Stettin, 3 September 1913 1913, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft, 2 July 1913 1913, Report of survey for repairs of engines and boilers for Stettin, 27 December 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with postponing the special survey, 9 June 1914 1914, Postponed survey form for Stettin, 8 June 1914 1914, Letter from Leith surveyors to the Secretary regarding the special survey of Stettin, 4 June 1914 1914, Copy of letter from the Secretary to Leith surveyors enclosing a letter sent by the owners of Stettin about her fourth special survey no. 3, 3 June 1914 1914, Postponed survey form for Stettin, 2 June 1914 1914, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding postponing the second special survey no. 3 of Stettin, 29 May 1914 1914, Report of survey for repairs of engines and boilers for Stettin, 2 July 1915 1915, Copy of letter from the Secretary to Newcastle-on-Tyne surveyors regarding the special survey of Stettin, 12 August 1913 1915, Letter from Aberdeen surveyors to the Secretary stating that Stettin has sailed to Newcastle-on-Tyne as she failed to obtain docking facilities at that port, 10 August 1915 1915, Remarks to the Chief Ship Surveyor regarding the fourth special survey no. 3 for Stettin, 13 July 1915 1915, Copy of letter from the Secretary to the Surveyors in Hull, Grimsby, Middlesbrough, Newcastle, Sunderland and Hartlepool, regarding the fourth special survey no. 3 of Stettin, which will be carried out at some East coast port, 19 July 1915 1915, Letter from Leith surveyors to the Secretary regarding the survey of Stettin to be carried out at some East coast port, 12 July 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the fourth special survey no. 3 for Stettin, 5 July 1915 1915, Report of survey for repairs for Stettin, 2 July 1915 1915, Letter from Leith surveyors to the Secretary stating that the special survey of Stettin is being carried out at that port, 22 May 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 for Stettin, 21 May 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding her survey, 20 April 1915 1915, Extract from a letter dated 15 April 1915 from James Currie & Co regarding surveying Stettin. Extract dated 16 April 1915 1915, Letter from Leith surveyors to the Secretary stating that they had spoken to the owners of Stettin and due to a shortage of labour it has been difficult to find a dry dock to carry out the special survey, 13 April 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the importance of carrying out the special survey due to the age of the ship, 13 April 1915 1915, Postponed survey form for Stettin, 12 April 1915 1915, Copy of letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding the survey of Stettin being postponed, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 of Stettin, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors enclosing information about the communication between the owners of Stettin, 26 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with the special survey being carried out in the next two or three months, 26 January 1915 1915, Postponed survey form for Stettin, 25 January 1915 1915, Letter from Leith surveyors to the Secretary regarding the special survey no.3 and boiler survey of Stettin, 23 January 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding postponing the survey of Stettin, 21 January 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the fourth special survey no.3 and special annual boiler survey of Stettin, 20 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the letter sent by the latter about the thrust shaft, 1 November 1915 1915, Letter from Lisbon surveyors to the Secretary about the repair of shaft of Stettin, 25 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 28 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 23 October 1915 1915, Copy of letter from the Assistant to the Secretary to Lisbon surveyors regarding the repair of Stettin's thrust shaft being not satisfactory, 18 October 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the new thrust shaft she received in Lisbon, 1916 1915, Letter reporting that the new thrust shaft for Stettin is not considered satisfactory, 14 October 1915 1915, London Office Copy of document certifying that surveyor has examined the machinery of Stettin and stating his recommendations, 4 October 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 6 October 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 67857, 19 August 1915 1915, Report of Survey for Repairs for Stettin, 18 August 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 August 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the thrust shaft supplied in Lisbon and if it will be approved by the Committee as a permanent repair, 29 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon and stating that it will be approved by the Committee as a permanent repair, 28 April 1916 1916, Letter reporting the results of the test carried out on Stettin's new thrust shaft that was made in Lisbon, 27 April 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the result of the tests carried out on the new thrust shaft, 14 April 1916 1916, Letter from Professor R Stanfield to James Currie & Co regarding the results of the test of the transverse section of the shaft of Stettin, 11 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Letter reporting that Stettin's new thrust shaft is not satisfactory to be recommended as a permanent repair, 22 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin stating that the repair of the thrust shaft is being looked at, 14 March 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary enclosing drawings and plans of the shaft of Stettin, 6 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the repair of the thrust shaft, 28 January 1916 1916, Postponed survey form for Stettin, 22 January 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft of Stettin, 24 January 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding when the ship will be in position to have the thrust shaft examined, 21 January 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to London Report 79106, 13 July 1917 1916, Report of Survey for Repairs for Stettin due to collision with ice, 1 July 1916 1916, Report of Survey for Repairs of Engines and Boilers for Stettin, 14 July 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70096, 27 July 1917 1917, London Office Copy of document certifying that surveyor has examined damage and transmitted the Report, and stating his Recommendations, 24 July 1917 1917, Report of Survey for Repairs for Stettin 1917, Letter from Newcastle surveyors informing Lloyd's Register London that Stettin is under survey at Newcastle, 21 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding whether Stettin has yet come under inspection, 20 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding their report 70069, and Stettin's owners' intention to make repairs at South Shields within the next couple of days, and calling attention to the need for the Annu 1917, Letter from James Currie & Co Managers, informing Lloyd's Register London that they have arranged for repairs of damage previously communicated by Smith's Dry Dock Co, South Shields, on the steamer's return there in the next day or two, 1 August 1917 1917, Copy of letter from Lloyd's Register's London Secretary to James Currie and Co, informing them of the damage done to Stettin when striking a quay wall, that temporary repairs have been effected but that for the vessel to remain in class permanent repairs 1917, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70306, 2 October 1917 1917, Report of Survey for Repairs for Stettin, 29 September 1917 1917, Report of Survey for Repairs of Engines and Boilers for Stettin, 1 October 1917 1917, Certificate of approval of a stockless anchor, with cancelled written across it, 4 September 1917 1917, Correspondence to Lloyd's Register's London Secretary regarding Stettin Report 71400, acknowledging remarks on the Rules for Engines and Boilers with a working pressure of less than 60lbs, 23 November 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 71400, 19 November 1918 1918, Report of survey for repairs of Stettin, 5 November 1918 1918, Memo to Newcastle surveyors regarding Rules for Engines and Boilers of a greater working pressure than 60lbs per square inch, 18 November 1918 1918, Report of Survey for Repairs of Boilers and Engines of Stettin, 13 November 1918 1918, Copy of letter from London Secretary to James Currie and Co regarding state or survey of Stettin, 17 October 1919 1919, Postponed Survey form for Stettin, October 1919 1919, Letter from James Currie and Co to Secretary, Lloyd's Register London, regarding postponing survey of Stettin, 10 October 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Leith Report 15769, 2 July 1920 1920, Report of Survey for Repairs of Stettin, 28 June 1920 1920, Copy of letter from Lloyd's Register London Secretary to Leith Surveyors, 30 March 1920 1920, Postponed Survey form for Stettin, 29 March 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 24 March 1920 1920, Copy of Letter from Lloyd's Register London Secretary to Leith Surveyors, 19 March 1920 1920, Letter from the Surveyors at Hull, per N Rowall, to London Secretary regarding state of survey of Stettin, 18 March 1920 1920, Copy of letter from the London Secretary to the Hull Surveyors regarding state of survey of Stettin, 17 March 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 10 February 1920 1920, Postponed Survey form for Stettin, 9 February 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 5 February 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 28 January 1920 1920, Report of Survey for Repairs of Engines and Boilers for Stettin, 28 June 1920 1920, Copy of letter from the Secretary to the owners of Stettin saying the Committee has agreed with postponing the boiler survey, 23 August 1921 1921, Report of Survey for Repairs of Stettin, 16 September 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London regarding Stettin now undergoing survey, 3 September 1921 1921, Postponed Surveys form for Stettin, 22 August 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London explaining why Stettin had not undergone survey, 18 August 1921 1921, Report of Survey for Repairs of Engines and Boilers for Stettin, 16 September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Stettin survey, with reference to Leith Report 16187, 6 October 1921 1922, Report of Survey for Repairs of Stettin, 3 October 1921 1922, Correspondence of Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding ongoing surveys on Stettin, 14 September 1922 1922, Copy of letter from Lloyd's Register London Assistant to the Secretary to Leith Surveyors regarding survey of Stettin's screwshaft, 21 July 1922 1922, Postponed Surveys form for Stettin, 20 July 1922 1922, Letter from Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding proposed survey date for Stettin's screw shaft, 17 July 1922 1922, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans of owners of Stettin for survey of screwshaft, 14 July 1922 1922, Report of Survey for Repairs of Boilers and Engines for Stettin, 26 September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding carrying out part of Stettin's Special Survey, with reference to Leith Report 16388, 30 October 1923 1923, Report of Survey for Repairs of Stettin, 24 October 1923 1923, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors, regarding Rule requirements for cables, 20 October 1923 1923, Remarks to the Chief Ship Surveyor regarding Rule requirements for cables, 19 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London requesting clarification on Rules for chains, 18 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London regarding proposed timeline for survey, 22 September 1923 1923, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding letter from Stettin's owners and requesting clarification of when the boiler survey shall be held, 21 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London, regarding carrying out a part survey, 18 September 1923 1923, Copy of letter from Assistant to the Secretary to James Currie and Co regarding schedule for surveys of Stettin, 14 September 1923 1923, Postponed Surveys form for Stettin, 13 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London querying survey schedule of Stettin, 10 September 1923 1923, Report of Survey for Repairs of Engines and Boilers for Stettin, 23 October 1923 1923, Letter from Leith Surveyor A T Thomas to James Currie and Co, informing them of future survey schedule for Stettin, 23 October 1923 1923, Plan of Main Boiler for Stettin, 24 May 1924 1924, Plan of Donkey Boiler for Stettin, 24 May 1924 1924, Hatch Plan of Stettin, 2 October 1924 1924, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Stettin, with reference to Leith Report 16388, 19 May 1924 1924, Letter from A T Thomas, Leith Surveyor, to J F Hill of London, regarding surveying Stettin, 16 May 1924 1924, Extract from a letter dated 14 May 1924 from Leith surveyors regarding examining Stettin. Extract dated 15 May 1924 1924, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans for survey of Stettin and expiry of year of grace, 14 May 1924 1924, Letter from Leith surveyor A T Thomas to Secretary, London, regarding proposed examination part of Stettin's combustion chamber, 18 April 1924 1924, Copy of letter from Assistant to the Secretary to the Leith surveyors questioning owners' arrangements to have Stettin's combustion chamber examined, 16 April 1924 1924, Report of Survey for Repairs of Engines and Boilers for Stettin, 12 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding fulfilment of special survey on Stettin, in reference to Leith Report 16611, 22 November 1924 1924, Report of Survey for Repairs of Stettin, 15 November 1924 1924, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 November 1924 1924, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding completion of reports on Stettin's new boilers, 31 October 1924 1924, Note submitting that certain reports be forwarded to the Leith Surveyors for their guidance and completion, 29 October 1924 1924, Note submitting that the amended plans of boilers for Stettin merit approval, 29 May 1924 1924, Correspondence accompanying boiler plans submitted for approval for Stettin from the Glasgow office to London, 26 May 1924 1924, Letter from Jas S Cairns submitting for approval plans for new boilers for the Stettin to the Glasgow Secretary, 26 May 1924 1924, Note submitting that plans for Stettin's boilers merit approval, 24 April 1924 1924, Letter from Leith Surveyors, per A T T[homas], to Secretary, London, noting they are forwarding plans of new boilers intended for Stettin, 14 April 1924 1924, Report on Main Boiler for Stettin, 11 October 1924 1924, Report on Donkey Boiler for Stettin, 11 October 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Delivery note for 3 furnaces from Forth Shipbuilding and Engineering, Glasgow, 4 July 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 27 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, LR stamp and signature J Barr, 2 July 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 14 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 28 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 26 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 17 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 16790, 28 August 1925 1925, Report of Survey for Repairs on Stettin, 25 August 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 August 1925 1925, Memo regarding approving a steel cylinder cover on Stettin, 5 October 1925 1925, Letter from Leith Surveyor to Secretary, London, regarding steel cover repair examined, 2 October 1925 1925, Letter from Hamburg Office to Secretary, London, regarding request by Leith Surveyors, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding Hamburg report on Stettin, 1 October 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding their request for the Hamburg report, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to A Chisholm, requesting a report for the Leith Surveyors, 30 September 1925 1925, Translation of Cablegram sent to Surveyors at Hamburg, 30 September 1925 1925, Copy of Cablegram from London Office to Hamburg Office, 30 September 1925 1925, Letter from Leith Surveyors, per A T T[homas], to London Office asking for a Hamburg report to be sent to them, 29 September 1925 1925, London Office Copy of document certifying that Hamburg surveyor has examined damage and transmitted the Report, and stating his Recommendations, 25 September 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 September 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 16897, March 1926 1926, Report of Survey for Repairs to Stettin, 30 March 1926 1926, Report of Survey for Repairs of Engines and Boilers to Stettin, 30 March 1926 1926, Report of Survey for Repairs to Stettin, 15 June 1927 1927, Report of Survey for Repairs of Engines and Boilers to Stettin, 15 June 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 17291, 8 December 1927 1927, Copy of Certificate of Survey after damage to Stettin by a breaker in heavy weather, 23 November 1927 1927, Report of Survey for Repairs to Stettin, 3 December 1927 1927, Question and Answer memo between London and Leith Offices regarding Hamburg Report 17858, 21 February 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 1 February 1928 1928, Correspondence memo with particulars from Leith Surveyors to Secretary, London, regarding return of report, 27 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 25 January 1928 1928, Copy of Certificate of Survey from Hamburg after collision damage suffered by Stettin, 22 January 1928 1928, Report of Survey for Repairs of Stettin, 23 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 17339, 15 March 1928 1928, Report of Survey for Repairs of Stettin, 5 March 1928 1928, Copy of letter from the Clerk of the Classification Committee to James Currie and Co, with a copy to the Leith Office, regarding 6th Special Survey of Stettin, 14 December 1928 1928, Postponed Survey form for Stettin's 6th Special Survey, 13 December 1928 1928, Letter from James Currie and Co to Lloyd's Register Secretary, London, regarding deferring Stettin's 6th Special Survey, 11 December 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage, in reference to Dundee Report 8638, 30 March 1928 1928, Copy of Certificate of Survey regarding damage and report of repairs to Stettin's port bow shell plating, Dundee, 23 March 1928 1928, Report of Survey for Repairs to Stettin, 23 March 1928 1928, Letter from Lloyd's Register Engineer Surveyor to James Currie and Co regarding schedule for survey of Stettin's propeller shaft, 5 March 1929 1929, Copy of letter from the Secretary, London, to the Secretary, Glasgow, returning Stettin boiler plans, 29 May 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin and 6th Special Survey, in reference to Leith Report 17540, 13 March 1929 1929, Report of Survey for Repairs of Stettin, 5 March 1929 1929, Report of Survey for Repairs of Engines and Boilers for Stettin, 5 March 1929 1929, Copy of letter from pro Secretary, London, to Leith Surveyors regarding examination of Stettin's screwshaft, 16 April 1930 1930, Postponed Survey form for Stettin's screwshaft, 14 April 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 9 April 1930 1930, Copy of letter from Secretary, London, to Leith Surveyors informing them Committee are agreeable to postponing Stettin's screwshaft survey, 25 February 1930 1930, Postponed Survey form for Stettin's screwshaft, 24 February 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 17 February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 17802, 22 May 1930 1930, Report of Survey for Repairs to Stettin, 15 May 1930 1930, Report on Engine Forgings for Stettin, 8 May 1930 1930, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 May 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 18082, 2 November 1931 1931, Form or memo from Secretary, Glasgow, to Secretary, London, regarding presence of Stettin, 16 October 1931 1931, Question and Answer memo from Secretary, London, to Leith Surveyors regarding Stettin Boiler Survey, 5 October 1931 1931, Copy of letter from pro Secretary, London, with copy to Leith, to James Currie and Co regarding postponing Stettin Boiler Survey, 26 June 1931 1931, Postponed Surveys form for Stettin's Boiler Survey, 25 June 1931 1931, Letter from James Currie and Co regarding postponing Boiler Survey due on Stettin, 20 June 1931 1931, Report of Survey for Repairs on Stettin, 26 October 1931 1931, Report of Survey for Repairs of Engines and Boilers on Stettin, 26 October 1931 1931, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of survey for Stettin, 23 December 1932 1932, Postponed Surveys form for Stettin, 22 December 1932 1932, Letter from Leith Surveyors per John Houston to the Secretary, London, regarding outstanding survey on Stettin, 17 December 1932 1932, Letter from James Currie and Co to Leith Surveyors regarding schedule of survey for Stettin, 16 December 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 14 December 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 24 November 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 September 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 21 June 1932 1932, Postponed Surveys form for Stettin, 20 June 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 June 1932 1932, Copy of letter from pro Secretary, London to Leith Surveyors regarding Stettin boiler survey schedule, 9 October 1931 1932, Postponed Surveys form for Stettin, 8 October 1931 1932, Report of Total Loss, Casualty, , for Stettin, which has been sold to be broken up, 4 December 1933 1933, Letter from Leith Surveyors, per John Houston, to Secretary, London, informing them Stettin is being broken up, 1 December 1933 1933, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of demolition for Stettin, 27 November 1933 1933, Copy of letter from Leith Surveyors, per John Houston, to the Secretary, London, regarding the firm to which Stettin was sold to be broken up, 24 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 23 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 31 August 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 15 June 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 16 March 1933 1933, Note related to Stettin stating SS no. 2 held now posting no date, Note regarding Stettin stating "Vessel left Lisbon Oct 3. + 3 mos from dats. of survey would expire 12/15" no date, Sketch or plan of steel cover part for Stettin no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Certificate for vessels navigated by Steam for Stettin, 30 November 1864 1864, Iron Ship survey report for Stettin, 2 December 1864 1864, Letter from Glasgow surveyor to the Secretary sending the machinery certificate and Stettin's report of survey no. 4255, 8 July 1876 1876, Report of survey for repairs for Stettin, 8 July 1876 1876, Memo from Messrs Napier Ltd. stating that Stettin's boilers are fitted in accordance with the Committee requirements and should have the notification Lloyd's MC in the Register Book, 3 July 1876 1876, Details of main boilers of Stettin, 29 June 1876 1876, Engineer surveyor's report on machinery for Stettin, 26 June 1876 1876, Annual surveys for Stettin, 30 November 1876 1876, Report of survey for repairs for Stettin, 16 January 1879 1879, Report of survey for repairs of engines and boilers for Stettin, 16 January 1880 1880, Cover note for reports number 4308 and 57 of Stettin, 31 January 1880 1880, Report of survey for repairs for Stettin, 28 January 1880 1880, Report of survey for repairs for Stettin, 2 February 1881 1881, Report of survey for repairs for Stettin, 27 January 1882 1882, Annual surveys for Stettin, 6 January 1883 1883, Annual surveys for Stettin, 23 January 1884 1884, Report of survey for repairs for Stettin, 30 January 1885 1885, Report of survey for repairs of engines and boilers for Stettin, 30 January 1885 1885, Report of survey for repairs for Stettin, 27 January 1886 1886, Report of survey for repairs of engines and boilers for Stettin, 30 January 1886 1886, Report of survey for repairs for Stettin, 26 February 1887 1887, Report of survey for repairs of engines and boilers for Stettin, 15 March 1887 1887, Report of survey for repairs for Stettin, 21 May 1888 1888, Report of survey for repairs of engines and boilers for Stettin, 25 May 1888 1888, Report of survey for repairs for Stettin, 29 December 1888 1888, Particulars for record of double bottoms in Lloyd's Register for Stettin, 5 December 1889 1889, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 10 December 1889 1889, Report of Survey for Repairs for Stettin, 6 December 1889 1889, Report on Machinery for Stettin, 3 December 1889 1889, Report of Survey for Repairs for Stettin, 18 October 1890 1890, Report of Survey for Repairs for Stettin, 6 November 1891 1891, Report of Survey for Repairs for Stettin, 16 January 1893 1893, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 19 February 1894 1894, Report of survey for repairs for Stettin, 12 February 1894 1894, Report of survey for repairs of engines and boilers for Stettin, 13 February 1894 1894, Letter from the surveyor Jas Barclay to the Secretary in London enclosing a letter received from the Master of Stettin about the boiler survey to be held at Bergen, 9 June 1894 1894, Letter from the Master of Stettin Otto E Jacobsen to the surveyor James Barclay about the survey of boilers to take place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to E Rusten, owner of Stettin, stating he agrees with the survey of boilers taking place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to Bergen surveyor stating that Stettin will have the survey of boilers carried out in Bergen, 8 June 1894 1894, Note stating the boiler survey for Stettin is due to April and the owners state the ship will be at Bergen where the survey will take place, 8 June 1894 1894, Letter from Erik Rusten, owner of Stettin, to Lloyd's Register stating that he wishes the survey of boilers to take place in Bergen, 4 June 1894 1894, Report of Survey for repairs of engines and boilers for Stettin, 12 July 1894 1894, Report of survey for repairs for Stettin, 6 February 1895 1895, Report of survey for repairs of engines and boilers for Stettin, 6 February 1895 1895, Report of survey for repairs for Stettin, 19 March 1896 1896, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin about the survey of boilers, 23 March 1896 1896, Letter from Leith surveyor to the Secretary stating that the Stettin is under survey, 5 March 1896 1896, Letter from the Secretary to the Leith Surveyor questioning about the survey of Stettin, 3 March 1896 1896, Copy of Letter from the Secretary to the owner of Stettin stating that he agrees with the boiler survey of that ship being carried out when she is in dry dock in the following month, 29 January 1896 1896, Note stating the boiler survey for Stettin will be in dry dock in the following month, 29 January 1896 1896, Letter from the owner of Stettin to the Secretary stating the ship will be in dry dock next month for the survey, 27 January 1896 1896, Report of survey for repairs of engines and boilers for Stettin, 19 March 1896 1896, Report of survey for repairs for Stettin, 19 March 1897 1897, Letter from the Leith surveyor to the Secretary stating that Stettin is now employed in the emigrant trade and therefore the pressure of boiler has been reduced, 24 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 19 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 26 July 1897 1897, Remarks of the Chief Surveyor to the Classing Committee about the special survey of the ship Stettin, 4 March 1898 1898, Copy of letter from the Secretary to the owners of Stettin stating that the special survey will take place when the ship is placed in dry dock, 3 February 1898 1898, Note stating the ship Stettin will be soon in dry dock to be surveyed, 3 February 1898 1898, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating their intention to put the ship in dry dock to be surveyed, 1 February 1898 1898, Report of survey for repairs for Stettin, 3 March 1898 1898, Report of survey for repairs of engines and boilers for Stettin, 3 March 1898 1898, Remarks of the Chief Surveyor to the Classing Committee about the damage and temporary repairs suffered by Stettin, 31 March 1898 1898, Letter from the Bremerhaven surveyor about the repairs to Stettin, 29 March 1898 1898, Cover note for report number 534 of Stettin, 1 April 1898 1898, Report of survey for repairs for Stettin, 28 March 1898 1898, Remarks of the Ship Surveyor to the Classing Committee saying the damage to Stettin has been repaired and she should remain classed, 6 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1899 1899, Report of survey for repairs of engines and boilers for Stettin, 5 April 1899 1899, Report of survey for repairs for Stettin, 28 April 1900 1900, Report of survey for repairs of engines and boilers for Stettin, 28 April 1900 1900, Report of survey for repairs for Stettin, 2 May 1901 1901, Report of survey for repairs of engines and boilers for Stettin, 2 May 1901 1901, Remarks of the Ship Surveyor to the Classing Committee about the special survey of Stettin and the particulars of her plating, 7 April 1902 1902, Report of survey for repairs for Stettin, 4 April 1902 1902, Copy of letter from the Secretary to the owners of Stettin statin the Committee agreed with the special survey being carried out in the next two months, 31 January 1902 1902, Postponed survey form for Stettin, 30 January 1902 1902, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating they expect to attend the special survey within the next two months, 29 January 1902 1902, Report of survey for repairs of engines and boilers for Stettin, 4 April 1902 1902, Report of survey for repairs for Stettin, 11 May 1903 1903, Copy of letter from the Secretary to Leith Surveyors stating that the steamer Stettin has been booked for the annual boiler survey that will take place in a few days, 7 April 1903 1903, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the annual overhaul has been booked for that next few days, 4 April 1903 1903, Report of survey for repairs of engines and boilers for Stettin, 11 May 1903 1903, Report of survey for repairs for Stettin, 29 June 1904 1904, Report of survey for repairs of engines and boilers for Stettin, 29 June 1904 1904, Report of survey for repairs for Stettin, 11 July 1905 1905, Report of survey for repairs of engines and boilers for Stettin, 11 July 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the damage and repairs to Stettin, 24 August 1905 1905, Report of survey for repairs for Stettin, 22 August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the special survey no.1 of Stettin, 26 July 1906 1906, Copy of letter from the Secretary to Leith Surveyors stating that Stettin will be in dry dock on her arrival from Konigsberg when the special survey no.1 will be carried out, 22 June 1906 1906, Copy of letter from the Secretary to the owners of Stettin stating that the special survey no.1 will be carried out next week in Leith, 22 June 1906 1906, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the special survey no.1 will be carried out in the next week on her arrival from Konigsberg, 20 June 1906 1906, Report of survey for repairs for Stettin, 23 July 1906 1906, Report of survey for repairs of engines and boilers for Stettin, 24 July 1906 1906, Report of survey for repairs for Stettin, 16 July 1907 1906, Report of survey for repairs of engines and boilers for Stettin, 16 July 1907 1906, Report of survey for repairs for Stettin, 19 September 1908 1908, Copy of letter from the Secretary to Leith Surveyors stating that Stettin is laid up for overhaul and that the boiler survey should be carried out, 8 September 1908 1908, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the steamer is laid up for overhaul and that the special survey of boilers should take place next week, 5 September 1908 1908, Report of survey for repairs of engines and boilers for Stettin, 19 September 1908 1908, Report of survey for repairs for Stettin, 2 October 1909 1909, Report of survey for repairs of engines and boilers for Stettin, 2 October 1909 1909, Plan of Rudder of Stettin, 1910. Scale 1"=one foot. Details 3"= one foot, 19 September 1910 1910, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding the special survey no. 2 and boiler survey for Stettin, 29 October 1910 1910, Letter from Leith Surveyor to the Secretary stating that they met with the owners of Stettin and arranged the special survey no. 2 to be carried out after the New Year holidays, 28 November 1910 1910, Copy of letter from the Secretary to Leith Surveyors regarding the report no. 13106 for Stettin and asking when the ship's owners expect the special survey no.2 to be carried out, 25 November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee about damage and repairs made to Stettin after grounding, 7 October 1910 1910, Postponed survey form for Stettin, 27 June 1910 1910, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating the special survey no.2 will be carried out in Leith in September, 23 October 1910 1910, Report of survey for repairs for Stettin, 5 October 1910 1910, Report of survey for repairs of engines and boilers for Stettin, 21 October 1910 1910, Report of Ship forgings or castings for Stettin, 30 September 1910 1910, Note about the sketch of rudder for Stettin, 19 September 1910 1910, Letter from Leith surveyors to the Secretary regarding the plan of rudder for Stettin to be approved by the Committee, 16 September 1910 1910, Copy of letter from Secretary, Lloyd's Register London, to James Currie and Co, regarding agreement for date of carrying out special survey, 28 June 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the special survey no.2 for Stettin and the repairs made, 6 June 1911 1911, Report of survey for repairs for Stettin, 3 June 1911 1911, Report of survey for repairs of engines and boilers for Stettin, 3 June 1911 1911, Copy of letter from the Assistant to the Secretary to the owners of Stettin, James Currie & Co, regarding the boiler survey to take place in about two months' time, 12 July 1912 1912, Report of survey for repairs for Stettin, 17 August 1912 1912, Postponed survey form for Stettin, 11 July 1912 1912, Letter from the owners of Stettin to the Secretary regarding the ship special survey and boilers survey, 9 July 1912 1912, Report of survey for repairs of engines and boilers for Stettin, 17 August 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the conditions of Stettin after repair, 29 December 1913 1913, Report of survey for repairs for Stettin, 27 December 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of Stettin taking place in three weeks’ time, 14 November 1913 1913, Postponed survey form for Stettin, 13 November 1913 1913, Letter from Leith surveyors to the Secretary regarding the survey of Stettin, 8 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin, 7 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin being carried out after the strike of the boilers makers, 9 November 1913 1913, Postponed survey form for Stettin, 8 September 1913 1913, Letter from Leith surveyors to the Secretary regarding the postpone of survey of Stettin due to the boilers makers strike, 5 September 1913 1913, Copy of letter from the Secretary to Leith surveyors regarding the survey of screw shaft of Stettin, 3 September 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating the Committee has agreed with the survey being carried out next month, 4 September 1913 1913, Postponed survey form for Stettin, 3 September 1913 1913, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft, 2 July 1913 1913, Report of survey for repairs of engines and boilers for Stettin, 27 December 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with postponing the special survey, 9 June 1914 1914, Postponed survey form for Stettin, 8 June 1914 1914, Letter from Leith surveyors to the Secretary regarding the special survey of Stettin, 4 June 1914 1914, Copy of letter from the Secretary to Leith surveyors enclosing a letter sent by the owners of Stettin about her fourth special survey no. 3, 3 June 1914 1914, Postponed survey form for Stettin, 2 June 1914 1914, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding postponing the second special survey no. 3 of Stettin, 29 May 1914 1914, Report of survey for repairs of engines and boilers for Stettin, 2 July 1915 1915, Copy of letter from the Secretary to Newcastle-on-Tyne surveyors regarding the special survey of Stettin, 12 August 1913 1915, Letter from Aberdeen surveyors to the Secretary stating that Stettin has sailed to Newcastle-on-Tyne as she failed to obtain docking facilities at that port, 10 August 1915 1915, Remarks to the Chief Ship Surveyor regarding the fourth special survey no. 3 for Stettin, 13 July 1915 1915, Copy of letter from the Secretary to the Surveyors in Hull, Grimsby, Middlesbrough, Newcastle, Sunderland and Hartlepool, regarding the fourth special survey no. 3 of Stettin, which will be carried out at some East coast port, 19 July 1915 1915, Letter from Leith surveyors to the Secretary regarding the survey of Stettin to be carried out at some East coast port, 12 July 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the fourth special survey no. 3 for Stettin, 5 July 1915 1915, Report of survey for repairs for Stettin, 2 July 1915 1915, Letter from Leith surveyors to the Secretary stating that the special survey of Stettin is being carried out at that port, 22 May 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 for Stettin, 21 May 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding her survey, 20 April 1915 1915, Extract from a letter dated 15 April 1915 from James Currie & Co regarding surveying Stettin. Extract dated 16 April 1915 1915, Letter from Leith surveyors to the Secretary stating that they had spoken to the owners of Stettin and due to a shortage of labour it has been difficult to find a dry dock to carry out the special survey, 13 April 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the importance of carrying out the special survey due to the age of the ship, 13 April 1915 1915, Postponed survey form for Stettin, 12 April 1915 1915, Copy of letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding the survey of Stettin being postponed, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 of Stettin, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors enclosing information about the communication between the owners of Stettin, 26 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with the special survey being carried out in the next two or three months, 26 January 1915 1915, Postponed survey form for Stettin, 25 January 1915 1915, Letter from Leith surveyors to the Secretary regarding the special survey no.3 and boiler survey of Stettin, 23 January 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding postponing the survey of Stettin, 21 January 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the fourth special survey no.3 and special annual boiler survey of Stettin, 20 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the letter sent by the latter about the thrust shaft, 1 November 1915 1915, Letter from Lisbon surveyors to the Secretary about the repair of shaft of Stettin, 25 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 28 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 23 October 1915 1915, Copy of letter from the Assistant to the Secretary to Lisbon surveyors regarding the repair of Stettin's thrust shaft being not satisfactory, 18 October 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the new thrust shaft she received in Lisbon, 1916 1915, Letter reporting that the new thrust shaft for Stettin is not considered satisfactory, 14 October 1915 1915, London Office Copy of document certifying that surveyor has examined the machinery of Stettin and stating his recommendations, 4 October 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 6 October 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 67857, 19 August 1915 1915, Report of Survey for Repairs for Stettin, 18 August 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 August 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the thrust shaft supplied in Lisbon and if it will be approved by the Committee as a permanent repair, 29 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon and stating that it will be approved by the Committee as a permanent repair, 28 April 1916 1916, Letter reporting the results of the test carried out on Stettin's new thrust shaft that was made in Lisbon, 27 April 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the result of the tests carried out on the new thrust shaft, 14 April 1916 1916, Letter from Professor R Stanfield to James Currie & Co regarding the results of the test of the transverse section of the shaft of Stettin, 11 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Letter reporting that Stettin's new thrust shaft is not satisfactory to be recommended as a permanent repair, 22 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin stating that the repair of the thrust shaft is being looked at, 14 March 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary enclosing drawings and plans of the shaft of Stettin, 6 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the repair of the thrust shaft, 28 January 1916 1916, Postponed survey form for Stettin, 22 January 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft of Stettin, 24 January 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding when the ship will be in position to have the thrust shaft examined, 21 January 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to London Report 79106, 13 July 1917 1916, Report of Survey for Repairs for Stettin due to collision with ice, 1 July 1916 1916, Report of Survey for Repairs of Engines and Boilers for Stettin, 14 July 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70096, 27 July 1917 1917, London Office Copy of document certifying that surveyor has examined damage and transmitted the Report, and stating his Recommendations, 24 July 1917 1917, Report of Survey for Repairs for Stettin 1917, Letter from Newcastle surveyors informing Lloyd's Register London that Stettin is under survey at Newcastle, 21 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding whether Stettin has yet come under inspection, 20 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding their report 70069, and Stettin's owners' intention to make repairs at South Shields within the next couple of days, and calling attention to the need for the Annu 1917, Letter from James Currie & Co Managers, informing Lloyd's Register London that they have arranged for repairs of damage previously communicated by Smith's Dry Dock Co, South Shields, on the steamer's return there in the next day or two, 1 August 1917 1917, Copy of letter from Lloyd's Register's London Secretary to James Currie and Co, informing them of the damage done to Stettin when striking a quay wall, that temporary repairs have been effected but that for the vessel to remain in class permanent repairs 1917, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70306, 2 October 1917 1917, Report of Survey for Repairs for Stettin, 29 September 1917 1917, Report of Survey for Repairs of Engines and Boilers for Stettin, 1 October 1917 1917, Certificate of approval of a stockless anchor, with cancelled written across it, 4 September 1917 1917, Correspondence to Lloyd's Register's London Secretary regarding Stettin Report 71400, acknowledging remarks on the Rules for Engines and Boilers with a working pressure of less than 60lbs, 23 November 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 71400, 19 November 1918 1918, Report of survey for repairs of Stettin, 5 November 1918 1918, Memo to Newcastle surveyors regarding Rules for Engines and Boilers of a greater working pressure than 60lbs per square inch, 18 November 1918 1918, Report of Survey for Repairs of Boilers and Engines of Stettin, 13 November 1918 1918, Copy of letter from London Secretary to James Currie and Co regarding state or survey of Stettin, 17 October 1919 1919, Postponed Survey form for Stettin, October 1919 1919, Letter from James Currie and Co to Secretary, Lloyd's Register London, regarding postponing survey of Stettin, 10 October 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Leith Report 15769, 2 July 1920 1920, Report of Survey for Repairs of Stettin, 28 June 1920 1920, Copy of letter from Lloyd's Register London Secretary to Leith Surveyors, 30 March 1920 1920, Postponed Survey form for Stettin, 29 March 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 24 March 1920 1920, Copy of Letter from Lloyd's Register London Secretary to Leith Surveyors, 19 March 1920 1920, Letter from the Surveyors at Hull, per N Rowall, to London Secretary regarding state of survey of Stettin, 18 March 1920 1920, Copy of letter from the London Secretary to the Hull Surveyors regarding state of survey of Stettin, 17 March 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 10 February 1920 1920, Postponed Survey form for Stettin, 9 February 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 5 February 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 28 January 1920 1920, Report of Survey for Repairs of Engines and Boilers for Stettin, 28 June 1920 1920, Copy of letter from the Secretary to the owners of Stettin saying the Committee has agreed with postponing the boiler survey, 23 August 1921 1921, Report of Survey for Repairs of Stettin, 16 September 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London regarding Stettin now undergoing survey, 3 September 1921 1921, Postponed Surveys form for Stettin, 22 August 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London explaining why Stettin had not undergone survey, 18 August 1921 1921, Report of Survey for Repairs of Engines and Boilers for Stettin, 16 September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Stettin survey, with reference to Leith Report 16187, 6 October 1921 1922, Report of Survey for Repairs of Stettin, 3 October 1921 1922, Correspondence of Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding ongoing surveys on Stettin, 14 September 1922 1922, Copy of letter from Lloyd's Register London Assistant to the Secretary to Leith Surveyors regarding survey of Stettin's screwshaft, 21 July 1922 1922, Postponed Surveys form for Stettin, 20 July 1922 1922, Letter from Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding proposed survey date for Stettin's screw shaft, 17 July 1922 1922, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans of owners of Stettin for survey of screwshaft, 14 July 1922 1922, Report of Survey for Repairs of Boilers and Engines for Stettin, 26 September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding carrying out part of Stettin's Special Survey, with reference to Leith Report 16388, 30 October 1923 1923, Report of Survey for Repairs of Stettin, 24 October 1923 1923, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors, regarding Rule requirements for cables, 20 October 1923 1923, Remarks to the Chief Ship Surveyor regarding Rule requirements for cables, 19 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London requesting clarification on Rules for chains, 18 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London regarding proposed timeline for survey, 22 September 1923 1923, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding letter from Stettin's owners and requesting clarification of when the boiler survey shall be held, 21 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London, regarding carrying out a part survey, 18 September 1923 1923, Copy of letter from Assistant to the Secretary to James Currie and Co regarding schedule for surveys of Stettin, 14 September 1923 1923, Postponed Surveys form for Stettin, 13 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London querying survey schedule of Stettin, 10 September 1923 1923, Report of Survey for Repairs of Engines and Boilers for Stettin, 23 October 1923 1923, Letter from Leith Surveyor A T Thomas to James Currie and Co, informing them of future survey schedule for Stettin, 23 October 1923 1923, Plan of Main Boiler for Stettin, 24 May 1924 1924, Plan of Donkey Boiler for Stettin, 24 May 1924 1924, Hatch Plan of Stettin, 2 October 1924 1924, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Stettin, with reference to Leith Report 16388, 19 May 1924 1924, Letter from A T Thomas, Leith Surveyor, to J F Hill of London, regarding surveying Stettin, 16 May 1924 1924, Extract from a letter dated 14 May 1924 from Leith surveyors regarding examining Stettin. Extract dated 15 May 1924 1924, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans for survey of Stettin and expiry of year of grace, 14 May 1924 1924, Letter from Leith surveyor A T Thomas to Secretary, London, regarding proposed examination part of Stettin's combustion chamber, 18 April 1924 1924, Copy of letter from Assistant to the Secretary to the Leith surveyors questioning owners' arrangements to have Stettin's combustion chamber examined, 16 April 1924 1924, Report of Survey for Repairs of Engines and Boilers for Stettin, 12 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding fulfilment of special survey on Stettin, in reference to Leith Report 16611, 22 November 1924 1924, Report of Survey for Repairs of Stettin, 15 November 1924 1924, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 November 1924 1924, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding completion of reports on Stettin's new boilers, 31 October 1924 1924, Note submitting that certain reports be forwarded to the Leith Surveyors for their guidance and completion, 29 October 1924 1924, Note submitting that the amended plans of boilers for Stettin merit approval, 29 May 1924 1924, Correspondence accompanying boiler plans submitted for approval for Stettin from the Glasgow office to London, 26 May 1924 1924, Letter from Jas S Cairns submitting for approval plans for new boilers for the Stettin to the Glasgow Secretary, 26 May 1924 1924, Note submitting that plans for Stettin's boilers merit approval, 24 April 1924 1924, Letter from Leith Surveyors, per A T T[homas], to Secretary, London, noting they are forwarding plans of new boilers intended for Stettin, 14 April 1924 1924, Report on Main Boiler for Stettin, 11 October 1924 1924, Report on Donkey Boiler for Stettin, 11 October 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Delivery note for 3 furnaces from Forth Shipbuilding and Engineering, Glasgow, 4 July 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 27 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, LR stamp and signature J Barr, 2 July 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 14 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 28 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 26 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 17 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 16790, 28 August 1925 1925, Report of Survey for Repairs on Stettin, 25 August 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 August 1925 1925, Memo regarding approving a steel cylinder cover on Stettin, 5 October 1925 1925, Letter from Leith Surveyor to Secretary, London, regarding steel cover repair examined, 2 October 1925 1925, Letter from Hamburg Office to Secretary, London, regarding request by Leith Surveyors, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding Hamburg report on Stettin, 1 October 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding their request for the Hamburg report, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to A Chisholm, requesting a report for the Leith Surveyors, 30 September 1925 1925, Translation of Cablegram sent to Surveyors at Hamburg, 30 September 1925 1925, Copy of Cablegram from London Office to Hamburg Office, 30 September 1925 1925, Letter from Leith Surveyors, per A T T[homas], to London Office asking for a Hamburg report to be sent to them, 29 September 1925 1925, London Office Copy of document certifying that Hamburg surveyor has examined damage and transmitted the Report, and stating his Recommendations, 25 September 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 September 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 16897, March 1926 1926, Report of Survey for Repairs to Stettin, 30 March 1926 1926, Report of Survey for Repairs of Engines and Boilers to Stettin, 30 March 1926 1926, Report of Survey for Repairs to Stettin, 15 June 1927 1927, Report of Survey for Repairs of Engines and Boilers to Stettin, 15 June 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 17291, 8 December 1927 1927, Copy of Certificate of Survey after damage to Stettin by a breaker in heavy weather, 23 November 1927 1927, Report of Survey for Repairs to Stettin, 3 December 1927 1927, Question and Answer memo between London and Leith Offices regarding Hamburg Report 17858, 21 February 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 1 February 1928 1928, Correspondence memo with particulars from Leith Surveyors to Secretary, London, regarding return of report, 27 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 25 January 1928 1928, Copy of Certificate of Survey from Hamburg after collision damage suffered by Stettin, 22 January 1928 1928, Report of Survey for Repairs of Stettin, 23 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 17339, 15 March 1928 1928, Report of Survey for Repairs of Stettin, 5 March 1928 1928, Copy of letter from the Clerk of the Classification Committee to James Currie and Co, with a copy to the Leith Office, regarding 6th Special Survey of Stettin, 14 December 1928 1928, Postponed Survey form for Stettin's 6th Special Survey, 13 December 1928 1928, Letter from James Currie and Co to Lloyd's Register Secretary, London, regarding deferring Stettin's 6th Special Survey, 11 December 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage, in reference to Dundee Report 8638, 30 March 1928 1928, Copy of Certificate of Survey regarding damage and report of repairs to Stettin's port bow shell plating, Dundee, 23 March 1928 1928, Report of Survey for Repairs to Stettin, 23 March 1928 1928, Letter from Lloyd's Register Engineer Surveyor to James Currie and Co regarding schedule for survey of Stettin's propeller shaft, 5 March 1929 1929, Copy of letter from the Secretary, London, to the Secretary, Glasgow, returning Stettin boiler plans, 29 May 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin and 6th Special Survey, in reference to Leith Report 17540, 13 March 1929 1929, Report of Survey for Repairs of Stettin, 5 March 1929 1929, Report of Survey for Repairs of Engines and Boilers for Stettin, 5 March 1929 1929, Copy of letter from pro Secretary, London, to Leith Surveyors regarding examination of Stettin's screwshaft, 16 April 1930 1930, Postponed Survey form for Stettin's screwshaft, 14 April 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 9 April 1930 1930, Copy of letter from Secretary, London, to Leith Surveyors informing them Committee are agreeable to postponing Stettin's screwshaft survey, 25 February 1930 1930, Postponed Survey form for Stettin's screwshaft, 24 February 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 17 February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 17802, 22 May 1930 1930, Report of Survey for Repairs to Stettin, 15 May 1930 1930, Report on Engine Forgings for Stettin, 8 May 1930 1930, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 May 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 18082, 2 November 1931 1931, Form or memo from Secretary, Glasgow, to Secretary, London, regarding presence of Stettin, 16 October 1931 1931, Question and Answer memo from Secretary, London, to Leith Surveyors regarding Stettin Boiler Survey, 5 October 1931 1931, Copy of letter from pro Secretary, London, with copy to Leith, to James Currie and Co regarding postponing Stettin Boiler Survey, 26 June 1931 1931, Postponed Surveys form for Stettin's Boiler Survey, 25 June 1931 1931, Letter from James Currie and Co regarding postponing Boiler Survey due on Stettin, 20 June 1931 1931, Report of Survey for Repairs on Stettin, 26 October 1931 1931, Report of Survey for Repairs of Engines and Boilers on Stettin, 26 October 1931 1931, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of survey for Stettin, 23 December 1932 1932, Postponed Surveys form for Stettin, 22 December 1932 1932, Letter from Leith Surveyors per John Houston to the Secretary, London, regarding outstanding survey on Stettin, 17 December 1932 1932, Letter from James Currie and Co to Leith Surveyors regarding schedule of survey for Stettin, 16 December 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 14 December 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 24 November 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 September 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 21 June 1932 1932, Postponed Surveys form for Stettin, 20 June 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 June 1932 1932, Copy of letter from pro Secretary, London to Leith Surveyors regarding Stettin boiler survey schedule, 9 October 1931 1932, Postponed Surveys form for Stettin, 8 October 1931 1932, Report of Total Loss, Casualty, , for Stettin, which has been sold to be broken up, 4 December 1933 1933, Letter from Leith Surveyors, per John Houston, to Secretary, London, informing them Stettin is being broken up, 1 December 1933 1933, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of demolition for Stettin, 27 November 1933 1933, Copy of letter from Leith Surveyors, per John Houston, to the Secretary, London, regarding the firm to which Stettin was sold to be broken up, 24 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 23 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 31 August 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 15 June 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 16 March 1933 1933, Note related to Stettin stating SS no. 2 held now posting no date, Note regarding Stettin stating "Vessel left Lisbon Oct 3. + 3 mos from dats. of survey would expire 12/15" no date, Sketch or plan of steel cover part for Stettin no date )
Does the vessel possess an auxiliary power source?
No ( Certificate for vessels navigated by Steam for Stettin, 30 November 1864 1864, Iron Ship survey report for Stettin, 2 December 1864 1864, Letter from Glasgow surveyor to the Secretary sending the machinery certificate and Stettin's report of survey no. 4255, 8 July 1876 1876, Report of survey for repairs for Stettin, 8 July 1876 1876, Memo from Messrs Napier Ltd. stating that Stettin's boilers are fitted in accordance with the Committee requirements and should have the notification Lloyd's MC in the Register Book, 3 July 1876 1876, Details of main boilers of Stettin, 29 June 1876 1876, Engineer surveyor's report on machinery for Stettin, 26 June 1876 1876, Annual surveys for Stettin, 30 November 1876 1876, Report of survey for repairs for Stettin, 16 January 1879 1879, Report of survey for repairs of engines and boilers for Stettin, 16 January 1880 1880, Cover note for reports number 4308 and 57 of Stettin, 31 January 1880 1880, Report of survey for repairs for Stettin, 28 January 1880 1880, Report of survey for repairs for Stettin, 2 February 1881 1881, Report of survey for repairs for Stettin, 27 January 1882 1882, Annual surveys for Stettin, 6 January 1883 1883, Annual surveys for Stettin, 23 January 1884 1884, Report of survey for repairs for Stettin, 30 January 1885 1885, Report of survey for repairs of engines and boilers for Stettin, 30 January 1885 1885, Report of survey for repairs for Stettin, 27 January 1886 1886, Report of survey for repairs of engines and boilers for Stettin, 30 January 1886 1886, Report of survey for repairs for Stettin, 26 February 1887 1887, Report of survey for repairs of engines and boilers for Stettin, 15 March 1887 1887, Report of survey for repairs for Stettin, 21 May 1888 1888, Report of survey for repairs of engines and boilers for Stettin, 25 May 1888 1888, Report of survey for repairs for Stettin, 29 December 1888 1888, Particulars for record of double bottoms in Lloyd's Register for Stettin, 5 December 1889 1889, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 10 December 1889 1889, Report of Survey for Repairs for Stettin, 6 December 1889 1889, Report on Machinery for Stettin, 3 December 1889 1889, Report of Survey for Repairs for Stettin, 18 October 1890 1890, Report of Survey for Repairs for Stettin, 6 November 1891 1891, Report of Survey for Repairs for Stettin, 16 January 1893 1893, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 19 February 1894 1894, Report of survey for repairs for Stettin, 12 February 1894 1894, Report of survey for repairs of engines and boilers for Stettin, 13 February 1894 1894, Letter from the surveyor Jas Barclay to the Secretary in London enclosing a letter received from the Master of Stettin about the boiler survey to be held at Bergen, 9 June 1894 1894, Letter from the Master of Stettin Otto E Jacobsen to the surveyor James Barclay about the survey of boilers to take place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to E Rusten, owner of Stettin, stating he agrees with the survey of boilers taking place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to Bergen surveyor stating that Stettin will have the survey of boilers carried out in Bergen, 8 June 1894 1894, Note stating the boiler survey for Stettin is due to April and the owners state the ship will be at Bergen where the survey will take place, 8 June 1894 1894, Letter from Erik Rusten, owner of Stettin, to Lloyd's Register stating that he wishes the survey of boilers to take place in Bergen, 4 June 1894 1894, Report of Survey for repairs of engines and boilers for Stettin, 12 July 1894 1894, Report of survey for repairs for Stettin, 6 February 1895 1895, Report of survey for repairs of engines and boilers for Stettin, 6 February 1895 1895, Report of survey for repairs for Stettin, 19 March 1896 1896, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin about the survey of boilers, 23 March 1896 1896, Letter from Leith surveyor to the Secretary stating that the Stettin is under survey, 5 March 1896 1896, Letter from the Secretary to the Leith Surveyor questioning about the survey of Stettin, 3 March 1896 1896, Copy of Letter from the Secretary to the owner of Stettin stating that he agrees with the boiler survey of that ship being carried out when she is in dry dock in the following month, 29 January 1896 1896, Note stating the boiler survey for Stettin will be in dry dock in the following month, 29 January 1896 1896, Letter from the owner of Stettin to the Secretary stating the ship will be in dry dock next month for the survey, 27 January 1896 1896, Report of survey for repairs of engines and boilers for Stettin, 19 March 1896 1896, Report of survey for repairs for Stettin, 19 March 1897 1897, Letter from the Leith surveyor to the Secretary stating that Stettin is now employed in the emigrant trade and therefore the pressure of boiler has been reduced, 24 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 19 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 26 July 1897 1897, Remarks of the Chief Surveyor to the Classing Committee about the special survey of the ship Stettin, 4 March 1898 1898, Copy of letter from the Secretary to the owners of Stettin stating that the special survey will take place when the ship is placed in dry dock, 3 February 1898 1898, Note stating the ship Stettin will be soon in dry dock to be surveyed, 3 February 1898 1898, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating their intention to put the ship in dry dock to be surveyed, 1 February 1898 1898, Report of survey for repairs for Stettin, 3 March 1898 1898, Report of survey for repairs of engines and boilers for Stettin, 3 March 1898 1898, Remarks of the Chief Surveyor to the Classing Committee about the damage and temporary repairs suffered by Stettin, 31 March 1898 1898, Letter from the Bremerhaven surveyor about the repairs to Stettin, 29 March 1898 1898, Cover note for report number 534 of Stettin, 1 April 1898 1898, Report of survey for repairs for Stettin, 28 March 1898 1898, Remarks of the Ship Surveyor to the Classing Committee saying the damage to Stettin has been repaired and she should remain classed, 6 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1899 1899, Report of survey for repairs of engines and boilers for Stettin, 5 April 1899 1899, Report of survey for repairs for Stettin, 28 April 1900 1900, Report of survey for repairs of engines and boilers for Stettin, 28 April 1900 1900, Report of survey for repairs for Stettin, 2 May 1901 1901, Report of survey for repairs of engines and boilers for Stettin, 2 May 1901 1901, Remarks of the Ship Surveyor to the Classing Committee about the special survey of Stettin and the particulars of her plating, 7 April 1902 1902, Report of survey for repairs for Stettin, 4 April 1902 1902, Copy of letter from the Secretary to the owners of Stettin statin the Committee agreed with the special survey being carried out in the next two months, 31 January 1902 1902, Postponed survey form for Stettin, 30 January 1902 1902, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating they expect to attend the special survey within the next two months, 29 January 1902 1902, Report of survey for repairs of engines and boilers for Stettin, 4 April 1902 1902, Report of survey for repairs for Stettin, 11 May 1903 1903, Copy of letter from the Secretary to Leith Surveyors stating that the steamer Stettin has been booked for the annual boiler survey that will take place in a few days, 7 April 1903 1903, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the annual overhaul has been booked for that next few days, 4 April 1903 1903, Report of survey for repairs of engines and boilers for Stettin, 11 May 1903 1903, Report of survey for repairs for Stettin, 29 June 1904 1904, Report of survey for repairs of engines and boilers for Stettin, 29 June 1904 1904, Report of survey for repairs for Stettin, 11 July 1905 1905, Report of survey for repairs of engines and boilers for Stettin, 11 July 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the damage and repairs to Stettin, 24 August 1905 1905, Report of survey for repairs for Stettin, 22 August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the special survey no.1 of Stettin, 26 July 1906 1906, Copy of letter from the Secretary to Leith Surveyors stating that Stettin will be in dry dock on her arrival from Konigsberg when the special survey no.1 will be carried out, 22 June 1906 1906, Copy of letter from the Secretary to the owners of Stettin stating that the special survey no.1 will be carried out next week in Leith, 22 June 1906 1906, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the special survey no.1 will be carried out in the next week on her arrival from Konigsberg, 20 June 1906 1906, Report of survey for repairs for Stettin, 23 July 1906 1906, Report of survey for repairs of engines and boilers for Stettin, 24 July 1906 1906, Report of survey for repairs for Stettin, 16 July 1907 1906, Report of survey for repairs of engines and boilers for Stettin, 16 July 1907 1906, Report of survey for repairs for Stettin, 19 September 1908 1908, Copy of letter from the Secretary to Leith Surveyors stating that Stettin is laid up for overhaul and that the boiler survey should be carried out, 8 September 1908 1908, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the steamer is laid up for overhaul and that the special survey of boilers should take place next week, 5 September 1908 1908, Report of survey for repairs of engines and boilers for Stettin, 19 September 1908 1908, Report of survey for repairs for Stettin, 2 October 1909 1909, Report of survey for repairs of engines and boilers for Stettin, 2 October 1909 1909, Plan of Rudder of Stettin, 1910. Scale 1"=one foot. Details 3"= one foot, 19 September 1910 1910, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding the special survey no. 2 and boiler survey for Stettin, 29 October 1910 1910, Letter from Leith Surveyor to the Secretary stating that they met with the owners of Stettin and arranged the special survey no. 2 to be carried out after the New Year holidays, 28 November 1910 1910, Copy of letter from the Secretary to Leith Surveyors regarding the report no. 13106 for Stettin and asking when the ship's owners expect the special survey no.2 to be carried out, 25 November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee about damage and repairs made to Stettin after grounding, 7 October 1910 1910, Postponed survey form for Stettin, 27 June 1910 1910, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating the special survey no.2 will be carried out in Leith in September, 23 October 1910 1910, Report of survey for repairs for Stettin, 5 October 1910 1910, Report of survey for repairs of engines and boilers for Stettin, 21 October 1910 1910, Report of Ship forgings or castings for Stettin, 30 September 1910 1910, Note about the sketch of rudder for Stettin, 19 September 1910 1910, Letter from Leith surveyors to the Secretary regarding the plan of rudder for Stettin to be approved by the Committee, 16 September 1910 1910, Copy of letter from Secretary, Lloyd's Register London, to James Currie and Co, regarding agreement for date of carrying out special survey, 28 June 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the special survey no.2 for Stettin and the repairs made, 6 June 1911 1911, Report of survey for repairs for Stettin, 3 June 1911 1911, Report of survey for repairs of engines and boilers for Stettin, 3 June 1911 1911, Copy of letter from the Assistant to the Secretary to the owners of Stettin, James Currie & Co, regarding the boiler survey to take place in about two months' time, 12 July 1912 1912, Report of survey for repairs for Stettin, 17 August 1912 1912, Postponed survey form for Stettin, 11 July 1912 1912, Letter from the owners of Stettin to the Secretary regarding the ship special survey and boilers survey, 9 July 1912 1912, Report of survey for repairs of engines and boilers for Stettin, 17 August 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the conditions of Stettin after repair, 29 December 1913 1913, Report of survey for repairs for Stettin, 27 December 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of Stettin taking place in three weeks’ time, 14 November 1913 1913, Postponed survey form for Stettin, 13 November 1913 1913, Letter from Leith surveyors to the Secretary regarding the survey of Stettin, 8 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin, 7 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin being carried out after the strike of the boilers makers, 9 November 1913 1913, Postponed survey form for Stettin, 8 September 1913 1913, Letter from Leith surveyors to the Secretary regarding the postpone of survey of Stettin due to the boilers makers strike, 5 September 1913 1913, Copy of letter from the Secretary to Leith surveyors regarding the survey of screw shaft of Stettin, 3 September 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating the Committee has agreed with the survey being carried out next month, 4 September 1913 1913, Postponed survey form for Stettin, 3 September 1913 1913, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft, 2 July 1913 1913, Report of survey for repairs of engines and boilers for Stettin, 27 December 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with postponing the special survey, 9 June 1914 1914, Postponed survey form for Stettin, 8 June 1914 1914, Letter from Leith surveyors to the Secretary regarding the special survey of Stettin, 4 June 1914 1914, Copy of letter from the Secretary to Leith surveyors enclosing a letter sent by the owners of Stettin about her fourth special survey no. 3, 3 June 1914 1914, Postponed survey form for Stettin, 2 June 1914 1914, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding postponing the second special survey no. 3 of Stettin, 29 May 1914 1914, Report of survey for repairs of engines and boilers for Stettin, 2 July 1915 1915, Copy of letter from the Secretary to Newcastle-on-Tyne surveyors regarding the special survey of Stettin, 12 August 1913 1915, Letter from Aberdeen surveyors to the Secretary stating that Stettin has sailed to Newcastle-on-Tyne as she failed to obtain docking facilities at that port, 10 August 1915 1915, Remarks to the Chief Ship Surveyor regarding the fourth special survey no. 3 for Stettin, 13 July 1915 1915, Copy of letter from the Secretary to the Surveyors in Hull, Grimsby, Middlesbrough, Newcastle, Sunderland and Hartlepool, regarding the fourth special survey no. 3 of Stettin, which will be carried out at some East coast port, 19 July 1915 1915, Letter from Leith surveyors to the Secretary regarding the survey of Stettin to be carried out at some East coast port, 12 July 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the fourth special survey no. 3 for Stettin, 5 July 1915 1915, Report of survey for repairs for Stettin, 2 July 1915 1915, Letter from Leith surveyors to the Secretary stating that the special survey of Stettin is being carried out at that port, 22 May 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 for Stettin, 21 May 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding her survey, 20 April 1915 1915, Extract from a letter dated 15 April 1915 from James Currie & Co regarding surveying Stettin. Extract dated 16 April 1915 1915, Letter from Leith surveyors to the Secretary stating that they had spoken to the owners of Stettin and due to a shortage of labour it has been difficult to find a dry dock to carry out the special survey, 13 April 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the importance of carrying out the special survey due to the age of the ship, 13 April 1915 1915, Postponed survey form for Stettin, 12 April 1915 1915, Copy of letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding the survey of Stettin being postponed, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 of Stettin, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors enclosing information about the communication between the owners of Stettin, 26 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with the special survey being carried out in the next two or three months, 26 January 1915 1915, Postponed survey form for Stettin, 25 January 1915 1915, Letter from Leith surveyors to the Secretary regarding the special survey no.3 and boiler survey of Stettin, 23 January 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding postponing the survey of Stettin, 21 January 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the fourth special survey no.3 and special annual boiler survey of Stettin, 20 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the letter sent by the latter about the thrust shaft, 1 November 1915 1915, Letter from Lisbon surveyors to the Secretary about the repair of shaft of Stettin, 25 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 28 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 23 October 1915 1915, Copy of letter from the Assistant to the Secretary to Lisbon surveyors regarding the repair of Stettin's thrust shaft being not satisfactory, 18 October 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the new thrust shaft she received in Lisbon, 1916 1915, Letter reporting that the new thrust shaft for Stettin is not considered satisfactory, 14 October 1915 1915, London Office Copy of document certifying that surveyor has examined the machinery of Stettin and stating his recommendations, 4 October 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 6 October 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 67857, 19 August 1915 1915, Report of Survey for Repairs for Stettin, 18 August 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 August 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the thrust shaft supplied in Lisbon and if it will be approved by the Committee as a permanent repair, 29 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon and stating that it will be approved by the Committee as a permanent repair, 28 April 1916 1916, Letter reporting the results of the test carried out on Stettin's new thrust shaft that was made in Lisbon, 27 April 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the result of the tests carried out on the new thrust shaft, 14 April 1916 1916, Letter from Professor R Stanfield to James Currie & Co regarding the results of the test of the transverse section of the shaft of Stettin, 11 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Letter reporting that Stettin's new thrust shaft is not satisfactory to be recommended as a permanent repair, 22 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin stating that the repair of the thrust shaft is being looked at, 14 March 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary enclosing drawings and plans of the shaft of Stettin, 6 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the repair of the thrust shaft, 28 January 1916 1916, Postponed survey form for Stettin, 22 January 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft of Stettin, 24 January 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding when the ship will be in position to have the thrust shaft examined, 21 January 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to London Report 79106, 13 July 1917 1916, Report of Survey for Repairs for Stettin due to collision with ice, 1 July 1916 1916, Report of Survey for Repairs of Engines and Boilers for Stettin, 14 July 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70096, 27 July 1917 1917, London Office Copy of document certifying that surveyor has examined damage and transmitted the Report, and stating his Recommendations, 24 July 1917 1917, Report of Survey for Repairs for Stettin 1917, Letter from Newcastle surveyors informing Lloyd's Register London that Stettin is under survey at Newcastle, 21 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding whether Stettin has yet come under inspection, 20 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding their report 70069, and Stettin's owners' intention to make repairs at South Shields within the next couple of days, and calling attention to the need for the Annu 1917, Letter from James Currie & Co Managers, informing Lloyd's Register London that they have arranged for repairs of damage previously communicated by Smith's Dry Dock Co, South Shields, on the steamer's return there in the next day or two, 1 August 1917 1917, Copy of letter from Lloyd's Register's London Secretary to James Currie and Co, informing them of the damage done to Stettin when striking a quay wall, that temporary repairs have been effected but that for the vessel to remain in class permanent repairs 1917, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70306, 2 October 1917 1917, Report of Survey for Repairs for Stettin, 29 September 1917 1917, Report of Survey for Repairs of Engines and Boilers for Stettin, 1 October 1917 1917, Certificate of approval of a stockless anchor, with cancelled written across it, 4 September 1917 1917, Correspondence to Lloyd's Register's London Secretary regarding Stettin Report 71400, acknowledging remarks on the Rules for Engines and Boilers with a working pressure of less than 60lbs, 23 November 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 71400, 19 November 1918 1918, Report of survey for repairs of Stettin, 5 November 1918 1918, Memo to Newcastle surveyors regarding Rules for Engines and Boilers of a greater working pressure than 60lbs per square inch, 18 November 1918 1918, Report of Survey for Repairs of Boilers and Engines of Stettin, 13 November 1918 1918, Copy of letter from London Secretary to James Currie and Co regarding state or survey of Stettin, 17 October 1919 1919, Postponed Survey form for Stettin, October 1919 1919, Letter from James Currie and Co to Secretary, Lloyd's Register London, regarding postponing survey of Stettin, 10 October 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Leith Report 15769, 2 July 1920 1920, Report of Survey for Repairs of Stettin, 28 June 1920 1920, Copy of letter from Lloyd's Register London Secretary to Leith Surveyors, 30 March 1920 1920, Postponed Survey form for Stettin, 29 March 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 24 March 1920 1920, Copy of Letter from Lloyd's Register London Secretary to Leith Surveyors, 19 March 1920 1920, Letter from the Surveyors at Hull, per N Rowall, to London Secretary regarding state of survey of Stettin, 18 March 1920 1920, Copy of letter from the London Secretary to the Hull Surveyors regarding state of survey of Stettin, 17 March 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 10 February 1920 1920, Postponed Survey form for Stettin, 9 February 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 5 February 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 28 January 1920 1920, Report of Survey for Repairs of Engines and Boilers for Stettin, 28 June 1920 1920, Copy of letter from the Secretary to the owners of Stettin saying the Committee has agreed with postponing the boiler survey, 23 August 1921 1921, Report of Survey for Repairs of Stettin, 16 September 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London regarding Stettin now undergoing survey, 3 September 1921 1921, Postponed Surveys form for Stettin, 22 August 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London explaining why Stettin had not undergone survey, 18 August 1921 1921, Report of Survey for Repairs of Engines and Boilers for Stettin, 16 September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Stettin survey, with reference to Leith Report 16187, 6 October 1921 1922, Report of Survey for Repairs of Stettin, 3 October 1921 1922, Correspondence of Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding ongoing surveys on Stettin, 14 September 1922 1922, Copy of letter from Lloyd's Register London Assistant to the Secretary to Leith Surveyors regarding survey of Stettin's screwshaft, 21 July 1922 1922, Postponed Surveys form for Stettin, 20 July 1922 1922, Letter from Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding proposed survey date for Stettin's screw shaft, 17 July 1922 1922, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans of owners of Stettin for survey of screwshaft, 14 July 1922 1922, Report of Survey for Repairs of Boilers and Engines for Stettin, 26 September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding carrying out part of Stettin's Special Survey, with reference to Leith Report 16388, 30 October 1923 1923, Report of Survey for Repairs of Stettin, 24 October 1923 1923, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors, regarding Rule requirements for cables, 20 October 1923 1923, Remarks to the Chief Ship Surveyor regarding Rule requirements for cables, 19 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London requesting clarification on Rules for chains, 18 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London regarding proposed timeline for survey, 22 September 1923 1923, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding letter from Stettin's owners and requesting clarification of when the boiler survey shall be held, 21 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London, regarding carrying out a part survey, 18 September 1923 1923, Copy of letter from Assistant to the Secretary to James Currie and Co regarding schedule for surveys of Stettin, 14 September 1923 1923, Postponed Surveys form for Stettin, 13 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London querying survey schedule of Stettin, 10 September 1923 1923, Report of Survey for Repairs of Engines and Boilers for Stettin, 23 October 1923 1923, Letter from Leith Surveyor A T Thomas to James Currie and Co, informing them of future survey schedule for Stettin, 23 October 1923 1923, Plan of Main Boiler for Stettin, 24 May 1924 1924, Plan of Donkey Boiler for Stettin, 24 May 1924 1924, Hatch Plan of Stettin, 2 October 1924 1924, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Stettin, with reference to Leith Report 16388, 19 May 1924 1924, Letter from A T Thomas, Leith Surveyor, to J F Hill of London, regarding surveying Stettin, 16 May 1924 1924, Extract from a letter dated 14 May 1924 from Leith surveyors regarding examining Stettin. Extract dated 15 May 1924 1924, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans for survey of Stettin and expiry of year of grace, 14 May 1924 1924, Letter from Leith surveyor A T Thomas to Secretary, London, regarding proposed examination part of Stettin's combustion chamber, 18 April 1924 1924, Copy of letter from Assistant to the Secretary to the Leith surveyors questioning owners' arrangements to have Stettin's combustion chamber examined, 16 April 1924 1924, Report of Survey for Repairs of Engines and Boilers for Stettin, 12 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding fulfilment of special survey on Stettin, in reference to Leith Report 16611, 22 November 1924 1924, Report of Survey for Repairs of Stettin, 15 November 1924 1924, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 November 1924 1924, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding completion of reports on Stettin's new boilers, 31 October 1924 1924, Note submitting that certain reports be forwarded to the Leith Surveyors for their guidance and completion, 29 October 1924 1924, Note submitting that the amended plans of boilers for Stettin merit approval, 29 May 1924 1924, Correspondence accompanying boiler plans submitted for approval for Stettin from the Glasgow office to London, 26 May 1924 1924, Letter from Jas S Cairns submitting for approval plans for new boilers for the Stettin to the Glasgow Secretary, 26 May 1924 1924, Note submitting that plans for Stettin's boilers merit approval, 24 April 1924 1924, Letter from Leith Surveyors, per A T T[homas], to Secretary, London, noting they are forwarding plans of new boilers intended for Stettin, 14 April 1924 1924, Report on Main Boiler for Stettin, 11 October 1924 1924, Report on Donkey Boiler for Stettin, 11 October 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Delivery note for 3 furnaces from Forth Shipbuilding and Engineering, Glasgow, 4 July 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 27 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, LR stamp and signature J Barr, 2 July 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 14 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 28 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 26 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 17 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 16790, 28 August 1925 1925, Report of Survey for Repairs on Stettin, 25 August 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 August 1925 1925, Memo regarding approving a steel cylinder cover on Stettin, 5 October 1925 1925, Letter from Leith Surveyor to Secretary, London, regarding steel cover repair examined, 2 October 1925 1925, Letter from Hamburg Office to Secretary, London, regarding request by Leith Surveyors, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding Hamburg report on Stettin, 1 October 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding their request for the Hamburg report, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to A Chisholm, requesting a report for the Leith Surveyors, 30 September 1925 1925, Translation of Cablegram sent to Surveyors at Hamburg, 30 September 1925 1925, Copy of Cablegram from London Office to Hamburg Office, 30 September 1925 1925, Letter from Leith Surveyors, per A T T[homas], to London Office asking for a Hamburg report to be sent to them, 29 September 1925 1925, London Office Copy of document certifying that Hamburg surveyor has examined damage and transmitted the Report, and stating his Recommendations, 25 September 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 September 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 16897, March 1926 1926, Report of Survey for Repairs to Stettin, 30 March 1926 1926, Report of Survey for Repairs of Engines and Boilers to Stettin, 30 March 1926 1926, Report of Survey for Repairs to Stettin, 15 June 1927 1927, Report of Survey for Repairs of Engines and Boilers to Stettin, 15 June 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 17291, 8 December 1927 1927, Copy of Certificate of Survey after damage to Stettin by a breaker in heavy weather, 23 November 1927 1927, Report of Survey for Repairs to Stettin, 3 December 1927 1927, Question and Answer memo between London and Leith Offices regarding Hamburg Report 17858, 21 February 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 1 February 1928 1928, Correspondence memo with particulars from Leith Surveyors to Secretary, London, regarding return of report, 27 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 25 January 1928 1928, Copy of Certificate of Survey from Hamburg after collision damage suffered by Stettin, 22 January 1928 1928, Report of Survey for Repairs of Stettin, 23 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 17339, 15 March 1928 1928, Report of Survey for Repairs of Stettin, 5 March 1928 1928, Copy of letter from the Clerk of the Classification Committee to James Currie and Co, with a copy to the Leith Office, regarding 6th Special Survey of Stettin, 14 December 1928 1928, Postponed Survey form for Stettin's 6th Special Survey, 13 December 1928 1928, Letter from James Currie and Co to Lloyd's Register Secretary, London, regarding deferring Stettin's 6th Special Survey, 11 December 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage, in reference to Dundee Report 8638, 30 March 1928 1928, Copy of Certificate of Survey regarding damage and report of repairs to Stettin's port bow shell plating, Dundee, 23 March 1928 1928, Report of Survey for Repairs to Stettin, 23 March 1928 1928, Letter from Lloyd's Register Engineer Surveyor to James Currie and Co regarding schedule for survey of Stettin's propeller shaft, 5 March 1929 1929, Copy of letter from the Secretary, London, to the Secretary, Glasgow, returning Stettin boiler plans, 29 May 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin and 6th Special Survey, in reference to Leith Report 17540, 13 March 1929 1929, Report of Survey for Repairs of Stettin, 5 March 1929 1929, Report of Survey for Repairs of Engines and Boilers for Stettin, 5 March 1929 1929, Copy of letter from pro Secretary, London, to Leith Surveyors regarding examination of Stettin's screwshaft, 16 April 1930 1930, Postponed Survey form for Stettin's screwshaft, 14 April 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 9 April 1930 1930, Copy of letter from Secretary, London, to Leith Surveyors informing them Committee are agreeable to postponing Stettin's screwshaft survey, 25 February 1930 1930, Postponed Survey form for Stettin's screwshaft, 24 February 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 17 February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 17802, 22 May 1930 1930, Report of Survey for Repairs to Stettin, 15 May 1930 1930, Report on Engine Forgings for Stettin, 8 May 1930 1930, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 May 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 18082, 2 November 1931 1931, Form or memo from Secretary, Glasgow, to Secretary, London, regarding presence of Stettin, 16 October 1931 1931, Question and Answer memo from Secretary, London, to Leith Surveyors regarding Stettin Boiler Survey, 5 October 1931 1931, Copy of letter from pro Secretary, London, with copy to Leith, to James Currie and Co regarding postponing Stettin Boiler Survey, 26 June 1931 1931, Postponed Surveys form for Stettin's Boiler Survey, 25 June 1931 1931, Letter from James Currie and Co regarding postponing Boiler Survey due on Stettin, 20 June 1931 1931, Report of Survey for Repairs on Stettin, 26 October 1931 1931, Report of Survey for Repairs of Engines and Boilers on Stettin, 26 October 1931 1931, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of survey for Stettin, 23 December 1932 1932, Postponed Surveys form for Stettin, 22 December 1932 1932, Letter from Leith Surveyors per John Houston to the Secretary, London, regarding outstanding survey on Stettin, 17 December 1932 1932, Letter from James Currie and Co to Leith Surveyors regarding schedule of survey for Stettin, 16 December 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 14 December 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 24 November 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 September 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 21 June 1932 1932, Postponed Surveys form for Stettin, 20 June 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 June 1932 1932, Copy of letter from pro Secretary, London to Leith Surveyors regarding Stettin boiler survey schedule, 9 October 1931 1932, Postponed Surveys form for Stettin, 8 October 1931 1932, Report of Total Loss, Casualty, , for Stettin, which has been sold to be broken up, 4 December 1933 1933, Letter from Leith Surveyors, per John Houston, to Secretary, London, informing them Stettin is being broken up, 1 December 1933 1933, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of demolition for Stettin, 27 November 1933 1933, Copy of letter from Leith Surveyors, per John Houston, to the Secretary, London, regarding the firm to which Stettin was sold to be broken up, 24 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 23 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 31 August 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 15 June 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 16 March 1933 1933, Note related to Stettin stating SS no. 2 held now posting no date, Note regarding Stettin stating "Vessel left Lisbon Oct 3. + 3 mos from dats. of survey would expire 12/15" no date, Sketch or plan of steel cover part for Stettin no date )
Is electric lighting fitted to the vessel?
No ( Certificate for vessels navigated by Steam for Stettin, 30 November 1864 1864, Iron Ship survey report for Stettin, 2 December 1864 1864, Letter from Glasgow surveyor to the Secretary sending the machinery certificate and Stettin's report of survey no. 4255, 8 July 1876 1876, Report of survey for repairs for Stettin, 8 July 1876 1876, Memo from Messrs Napier Ltd. stating that Stettin's boilers are fitted in accordance with the Committee requirements and should have the notification Lloyd's MC in the Register Book, 3 July 1876 1876, Details of main boilers of Stettin, 29 June 1876 1876, Engineer surveyor's report on machinery for Stettin, 26 June 1876 1876, Annual surveys for Stettin, 30 November 1876 1876, Report of survey for repairs for Stettin, 16 January 1879 1879, Report of survey for repairs of engines and boilers for Stettin, 16 January 1880 1880, Cover note for reports number 4308 and 57 of Stettin, 31 January 1880 1880, Report of survey for repairs for Stettin, 28 January 1880 1880, Report of survey for repairs for Stettin, 2 February 1881 1881, Report of survey for repairs for Stettin, 27 January 1882 1882, Annual surveys for Stettin, 6 January 1883 1883, Annual surveys for Stettin, 23 January 1884 1884, Report of survey for repairs for Stettin, 30 January 1885 1885, Report of survey for repairs of engines and boilers for Stettin, 30 January 1885 1885, Report of survey for repairs for Stettin, 27 January 1886 1886, Report of survey for repairs of engines and boilers for Stettin, 30 January 1886 1886, Report of survey for repairs for Stettin, 26 February 1887 1887, Report of survey for repairs of engines and boilers for Stettin, 15 March 1887 1887, Report of survey for repairs for Stettin, 21 May 1888 1888, Report of survey for repairs of engines and boilers for Stettin, 25 May 1888 1888, Report of survey for repairs for Stettin, 29 December 1888 1888, Particulars for record of double bottoms in Lloyd's Register for Stettin, 5 December 1889 1889, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 10 December 1889 1889, Report of Survey for Repairs for Stettin, 6 December 1889 1889, Report on Machinery for Stettin, 3 December 1889 1889, Report of Survey for Repairs for Stettin, 18 October 1890 1890, Report of Survey for Repairs for Stettin, 6 November 1891 1891, Report of Survey for Repairs for Stettin, 16 January 1893 1893, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 19 February 1894 1894, Report of survey for repairs for Stettin, 12 February 1894 1894, Report of survey for repairs of engines and boilers for Stettin, 13 February 1894 1894, Letter from the surveyor Jas Barclay to the Secretary in London enclosing a letter received from the Master of Stettin about the boiler survey to be held at Bergen, 9 June 1894 1894, Letter from the Master of Stettin Otto E Jacobsen to the surveyor James Barclay about the survey of boilers to take place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to E Rusten, owner of Stettin, stating he agrees with the survey of boilers taking place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to Bergen surveyor stating that Stettin will have the survey of boilers carried out in Bergen, 8 June 1894 1894, Note stating the boiler survey for Stettin is due to April and the owners state the ship will be at Bergen where the survey will take place, 8 June 1894 1894, Letter from Erik Rusten, owner of Stettin, to Lloyd's Register stating that he wishes the survey of boilers to take place in Bergen, 4 June 1894 1894, Report of Survey for repairs of engines and boilers for Stettin, 12 July 1894 1894, Report of survey for repairs for Stettin, 6 February 1895 1895, Report of survey for repairs of engines and boilers for Stettin, 6 February 1895 1895, Report of survey for repairs for Stettin, 19 March 1896 1896, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin about the survey of boilers, 23 March 1896 1896, Letter from Leith surveyor to the Secretary stating that the Stettin is under survey, 5 March 1896 1896, Letter from the Secretary to the Leith Surveyor questioning about the survey of Stettin, 3 March 1896 1896, Copy of Letter from the Secretary to the owner of Stettin stating that he agrees with the boiler survey of that ship being carried out when she is in dry dock in the following month, 29 January 1896 1896, Note stating the boiler survey for Stettin will be in dry dock in the following month, 29 January 1896 1896, Letter from the owner of Stettin to the Secretary stating the ship will be in dry dock next month for the survey, 27 January 1896 1896, Report of survey for repairs of engines and boilers for Stettin, 19 March 1896 1896, Report of survey for repairs for Stettin, 19 March 1897 1897, Letter from the Leith surveyor to the Secretary stating that Stettin is now employed in the emigrant trade and therefore the pressure of boiler has been reduced, 24 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 19 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 26 July 1897 1897, Remarks of the Chief Surveyor to the Classing Committee about the special survey of the ship Stettin, 4 March 1898 1898, Copy of letter from the Secretary to the owners of Stettin stating that the special survey will take place when the ship is placed in dry dock, 3 February 1898 1898, Note stating the ship Stettin will be soon in dry dock to be surveyed, 3 February 1898 1898, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating their intention to put the ship in dry dock to be surveyed, 1 February 1898 1898, Report of survey for repairs for Stettin, 3 March 1898 1898, Report of survey for repairs of engines and boilers for Stettin, 3 March 1898 1898, Remarks of the Chief Surveyor to the Classing Committee about the damage and temporary repairs suffered by Stettin, 31 March 1898 1898, Letter from the Bremerhaven surveyor about the repairs to Stettin, 29 March 1898 1898, Cover note for report number 534 of Stettin, 1 April 1898 1898, Report of survey for repairs for Stettin, 28 March 1898 1898, Remarks of the Ship Surveyor to the Classing Committee saying the damage to Stettin has been repaired and she should remain classed, 6 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1899 1899, Report of survey for repairs of engines and boilers for Stettin, 5 April 1899 1899, Report of survey for repairs for Stettin, 28 April 1900 1900, Report of survey for repairs of engines and boilers for Stettin, 28 April 1900 1900, Report of survey for repairs for Stettin, 2 May 1901 1901, Report of survey for repairs of engines and boilers for Stettin, 2 May 1901 1901, Remarks of the Ship Surveyor to the Classing Committee about the special survey of Stettin and the particulars of her plating, 7 April 1902 1902, Report of survey for repairs for Stettin, 4 April 1902 1902, Copy of letter from the Secretary to the owners of Stettin statin the Committee agreed with the special survey being carried out in the next two months, 31 January 1902 1902, Postponed survey form for Stettin, 30 January 1902 1902, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating they expect to attend the special survey within the next two months, 29 January 1902 1902, Report of survey for repairs of engines and boilers for Stettin, 4 April 1902 1902, Report of survey for repairs for Stettin, 11 May 1903 1903, Copy of letter from the Secretary to Leith Surveyors stating that the steamer Stettin has been booked for the annual boiler survey that will take place in a few days, 7 April 1903 1903, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the annual overhaul has been booked for that next few days, 4 April 1903 1903, Report of survey for repairs of engines and boilers for Stettin, 11 May 1903 1903, Report of survey for repairs for Stettin, 29 June 1904 1904, Report of survey for repairs of engines and boilers for Stettin, 29 June 1904 1904, Report of survey for repairs for Stettin, 11 July 1905 1905, Report of survey for repairs of engines and boilers for Stettin, 11 July 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the damage and repairs to Stettin, 24 August 1905 1905, Report of survey for repairs for Stettin, 22 August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the special survey no.1 of Stettin, 26 July 1906 1906, Copy of letter from the Secretary to Leith Surveyors stating that Stettin will be in dry dock on her arrival from Konigsberg when the special survey no.1 will be carried out, 22 June 1906 1906, Copy of letter from the Secretary to the owners of Stettin stating that the special survey no.1 will be carried out next week in Leith, 22 June 1906 1906, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the special survey no.1 will be carried out in the next week on her arrival from Konigsberg, 20 June 1906 1906, Report of survey for repairs for Stettin, 23 July 1906 1906, Report of survey for repairs of engines and boilers for Stettin, 24 July 1906 1906, Report of survey for repairs for Stettin, 16 July 1907 1906, Report of survey for repairs of engines and boilers for Stettin, 16 July 1907 1906, Report of survey for repairs for Stettin, 19 September 1908 1908, Copy of letter from the Secretary to Leith Surveyors stating that Stettin is laid up for overhaul and that the boiler survey should be carried out, 8 September 1908 1908, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the steamer is laid up for overhaul and that the special survey of boilers should take place next week, 5 September 1908 1908, Report of survey for repairs of engines and boilers for Stettin, 19 September 1908 1908, Report of survey for repairs for Stettin, 2 October 1909 1909, Report of survey for repairs of engines and boilers for Stettin, 2 October 1909 1909, Plan of Rudder of Stettin, 1910. Scale 1"=one foot. Details 3"= one foot, 19 September 1910 1910, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding the special survey no. 2 and boiler survey for Stettin, 29 October 1910 1910, Letter from Leith Surveyor to the Secretary stating that they met with the owners of Stettin and arranged the special survey no. 2 to be carried out after the New Year holidays, 28 November 1910 1910, Copy of letter from the Secretary to Leith Surveyors regarding the report no. 13106 for Stettin and asking when the ship's owners expect the special survey no.2 to be carried out, 25 November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee about damage and repairs made to Stettin after grounding, 7 October 1910 1910, Postponed survey form for Stettin, 27 June 1910 1910, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating the special survey no.2 will be carried out in Leith in September, 23 October 1910 1910, Report of survey for repairs for Stettin, 5 October 1910 1910, Report of survey for repairs of engines and boilers for Stettin, 21 October 1910 1910, Report of Ship forgings or castings for Stettin, 30 September 1910 1910, Note about the sketch of rudder for Stettin, 19 September 1910 1910, Letter from Leith surveyors to the Secretary regarding the plan of rudder for Stettin to be approved by the Committee, 16 September 1910 1910, Copy of letter from Secretary, Lloyd's Register London, to James Currie and Co, regarding agreement for date of carrying out special survey, 28 June 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the special survey no.2 for Stettin and the repairs made, 6 June 1911 1911, Report of survey for repairs for Stettin, 3 June 1911 1911, Report of survey for repairs of engines and boilers for Stettin, 3 June 1911 1911, Copy of letter from the Assistant to the Secretary to the owners of Stettin, James Currie & Co, regarding the boiler survey to take place in about two months' time, 12 July 1912 1912, Report of survey for repairs for Stettin, 17 August 1912 1912, Postponed survey form for Stettin, 11 July 1912 1912, Letter from the owners of Stettin to the Secretary regarding the ship special survey and boilers survey, 9 July 1912 1912, Report of survey for repairs of engines and boilers for Stettin, 17 August 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the conditions of Stettin after repair, 29 December 1913 1913, Report of survey for repairs for Stettin, 27 December 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of Stettin taking place in three weeks’ time, 14 November 1913 1913, Postponed survey form for Stettin, 13 November 1913 1913, Letter from Leith surveyors to the Secretary regarding the survey of Stettin, 8 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin, 7 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin being carried out after the strike of the boilers makers, 9 November 1913 1913, Postponed survey form for Stettin, 8 September 1913 1913, Letter from Leith surveyors to the Secretary regarding the postpone of survey of Stettin due to the boilers makers strike, 5 September 1913 1913, Copy of letter from the Secretary to Leith surveyors regarding the survey of screw shaft of Stettin, 3 September 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating the Committee has agreed with the survey being carried out next month, 4 September 1913 1913, Postponed survey form for Stettin, 3 September 1913 1913, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft, 2 July 1913 1913, Report of survey for repairs of engines and boilers for Stettin, 27 December 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with postponing the special survey, 9 June 1914 1914, Postponed survey form for Stettin, 8 June 1914 1914, Letter from Leith surveyors to the Secretary regarding the special survey of Stettin, 4 June 1914 1914, Copy of letter from the Secretary to Leith surveyors enclosing a letter sent by the owners of Stettin about her fourth special survey no. 3, 3 June 1914 1914, Postponed survey form for Stettin, 2 June 1914 1914, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding postponing the second special survey no. 3 of Stettin, 29 May 1914 1914, Report of survey for repairs of engines and boilers for Stettin, 2 July 1915 1915, Copy of letter from the Secretary to Newcastle-on-Tyne surveyors regarding the special survey of Stettin, 12 August 1913 1915, Letter from Aberdeen surveyors to the Secretary stating that Stettin has sailed to Newcastle-on-Tyne as she failed to obtain docking facilities at that port, 10 August 1915 1915, Remarks to the Chief Ship Surveyor regarding the fourth special survey no. 3 for Stettin, 13 July 1915 1915, Copy of letter from the Secretary to the Surveyors in Hull, Grimsby, Middlesbrough, Newcastle, Sunderland and Hartlepool, regarding the fourth special survey no. 3 of Stettin, which will be carried out at some East coast port, 19 July 1915 1915, Letter from Leith surveyors to the Secretary regarding the survey of Stettin to be carried out at some East coast port, 12 July 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the fourth special survey no. 3 for Stettin, 5 July 1915 1915, Report of survey for repairs for Stettin, 2 July 1915 1915, Letter from Leith surveyors to the Secretary stating that the special survey of Stettin is being carried out at that port, 22 May 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 for Stettin, 21 May 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding her survey, 20 April 1915 1915, Extract from a letter dated 15 April 1915 from James Currie & Co regarding surveying Stettin. Extract dated 16 April 1915 1915, Letter from Leith surveyors to the Secretary stating that they had spoken to the owners of Stettin and due to a shortage of labour it has been difficult to find a dry dock to carry out the special survey, 13 April 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the importance of carrying out the special survey due to the age of the ship, 13 April 1915 1915, Postponed survey form for Stettin, 12 April 1915 1915, Copy of letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding the survey of Stettin being postponed, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 of Stettin, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors enclosing information about the communication between the owners of Stettin, 26 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with the special survey being carried out in the next two or three months, 26 January 1915 1915, Postponed survey form for Stettin, 25 January 1915 1915, Letter from Leith surveyors to the Secretary regarding the special survey no.3 and boiler survey of Stettin, 23 January 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding postponing the survey of Stettin, 21 January 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the fourth special survey no.3 and special annual boiler survey of Stettin, 20 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the letter sent by the latter about the thrust shaft, 1 November 1915 1915, Letter from Lisbon surveyors to the Secretary about the repair of shaft of Stettin, 25 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 28 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 23 October 1915 1915, Copy of letter from the Assistant to the Secretary to Lisbon surveyors regarding the repair of Stettin's thrust shaft being not satisfactory, 18 October 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the new thrust shaft she received in Lisbon, 1916 1915, Letter reporting that the new thrust shaft for Stettin is not considered satisfactory, 14 October 1915 1915, London Office Copy of document certifying that surveyor has examined the machinery of Stettin and stating his recommendations, 4 October 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 6 October 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 67857, 19 August 1915 1915, Report of Survey for Repairs for Stettin, 18 August 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 August 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the thrust shaft supplied in Lisbon and if it will be approved by the Committee as a permanent repair, 29 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon and stating that it will be approved by the Committee as a permanent repair, 28 April 1916 1916, Letter reporting the results of the test carried out on Stettin's new thrust shaft that was made in Lisbon, 27 April 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the result of the tests carried out on the new thrust shaft, 14 April 1916 1916, Letter from Professor R Stanfield to James Currie & Co regarding the results of the test of the transverse section of the shaft of Stettin, 11 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Letter reporting that Stettin's new thrust shaft is not satisfactory to be recommended as a permanent repair, 22 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin stating that the repair of the thrust shaft is being looked at, 14 March 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary enclosing drawings and plans of the shaft of Stettin, 6 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the repair of the thrust shaft, 28 January 1916 1916, Postponed survey form for Stettin, 22 January 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft of Stettin, 24 January 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding when the ship will be in position to have the thrust shaft examined, 21 January 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to London Report 79106, 13 July 1917 1916, Report of Survey for Repairs for Stettin due to collision with ice, 1 July 1916 1916, Report of Survey for Repairs of Engines and Boilers for Stettin, 14 July 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70096, 27 July 1917 1917, London Office Copy of document certifying that surveyor has examined damage and transmitted the Report, and stating his Recommendations, 24 July 1917 1917, Report of Survey for Repairs for Stettin 1917, Letter from Newcastle surveyors informing Lloyd's Register London that Stettin is under survey at Newcastle, 21 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding whether Stettin has yet come under inspection, 20 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding their report 70069, and Stettin's owners' intention to make repairs at South Shields within the next couple of days, and calling attention to the need for the Annu 1917, Letter from James Currie & Co Managers, informing Lloyd's Register London that they have arranged for repairs of damage previously communicated by Smith's Dry Dock Co, South Shields, on the steamer's return there in the next day or two, 1 August 1917 1917, Copy of letter from Lloyd's Register's London Secretary to James Currie and Co, informing them of the damage done to Stettin when striking a quay wall, that temporary repairs have been effected but that for the vessel to remain in class permanent repairs 1917, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70306, 2 October 1917 1917, Report of Survey for Repairs for Stettin, 29 September 1917 1917, Report of Survey for Repairs of Engines and Boilers for Stettin, 1 October 1917 1917, Certificate of approval of a stockless anchor, with cancelled written across it, 4 September 1917 1917, Correspondence to Lloyd's Register's London Secretary regarding Stettin Report 71400, acknowledging remarks on the Rules for Engines and Boilers with a working pressure of less than 60lbs, 23 November 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 71400, 19 November 1918 1918, Report of survey for repairs of Stettin, 5 November 1918 1918, Memo to Newcastle surveyors regarding Rules for Engines and Boilers of a greater working pressure than 60lbs per square inch, 18 November 1918 1918, Report of Survey for Repairs of Boilers and Engines of Stettin, 13 November 1918 1918, Copy of letter from London Secretary to James Currie and Co regarding state or survey of Stettin, 17 October 1919 1919, Postponed Survey form for Stettin, October 1919 1919, Letter from James Currie and Co to Secretary, Lloyd's Register London, regarding postponing survey of Stettin, 10 October 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Leith Report 15769, 2 July 1920 1920, Report of Survey for Repairs of Stettin, 28 June 1920 1920, Copy of letter from Lloyd's Register London Secretary to Leith Surveyors, 30 March 1920 1920, Postponed Survey form for Stettin, 29 March 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 24 March 1920 1920, Copy of Letter from Lloyd's Register London Secretary to Leith Surveyors, 19 March 1920 1920, Letter from the Surveyors at Hull, per N Rowall, to London Secretary regarding state of survey of Stettin, 18 March 1920 1920, Copy of letter from the London Secretary to the Hull Surveyors regarding state of survey of Stettin, 17 March 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 10 February 1920 1920, Postponed Survey form for Stettin, 9 February 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 5 February 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 28 January 1920 1920, Report of Survey for Repairs of Engines and Boilers for Stettin, 28 June 1920 1920, Copy of letter from the Secretary to the owners of Stettin saying the Committee has agreed with postponing the boiler survey, 23 August 1921 1921, Report of Survey for Repairs of Stettin, 16 September 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London regarding Stettin now undergoing survey, 3 September 1921 1921, Postponed Surveys form for Stettin, 22 August 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London explaining why Stettin had not undergone survey, 18 August 1921 1921, Report of Survey for Repairs of Engines and Boilers for Stettin, 16 September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Stettin survey, with reference to Leith Report 16187, 6 October 1921 1922, Report of Survey for Repairs of Stettin, 3 October 1921 1922, Correspondence of Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding ongoing surveys on Stettin, 14 September 1922 1922, Copy of letter from Lloyd's Register London Assistant to the Secretary to Leith Surveyors regarding survey of Stettin's screwshaft, 21 July 1922 1922, Postponed Surveys form for Stettin, 20 July 1922 1922, Letter from Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding proposed survey date for Stettin's screw shaft, 17 July 1922 1922, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans of owners of Stettin for survey of screwshaft, 14 July 1922 1922, Report of Survey for Repairs of Boilers and Engines for Stettin, 26 September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding carrying out part of Stettin's Special Survey, with reference to Leith Report 16388, 30 October 1923 1923, Report of Survey for Repairs of Stettin, 24 October 1923 1923, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors, regarding Rule requirements for cables, 20 October 1923 1923, Remarks to the Chief Ship Surveyor regarding Rule requirements for cables, 19 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London requesting clarification on Rules for chains, 18 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London regarding proposed timeline for survey, 22 September 1923 1923, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding letter from Stettin's owners and requesting clarification of when the boiler survey shall be held, 21 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London, regarding carrying out a part survey, 18 September 1923 1923, Copy of letter from Assistant to the Secretary to James Currie and Co regarding schedule for surveys of Stettin, 14 September 1923 1923, Postponed Surveys form for Stettin, 13 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London querying survey schedule of Stettin, 10 September 1923 1923, Report of Survey for Repairs of Engines and Boilers for Stettin, 23 October 1923 1923, Letter from Leith Surveyor A T Thomas to James Currie and Co, informing them of future survey schedule for Stettin, 23 October 1923 1923, Plan of Main Boiler for Stettin, 24 May 1924 1924, Plan of Donkey Boiler for Stettin, 24 May 1924 1924, Hatch Plan of Stettin, 2 October 1924 1924, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Stettin, with reference to Leith Report 16388, 19 May 1924 1924, Letter from A T Thomas, Leith Surveyor, to J F Hill of London, regarding surveying Stettin, 16 May 1924 1924, Extract from a letter dated 14 May 1924 from Leith surveyors regarding examining Stettin. Extract dated 15 May 1924 1924, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans for survey of Stettin and expiry of year of grace, 14 May 1924 1924, Letter from Leith surveyor A T Thomas to Secretary, London, regarding proposed examination part of Stettin's combustion chamber, 18 April 1924 1924, Copy of letter from Assistant to the Secretary to the Leith surveyors questioning owners' arrangements to have Stettin's combustion chamber examined, 16 April 1924 1924, Report of Survey for Repairs of Engines and Boilers for Stettin, 12 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding fulfilment of special survey on Stettin, in reference to Leith Report 16611, 22 November 1924 1924, Report of Survey for Repairs of Stettin, 15 November 1924 1924, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 November 1924 1924, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding completion of reports on Stettin's new boilers, 31 October 1924 1924, Note submitting that certain reports be forwarded to the Leith Surveyors for their guidance and completion, 29 October 1924 1924, Note submitting that the amended plans of boilers for Stettin merit approval, 29 May 1924 1924, Correspondence accompanying boiler plans submitted for approval for Stettin from the Glasgow office to London, 26 May 1924 1924, Letter from Jas S Cairns submitting for approval plans for new boilers for the Stettin to the Glasgow Secretary, 26 May 1924 1924, Note submitting that plans for Stettin's boilers merit approval, 24 April 1924 1924, Letter from Leith Surveyors, per A T T[homas], to Secretary, London, noting they are forwarding plans of new boilers intended for Stettin, 14 April 1924 1924, Report on Main Boiler for Stettin, 11 October 1924 1924, Report on Donkey Boiler for Stettin, 11 October 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Delivery note for 3 furnaces from Forth Shipbuilding and Engineering, Glasgow, 4 July 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 27 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, LR stamp and signature J Barr, 2 July 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 14 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 28 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 26 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 17 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 16790, 28 August 1925 1925, Report of Survey for Repairs on Stettin, 25 August 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 August 1925 1925, Memo regarding approving a steel cylinder cover on Stettin, 5 October 1925 1925, Letter from Leith Surveyor to Secretary, London, regarding steel cover repair examined, 2 October 1925 1925, Letter from Hamburg Office to Secretary, London, regarding request by Leith Surveyors, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding Hamburg report on Stettin, 1 October 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding their request for the Hamburg report, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to A Chisholm, requesting a report for the Leith Surveyors, 30 September 1925 1925, Translation of Cablegram sent to Surveyors at Hamburg, 30 September 1925 1925, Copy of Cablegram from London Office to Hamburg Office, 30 September 1925 1925, Letter from Leith Surveyors, per A T T[homas], to London Office asking for a Hamburg report to be sent to them, 29 September 1925 1925, London Office Copy of document certifying that Hamburg surveyor has examined damage and transmitted the Report, and stating his Recommendations, 25 September 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 September 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 16897, March 1926 1926, Report of Survey for Repairs to Stettin, 30 March 1926 1926, Report of Survey for Repairs of Engines and Boilers to Stettin, 30 March 1926 1926, Report of Survey for Repairs to Stettin, 15 June 1927 1927, Report of Survey for Repairs of Engines and Boilers to Stettin, 15 June 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 17291, 8 December 1927 1927, Copy of Certificate of Survey after damage to Stettin by a breaker in heavy weather, 23 November 1927 1927, Report of Survey for Repairs to Stettin, 3 December 1927 1927, Question and Answer memo between London and Leith Offices regarding Hamburg Report 17858, 21 February 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 1 February 1928 1928, Correspondence memo with particulars from Leith Surveyors to Secretary, London, regarding return of report, 27 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 25 January 1928 1928, Copy of Certificate of Survey from Hamburg after collision damage suffered by Stettin, 22 January 1928 1928, Report of Survey for Repairs of Stettin, 23 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 17339, 15 March 1928 1928, Report of Survey for Repairs of Stettin, 5 March 1928 1928, Copy of letter from the Clerk of the Classification Committee to James Currie and Co, with a copy to the Leith Office, regarding 6th Special Survey of Stettin, 14 December 1928 1928, Postponed Survey form for Stettin's 6th Special Survey, 13 December 1928 1928, Letter from James Currie and Co to Lloyd's Register Secretary, London, regarding deferring Stettin's 6th Special Survey, 11 December 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage, in reference to Dundee Report 8638, 30 March 1928 1928, Copy of Certificate of Survey regarding damage and report of repairs to Stettin's port bow shell plating, Dundee, 23 March 1928 1928, Report of Survey for Repairs to Stettin, 23 March 1928 1928, Letter from Lloyd's Register Engineer Surveyor to James Currie and Co regarding schedule for survey of Stettin's propeller shaft, 5 March 1929 1929, Copy of letter from the Secretary, London, to the Secretary, Glasgow, returning Stettin boiler plans, 29 May 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin and 6th Special Survey, in reference to Leith Report 17540, 13 March 1929 1929, Report of Survey for Repairs of Stettin, 5 March 1929 1929, Report of Survey for Repairs of Engines and Boilers for Stettin, 5 March 1929 1929, Copy of letter from pro Secretary, London, to Leith Surveyors regarding examination of Stettin's screwshaft, 16 April 1930 1930, Postponed Survey form for Stettin's screwshaft, 14 April 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 9 April 1930 1930, Copy of letter from Secretary, London, to Leith Surveyors informing them Committee are agreeable to postponing Stettin's screwshaft survey, 25 February 1930 1930, Postponed Survey form for Stettin's screwshaft, 24 February 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 17 February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 17802, 22 May 1930 1930, Report of Survey for Repairs to Stettin, 15 May 1930 1930, Report on Engine Forgings for Stettin, 8 May 1930 1930, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 May 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 18082, 2 November 1931 1931, Form or memo from Secretary, Glasgow, to Secretary, London, regarding presence of Stettin, 16 October 1931 1931, Question and Answer memo from Secretary, London, to Leith Surveyors regarding Stettin Boiler Survey, 5 October 1931 1931, Copy of letter from pro Secretary, London, with copy to Leith, to James Currie and Co regarding postponing Stettin Boiler Survey, 26 June 1931 1931, Postponed Surveys form for Stettin's Boiler Survey, 25 June 1931 1931, Letter from James Currie and Co regarding postponing Boiler Survey due on Stettin, 20 June 1931 1931, Report of Survey for Repairs on Stettin, 26 October 1931 1931, Report of Survey for Repairs of Engines and Boilers on Stettin, 26 October 1931 1931, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of survey for Stettin, 23 December 1932 1932, Postponed Surveys form for Stettin, 22 December 1932 1932, Letter from Leith Surveyors per John Houston to the Secretary, London, regarding outstanding survey on Stettin, 17 December 1932 1932, Letter from James Currie and Co to Leith Surveyors regarding schedule of survey for Stettin, 16 December 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 14 December 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 24 November 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 September 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 21 June 1932 1932, Postponed Surveys form for Stettin, 20 June 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 June 1932 1932, Copy of letter from pro Secretary, London to Leith Surveyors regarding Stettin boiler survey schedule, 9 October 1931 1932, Postponed Surveys form for Stettin, 8 October 1931 1932, Report of Total Loss, Casualty, , for Stettin, which has been sold to be broken up, 4 December 1933 1933, Letter from Leith Surveyors, per John Houston, to Secretary, London, informing them Stettin is being broken up, 1 December 1933 1933, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of demolition for Stettin, 27 November 1933 1933, Copy of letter from Leith Surveyors, per John Houston, to the Secretary, London, regarding the firm to which Stettin was sold to be broken up, 24 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 23 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 31 August 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 15 June 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 16 March 1933 1933, Note related to Stettin stating SS no. 2 held now posting no date, Note regarding Stettin stating "Vessel left Lisbon Oct 3. + 3 mos from dats. of survey would expire 12/15" no date, Sketch or plan of steel cover part for Stettin no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls ( Iron Ship survey report for Stettin, 2 December 1864 1864, Report of survey for repairs for Stettin, 8 July 1876 1876, Details of main boilers of Stettin, 29 June 1876 1876, Engineer surveyor's report on machinery for Stettin, 26 June 1876 1876, Report on Main Boiler for Stettin, 11 October 1924 1924, Report on Donkey Boiler for Stettin, 11 October 1924 1924 )
Lon ( Annual surveys for Stettin, 30 November 1876 1876, Report of Survey for Repairs for Stettin due to collision with ice, 1 July 1916 1916, Report of Survey for Repairs of Engines and Boilers for Stettin, 14 July 1916 1916 )
Lth ( Report of survey for repairs for Stettin, 16 January 1879 1879, Report of survey for repairs for Stettin, 28 January 1880 1880, Report of survey for repairs for Stettin, 2 February 1881 1881, Report of survey for repairs for Stettin, 27 January 1882 1882, Annual surveys for Stettin, 6 January 1883 1883, Annual surveys for Stettin, 23 January 1884 1884, Report of survey for repairs for Stettin, 30 January 1885 1885, Report of survey for repairs of engines and boilers for Stettin, 30 January 1885 1885, Report of survey for repairs for Stettin, 27 January 1886 1886, Report of survey for repairs of engines and boilers for Stettin, 30 January 1886 1886, Report of survey for repairs for Stettin, 26 February 1887 1887, Report of survey for repairs of engines and boilers for Stettin, 15 March 1887 1887, Report of survey for repairs for Stettin, 21 May 1888 1888, Report of survey for repairs of engines and boilers for Stettin, 25 May 1888 1888, Report of survey for repairs for Stettin, 29 December 1888 1888, Particulars for record of double bottoms in Lloyd's Register for Stettin, 5 December 1889 1889, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 10 December 1889 1889, Report of Survey for Repairs for Stettin, 6 December 1889 1889, Report on Machinery for Stettin, 3 December 1889 1889, Report of Survey for Repairs for Stettin, 18 October 1890 1890, Report of Survey for Repairs for Stettin, 6 November 1891 1891, Report of Survey for Repairs for Stettin, 16 January 1893 1893, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 19 February 1894 1894, Report of survey for repairs for Stettin, 12 February 1894 1894, Report of survey for repairs of engines and boilers for Stettin, 13 February 1894 1894, Report of survey for repairs for Stettin, 6 February 1895 1895, Report of survey for repairs of engines and boilers for Stettin, 6 February 1895 1895, Report of survey for repairs for Stettin, 19 March 1896 1896, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin about the survey of boilers, 23 March 1896 1896, Report of survey for repairs of engines and boilers for Stettin, 19 March 1896 1896, Report of survey for repairs for Stettin, 19 March 1897 1897, Letter from the Leith surveyor to the Secretary stating that Stettin is now employed in the emigrant trade and therefore the pressure of boiler has been reduced, 24 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 19 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 26 July 1897 1897, Remarks of the Chief Surveyor to the Classing Committee about the special survey of the ship Stettin, 4 March 1898 1898, Report of survey for repairs for Stettin, 3 March 1898 1898, Report of survey for repairs of engines and boilers for Stettin, 3 March 1898 1898, Report of survey for repairs for Stettin, 5 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1899 1899, Report of survey for repairs of engines and boilers for Stettin, 5 April 1899 1899, Report of survey for repairs for Stettin, 28 April 1900 1900, Report of survey for repairs of engines and boilers for Stettin, 28 April 1900 1900, Report of survey for repairs for Stettin, 2 May 1901 1901, Report of survey for repairs of engines and boilers for Stettin, 2 May 1901 1901, Remarks of the Ship Surveyor to the Classing Committee about the special survey of Stettin and the particulars of her plating, 7 April 1902 1902, Report of survey for repairs for Stettin, 4 April 1902 1902, Report of survey for repairs of engines and boilers for Stettin, 4 April 1902 1902, Report of survey for repairs for Stettin, 11 May 1903 1903, Report of survey for repairs of engines and boilers for Stettin, 11 May 1903 1903, Report of survey for repairs for Stettin, 29 June 1904 1904, Report of survey for repairs of engines and boilers for Stettin, 29 June 1904 1904, Report of survey for repairs for Stettin, 11 July 1905 1905, Report of survey for repairs of engines and boilers for Stettin, 11 July 1905 1905, Report of survey for repairs for Stettin, 22 August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the special survey no.1 of Stettin, 26 July 1906 1906, Report of survey for repairs for Stettin, 23 July 1906 1906, Report of survey for repairs of engines and boilers for Stettin, 24 July 1906 1906, Report of survey for repairs for Stettin, 16 July 1907 1906, Report of survey for repairs of engines and boilers for Stettin, 16 July 1907 1906, Report of survey for repairs for Stettin, 19 September 1908 1908, Report of survey for repairs of engines and boilers for Stettin, 19 September 1908 1908, Report of survey for repairs for Stettin, 2 October 1909 1909, Report of survey for repairs of engines and boilers for Stettin, 2 October 1909 1909, Report of survey for repairs for Stettin, 5 October 1910 1910, Report of survey for repairs of engines and boilers for Stettin, 21 October 1910 1910, Report of Ship forgings or castings for Stettin, 30 September 1910 1910, Report of survey for repairs for Stettin, 3 June 1911 1911, Report of survey for repairs of engines and boilers for Stettin, 3 June 1911 1911, Report of survey for repairs for Stettin, 17 August 1912 1912, Report of survey for repairs of engines and boilers for Stettin, 17 August 1912 1912, Report of survey for repairs for Stettin, 27 December 1913 1913, Report of survey for repairs of engines and boilers for Stettin, 27 December 1913 1913, Report of survey for repairs of engines and boilers for Stettin, 2 July 1915 1915, Report of survey for repairs for Stettin, 2 July 1915 1915, Report of Survey for Repairs of Stettin, 28 June 1920 1920, Report of Survey for Repairs of Engines and Boilers for Stettin, 28 June 1920 1920, Report of Survey for Repairs of Stettin, 16 September 1921 1921, Report of Survey for Repairs of Engines and Boilers for Stettin, 16 September 1921 1921, Report of Survey for Repairs of Stettin, 3 October 1921 1922, Report of Survey for Repairs of Boilers and Engines for Stettin, 26 September 1922 1922, Report of Survey for Repairs of Stettin, 24 October 1923 1923, Report of Survey for Repairs of Engines and Boilers for Stettin, 23 October 1923 1923, Report of Survey for Repairs of Engines and Boilers for Stettin, 12 June 1924 1924, Report of Survey for Repairs of Stettin, 15 November 1924 1924, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 November 1924 1924, Report of Survey for Repairs on Stettin, 25 August 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 August 1925 1925, Report of Survey for Repairs to Stettin, 30 March 1926 1926, Report of Survey for Repairs of Engines and Boilers to Stettin, 30 March 1926 1926, Report of Survey for Repairs to Stettin, 15 June 1927 1927, Report of Survey for Repairs of Engines and Boilers to Stettin, 15 June 1927 1927, Report of Survey for Repairs to Stettin, 3 December 1927 1927, Report of Survey for Repairs of Stettin, 5 March 1928 1928, Report of Survey for Repairs of Stettin, 5 March 1929 1929, Report of Survey for Repairs of Engines and Boilers for Stettin, 5 March 1929 1929, Report of Survey for Repairs to Stettin, 15 May 1930 1930, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 May 1930 1930, Report of Survey for Repairs on Stettin, 26 October 1931 1931, Report of Survey for Repairs of Engines and Boilers on Stettin, 26 October 1931 1931 )
Bgn ( Report of Survey for repairs of engines and boilers for Stettin, 12 July 1894 1894 )
Bmn ( Report of survey for repairs for Stettin, 28 March 1898 1898 )
Lis ( Report of Survey for Repairs of Engines and Boilers of Stettin, 6 October 1915 1915 )
Nwc ( Report of Survey for Repairs for Stettin, 18 August 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 August 1915 1915, Report of Survey for Repairs for Stettin 1917, Report of Survey for Repairs for Stettin, 29 September 1917 1917, Report of Survey for Repairs of Engines and Boilers for Stettin, 1 October 1917 1917, Report of survey for repairs of Stettin, 5 November 1918 1918, Report of Survey for Repairs of Boilers and Engines of Stettin, 13 November 1918 1918 )
Ham ( Report of Survey for Repairs of Engines and Boilers of Stettin, 25 September 1925 1925, Report of Survey for Repairs of Stettin, 23 January 1928 1928 )
Dun ( Copy of Certificate of Survey regarding damage and report of repairs to Stettin's port bow shell plating, Dundee, 23 March 1928 1928, Report of Survey for Repairs to Stettin, 23 March 1928 1928 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
AB ( Iron Ship survey report for Stettin, 2 December 1864 1864, Report of survey for repairs for Stettin, 8 July 1876 1876 )
AB1 ( Annual surveys for Stettin, 30 November 1876 1876, Report of survey for repairs for Stettin, 16 January 1879 1879, Report of survey for repairs of engines and boilers for Stettin, 16 January 1880 1880, Report of survey for repairs for Stettin, 28 January 1880 1880, Report of survey for repairs for Stettin, 2 February 1881 1881, Report of survey for repairs for Stettin, 27 January 1882 1882, Annual surveys for Stettin, 6 January 1883 1883, Annual surveys for Stettin, 23 January 1884 1884, Report of survey for repairs for Stettin, 30 January 1885 1885, Report of survey for repairs of engines and boilers for Stettin, 30 January 1885 1885, Report of survey for repairs for Stettin, 27 January 1886 1886, Report of survey for repairs of engines and boilers for Stettin, 30 January 1886 1886, Report of survey for repairs for Stettin, 26 February 1887 1887, Report of survey for repairs of engines and boilers for Stettin, 15 March 1887 1887, Report of survey for repairs for Stettin, 21 May 1888 1888, Report of survey for repairs of engines and boilers for Stettin, 25 May 1888 1888, Report of survey for repairs for Stettin, 29 December 1888 1888, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 10 December 1889 1889, Report of Survey for Repairs for Stettin, 6 December 1889 1889, Report of Survey for Repairs for Stettin, 18 October 1890 1890, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 19 February 1894 1894, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 67857, 19 August 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 71400, 19 November 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Leith Report 15769, 2 July 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Stettin survey, with reference to Leith Report 16187, 6 October 1921 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding fulfilment of special survey on Stettin, in reference to Leith Report 16611, 22 November 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 16790, 28 August 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 16897, March 1926 1926, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 17802, 22 May 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 18082, 2 November 1931 1931 )
+ AB1 ( Report of Survey for Repairs for Stettin, 6 November 1891 1891, Report of Survey for Repairs for Stettin, 16 January 1893 1893, Report of survey for repairs for Stettin, 12 February 1894 1894, Report of survey for repairs of engines and boilers for Stettin, 13 February 1894 1894, Report of survey for repairs for Stettin, 6 February 1895 1895, Report of survey for repairs of engines and boilers for Stettin, 6 February 1895 1895, Report of survey for repairs for Stettin, 19 March 1896 1896, Report of survey for repairs of engines and boilers for Stettin, 19 March 1896 1896, Report of survey for repairs for Stettin, 19 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 19 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 26 July 1897 1897, Remarks of the Chief Surveyor to the Classing Committee about the special survey of the ship Stettin, 4 March 1898 1898, Report of survey for repairs for Stettin, 3 March 1898 1898, Report of survey for repairs of engines and boilers for Stettin, 3 March 1898 1898, Report of survey for repairs for Stettin, 28 March 1898 1898, Report of survey for repairs for Stettin, 5 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1899 1899, Report of survey for repairs of engines and boilers for Stettin, 5 April 1899 1899, Report of survey for repairs for Stettin, 28 April 1900 1900, Report of survey for repairs of engines and boilers for Stettin, 28 April 1900 1900, Report of survey for repairs for Stettin, 2 May 1901 1901, Report of survey for repairs of engines and boilers for Stettin, 2 May 1901 1901, Remarks of the Ship Surveyor to the Classing Committee about the special survey of Stettin and the particulars of her plating, 7 April 1902 1902, Report of survey for repairs for Stettin, 4 April 1902 1902, Report of survey for repairs of engines and boilers for Stettin, 4 April 1902 1902, Report of survey for repairs for Stettin, 11 May 1903 1903, Report of survey for repairs of engines and boilers for Stettin, 11 May 1903 1903, Report of survey for repairs for Stettin, 29 June 1904 1904, Report of survey for repairs of engines and boilers for Stettin, 29 June 1904 1904, Report of survey for repairs for Stettin, 11 July 1905 1905, Report of survey for repairs of engines and boilers for Stettin, 11 July 1905 1905, Report of survey for repairs for Stettin, 22 August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the special survey no.1 of Stettin, 26 July 1906 1906, Report of survey for repairs for Stettin, 23 July 1906 1906, Report of survey for repairs of engines and boilers for Stettin, 24 July 1906 1906, Report of survey for repairs for Stettin, 16 July 1907 1906, Report of survey for repairs of engines and boilers for Stettin, 16 July 1907 1906, Report of survey for repairs for Stettin, 19 September 1908 1908, Report of survey for repairs of engines and boilers for Stettin, 19 September 1908 1908, Report of survey for repairs for Stettin, 2 October 1909 1909, Report of survey for repairs of engines and boilers for Stettin, 2 October 1909 1909, Report of survey for repairs for Stettin, 5 October 1910 1910, Report of survey for repairs of engines and boilers for Stettin, 21 October 1910 1910, Report of survey for repairs for Stettin, 3 June 1911 1911, Report of survey for repairs of engines and boilers for Stettin, 3 June 1911 1911, Report of survey for repairs for Stettin, 17 August 1912 1912, Report of survey for repairs of engines and boilers for Stettin, 17 August 1912 1912, Report of survey for repairs for Stettin, 27 December 1913 1913, Report of survey for repairs of engines and boilers for Stettin, 27 December 1913 1913, Report of survey for repairs of engines and boilers for Stettin, 2 July 1915 1915, Report of survey for repairs for Stettin, 2 July 1915 1915 )
+ 90A1 ( Report of Survey for repairs of engines and boilers for Stettin, 12 July 1894 1894 )
+AB1 ( Report of Survey for Repairs of Engines and Boilers of Stettin, 6 October 1915 1915, Report of Survey for Repairs for Stettin, 18 August 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 August 1915 1915, Report of Survey for Repairs for Stettin due to collision with ice, 1 July 1916 1916, Report of Survey for Repairs of Engines and Boilers for Stettin, 14 July 1916 1916, Report of Survey for Repairs for Stettin 1917, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70306, 2 October 1917 1917, Report of Survey for Repairs for Stettin, 29 September 1917 1917, Report of Survey for Repairs of Engines and Boilers for Stettin, 1 October 1917 1917, Report of survey for repairs of Stettin, 5 November 1918 1918, Report of Survey for Repairs of Boilers and Engines of Stettin, 13 November 1918 1918, Report of Survey for Repairs of Stettin, 28 June 1920 1920, Report of Survey for Repairs of Engines and Boilers for Stettin, 28 June 1920 1920, Report of Survey for Repairs of Stettin, 16 September 1921 1921, Report of Survey for Repairs of Engines and Boilers for Stettin, 16 September 1921 1921, Report of Survey for Repairs of Stettin, 3 October 1921 1922, Report of Survey for Repairs of Boilers and Engines for Stettin, 26 September 1922 1922, Report of Survey for Repairs of Stettin, 24 October 1923 1923, Report of Survey for Repairs of Engines and Boilers for Stettin, 23 October 1923 1923, Report of Survey for Repairs of Engines and Boilers for Stettin, 12 June 1924 1924, Report of Survey for Repairs of Stettin, 15 November 1924 1924, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 November 1924 1924, Report of Survey for Repairs on Stettin, 25 August 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 August 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 September 1925 1925, Report of Survey for Repairs to Stettin, 30 March 1926 1926, Report of Survey for Repairs of Engines and Boilers to Stettin, 30 March 1926 1926, Report of Survey for Repairs to Stettin, 15 June 1927 1927, Report of Survey for Repairs of Engines and Boilers to Stettin, 15 June 1927 1927, Report of Survey for Repairs to Stettin, 3 December 1927 1927, Copy of Certificate of Survey from Hamburg after collision damage suffered by Stettin, 22 January 1928 1928, Report of Survey for Repairs of Stettin, 23 January 1928 1928, Report of Survey for Repairs of Stettin, 5 March 1928 1928, Report of Survey for Repairs to Stettin, 23 March 1928 1928, Report of Survey for Repairs of Stettin, 5 March 1929 1929, Report of Survey for Repairs of Engines and Boilers for Stettin, 5 March 1929 1929, Report of Survey for Repairs to Stettin, 15 May 1930 1930, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 May 1930 1930, Report of Survey for Repairs on Stettin, 26 October 1931 1931, Report of Survey for Repairs of Engines and Boilers on Stettin, 26 October 1931 1931 )
The year in which a vessel’s construction is completed.
1864 ( Certificate for vessels navigated by Steam for Stettin, 30 November 1864 1864, Iron Ship survey report for Stettin, 2 December 1864 1864, Letter from Glasgow surveyor to the Secretary sending the machinery certificate and Stettin's report of survey no. 4255, 8 July 1876 1876, Report of survey for repairs for Stettin, 8 July 1876 1876, Memo from Messrs Napier Ltd. stating that Stettin's boilers are fitted in accordance with the Committee requirements and should have the notification Lloyd's MC in the Register Book, 3 July 1876 1876, Details of main boilers of Stettin, 29 June 1876 1876, Engineer surveyor's report on machinery for Stettin, 26 June 1876 1876, Annual surveys for Stettin, 30 November 1876 1876, Report of survey for repairs for Stettin, 16 January 1879 1879, Report of survey for repairs of engines and boilers for Stettin, 16 January 1880 1880, Cover note for reports number 4308 and 57 of Stettin, 31 January 1880 1880, Report of survey for repairs for Stettin, 28 January 1880 1880, Report of survey for repairs for Stettin, 2 February 1881 1881, Report of survey for repairs for Stettin, 27 January 1882 1882, Annual surveys for Stettin, 6 January 1883 1883, Annual surveys for Stettin, 23 January 1884 1884, Report of survey for repairs for Stettin, 30 January 1885 1885, Report of survey for repairs of engines and boilers for Stettin, 30 January 1885 1885, Report of survey for repairs for Stettin, 27 January 1886 1886, Report of survey for repairs of engines and boilers for Stettin, 30 January 1886 1886, Report of survey for repairs for Stettin, 26 February 1887 1887, Report of survey for repairs of engines and boilers for Stettin, 15 March 1887 1887, Report of survey for repairs for Stettin, 21 May 1888 1888, Report of survey for repairs of engines and boilers for Stettin, 25 May 1888 1888, Report of survey for repairs for Stettin, 29 December 1888 1888, Particulars for record of double bottoms in Lloyd's Register for Stettin, 5 December 1889 1889, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 10 December 1889 1889, Report of Survey for Repairs for Stettin, 6 December 1889 1889, Report on Machinery for Stettin, 3 December 1889 1889, Report of Survey for Repairs for Stettin, 18 October 1890 1890, Report of Survey for Repairs for Stettin, 6 November 1891 1891, Report of Survey for Repairs for Stettin, 16 January 1893 1893, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 19 February 1894 1894, Report of survey for repairs for Stettin, 12 February 1894 1894, Report of survey for repairs of engines and boilers for Stettin, 13 February 1894 1894, Letter from the surveyor Jas Barclay to the Secretary in London enclosing a letter received from the Master of Stettin about the boiler survey to be held at Bergen, 9 June 1894 1894, Letter from the Master of Stettin Otto E Jacobsen to the surveyor James Barclay about the survey of boilers to take place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to E Rusten, owner of Stettin, stating he agrees with the survey of boilers taking place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to Bergen surveyor stating that Stettin will have the survey of boilers carried out in Bergen, 8 June 1894 1894, Note stating the boiler survey for Stettin is due to April and the owners state the ship will be at Bergen where the survey will take place, 8 June 1894 1894, Letter from Erik Rusten, owner of Stettin, to Lloyd's Register stating that he wishes the survey of boilers to take place in Bergen, 4 June 1894 1894, Report of Survey for repairs of engines and boilers for Stettin, 12 July 1894 1894, Report of survey for repairs for Stettin, 6 February 1895 1895, Report of survey for repairs of engines and boilers for Stettin, 6 February 1895 1895, Report of survey for repairs for Stettin, 19 March 1896 1896, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin about the survey of boilers, 23 March 1896 1896, Letter from Leith surveyor to the Secretary stating that the Stettin is under survey, 5 March 1896 1896, Letter from the Secretary to the Leith Surveyor questioning about the survey of Stettin, 3 March 1896 1896, Copy of Letter from the Secretary to the owner of Stettin stating that he agrees with the boiler survey of that ship being carried out when she is in dry dock in the following month, 29 January 1896 1896, Note stating the boiler survey for Stettin will be in dry dock in the following month, 29 January 1896 1896, Letter from the owner of Stettin to the Secretary stating the ship will be in dry dock next month for the survey, 27 January 1896 1896, Report of survey for repairs of engines and boilers for Stettin, 19 March 1896 1896, Report of survey for repairs for Stettin, 19 March 1897 1897, Letter from the Leith surveyor to the Secretary stating that Stettin is now employed in the emigrant trade and therefore the pressure of boiler has been reduced, 24 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 19 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 26 July 1897 1897, Remarks of the Chief Surveyor to the Classing Committee about the special survey of the ship Stettin, 4 March 1898 1898, Copy of letter from the Secretary to the owners of Stettin stating that the special survey will take place when the ship is placed in dry dock, 3 February 1898 1898, Note stating the ship Stettin will be soon in dry dock to be surveyed, 3 February 1898 1898, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating their intention to put the ship in dry dock to be surveyed, 1 February 1898 1898, Report of survey for repairs for Stettin, 3 March 1898 1898, Report of survey for repairs of engines and boilers for Stettin, 3 March 1898 1898, Remarks of the Chief Surveyor to the Classing Committee about the damage and temporary repairs suffered by Stettin, 31 March 1898 1898, Letter from the Bremerhaven surveyor about the repairs to Stettin, 29 March 1898 1898, Cover note for report number 534 of Stettin, 1 April 1898 1898, Report of survey for repairs for Stettin, 28 March 1898 1898, Remarks of the Ship Surveyor to the Classing Committee saying the damage to Stettin has been repaired and she should remain classed, 6 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1899 1899, Report of survey for repairs of engines and boilers for Stettin, 5 April 1899 1899, Report of survey for repairs for Stettin, 28 April 1900 1900, Report of survey for repairs of engines and boilers for Stettin, 28 April 1900 1900, Report of survey for repairs for Stettin, 2 May 1901 1901, Report of survey for repairs of engines and boilers for Stettin, 2 May 1901 1901, Remarks of the Ship Surveyor to the Classing Committee about the special survey of Stettin and the particulars of her plating, 7 April 1902 1902, Report of survey for repairs for Stettin, 4 April 1902 1902, Copy of letter from the Secretary to the owners of Stettin statin the Committee agreed with the special survey being carried out in the next two months, 31 January 1902 1902, Postponed survey form for Stettin, 30 January 1902 1902, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating they expect to attend the special survey within the next two months, 29 January 1902 1902, Report of survey for repairs of engines and boilers for Stettin, 4 April 1902 1902, Report of survey for repairs for Stettin, 11 May 1903 1903, Copy of letter from the Secretary to Leith Surveyors stating that the steamer Stettin has been booked for the annual boiler survey that will take place in a few days, 7 April 1903 1903, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the annual overhaul has been booked for that next few days, 4 April 1903 1903, Report of survey for repairs of engines and boilers for Stettin, 11 May 1903 1903, Report of survey for repairs for Stettin, 29 June 1904 1904, Report of survey for repairs of engines and boilers for Stettin, 29 June 1904 1904, Report of survey for repairs for Stettin, 11 July 1905 1905, Report of survey for repairs of engines and boilers for Stettin, 11 July 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the damage and repairs to Stettin, 24 August 1905 1905, Report of survey for repairs for Stettin, 22 August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the special survey no.1 of Stettin, 26 July 1906 1906, Copy of letter from the Secretary to Leith Surveyors stating that Stettin will be in dry dock on her arrival from Konigsberg when the special survey no.1 will be carried out, 22 June 1906 1906, Copy of letter from the Secretary to the owners of Stettin stating that the special survey no.1 will be carried out next week in Leith, 22 June 1906 1906, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the special survey no.1 will be carried out in the next week on her arrival from Konigsberg, 20 June 1906 1906, Report of survey for repairs for Stettin, 23 July 1906 1906, Report of survey for repairs of engines and boilers for Stettin, 24 July 1906 1906, Report of survey for repairs for Stettin, 16 July 1907 1906, Report of survey for repairs of engines and boilers for Stettin, 16 July 1907 1906, Report of survey for repairs for Stettin, 19 September 1908 1908, Copy of letter from the Secretary to Leith Surveyors stating that Stettin is laid up for overhaul and that the boiler survey should be carried out, 8 September 1908 1908, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the steamer is laid up for overhaul and that the special survey of boilers should take place next week, 5 September 1908 1908, Report of survey for repairs of engines and boilers for Stettin, 19 September 1908 1908, Report of survey for repairs for Stettin, 2 October 1909 1909, Report of survey for repairs of engines and boilers for Stettin, 2 October 1909 1909, Plan of Rudder of Stettin, 1910. Scale 1"=one foot. Details 3"= one foot, 19 September 1910 1910, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding the special survey no. 2 and boiler survey for Stettin, 29 October 1910 1910, Letter from Leith Surveyor to the Secretary stating that they met with the owners of Stettin and arranged the special survey no. 2 to be carried out after the New Year holidays, 28 November 1910 1910, Copy of letter from the Secretary to Leith Surveyors regarding the report no. 13106 for Stettin and asking when the ship's owners expect the special survey no.2 to be carried out, 25 November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee about damage and repairs made to Stettin after grounding, 7 October 1910 1910, Postponed survey form for Stettin, 27 June 1910 1910, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating the special survey no.2 will be carried out in Leith in September, 23 October 1910 1910, Report of survey for repairs for Stettin, 5 October 1910 1910, Report of survey for repairs of engines and boilers for Stettin, 21 October 1910 1910, Report of Ship forgings or castings for Stettin, 30 September 1910 1910, Note about the sketch of rudder for Stettin, 19 September 1910 1910, Letter from Leith surveyors to the Secretary regarding the plan of rudder for Stettin to be approved by the Committee, 16 September 1910 1910, Copy of letter from Secretary, Lloyd's Register London, to James Currie and Co, regarding agreement for date of carrying out special survey, 28 June 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the special survey no.2 for Stettin and the repairs made, 6 June 1911 1911, Report of survey for repairs for Stettin, 3 June 1911 1911, Report of survey for repairs of engines and boilers for Stettin, 3 June 1911 1911, Copy of letter from the Assistant to the Secretary to the owners of Stettin, James Currie & Co, regarding the boiler survey to take place in about two months' time, 12 July 1912 1912, Report of survey for repairs for Stettin, 17 August 1912 1912, Postponed survey form for Stettin, 11 July 1912 1912, Letter from the owners of Stettin to the Secretary regarding the ship special survey and boilers survey, 9 July 1912 1912, Report of survey for repairs of engines and boilers for Stettin, 17 August 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the conditions of Stettin after repair, 29 December 1913 1913, Report of survey for repairs for Stettin, 27 December 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of Stettin taking place in three weeks’ time, 14 November 1913 1913, Postponed survey form for Stettin, 13 November 1913 1913, Letter from Leith surveyors to the Secretary regarding the survey of Stettin, 8 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin, 7 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin being carried out after the strike of the boilers makers, 9 November 1913 1913, Postponed survey form for Stettin, 8 September 1913 1913, Letter from Leith surveyors to the Secretary regarding the postpone of survey of Stettin due to the boilers makers strike, 5 September 1913 1913, Copy of letter from the Secretary to Leith surveyors regarding the survey of screw shaft of Stettin, 3 September 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating the Committee has agreed with the survey being carried out next month, 4 September 1913 1913, Postponed survey form for Stettin, 3 September 1913 1913, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft, 2 July 1913 1913, Report of survey for repairs of engines and boilers for Stettin, 27 December 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with postponing the special survey, 9 June 1914 1914, Postponed survey form for Stettin, 8 June 1914 1914, Letter from Leith surveyors to the Secretary regarding the special survey of Stettin, 4 June 1914 1914, Copy of letter from the Secretary to Leith surveyors enclosing a letter sent by the owners of Stettin about her fourth special survey no. 3, 3 June 1914 1914, Postponed survey form for Stettin, 2 June 1914 1914, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding postponing the second special survey no. 3 of Stettin, 29 May 1914 1914, Report of survey for repairs of engines and boilers for Stettin, 2 July 1915 1915, Copy of letter from the Secretary to Newcastle-on-Tyne surveyors regarding the special survey of Stettin, 12 August 1913 1915, Letter from Aberdeen surveyors to the Secretary stating that Stettin has sailed to Newcastle-on-Tyne as she failed to obtain docking facilities at that port, 10 August 1915 1915, Remarks to the Chief Ship Surveyor regarding the fourth special survey no. 3 for Stettin, 13 July 1915 1915, Copy of letter from the Secretary to the Surveyors in Hull, Grimsby, Middlesbrough, Newcastle, Sunderland and Hartlepool, regarding the fourth special survey no. 3 of Stettin, which will be carried out at some East coast port, 19 July 1915 1915, Letter from Leith surveyors to the Secretary regarding the survey of Stettin to be carried out at some East coast port, 12 July 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the fourth special survey no. 3 for Stettin, 5 July 1915 1915, Report of survey for repairs for Stettin, 2 July 1915 1915, Letter from Leith surveyors to the Secretary stating that the special survey of Stettin is being carried out at that port, 22 May 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 for Stettin, 21 May 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding her survey, 20 April 1915 1915, Extract from a letter dated 15 April 1915 from James Currie & Co regarding surveying Stettin. Extract dated 16 April 1915 1915, Letter from Leith surveyors to the Secretary stating that they had spoken to the owners of Stettin and due to a shortage of labour it has been difficult to find a dry dock to carry out the special survey, 13 April 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the importance of carrying out the special survey due to the age of the ship, 13 April 1915 1915, Postponed survey form for Stettin, 12 April 1915 1915, Copy of letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding the survey of Stettin being postponed, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 of Stettin, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors enclosing information about the communication between the owners of Stettin, 26 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with the special survey being carried out in the next two or three months, 26 January 1915 1915, Postponed survey form for Stettin, 25 January 1915 1915, Letter from Leith surveyors to the Secretary regarding the special survey no.3 and boiler survey of Stettin, 23 January 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding postponing the survey of Stettin, 21 January 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the fourth special survey no.3 and special annual boiler survey of Stettin, 20 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the letter sent by the latter about the thrust shaft, 1 November 1915 1915, Letter from Lisbon surveyors to the Secretary about the repair of shaft of Stettin, 25 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 28 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 23 October 1915 1915, Copy of letter from the Assistant to the Secretary to Lisbon surveyors regarding the repair of Stettin's thrust shaft being not satisfactory, 18 October 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the new thrust shaft she received in Lisbon, 1916 1915, Letter reporting that the new thrust shaft for Stettin is not considered satisfactory, 14 October 1915 1915, London Office Copy of document certifying that surveyor has examined the machinery of Stettin and stating his recommendations, 4 October 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 6 October 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 67857, 19 August 1915 1915, Report of Survey for Repairs for Stettin, 18 August 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 August 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the thrust shaft supplied in Lisbon and if it will be approved by the Committee as a permanent repair, 29 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon and stating that it will be approved by the Committee as a permanent repair, 28 April 1916 1916, Letter reporting the results of the test carried out on Stettin's new thrust shaft that was made in Lisbon, 27 April 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the result of the tests carried out on the new thrust shaft, 14 April 1916 1916, Letter from Professor R Stanfield to James Currie & Co regarding the results of the test of the transverse section of the shaft of Stettin, 11 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Letter reporting that Stettin's new thrust shaft is not satisfactory to be recommended as a permanent repair, 22 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin stating that the repair of the thrust shaft is being looked at, 14 March 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary enclosing drawings and plans of the shaft of Stettin, 6 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the repair of the thrust shaft, 28 January 1916 1916, Postponed survey form for Stettin, 22 January 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft of Stettin, 24 January 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding when the ship will be in position to have the thrust shaft examined, 21 January 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to London Report 79106, 13 July 1917 1916, Report of Survey for Repairs for Stettin due to collision with ice, 1 July 1916 1916, Report of Survey for Repairs of Engines and Boilers for Stettin, 14 July 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70096, 27 July 1917 1917, London Office Copy of document certifying that surveyor has examined damage and transmitted the Report, and stating his Recommendations, 24 July 1917 1917, Report of Survey for Repairs for Stettin 1917, Letter from Newcastle surveyors informing Lloyd's Register London that Stettin is under survey at Newcastle, 21 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding whether Stettin has yet come under inspection, 20 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding their report 70069, and Stettin's owners' intention to make repairs at South Shields within the next couple of days, and calling attention to the need for the Annu 1917, Letter from James Currie & Co Managers, informing Lloyd's Register London that they have arranged for repairs of damage previously communicated by Smith's Dry Dock Co, South Shields, on the steamer's return there in the next day or two, 1 August 1917 1917, Copy of letter from Lloyd's Register's London Secretary to James Currie and Co, informing them of the damage done to Stettin when striking a quay wall, that temporary repairs have been effected but that for the vessel to remain in class permanent repairs 1917, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70306, 2 October 1917 1917, Report of Survey for Repairs for Stettin, 29 September 1917 1917, Report of Survey for Repairs of Engines and Boilers for Stettin, 1 October 1917 1917, Certificate of approval of a stockless anchor, with cancelled written across it, 4 September 1917 1917, Correspondence to Lloyd's Register's London Secretary regarding Stettin Report 71400, acknowledging remarks on the Rules for Engines and Boilers with a working pressure of less than 60lbs, 23 November 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 71400, 19 November 1918 1918, Report of survey for repairs of Stettin, 5 November 1918 1918, Memo to Newcastle surveyors regarding Rules for Engines and Boilers of a greater working pressure than 60lbs per square inch, 18 November 1918 1918, Report of Survey for Repairs of Boilers and Engines of Stettin, 13 November 1918 1918, Copy of letter from London Secretary to James Currie and Co regarding state or survey of Stettin, 17 October 1919 1919, Postponed Survey form for Stettin, October 1919 1919, Letter from James Currie and Co to Secretary, Lloyd's Register London, regarding postponing survey of Stettin, 10 October 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Leith Report 15769, 2 July 1920 1920, Report of Survey for Repairs of Stettin, 28 June 1920 1920, Copy of letter from Lloyd's Register London Secretary to Leith Surveyors, 30 March 1920 1920, Postponed Survey form for Stettin, 29 March 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 24 March 1920 1920, Copy of Letter from Lloyd's Register London Secretary to Leith Surveyors, 19 March 1920 1920, Letter from the Surveyors at Hull, per N Rowall, to London Secretary regarding state of survey of Stettin, 18 March 1920 1920, Copy of letter from the London Secretary to the Hull Surveyors regarding state of survey of Stettin, 17 March 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 10 February 1920 1920, Postponed Survey form for Stettin, 9 February 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 5 February 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 28 January 1920 1920, Report of Survey for Repairs of Engines and Boilers for Stettin, 28 June 1920 1920, Copy of letter from the Secretary to the owners of Stettin saying the Committee has agreed with postponing the boiler survey, 23 August 1921 1921, Report of Survey for Repairs of Stettin, 16 September 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London regarding Stettin now undergoing survey, 3 September 1921 1921, Postponed Surveys form for Stettin, 22 August 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London explaining why Stettin had not undergone survey, 18 August 1921 1921, Report of Survey for Repairs of Engines and Boilers for Stettin, 16 September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Stettin survey, with reference to Leith Report 16187, 6 October 1921 1922, Report of Survey for Repairs of Stettin, 3 October 1921 1922, Correspondence of Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding ongoing surveys on Stettin, 14 September 1922 1922, Copy of letter from Lloyd's Register London Assistant to the Secretary to Leith Surveyors regarding survey of Stettin's screwshaft, 21 July 1922 1922, Postponed Surveys form for Stettin, 20 July 1922 1922, Letter from Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding proposed survey date for Stettin's screw shaft, 17 July 1922 1922, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans of owners of Stettin for survey of screwshaft, 14 July 1922 1922, Report of Survey for Repairs of Boilers and Engines for Stettin, 26 September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding carrying out part of Stettin's Special Survey, with reference to Leith Report 16388, 30 October 1923 1923, Report of Survey for Repairs of Stettin, 24 October 1923 1923, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors, regarding Rule requirements for cables, 20 October 1923 1923, Remarks to the Chief Ship Surveyor regarding Rule requirements for cables, 19 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London requesting clarification on Rules for chains, 18 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London regarding proposed timeline for survey, 22 September 1923 1923, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding letter from Stettin's owners and requesting clarification of when the boiler survey shall be held, 21 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London, regarding carrying out a part survey, 18 September 1923 1923, Copy of letter from Assistant to the Secretary to James Currie and Co regarding schedule for surveys of Stettin, 14 September 1923 1923, Postponed Surveys form for Stettin, 13 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London querying survey schedule of Stettin, 10 September 1923 1923, Report of Survey for Repairs of Engines and Boilers for Stettin, 23 October 1923 1923, Letter from Leith Surveyor A T Thomas to James Currie and Co, informing them of future survey schedule for Stettin, 23 October 1923 1923, Plan of Main Boiler for Stettin, 24 May 1924 1924, Plan of Donkey Boiler for Stettin, 24 May 1924 1924, Hatch Plan of Stettin, 2 October 1924 1924, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Stettin, with reference to Leith Report 16388, 19 May 1924 1924, Letter from A T Thomas, Leith Surveyor, to J F Hill of London, regarding surveying Stettin, 16 May 1924 1924, Extract from a letter dated 14 May 1924 from Leith surveyors regarding examining Stettin. Extract dated 15 May 1924 1924, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans for survey of Stettin and expiry of year of grace, 14 May 1924 1924, Letter from Leith surveyor A T Thomas to Secretary, London, regarding proposed examination part of Stettin's combustion chamber, 18 April 1924 1924, Copy of letter from Assistant to the Secretary to the Leith surveyors questioning owners' arrangements to have Stettin's combustion chamber examined, 16 April 1924 1924, Report of Survey for Repairs of Engines and Boilers for Stettin, 12 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding fulfilment of special survey on Stettin, in reference to Leith Report 16611, 22 November 1924 1924, Report of Survey for Repairs of Stettin, 15 November 1924 1924, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 November 1924 1924, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding completion of reports on Stettin's new boilers, 31 October 1924 1924, Note submitting that certain reports be forwarded to the Leith Surveyors for their guidance and completion, 29 October 1924 1924, Note submitting that the amended plans of boilers for Stettin merit approval, 29 May 1924 1924, Correspondence accompanying boiler plans submitted for approval for Stettin from the Glasgow office to London, 26 May 1924 1924, Letter from Jas S Cairns submitting for approval plans for new boilers for the Stettin to the Glasgow Secretary, 26 May 1924 1924, Note submitting that plans for Stettin's boilers merit approval, 24 April 1924 1924, Letter from Leith Surveyors, per A T T[homas], to Secretary, London, noting they are forwarding plans of new boilers intended for Stettin, 14 April 1924 1924, Report on Main Boiler for Stettin, 11 October 1924 1924, Report on Donkey Boiler for Stettin, 11 October 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Delivery note for 3 furnaces from Forth Shipbuilding and Engineering, Glasgow, 4 July 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 27 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, LR stamp and signature J Barr, 2 July 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 14 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 28 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 26 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 17 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 16790, 28 August 1925 1925, Report of Survey for Repairs on Stettin, 25 August 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 August 1925 1925, Memo regarding approving a steel cylinder cover on Stettin, 5 October 1925 1925, Letter from Leith Surveyor to Secretary, London, regarding steel cover repair examined, 2 October 1925 1925, Letter from Hamburg Office to Secretary, London, regarding request by Leith Surveyors, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding Hamburg report on Stettin, 1 October 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding their request for the Hamburg report, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to A Chisholm, requesting a report for the Leith Surveyors, 30 September 1925 1925, Translation of Cablegram sent to Surveyors at Hamburg, 30 September 1925 1925, Copy of Cablegram from London Office to Hamburg Office, 30 September 1925 1925, Letter from Leith Surveyors, per A T T[homas], to London Office asking for a Hamburg report to be sent to them, 29 September 1925 1925, London Office Copy of document certifying that Hamburg surveyor has examined damage and transmitted the Report, and stating his Recommendations, 25 September 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 September 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 16897, March 1926 1926, Report of Survey for Repairs to Stettin, 30 March 1926 1926, Report of Survey for Repairs of Engines and Boilers to Stettin, 30 March 1926 1926, Report of Survey for Repairs to Stettin, 15 June 1927 1927, Report of Survey for Repairs of Engines and Boilers to Stettin, 15 June 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 17291, 8 December 1927 1927, Copy of Certificate of Survey after damage to Stettin by a breaker in heavy weather, 23 November 1927 1927, Report of Survey for Repairs to Stettin, 3 December 1927 1927, Question and Answer memo between London and Leith Offices regarding Hamburg Report 17858, 21 February 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 1 February 1928 1928, Correspondence memo with particulars from Leith Surveyors to Secretary, London, regarding return of report, 27 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 25 January 1928 1928, Copy of Certificate of Survey from Hamburg after collision damage suffered by Stettin, 22 January 1928 1928, Report of Survey for Repairs of Stettin, 23 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 17339, 15 March 1928 1928, Report of Survey for Repairs of Stettin, 5 March 1928 1928, Copy of letter from the Clerk of the Classification Committee to James Currie and Co, with a copy to the Leith Office, regarding 6th Special Survey of Stettin, 14 December 1928 1928, Postponed Survey form for Stettin's 6th Special Survey, 13 December 1928 1928, Letter from James Currie and Co to Lloyd's Register Secretary, London, regarding deferring Stettin's 6th Special Survey, 11 December 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage, in reference to Dundee Report 8638, 30 March 1928 1928, Copy of Certificate of Survey regarding damage and report of repairs to Stettin's port bow shell plating, Dundee, 23 March 1928 1928, Report of Survey for Repairs to Stettin, 23 March 1928 1928, Letter from Lloyd's Register Engineer Surveyor to James Currie and Co regarding schedule for survey of Stettin's propeller shaft, 5 March 1929 1929, Copy of letter from the Secretary, London, to the Secretary, Glasgow, returning Stettin boiler plans, 29 May 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin and 6th Special Survey, in reference to Leith Report 17540, 13 March 1929 1929, Report of Survey for Repairs of Stettin, 5 March 1929 1929, Report of Survey for Repairs of Engines and Boilers for Stettin, 5 March 1929 1929, Copy of letter from pro Secretary, London, to Leith Surveyors regarding examination of Stettin's screwshaft, 16 April 1930 1930, Postponed Survey form for Stettin's screwshaft, 14 April 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 9 April 1930 1930, Copy of letter from Secretary, London, to Leith Surveyors informing them Committee are agreeable to postponing Stettin's screwshaft survey, 25 February 1930 1930, Postponed Survey form for Stettin's screwshaft, 24 February 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 17 February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 17802, 22 May 1930 1930, Report of Survey for Repairs to Stettin, 15 May 1930 1930, Report on Engine Forgings for Stettin, 8 May 1930 1930, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 May 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 18082, 2 November 1931 1931, Form or memo from Secretary, Glasgow, to Secretary, London, regarding presence of Stettin, 16 October 1931 1931, Question and Answer memo from Secretary, London, to Leith Surveyors regarding Stettin Boiler Survey, 5 October 1931 1931, Copy of letter from pro Secretary, London, with copy to Leith, to James Currie and Co regarding postponing Stettin Boiler Survey, 26 June 1931 1931, Postponed Surveys form for Stettin's Boiler Survey, 25 June 1931 1931, Letter from James Currie and Co regarding postponing Boiler Survey due on Stettin, 20 June 1931 1931, Report of Survey for Repairs on Stettin, 26 October 1931 1931, Report of Survey for Repairs of Engines and Boilers on Stettin, 26 October 1931 1931, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of survey for Stettin, 23 December 1932 1932, Postponed Surveys form for Stettin, 22 December 1932 1932, Letter from Leith Surveyors per John Houston to the Secretary, London, regarding outstanding survey on Stettin, 17 December 1932 1932, Letter from James Currie and Co to Leith Surveyors regarding schedule of survey for Stettin, 16 December 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 14 December 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 24 November 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 September 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 21 June 1932 1932, Postponed Surveys form for Stettin, 20 June 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 June 1932 1932, Copy of letter from pro Secretary, London to Leith Surveyors regarding Stettin boiler survey schedule, 9 October 1931 1932, Postponed Surveys form for Stettin, 8 October 1931 1932, Report of Total Loss, Casualty, , for Stettin, which has been sold to be broken up, 4 December 1933 1933, Letter from Leith Surveyors, per John Houston, to Secretary, London, informing them Stettin is being broken up, 1 December 1933 1933, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of demolition for Stettin, 27 November 1933 1933, Copy of letter from Leith Surveyors, per John Houston, to the Secretary, London, regarding the firm to which Stettin was sold to be broken up, 24 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 23 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 31 August 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 15 June 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 16 March 1933 1933, Note related to Stettin stating SS no. 2 held now posting no date, Note regarding Stettin stating "Vessel left Lisbon Oct 3. + 3 mos from dats. of survey would expire 12/15" no date, Sketch or plan of steel cover part for Stettin no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Barclay, Curle & Co Ltd ( Certificate for vessels navigated by Steam for Stettin, 30 November 1864 1864, Iron Ship survey report for Stettin, 2 December 1864 1864, Letter from Glasgow surveyor to the Secretary sending the machinery certificate and Stettin's report of survey no. 4255, 8 July 1876 1876, Report of survey for repairs for Stettin, 8 July 1876 1876, Memo from Messrs Napier Ltd. stating that Stettin's boilers are fitted in accordance with the Committee requirements and should have the notification Lloyd's MC in the Register Book, 3 July 1876 1876, Details of main boilers of Stettin, 29 June 1876 1876, Engineer surveyor's report on machinery for Stettin, 26 June 1876 1876, Annual surveys for Stettin, 30 November 1876 1876, Report of survey for repairs for Stettin, 16 January 1879 1879, Report of survey for repairs of engines and boilers for Stettin, 16 January 1880 1880, Cover note for reports number 4308 and 57 of Stettin, 31 January 1880 1880, Report of survey for repairs for Stettin, 28 January 1880 1880, Report of survey for repairs for Stettin, 2 February 1881 1881, Report of survey for repairs for Stettin, 27 January 1882 1882, Annual surveys for Stettin, 6 January 1883 1883, Annual surveys for Stettin, 23 January 1884 1884, Report of survey for repairs for Stettin, 30 January 1885 1885, Report of survey for repairs of engines and boilers for Stettin, 30 January 1885 1885, Report of survey for repairs for Stettin, 27 January 1886 1886, Report of survey for repairs of engines and boilers for Stettin, 30 January 1886 1886, Report of survey for repairs for Stettin, 26 February 1887 1887, Report of survey for repairs of engines and boilers for Stettin, 15 March 1887 1887, Report of survey for repairs for Stettin, 21 May 1888 1888, Report of survey for repairs of engines and boilers for Stettin, 25 May 1888 1888, Report of survey for repairs for Stettin, 29 December 1888 1888, Particulars for record of double bottoms in Lloyd's Register for Stettin, 5 December 1889 1889, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 10 December 1889 1889, Report of Survey for Repairs for Stettin, 6 December 1889 1889, Report on Machinery for Stettin, 3 December 1889 1889, Report of Survey for Repairs for Stettin, 18 October 1890 1890, Report of Survey for Repairs for Stettin, 6 November 1891 1891, Report of Survey for Repairs for Stettin, 16 January 1893 1893, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 19 February 1894 1894, Report of survey for repairs for Stettin, 12 February 1894 1894, Report of survey for repairs of engines and boilers for Stettin, 13 February 1894 1894, Letter from the surveyor Jas Barclay to the Secretary in London enclosing a letter received from the Master of Stettin about the boiler survey to be held at Bergen, 9 June 1894 1894, Letter from the Master of Stettin Otto E Jacobsen to the surveyor James Barclay about the survey of boilers to take place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to E Rusten, owner of Stettin, stating he agrees with the survey of boilers taking place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to Bergen surveyor stating that Stettin will have the survey of boilers carried out in Bergen, 8 June 1894 1894, Note stating the boiler survey for Stettin is due to April and the owners state the ship will be at Bergen where the survey will take place, 8 June 1894 1894, Letter from Erik Rusten, owner of Stettin, to Lloyd's Register stating that he wishes the survey of boilers to take place in Bergen, 4 June 1894 1894, Report of Survey for repairs of engines and boilers for Stettin, 12 July 1894 1894, Report of survey for repairs for Stettin, 6 February 1895 1895, Report of survey for repairs of engines and boilers for Stettin, 6 February 1895 1895, Report of survey for repairs for Stettin, 19 March 1896 1896, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin about the survey of boilers, 23 March 1896 1896, Letter from Leith surveyor to the Secretary stating that the Stettin is under survey, 5 March 1896 1896, Letter from the Secretary to the Leith Surveyor questioning about the survey of Stettin, 3 March 1896 1896, Copy of Letter from the Secretary to the owner of Stettin stating that he agrees with the boiler survey of that ship being carried out when she is in dry dock in the following month, 29 January 1896 1896, Note stating the boiler survey for Stettin will be in dry dock in the following month, 29 January 1896 1896, Letter from the owner of Stettin to the Secretary stating the ship will be in dry dock next month for the survey, 27 January 1896 1896, Report of survey for repairs of engines and boilers for Stettin, 19 March 1896 1896, Report of survey for repairs for Stettin, 19 March 1897 1897, Letter from the Leith surveyor to the Secretary stating that Stettin is now employed in the emigrant trade and therefore the pressure of boiler has been reduced, 24 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 19 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 26 July 1897 1897, Remarks of the Chief Surveyor to the Classing Committee about the special survey of the ship Stettin, 4 March 1898 1898, Copy of letter from the Secretary to the owners of Stettin stating that the special survey will take place when the ship is placed in dry dock, 3 February 1898 1898, Note stating the ship Stettin will be soon in dry dock to be surveyed, 3 February 1898 1898, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating their intention to put the ship in dry dock to be surveyed, 1 February 1898 1898, Report of survey for repairs for Stettin, 3 March 1898 1898, Report of survey for repairs of engines and boilers for Stettin, 3 March 1898 1898, Remarks of the Chief Surveyor to the Classing Committee about the damage and temporary repairs suffered by Stettin, 31 March 1898 1898, Letter from the Bremerhaven surveyor about the repairs to Stettin, 29 March 1898 1898, Cover note for report number 534 of Stettin, 1 April 1898 1898, Report of survey for repairs for Stettin, 28 March 1898 1898, Remarks of the Ship Surveyor to the Classing Committee saying the damage to Stettin has been repaired and she should remain classed, 6 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1899 1899, Report of survey for repairs of engines and boilers for Stettin, 5 April 1899 1899, Report of survey for repairs for Stettin, 28 April 1900 1900, Report of survey for repairs of engines and boilers for Stettin, 28 April 1900 1900, Report of survey for repairs for Stettin, 2 May 1901 1901, Report of survey for repairs of engines and boilers for Stettin, 2 May 1901 1901, Remarks of the Ship Surveyor to the Classing Committee about the special survey of Stettin and the particulars of her plating, 7 April 1902 1902, Report of survey for repairs for Stettin, 4 April 1902 1902, Copy of letter from the Secretary to the owners of Stettin statin the Committee agreed with the special survey being carried out in the next two months, 31 January 1902 1902, Postponed survey form for Stettin, 30 January 1902 1902, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating they expect to attend the special survey within the next two months, 29 January 1902 1902, Report of survey for repairs of engines and boilers for Stettin, 4 April 1902 1902, Report of survey for repairs for Stettin, 11 May 1903 1903, Copy of letter from the Secretary to Leith Surveyors stating that the steamer Stettin has been booked for the annual boiler survey that will take place in a few days, 7 April 1903 1903, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the annual overhaul has been booked for that next few days, 4 April 1903 1903, Report of survey for repairs of engines and boilers for Stettin, 11 May 1903 1903, Report of survey for repairs for Stettin, 29 June 1904 1904, Report of survey for repairs of engines and boilers for Stettin, 29 June 1904 1904, Report of survey for repairs for Stettin, 11 July 1905 1905, Report of survey for repairs of engines and boilers for Stettin, 11 July 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the damage and repairs to Stettin, 24 August 1905 1905, Report of survey for repairs for Stettin, 22 August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the special survey no.1 of Stettin, 26 July 1906 1906, Copy of letter from the Secretary to Leith Surveyors stating that Stettin will be in dry dock on her arrival from Konigsberg when the special survey no.1 will be carried out, 22 June 1906 1906, Copy of letter from the Secretary to the owners of Stettin stating that the special survey no.1 will be carried out next week in Leith, 22 June 1906 1906, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the special survey no.1 will be carried out in the next week on her arrival from Konigsberg, 20 June 1906 1906, Report of survey for repairs for Stettin, 23 July 1906 1906, Report of survey for repairs of engines and boilers for Stettin, 24 July 1906 1906, Report of survey for repairs for Stettin, 16 July 1907 1906, Report of survey for repairs of engines and boilers for Stettin, 16 July 1907 1906, Report of survey for repairs for Stettin, 19 September 1908 1908, Copy of letter from the Secretary to Leith Surveyors stating that Stettin is laid up for overhaul and that the boiler survey should be carried out, 8 September 1908 1908, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the steamer is laid up for overhaul and that the special survey of boilers should take place next week, 5 September 1908 1908, Report of survey for repairs of engines and boilers for Stettin, 19 September 1908 1908, Report of survey for repairs for Stettin, 2 October 1909 1909, Report of survey for repairs of engines and boilers for Stettin, 2 October 1909 1909, Plan of Rudder of Stettin, 1910. Scale 1"=one foot. Details 3"= one foot, 19 September 1910 1910, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding the special survey no. 2 and boiler survey for Stettin, 29 October 1910 1910, Letter from Leith Surveyor to the Secretary stating that they met with the owners of Stettin and arranged the special survey no. 2 to be carried out after the New Year holidays, 28 November 1910 1910, Copy of letter from the Secretary to Leith Surveyors regarding the report no. 13106 for Stettin and asking when the ship's owners expect the special survey no.2 to be carried out, 25 November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee about damage and repairs made to Stettin after grounding, 7 October 1910 1910, Postponed survey form for Stettin, 27 June 1910 1910, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating the special survey no.2 will be carried out in Leith in September, 23 October 1910 1910, Report of survey for repairs for Stettin, 5 October 1910 1910, Report of survey for repairs of engines and boilers for Stettin, 21 October 1910 1910, Report of Ship forgings or castings for Stettin, 30 September 1910 1910, Note about the sketch of rudder for Stettin, 19 September 1910 1910, Letter from Leith surveyors to the Secretary regarding the plan of rudder for Stettin to be approved by the Committee, 16 September 1910 1910, Copy of letter from Secretary, Lloyd's Register London, to James Currie and Co, regarding agreement for date of carrying out special survey, 28 June 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the special survey no.2 for Stettin and the repairs made, 6 June 1911 1911, Report of survey for repairs for Stettin, 3 June 1911 1911, Report of survey for repairs of engines and boilers for Stettin, 3 June 1911 1911, Copy of letter from the Assistant to the Secretary to the owners of Stettin, James Currie & Co, regarding the boiler survey to take place in about two months' time, 12 July 1912 1912, Report of survey for repairs for Stettin, 17 August 1912 1912, Postponed survey form for Stettin, 11 July 1912 1912, Letter from the owners of Stettin to the Secretary regarding the ship special survey and boilers survey, 9 July 1912 1912, Report of survey for repairs of engines and boilers for Stettin, 17 August 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the conditions of Stettin after repair, 29 December 1913 1913, Report of survey for repairs for Stettin, 27 December 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of Stettin taking place in three weeks’ time, 14 November 1913 1913, Postponed survey form for Stettin, 13 November 1913 1913, Letter from Leith surveyors to the Secretary regarding the survey of Stettin, 8 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin, 7 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin being carried out after the strike of the boilers makers, 9 November 1913 1913, Postponed survey form for Stettin, 8 September 1913 1913, Letter from Leith surveyors to the Secretary regarding the postpone of survey of Stettin due to the boilers makers strike, 5 September 1913 1913, Copy of letter from the Secretary to Leith surveyors regarding the survey of screw shaft of Stettin, 3 September 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating the Committee has agreed with the survey being carried out next month, 4 September 1913 1913, Postponed survey form for Stettin, 3 September 1913 1913, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft, 2 July 1913 1913, Report of survey for repairs of engines and boilers for Stettin, 27 December 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with postponing the special survey, 9 June 1914 1914, Postponed survey form for Stettin, 8 June 1914 1914, Letter from Leith surveyors to the Secretary regarding the special survey of Stettin, 4 June 1914 1914, Copy of letter from the Secretary to Leith surveyors enclosing a letter sent by the owners of Stettin about her fourth special survey no. 3, 3 June 1914 1914, Postponed survey form for Stettin, 2 June 1914 1914, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding postponing the second special survey no. 3 of Stettin, 29 May 1914 1914, Report of survey for repairs of engines and boilers for Stettin, 2 July 1915 1915, Copy of letter from the Secretary to Newcastle-on-Tyne surveyors regarding the special survey of Stettin, 12 August 1913 1915, Letter from Aberdeen surveyors to the Secretary stating that Stettin has sailed to Newcastle-on-Tyne as she failed to obtain docking facilities at that port, 10 August 1915 1915, Remarks to the Chief Ship Surveyor regarding the fourth special survey no. 3 for Stettin, 13 July 1915 1915, Copy of letter from the Secretary to the Surveyors in Hull, Grimsby, Middlesbrough, Newcastle, Sunderland and Hartlepool, regarding the fourth special survey no. 3 of Stettin, which will be carried out at some East coast port, 19 July 1915 1915, Letter from Leith surveyors to the Secretary regarding the survey of Stettin to be carried out at some East coast port, 12 July 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the fourth special survey no. 3 for Stettin, 5 July 1915 1915, Report of survey for repairs for Stettin, 2 July 1915 1915, Letter from Leith surveyors to the Secretary stating that the special survey of Stettin is being carried out at that port, 22 May 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 for Stettin, 21 May 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding her survey, 20 April 1915 1915, Extract from a letter dated 15 April 1915 from James Currie & Co regarding surveying Stettin. Extract dated 16 April 1915 1915, Letter from Leith surveyors to the Secretary stating that they had spoken to the owners of Stettin and due to a shortage of labour it has been difficult to find a dry dock to carry out the special survey, 13 April 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the importance of carrying out the special survey due to the age of the ship, 13 April 1915 1915, Postponed survey form for Stettin, 12 April 1915 1915, Copy of letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding the survey of Stettin being postponed, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 of Stettin, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors enclosing information about the communication between the owners of Stettin, 26 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with the special survey being carried out in the next two or three months, 26 January 1915 1915, Postponed survey form for Stettin, 25 January 1915 1915, Letter from Leith surveyors to the Secretary regarding the special survey no.3 and boiler survey of Stettin, 23 January 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding postponing the survey of Stettin, 21 January 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the fourth special survey no.3 and special annual boiler survey of Stettin, 20 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the letter sent by the latter about the thrust shaft, 1 November 1915 1915, Letter from Lisbon surveyors to the Secretary about the repair of shaft of Stettin, 25 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 28 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 23 October 1915 1915, Copy of letter from the Assistant to the Secretary to Lisbon surveyors regarding the repair of Stettin's thrust shaft being not satisfactory, 18 October 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the new thrust shaft she received in Lisbon, 1916 1915, Letter reporting that the new thrust shaft for Stettin is not considered satisfactory, 14 October 1915 1915, London Office Copy of document certifying that surveyor has examined the machinery of Stettin and stating his recommendations, 4 October 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 6 October 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 67857, 19 August 1915 1915, Report of Survey for Repairs for Stettin, 18 August 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 August 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the thrust shaft supplied in Lisbon and if it will be approved by the Committee as a permanent repair, 29 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon and stating that it will be approved by the Committee as a permanent repair, 28 April 1916 1916, Letter reporting the results of the test carried out on Stettin's new thrust shaft that was made in Lisbon, 27 April 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the result of the tests carried out on the new thrust shaft, 14 April 1916 1916, Letter from Professor R Stanfield to James Currie & Co regarding the results of the test of the transverse section of the shaft of Stettin, 11 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Letter reporting that Stettin's new thrust shaft is not satisfactory to be recommended as a permanent repair, 22 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin stating that the repair of the thrust shaft is being looked at, 14 March 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary enclosing drawings and plans of the shaft of Stettin, 6 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the repair of the thrust shaft, 28 January 1916 1916, Postponed survey form for Stettin, 22 January 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft of Stettin, 24 January 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding when the ship will be in position to have the thrust shaft examined, 21 January 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to London Report 79106, 13 July 1917 1916, Report of Survey for Repairs for Stettin due to collision with ice, 1 July 1916 1916, Report of Survey for Repairs of Engines and Boilers for Stettin, 14 July 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70096, 27 July 1917 1917, London Office Copy of document certifying that surveyor has examined damage and transmitted the Report, and stating his Recommendations, 24 July 1917 1917, Report of Survey for Repairs for Stettin 1917, Letter from Newcastle surveyors informing Lloyd's Register London that Stettin is under survey at Newcastle, 21 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding whether Stettin has yet come under inspection, 20 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding their report 70069, and Stettin's owners' intention to make repairs at South Shields within the next couple of days, and calling attention to the need for the Annu 1917, Letter from James Currie & Co Managers, informing Lloyd's Register London that they have arranged for repairs of damage previously communicated by Smith's Dry Dock Co, South Shields, on the steamer's return there in the next day or two, 1 August 1917 1917, Copy of letter from Lloyd's Register's London Secretary to James Currie and Co, informing them of the damage done to Stettin when striking a quay wall, that temporary repairs have been effected but that for the vessel to remain in class permanent repairs 1917, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70306, 2 October 1917 1917, Report of Survey for Repairs for Stettin, 29 September 1917 1917, Report of Survey for Repairs of Engines and Boilers for Stettin, 1 October 1917 1917, Certificate of approval of a stockless anchor, with cancelled written across it, 4 September 1917 1917, Correspondence to Lloyd's Register's London Secretary regarding Stettin Report 71400, acknowledging remarks on the Rules for Engines and Boilers with a working pressure of less than 60lbs, 23 November 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 71400, 19 November 1918 1918, Report of survey for repairs of Stettin, 5 November 1918 1918, Memo to Newcastle surveyors regarding Rules for Engines and Boilers of a greater working pressure than 60lbs per square inch, 18 November 1918 1918, Report of Survey for Repairs of Boilers and Engines of Stettin, 13 November 1918 1918, Copy of letter from London Secretary to James Currie and Co regarding state or survey of Stettin, 17 October 1919 1919, Postponed Survey form for Stettin, October 1919 1919, Letter from James Currie and Co to Secretary, Lloyd's Register London, regarding postponing survey of Stettin, 10 October 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Leith Report 15769, 2 July 1920 1920, Report of Survey for Repairs of Stettin, 28 June 1920 1920, Copy of letter from Lloyd's Register London Secretary to Leith Surveyors, 30 March 1920 1920, Postponed Survey form for Stettin, 29 March 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 24 March 1920 1920, Copy of Letter from Lloyd's Register London Secretary to Leith Surveyors, 19 March 1920 1920, Letter from the Surveyors at Hull, per N Rowall, to London Secretary regarding state of survey of Stettin, 18 March 1920 1920, Copy of letter from the London Secretary to the Hull Surveyors regarding state of survey of Stettin, 17 March 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 10 February 1920 1920, Postponed Survey form for Stettin, 9 February 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 5 February 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 28 January 1920 1920, Report of Survey for Repairs of Engines and Boilers for Stettin, 28 June 1920 1920, Copy of letter from the Secretary to the owners of Stettin saying the Committee has agreed with postponing the boiler survey, 23 August 1921 1921, Report of Survey for Repairs of Stettin, 16 September 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London regarding Stettin now undergoing survey, 3 September 1921 1921, Postponed Surveys form for Stettin, 22 August 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London explaining why Stettin had not undergone survey, 18 August 1921 1921, Report of Survey for Repairs of Engines and Boilers for Stettin, 16 September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Stettin survey, with reference to Leith Report 16187, 6 October 1921 1922, Report of Survey for Repairs of Stettin, 3 October 1921 1922, Correspondence of Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding ongoing surveys on Stettin, 14 September 1922 1922, Copy of letter from Lloyd's Register London Assistant to the Secretary to Leith Surveyors regarding survey of Stettin's screwshaft, 21 July 1922 1922, Postponed Surveys form for Stettin, 20 July 1922 1922, Letter from Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding proposed survey date for Stettin's screw shaft, 17 July 1922 1922, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans of owners of Stettin for survey of screwshaft, 14 July 1922 1922, Report of Survey for Repairs of Boilers and Engines for Stettin, 26 September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding carrying out part of Stettin's Special Survey, with reference to Leith Report 16388, 30 October 1923 1923, Report of Survey for Repairs of Stettin, 24 October 1923 1923, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors, regarding Rule requirements for cables, 20 October 1923 1923, Remarks to the Chief Ship Surveyor regarding Rule requirements for cables, 19 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London requesting clarification on Rules for chains, 18 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London regarding proposed timeline for survey, 22 September 1923 1923, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding letter from Stettin's owners and requesting clarification of when the boiler survey shall be held, 21 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London, regarding carrying out a part survey, 18 September 1923 1923, Copy of letter from Assistant to the Secretary to James Currie and Co regarding schedule for surveys of Stettin, 14 September 1923 1923, Postponed Surveys form for Stettin, 13 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London querying survey schedule of Stettin, 10 September 1923 1923, Report of Survey for Repairs of Engines and Boilers for Stettin, 23 October 1923 1923, Letter from Leith Surveyor A T Thomas to James Currie and Co, informing them of future survey schedule for Stettin, 23 October 1923 1923, Plan of Main Boiler for Stettin, 24 May 1924 1924, Plan of Donkey Boiler for Stettin, 24 May 1924 1924, Hatch Plan of Stettin, 2 October 1924 1924, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Stettin, with reference to Leith Report 16388, 19 May 1924 1924, Letter from A T Thomas, Leith Surveyor, to J F Hill of London, regarding surveying Stettin, 16 May 1924 1924, Extract from a letter dated 14 May 1924 from Leith surveyors regarding examining Stettin. Extract dated 15 May 1924 1924, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans for survey of Stettin and expiry of year of grace, 14 May 1924 1924, Letter from Leith surveyor A T Thomas to Secretary, London, regarding proposed examination part of Stettin's combustion chamber, 18 April 1924 1924, Copy of letter from Assistant to the Secretary to the Leith surveyors questioning owners' arrangements to have Stettin's combustion chamber examined, 16 April 1924 1924, Report of Survey for Repairs of Engines and Boilers for Stettin, 12 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding fulfilment of special survey on Stettin, in reference to Leith Report 16611, 22 November 1924 1924, Report of Survey for Repairs of Stettin, 15 November 1924 1924, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 November 1924 1924, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding completion of reports on Stettin's new boilers, 31 October 1924 1924, Note submitting that certain reports be forwarded to the Leith Surveyors for their guidance and completion, 29 October 1924 1924, Note submitting that the amended plans of boilers for Stettin merit approval, 29 May 1924 1924, Correspondence accompanying boiler plans submitted for approval for Stettin from the Glasgow office to London, 26 May 1924 1924, Letter from Jas S Cairns submitting for approval plans for new boilers for the Stettin to the Glasgow Secretary, 26 May 1924 1924, Note submitting that plans for Stettin's boilers merit approval, 24 April 1924 1924, Letter from Leith Surveyors, per A T T[homas], to Secretary, London, noting they are forwarding plans of new boilers intended for Stettin, 14 April 1924 1924, Report on Main Boiler for Stettin, 11 October 1924 1924, Report on Donkey Boiler for Stettin, 11 October 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Delivery note for 3 furnaces from Forth Shipbuilding and Engineering, Glasgow, 4 July 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 27 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, LR stamp and signature J Barr, 2 July 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 14 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 28 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 26 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 17 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 16790, 28 August 1925 1925, Report of Survey for Repairs on Stettin, 25 August 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 August 1925 1925, Memo regarding approving a steel cylinder cover on Stettin, 5 October 1925 1925, Letter from Leith Surveyor to Secretary, London, regarding steel cover repair examined, 2 October 1925 1925, Letter from Hamburg Office to Secretary, London, regarding request by Leith Surveyors, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding Hamburg report on Stettin, 1 October 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding their request for the Hamburg report, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to A Chisholm, requesting a report for the Leith Surveyors, 30 September 1925 1925, Translation of Cablegram sent to Surveyors at Hamburg, 30 September 1925 1925, Copy of Cablegram from London Office to Hamburg Office, 30 September 1925 1925, Letter from Leith Surveyors, per A T T[homas], to London Office asking for a Hamburg report to be sent to them, 29 September 1925 1925, London Office Copy of document certifying that Hamburg surveyor has examined damage and transmitted the Report, and stating his Recommendations, 25 September 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 September 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 16897, March 1926 1926, Report of Survey for Repairs to Stettin, 30 March 1926 1926, Report of Survey for Repairs of Engines and Boilers to Stettin, 30 March 1926 1926, Report of Survey for Repairs to Stettin, 15 June 1927 1927, Report of Survey for Repairs of Engines and Boilers to Stettin, 15 June 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 17291, 8 December 1927 1927, Copy of Certificate of Survey after damage to Stettin by a breaker in heavy weather, 23 November 1927 1927, Report of Survey for Repairs to Stettin, 3 December 1927 1927, Question and Answer memo between London and Leith Offices regarding Hamburg Report 17858, 21 February 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 1 February 1928 1928, Correspondence memo with particulars from Leith Surveyors to Secretary, London, regarding return of report, 27 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 25 January 1928 1928, Copy of Certificate of Survey from Hamburg after collision damage suffered by Stettin, 22 January 1928 1928, Report of Survey for Repairs of Stettin, 23 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 17339, 15 March 1928 1928, Report of Survey for Repairs of Stettin, 5 March 1928 1928, Copy of letter from the Clerk of the Classification Committee to James Currie and Co, with a copy to the Leith Office, regarding 6th Special Survey of Stettin, 14 December 1928 1928, Postponed Survey form for Stettin's 6th Special Survey, 13 December 1928 1928, Letter from James Currie and Co to Lloyd's Register Secretary, London, regarding deferring Stettin's 6th Special Survey, 11 December 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage, in reference to Dundee Report 8638, 30 March 1928 1928, Copy of Certificate of Survey regarding damage and report of repairs to Stettin's port bow shell plating, Dundee, 23 March 1928 1928, Report of Survey for Repairs to Stettin, 23 March 1928 1928, Letter from Lloyd's Register Engineer Surveyor to James Currie and Co regarding schedule for survey of Stettin's propeller shaft, 5 March 1929 1929, Copy of letter from the Secretary, London, to the Secretary, Glasgow, returning Stettin boiler plans, 29 May 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin and 6th Special Survey, in reference to Leith Report 17540, 13 March 1929 1929, Report of Survey for Repairs of Stettin, 5 March 1929 1929, Report of Survey for Repairs of Engines and Boilers for Stettin, 5 March 1929 1929, Copy of letter from pro Secretary, London, to Leith Surveyors regarding examination of Stettin's screwshaft, 16 April 1930 1930, Postponed Survey form for Stettin's screwshaft, 14 April 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 9 April 1930 1930, Copy of letter from Secretary, London, to Leith Surveyors informing them Committee are agreeable to postponing Stettin's screwshaft survey, 25 February 1930 1930, Postponed Survey form for Stettin's screwshaft, 24 February 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 17 February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 17802, 22 May 1930 1930, Report of Survey for Repairs to Stettin, 15 May 1930 1930, Report on Engine Forgings for Stettin, 8 May 1930 1930, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 May 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 18082, 2 November 1931 1931, Form or memo from Secretary, Glasgow, to Secretary, London, regarding presence of Stettin, 16 October 1931 1931, Question and Answer memo from Secretary, London, to Leith Surveyors regarding Stettin Boiler Survey, 5 October 1931 1931, Copy of letter from pro Secretary, London, with copy to Leith, to James Currie and Co regarding postponing Stettin Boiler Survey, 26 June 1931 1931, Postponed Surveys form for Stettin's Boiler Survey, 25 June 1931 1931, Letter from James Currie and Co regarding postponing Boiler Survey due on Stettin, 20 June 1931 1931, Report of Survey for Repairs on Stettin, 26 October 1931 1931, Report of Survey for Repairs of Engines and Boilers on Stettin, 26 October 1931 1931, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of survey for Stettin, 23 December 1932 1932, Postponed Surveys form for Stettin, 22 December 1932 1932, Letter from Leith Surveyors per John Houston to the Secretary, London, regarding outstanding survey on Stettin, 17 December 1932 1932, Letter from James Currie and Co to Leith Surveyors regarding schedule of survey for Stettin, 16 December 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 14 December 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 24 November 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 September 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 21 June 1932 1932, Postponed Surveys form for Stettin, 20 June 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 June 1932 1932, Copy of letter from pro Secretary, London to Leith Surveyors regarding Stettin boiler survey schedule, 9 October 1931 1932, Postponed Surveys form for Stettin, 8 October 1931 1932, Report of Total Loss, Casualty, , for Stettin, which has been sold to be broken up, 4 December 1933 1933, Letter from Leith Surveyors, per John Houston, to Secretary, London, informing them Stettin is being broken up, 1 December 1933 1933, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of demolition for Stettin, 27 November 1933 1933, Copy of letter from Leith Surveyors, per John Houston, to the Secretary, London, regarding the firm to which Stettin was sold to be broken up, 24 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 23 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 31 August 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 15 June 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 16 March 1933 1933, Note related to Stettin stating SS no. 2 held now posting no date, Note regarding Stettin stating "Vessel left Lisbon Oct 3. + 3 mos from dats. of survey would expire 12/15" no date, Sketch or plan of steel cover part for Stettin no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Glasgow ( Certificate for vessels navigated by Steam for Stettin, 30 November 1864 1864, Iron Ship survey report for Stettin, 2 December 1864 1864, Letter from Glasgow surveyor to the Secretary sending the machinery certificate and Stettin's report of survey no. 4255, 8 July 1876 1876, Report of survey for repairs for Stettin, 8 July 1876 1876, Memo from Messrs Napier Ltd. stating that Stettin's boilers are fitted in accordance with the Committee requirements and should have the notification Lloyd's MC in the Register Book, 3 July 1876 1876, Details of main boilers of Stettin, 29 June 1876 1876, Engineer surveyor's report on machinery for Stettin, 26 June 1876 1876, Annual surveys for Stettin, 30 November 1876 1876, Report of survey for repairs for Stettin, 16 January 1879 1879, Report of survey for repairs of engines and boilers for Stettin, 16 January 1880 1880, Cover note for reports number 4308 and 57 of Stettin, 31 January 1880 1880, Report of survey for repairs for Stettin, 28 January 1880 1880, Report of survey for repairs for Stettin, 2 February 1881 1881, Report of survey for repairs for Stettin, 27 January 1882 1882, Annual surveys for Stettin, 6 January 1883 1883, Annual surveys for Stettin, 23 January 1884 1884, Report of survey for repairs for Stettin, 30 January 1885 1885, Report of survey for repairs of engines and boilers for Stettin, 30 January 1885 1885, Report of survey for repairs for Stettin, 27 January 1886 1886, Report of survey for repairs of engines and boilers for Stettin, 30 January 1886 1886, Report of survey for repairs for Stettin, 26 February 1887 1887, Report of survey for repairs of engines and boilers for Stettin, 15 March 1887 1887, Report of survey for repairs for Stettin, 21 May 1888 1888, Report of survey for repairs of engines and boilers for Stettin, 25 May 1888 1888, Report of survey for repairs for Stettin, 29 December 1888 1888, Particulars for record of double bottoms in Lloyd's Register for Stettin, 5 December 1889 1889, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 10 December 1889 1889, Report of Survey for Repairs for Stettin, 6 December 1889 1889, Report on Machinery for Stettin, 3 December 1889 1889, Report of Survey for Repairs for Stettin, 18 October 1890 1890, Report of Survey for Repairs for Stettin, 6 November 1891 1891, Report of Survey for Repairs for Stettin, 16 January 1893 1893, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 19 February 1894 1894, Report of survey for repairs for Stettin, 12 February 1894 1894, Report of survey for repairs of engines and boilers for Stettin, 13 February 1894 1894, Letter from the surveyor Jas Barclay to the Secretary in London enclosing a letter received from the Master of Stettin about the boiler survey to be held at Bergen, 9 June 1894 1894, Letter from the Master of Stettin Otto E Jacobsen to the surveyor James Barclay about the survey of boilers to take place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to E Rusten, owner of Stettin, stating he agrees with the survey of boilers taking place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to Bergen surveyor stating that Stettin will have the survey of boilers carried out in Bergen, 8 June 1894 1894, Note stating the boiler survey for Stettin is due to April and the owners state the ship will be at Bergen where the survey will take place, 8 June 1894 1894, Letter from Erik Rusten, owner of Stettin, to Lloyd's Register stating that he wishes the survey of boilers to take place in Bergen, 4 June 1894 1894, Report of Survey for repairs of engines and boilers for Stettin, 12 July 1894 1894, Report of survey for repairs for Stettin, 6 February 1895 1895, Report of survey for repairs of engines and boilers for Stettin, 6 February 1895 1895, Report of survey for repairs for Stettin, 19 March 1896 1896, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin about the survey of boilers, 23 March 1896 1896, Letter from Leith surveyor to the Secretary stating that the Stettin is under survey, 5 March 1896 1896, Letter from the Secretary to the Leith Surveyor questioning about the survey of Stettin, 3 March 1896 1896, Copy of Letter from the Secretary to the owner of Stettin stating that he agrees with the boiler survey of that ship being carried out when she is in dry dock in the following month, 29 January 1896 1896, Note stating the boiler survey for Stettin will be in dry dock in the following month, 29 January 1896 1896, Letter from the owner of Stettin to the Secretary stating the ship will be in dry dock next month for the survey, 27 January 1896 1896, Report of survey for repairs of engines and boilers for Stettin, 19 March 1896 1896, Report of survey for repairs for Stettin, 19 March 1897 1897, Letter from the Leith surveyor to the Secretary stating that Stettin is now employed in the emigrant trade and therefore the pressure of boiler has been reduced, 24 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 19 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 26 July 1897 1897, Remarks of the Chief Surveyor to the Classing Committee about the special survey of the ship Stettin, 4 March 1898 1898, Copy of letter from the Secretary to the owners of Stettin stating that the special survey will take place when the ship is placed in dry dock, 3 February 1898 1898, Note stating the ship Stettin will be soon in dry dock to be surveyed, 3 February 1898 1898, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating their intention to put the ship in dry dock to be surveyed, 1 February 1898 1898, Report of survey for repairs for Stettin, 3 March 1898 1898, Report of survey for repairs of engines and boilers for Stettin, 3 March 1898 1898, Remarks of the Chief Surveyor to the Classing Committee about the damage and temporary repairs suffered by Stettin, 31 March 1898 1898, Letter from the Bremerhaven surveyor about the repairs to Stettin, 29 March 1898 1898, Cover note for report number 534 of Stettin, 1 April 1898 1898, Report of survey for repairs for Stettin, 28 March 1898 1898, Remarks of the Ship Surveyor to the Classing Committee saying the damage to Stettin has been repaired and she should remain classed, 6 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1899 1899, Report of survey for repairs of engines and boilers for Stettin, 5 April 1899 1899, Report of survey for repairs for Stettin, 28 April 1900 1900, Report of survey for repairs of engines and boilers for Stettin, 28 April 1900 1900, Report of survey for repairs for Stettin, 2 May 1901 1901, Report of survey for repairs of engines and boilers for Stettin, 2 May 1901 1901, Remarks of the Ship Surveyor to the Classing Committee about the special survey of Stettin and the particulars of her plating, 7 April 1902 1902, Report of survey for repairs for Stettin, 4 April 1902 1902, Copy of letter from the Secretary to the owners of Stettin statin the Committee agreed with the special survey being carried out in the next two months, 31 January 1902 1902, Postponed survey form for Stettin, 30 January 1902 1902, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating they expect to attend the special survey within the next two months, 29 January 1902 1902, Report of survey for repairs of engines and boilers for Stettin, 4 April 1902 1902, Report of survey for repairs for Stettin, 11 May 1903 1903, Copy of letter from the Secretary to Leith Surveyors stating that the steamer Stettin has been booked for the annual boiler survey that will take place in a few days, 7 April 1903 1903, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the annual overhaul has been booked for that next few days, 4 April 1903 1903, Report of survey for repairs of engines and boilers for Stettin, 11 May 1903 1903, Report of survey for repairs for Stettin, 29 June 1904 1904, Report of survey for repairs of engines and boilers for Stettin, 29 June 1904 1904, Report of survey for repairs for Stettin, 11 July 1905 1905, Report of survey for repairs of engines and boilers for Stettin, 11 July 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the damage and repairs to Stettin, 24 August 1905 1905, Report of survey for repairs for Stettin, 22 August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the special survey no.1 of Stettin, 26 July 1906 1906, Copy of letter from the Secretary to Leith Surveyors stating that Stettin will be in dry dock on her arrival from Konigsberg when the special survey no.1 will be carried out, 22 June 1906 1906, Copy of letter from the Secretary to the owners of Stettin stating that the special survey no.1 will be carried out next week in Leith, 22 June 1906 1906, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the special survey no.1 will be carried out in the next week on her arrival from Konigsberg, 20 June 1906 1906, Report of survey for repairs for Stettin, 23 July 1906 1906, Report of survey for repairs of engines and boilers for Stettin, 24 July 1906 1906, Report of survey for repairs for Stettin, 16 July 1907 1906, Report of survey for repairs of engines and boilers for Stettin, 16 July 1907 1906, Report of survey for repairs for Stettin, 19 September 1908 1908, Copy of letter from the Secretary to Leith Surveyors stating that Stettin is laid up for overhaul and that the boiler survey should be carried out, 8 September 1908 1908, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the steamer is laid up for overhaul and that the special survey of boilers should take place next week, 5 September 1908 1908, Report of survey for repairs of engines and boilers for Stettin, 19 September 1908 1908, Report of survey for repairs for Stettin, 2 October 1909 1909, Report of survey for repairs of engines and boilers for Stettin, 2 October 1909 1909, Plan of Rudder of Stettin, 1910. Scale 1"=one foot. Details 3"= one foot, 19 September 1910 1910, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding the special survey no. 2 and boiler survey for Stettin, 29 October 1910 1910, Letter from Leith Surveyor to the Secretary stating that they met with the owners of Stettin and arranged the special survey no. 2 to be carried out after the New Year holidays, 28 November 1910 1910, Copy of letter from the Secretary to Leith Surveyors regarding the report no. 13106 for Stettin and asking when the ship's owners expect the special survey no.2 to be carried out, 25 November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee about damage and repairs made to Stettin after grounding, 7 October 1910 1910, Postponed survey form for Stettin, 27 June 1910 1910, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating the special survey no.2 will be carried out in Leith in September, 23 October 1910 1910, Report of survey for repairs for Stettin, 5 October 1910 1910, Report of survey for repairs of engines and boilers for Stettin, 21 October 1910 1910, Report of Ship forgings or castings for Stettin, 30 September 1910 1910, Note about the sketch of rudder for Stettin, 19 September 1910 1910, Letter from Leith surveyors to the Secretary regarding the plan of rudder for Stettin to be approved by the Committee, 16 September 1910 1910, Copy of letter from Secretary, Lloyd's Register London, to James Currie and Co, regarding agreement for date of carrying out special survey, 28 June 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the special survey no.2 for Stettin and the repairs made, 6 June 1911 1911, Report of survey for repairs for Stettin, 3 June 1911 1911, Report of survey for repairs of engines and boilers for Stettin, 3 June 1911 1911, Copy of letter from the Assistant to the Secretary to the owners of Stettin, James Currie & Co, regarding the boiler survey to take place in about two months' time, 12 July 1912 1912, Report of survey for repairs for Stettin, 17 August 1912 1912, Postponed survey form for Stettin, 11 July 1912 1912, Letter from the owners of Stettin to the Secretary regarding the ship special survey and boilers survey, 9 July 1912 1912, Report of survey for repairs of engines and boilers for Stettin, 17 August 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the conditions of Stettin after repair, 29 December 1913 1913, Report of survey for repairs for Stettin, 27 December 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of Stettin taking place in three weeks’ time, 14 November 1913 1913, Postponed survey form for Stettin, 13 November 1913 1913, Letter from Leith surveyors to the Secretary regarding the survey of Stettin, 8 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin, 7 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin being carried out after the strike of the boilers makers, 9 November 1913 1913, Postponed survey form for Stettin, 8 September 1913 1913, Letter from Leith surveyors to the Secretary regarding the postpone of survey of Stettin due to the boilers makers strike, 5 September 1913 1913, Copy of letter from the Secretary to Leith surveyors regarding the survey of screw shaft of Stettin, 3 September 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating the Committee has agreed with the survey being carried out next month, 4 September 1913 1913, Postponed survey form for Stettin, 3 September 1913 1913, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft, 2 July 1913 1913, Report of survey for repairs of engines and boilers for Stettin, 27 December 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with postponing the special survey, 9 June 1914 1914, Postponed survey form for Stettin, 8 June 1914 1914, Letter from Leith surveyors to the Secretary regarding the special survey of Stettin, 4 June 1914 1914, Copy of letter from the Secretary to Leith surveyors enclosing a letter sent by the owners of Stettin about her fourth special survey no. 3, 3 June 1914 1914, Postponed survey form for Stettin, 2 June 1914 1914, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding postponing the second special survey no. 3 of Stettin, 29 May 1914 1914, Report of survey for repairs of engines and boilers for Stettin, 2 July 1915 1915, Copy of letter from the Secretary to Newcastle-on-Tyne surveyors regarding the special survey of Stettin, 12 August 1913 1915, Letter from Aberdeen surveyors to the Secretary stating that Stettin has sailed to Newcastle-on-Tyne as she failed to obtain docking facilities at that port, 10 August 1915 1915, Remarks to the Chief Ship Surveyor regarding the fourth special survey no. 3 for Stettin, 13 July 1915 1915, Copy of letter from the Secretary to the Surveyors in Hull, Grimsby, Middlesbrough, Newcastle, Sunderland and Hartlepool, regarding the fourth special survey no. 3 of Stettin, which will be carried out at some East coast port, 19 July 1915 1915, Letter from Leith surveyors to the Secretary regarding the survey of Stettin to be carried out at some East coast port, 12 July 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the fourth special survey no. 3 for Stettin, 5 July 1915 1915, Report of survey for repairs for Stettin, 2 July 1915 1915, Letter from Leith surveyors to the Secretary stating that the special survey of Stettin is being carried out at that port, 22 May 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 for Stettin, 21 May 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding her survey, 20 April 1915 1915, Extract from a letter dated 15 April 1915 from James Currie & Co regarding surveying Stettin. Extract dated 16 April 1915 1915, Letter from Leith surveyors to the Secretary stating that they had spoken to the owners of Stettin and due to a shortage of labour it has been difficult to find a dry dock to carry out the special survey, 13 April 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the importance of carrying out the special survey due to the age of the ship, 13 April 1915 1915, Postponed survey form for Stettin, 12 April 1915 1915, Copy of letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding the survey of Stettin being postponed, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 of Stettin, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors enclosing information about the communication between the owners of Stettin, 26 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with the special survey being carried out in the next two or three months, 26 January 1915 1915, Postponed survey form for Stettin, 25 January 1915 1915, Letter from Leith surveyors to the Secretary regarding the special survey no.3 and boiler survey of Stettin, 23 January 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding postponing the survey of Stettin, 21 January 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the fourth special survey no.3 and special annual boiler survey of Stettin, 20 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the letter sent by the latter about the thrust shaft, 1 November 1915 1915, Letter from Lisbon surveyors to the Secretary about the repair of shaft of Stettin, 25 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 28 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 23 October 1915 1915, Copy of letter from the Assistant to the Secretary to Lisbon surveyors regarding the repair of Stettin's thrust shaft being not satisfactory, 18 October 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the new thrust shaft she received in Lisbon, 1916 1915, Letter reporting that the new thrust shaft for Stettin is not considered satisfactory, 14 October 1915 1915, London Office Copy of document certifying that surveyor has examined the machinery of Stettin and stating his recommendations, 4 October 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 6 October 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 67857, 19 August 1915 1915, Report of Survey for Repairs for Stettin, 18 August 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 August 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the thrust shaft supplied in Lisbon and if it will be approved by the Committee as a permanent repair, 29 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon and stating that it will be approved by the Committee as a permanent repair, 28 April 1916 1916, Letter reporting the results of the test carried out on Stettin's new thrust shaft that was made in Lisbon, 27 April 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the result of the tests carried out on the new thrust shaft, 14 April 1916 1916, Letter from Professor R Stanfield to James Currie & Co regarding the results of the test of the transverse section of the shaft of Stettin, 11 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Letter reporting that Stettin's new thrust shaft is not satisfactory to be recommended as a permanent repair, 22 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin stating that the repair of the thrust shaft is being looked at, 14 March 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary enclosing drawings and plans of the shaft of Stettin, 6 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the repair of the thrust shaft, 28 January 1916 1916, Postponed survey form for Stettin, 22 January 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft of Stettin, 24 January 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding when the ship will be in position to have the thrust shaft examined, 21 January 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to London Report 79106, 13 July 1917 1916, Report of Survey for Repairs for Stettin due to collision with ice, 1 July 1916 1916, Report of Survey for Repairs of Engines and Boilers for Stettin, 14 July 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70096, 27 July 1917 1917, London Office Copy of document certifying that surveyor has examined damage and transmitted the Report, and stating his Recommendations, 24 July 1917 1917, Report of Survey for Repairs for Stettin 1917, Letter from Newcastle surveyors informing Lloyd's Register London that Stettin is under survey at Newcastle, 21 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding whether Stettin has yet come under inspection, 20 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding their report 70069, and Stettin's owners' intention to make repairs at South Shields within the next couple of days, and calling attention to the need for the Annu 1917, Letter from James Currie & Co Managers, informing Lloyd's Register London that they have arranged for repairs of damage previously communicated by Smith's Dry Dock Co, South Shields, on the steamer's return there in the next day or two, 1 August 1917 1917, Copy of letter from Lloyd's Register's London Secretary to James Currie and Co, informing them of the damage done to Stettin when striking a quay wall, that temporary repairs have been effected but that for the vessel to remain in class permanent repairs 1917, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70306, 2 October 1917 1917, Report of Survey for Repairs for Stettin, 29 September 1917 1917, Report of Survey for Repairs of Engines and Boilers for Stettin, 1 October 1917 1917, Certificate of approval of a stockless anchor, with cancelled written across it, 4 September 1917 1917, Correspondence to Lloyd's Register's London Secretary regarding Stettin Report 71400, acknowledging remarks on the Rules for Engines and Boilers with a working pressure of less than 60lbs, 23 November 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 71400, 19 November 1918 1918, Report of survey for repairs of Stettin, 5 November 1918 1918, Memo to Newcastle surveyors regarding Rules for Engines and Boilers of a greater working pressure than 60lbs per square inch, 18 November 1918 1918, Report of Survey for Repairs of Boilers and Engines of Stettin, 13 November 1918 1918, Copy of letter from London Secretary to James Currie and Co regarding state or survey of Stettin, 17 October 1919 1919, Postponed Survey form for Stettin, October 1919 1919, Letter from James Currie and Co to Secretary, Lloyd's Register London, regarding postponing survey of Stettin, 10 October 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Leith Report 15769, 2 July 1920 1920, Report of Survey for Repairs of Stettin, 28 June 1920 1920, Copy of letter from Lloyd's Register London Secretary to Leith Surveyors, 30 March 1920 1920, Postponed Survey form for Stettin, 29 March 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 24 March 1920 1920, Copy of Letter from Lloyd's Register London Secretary to Leith Surveyors, 19 March 1920 1920, Letter from the Surveyors at Hull, per N Rowall, to London Secretary regarding state of survey of Stettin, 18 March 1920 1920, Copy of letter from the London Secretary to the Hull Surveyors regarding state of survey of Stettin, 17 March 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 10 February 1920 1920, Postponed Survey form for Stettin, 9 February 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 5 February 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 28 January 1920 1920, Report of Survey for Repairs of Engines and Boilers for Stettin, 28 June 1920 1920, Copy of letter from the Secretary to the owners of Stettin saying the Committee has agreed with postponing the boiler survey, 23 August 1921 1921, Report of Survey for Repairs of Stettin, 16 September 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London regarding Stettin now undergoing survey, 3 September 1921 1921, Postponed Surveys form for Stettin, 22 August 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London explaining why Stettin had not undergone survey, 18 August 1921 1921, Report of Survey for Repairs of Engines and Boilers for Stettin, 16 September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Stettin survey, with reference to Leith Report 16187, 6 October 1921 1922, Report of Survey for Repairs of Stettin, 3 October 1921 1922, Correspondence of Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding ongoing surveys on Stettin, 14 September 1922 1922, Copy of letter from Lloyd's Register London Assistant to the Secretary to Leith Surveyors regarding survey of Stettin's screwshaft, 21 July 1922 1922, Postponed Surveys form for Stettin, 20 July 1922 1922, Letter from Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding proposed survey date for Stettin's screw shaft, 17 July 1922 1922, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans of owners of Stettin for survey of screwshaft, 14 July 1922 1922, Report of Survey for Repairs of Boilers and Engines for Stettin, 26 September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding carrying out part of Stettin's Special Survey, with reference to Leith Report 16388, 30 October 1923 1923, Report of Survey for Repairs of Stettin, 24 October 1923 1923, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors, regarding Rule requirements for cables, 20 October 1923 1923, Remarks to the Chief Ship Surveyor regarding Rule requirements for cables, 19 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London requesting clarification on Rules for chains, 18 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London regarding proposed timeline for survey, 22 September 1923 1923, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding letter from Stettin's owners and requesting clarification of when the boiler survey shall be held, 21 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London, regarding carrying out a part survey, 18 September 1923 1923, Copy of letter from Assistant to the Secretary to James Currie and Co regarding schedule for surveys of Stettin, 14 September 1923 1923, Postponed Surveys form for Stettin, 13 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London querying survey schedule of Stettin, 10 September 1923 1923, Report of Survey for Repairs of Engines and Boilers for Stettin, 23 October 1923 1923, Letter from Leith Surveyor A T Thomas to James Currie and Co, informing them of future survey schedule for Stettin, 23 October 1923 1923, Plan of Main Boiler for Stettin, 24 May 1924 1924, Plan of Donkey Boiler for Stettin, 24 May 1924 1924, Hatch Plan of Stettin, 2 October 1924 1924, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Stettin, with reference to Leith Report 16388, 19 May 1924 1924, Letter from A T Thomas, Leith Surveyor, to J F Hill of London, regarding surveying Stettin, 16 May 1924 1924, Extract from a letter dated 14 May 1924 from Leith surveyors regarding examining Stettin. Extract dated 15 May 1924 1924, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans for survey of Stettin and expiry of year of grace, 14 May 1924 1924, Letter from Leith surveyor A T Thomas to Secretary, London, regarding proposed examination part of Stettin's combustion chamber, 18 April 1924 1924, Copy of letter from Assistant to the Secretary to the Leith surveyors questioning owners' arrangements to have Stettin's combustion chamber examined, 16 April 1924 1924, Report of Survey for Repairs of Engines and Boilers for Stettin, 12 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding fulfilment of special survey on Stettin, in reference to Leith Report 16611, 22 November 1924 1924, Report of Survey for Repairs of Stettin, 15 November 1924 1924, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 November 1924 1924, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding completion of reports on Stettin's new boilers, 31 October 1924 1924, Note submitting that certain reports be forwarded to the Leith Surveyors for their guidance and completion, 29 October 1924 1924, Note submitting that the amended plans of boilers for Stettin merit approval, 29 May 1924 1924, Correspondence accompanying boiler plans submitted for approval for Stettin from the Glasgow office to London, 26 May 1924 1924, Letter from Jas S Cairns submitting for approval plans for new boilers for the Stettin to the Glasgow Secretary, 26 May 1924 1924, Note submitting that plans for Stettin's boilers merit approval, 24 April 1924 1924, Letter from Leith Surveyors, per A T T[homas], to Secretary, London, noting they are forwarding plans of new boilers intended for Stettin, 14 April 1924 1924, Report on Main Boiler for Stettin, 11 October 1924 1924, Report on Donkey Boiler for Stettin, 11 October 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Delivery note for 3 furnaces from Forth Shipbuilding and Engineering, Glasgow, 4 July 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 27 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, LR stamp and signature J Barr, 2 July 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 14 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 28 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 26 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 17 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 16790, 28 August 1925 1925, Report of Survey for Repairs on Stettin, 25 August 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 August 1925 1925, Memo regarding approving a steel cylinder cover on Stettin, 5 October 1925 1925, Letter from Leith Surveyor to Secretary, London, regarding steel cover repair examined, 2 October 1925 1925, Letter from Hamburg Office to Secretary, London, regarding request by Leith Surveyors, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding Hamburg report on Stettin, 1 October 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding their request for the Hamburg report, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to A Chisholm, requesting a report for the Leith Surveyors, 30 September 1925 1925, Translation of Cablegram sent to Surveyors at Hamburg, 30 September 1925 1925, Copy of Cablegram from London Office to Hamburg Office, 30 September 1925 1925, Letter from Leith Surveyors, per A T T[homas], to London Office asking for a Hamburg report to be sent to them, 29 September 1925 1925, London Office Copy of document certifying that Hamburg surveyor has examined damage and transmitted the Report, and stating his Recommendations, 25 September 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 September 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 16897, March 1926 1926, Report of Survey for Repairs to Stettin, 30 March 1926 1926, Report of Survey for Repairs of Engines and Boilers to Stettin, 30 March 1926 1926, Report of Survey for Repairs to Stettin, 15 June 1927 1927, Report of Survey for Repairs of Engines and Boilers to Stettin, 15 June 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 17291, 8 December 1927 1927, Copy of Certificate of Survey after damage to Stettin by a breaker in heavy weather, 23 November 1927 1927, Report of Survey for Repairs to Stettin, 3 December 1927 1927, Question and Answer memo between London and Leith Offices regarding Hamburg Report 17858, 21 February 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 1 February 1928 1928, Correspondence memo with particulars from Leith Surveyors to Secretary, London, regarding return of report, 27 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 25 January 1928 1928, Copy of Certificate of Survey from Hamburg after collision damage suffered by Stettin, 22 January 1928 1928, Report of Survey for Repairs of Stettin, 23 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 17339, 15 March 1928 1928, Report of Survey for Repairs of Stettin, 5 March 1928 1928, Copy of letter from the Clerk of the Classification Committee to James Currie and Co, with a copy to the Leith Office, regarding 6th Special Survey of Stettin, 14 December 1928 1928, Postponed Survey form for Stettin's 6th Special Survey, 13 December 1928 1928, Letter from James Currie and Co to Lloyd's Register Secretary, London, regarding deferring Stettin's 6th Special Survey, 11 December 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage, in reference to Dundee Report 8638, 30 March 1928 1928, Copy of Certificate of Survey regarding damage and report of repairs to Stettin's port bow shell plating, Dundee, 23 March 1928 1928, Report of Survey for Repairs to Stettin, 23 March 1928 1928, Letter from Lloyd's Register Engineer Surveyor to James Currie and Co regarding schedule for survey of Stettin's propeller shaft, 5 March 1929 1929, Copy of letter from the Secretary, London, to the Secretary, Glasgow, returning Stettin boiler plans, 29 May 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin and 6th Special Survey, in reference to Leith Report 17540, 13 March 1929 1929, Report of Survey for Repairs of Stettin, 5 March 1929 1929, Report of Survey for Repairs of Engines and Boilers for Stettin, 5 March 1929 1929, Copy of letter from pro Secretary, London, to Leith Surveyors regarding examination of Stettin's screwshaft, 16 April 1930 1930, Postponed Survey form for Stettin's screwshaft, 14 April 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 9 April 1930 1930, Copy of letter from Secretary, London, to Leith Surveyors informing them Committee are agreeable to postponing Stettin's screwshaft survey, 25 February 1930 1930, Postponed Survey form for Stettin's screwshaft, 24 February 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 17 February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 17802, 22 May 1930 1930, Report of Survey for Repairs to Stettin, 15 May 1930 1930, Report on Engine Forgings for Stettin, 8 May 1930 1930, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 May 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 18082, 2 November 1931 1931, Form or memo from Secretary, Glasgow, to Secretary, London, regarding presence of Stettin, 16 October 1931 1931, Question and Answer memo from Secretary, London, to Leith Surveyors regarding Stettin Boiler Survey, 5 October 1931 1931, Copy of letter from pro Secretary, London, with copy to Leith, to James Currie and Co regarding postponing Stettin Boiler Survey, 26 June 1931 1931, Postponed Surveys form for Stettin's Boiler Survey, 25 June 1931 1931, Letter from James Currie and Co regarding postponing Boiler Survey due on Stettin, 20 June 1931 1931, Report of Survey for Repairs on Stettin, 26 October 1931 1931, Report of Survey for Repairs of Engines and Boilers on Stettin, 26 October 1931 1931, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of survey for Stettin, 23 December 1932 1932, Postponed Surveys form for Stettin, 22 December 1932 1932, Letter from Leith Surveyors per John Houston to the Secretary, London, regarding outstanding survey on Stettin, 17 December 1932 1932, Letter from James Currie and Co to Leith Surveyors regarding schedule of survey for Stettin, 16 December 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 14 December 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 24 November 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 September 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 21 June 1932 1932, Postponed Surveys form for Stettin, 20 June 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 June 1932 1932, Copy of letter from pro Secretary, London to Leith Surveyors regarding Stettin boiler survey schedule, 9 October 1931 1932, Postponed Surveys form for Stettin, 8 October 1931 1932, Report of Total Loss, Casualty, , for Stettin, which has been sold to be broken up, 4 December 1933 1933, Letter from Leith Surveyors, per John Houston, to Secretary, London, informing them Stettin is being broken up, 1 December 1933 1933, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of demolition for Stettin, 27 November 1933 1933, Copy of letter from Leith Surveyors, per John Houston, to the Secretary, London, regarding the firm to which Stettin was sold to be broken up, 24 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 23 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 31 August 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 15 June 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 16 March 1933 1933, Note related to Stettin stating SS no. 2 held now posting no date, Note regarding Stettin stating "Vessel left Lisbon Oct 3. + 3 mos from dats. of survey would expire 12/15" no date, Sketch or plan of steel cover part for Stettin no date )
The country (flag) that a vessel is registered to, at the time of writing.
United Kingdom ( Certificate for vessels navigated by Steam for Stettin, 30 November 1864 1864, Iron Ship survey report for Stettin, 2 December 1864 1864, Letter from Glasgow surveyor to the Secretary sending the machinery certificate and Stettin's report of survey no. 4255, 8 July 1876 1876, Report of survey for repairs for Stettin, 8 July 1876 1876, Memo from Messrs Napier Ltd. stating that Stettin's boilers are fitted in accordance with the Committee requirements and should have the notification Lloyd's MC in the Register Book, 3 July 1876 1876, Details of main boilers of Stettin, 29 June 1876 1876, Engineer surveyor's report on machinery for Stettin, 26 June 1876 1876, Annual surveys for Stettin, 30 November 1876 1876, Report of survey for repairs for Stettin, 16 January 1879 1879, Report of survey for repairs of engines and boilers for Stettin, 16 January 1880 1880, Cover note for reports number 4308 and 57 of Stettin, 31 January 1880 1880, Report of survey for repairs for Stettin, 28 January 1880 1880, Report of survey for repairs for Stettin, 2 February 1881 1881, Report of survey for repairs for Stettin, 27 January 1882 1882, Annual surveys for Stettin, 6 January 1883 1883, Annual surveys for Stettin, 23 January 1884 1884, Report of survey for repairs for Stettin, 30 January 1885 1885, Report of survey for repairs of engines and boilers for Stettin, 30 January 1885 1885, Report of survey for repairs for Stettin, 27 January 1886 1886, Report of survey for repairs of engines and boilers for Stettin, 30 January 1886 1886, Report of survey for repairs for Stettin, 26 February 1887 1887, Report of survey for repairs of engines and boilers for Stettin, 15 March 1887 1887, Report of survey for repairs for Stettin, 21 May 1888 1888, Report of survey for repairs of engines and boilers for Stettin, 25 May 1888 1888, Report of survey for repairs for Stettin, 29 December 1888 1888, Particulars for record of double bottoms in Lloyd's Register for Stettin, 5 December 1889 1889, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 10 December 1889 1889, Report of Survey for Repairs for Stettin, 6 December 1889 1889, Report on Machinery for Stettin, 3 December 1889 1889, Report of Survey for Repairs for Stettin, 18 October 1890 1890, Report of Survey for Repairs for Stettin, 6 November 1891 1891, Report of Survey for Repairs for Stettin, 16 January 1893 1893, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 19 February 1894 1894, Report of survey for repairs for Stettin, 12 February 1894 1894, Report of survey for repairs of engines and boilers for Stettin, 13 February 1894 1894, Letter from the surveyor Jas Barclay to the Secretary in London enclosing a letter received from the Master of Stettin about the boiler survey to be held at Bergen, 9 June 1894 1894, Letter from the Master of Stettin Otto E Jacobsen to the surveyor James Barclay about the survey of boilers to take place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to E Rusten, owner of Stettin, stating he agrees with the survey of boilers taking place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to Bergen surveyor stating that Stettin will have the survey of boilers carried out in Bergen, 8 June 1894 1894, Note stating the boiler survey for Stettin is due to April and the owners state the ship will be at Bergen where the survey will take place, 8 June 1894 1894, Letter from Erik Rusten, owner of Stettin, to Lloyd's Register stating that he wishes the survey of boilers to take place in Bergen, 4 June 1894 1894, Report of Survey for repairs of engines and boilers for Stettin, 12 July 1894 1894, Report of survey for repairs for Stettin, 6 February 1895 1895, Report of survey for repairs of engines and boilers for Stettin, 6 February 1895 1895, Report of survey for repairs for Stettin, 19 March 1896 1896, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin about the survey of boilers, 23 March 1896 1896, Letter from Leith surveyor to the Secretary stating that the Stettin is under survey, 5 March 1896 1896, Letter from the Secretary to the Leith Surveyor questioning about the survey of Stettin, 3 March 1896 1896, Copy of Letter from the Secretary to the owner of Stettin stating that he agrees with the boiler survey of that ship being carried out when she is in dry dock in the following month, 29 January 1896 1896, Note stating the boiler survey for Stettin will be in dry dock in the following month, 29 January 1896 1896, Letter from the owner of Stettin to the Secretary stating the ship will be in dry dock next month for the survey, 27 January 1896 1896, Report of survey for repairs of engines and boilers for Stettin, 19 March 1896 1896, Report of survey for repairs for Stettin, 19 March 1897 1897, Letter from the Leith surveyor to the Secretary stating that Stettin is now employed in the emigrant trade and therefore the pressure of boiler has been reduced, 24 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 19 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 26 July 1897 1897, Remarks of the Chief Surveyor to the Classing Committee about the special survey of the ship Stettin, 4 March 1898 1898, Copy of letter from the Secretary to the owners of Stettin stating that the special survey will take place when the ship is placed in dry dock, 3 February 1898 1898, Note stating the ship Stettin will be soon in dry dock to be surveyed, 3 February 1898 1898, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating their intention to put the ship in dry dock to be surveyed, 1 February 1898 1898, Report of survey for repairs for Stettin, 3 March 1898 1898, Report of survey for repairs of engines and boilers for Stettin, 3 March 1898 1898, Remarks of the Chief Surveyor to the Classing Committee about the damage and temporary repairs suffered by Stettin, 31 March 1898 1898, Letter from the Bremerhaven surveyor about the repairs to Stettin, 29 March 1898 1898, Cover note for report number 534 of Stettin, 1 April 1898 1898, Report of survey for repairs for Stettin, 28 March 1898 1898, Remarks of the Ship Surveyor to the Classing Committee saying the damage to Stettin has been repaired and she should remain classed, 6 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1899 1899, Report of survey for repairs of engines and boilers for Stettin, 5 April 1899 1899, Report of survey for repairs for Stettin, 28 April 1900 1900, Report of survey for repairs of engines and boilers for Stettin, 28 April 1900 1900, Report of survey for repairs for Stettin, 2 May 1901 1901, Report of survey for repairs of engines and boilers for Stettin, 2 May 1901 1901, Remarks of the Ship Surveyor to the Classing Committee about the special survey of Stettin and the particulars of her plating, 7 April 1902 1902, Report of survey for repairs for Stettin, 4 April 1902 1902, Copy of letter from the Secretary to the owners of Stettin statin the Committee agreed with the special survey being carried out in the next two months, 31 January 1902 1902, Postponed survey form for Stettin, 30 January 1902 1902, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating they expect to attend the special survey within the next two months, 29 January 1902 1902, Report of survey for repairs of engines and boilers for Stettin, 4 April 1902 1902, Report of survey for repairs for Stettin, 11 May 1903 1903, Copy of letter from the Secretary to Leith Surveyors stating that the steamer Stettin has been booked for the annual boiler survey that will take place in a few days, 7 April 1903 1903, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the annual overhaul has been booked for that next few days, 4 April 1903 1903, Report of survey for repairs of engines and boilers for Stettin, 11 May 1903 1903, Report of survey for repairs for Stettin, 29 June 1904 1904, Report of survey for repairs of engines and boilers for Stettin, 29 June 1904 1904, Report of survey for repairs for Stettin, 11 July 1905 1905, Report of survey for repairs of engines and boilers for Stettin, 11 July 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the damage and repairs to Stettin, 24 August 1905 1905, Report of survey for repairs for Stettin, 22 August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the special survey no.1 of Stettin, 26 July 1906 1906, Copy of letter from the Secretary to Leith Surveyors stating that Stettin will be in dry dock on her arrival from Konigsberg when the special survey no.1 will be carried out, 22 June 1906 1906, Copy of letter from the Secretary to the owners of Stettin stating that the special survey no.1 will be carried out next week in Leith, 22 June 1906 1906, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the special survey no.1 will be carried out in the next week on her arrival from Konigsberg, 20 June 1906 1906, Report of survey for repairs for Stettin, 23 July 1906 1906, Report of survey for repairs of engines and boilers for Stettin, 24 July 1906 1906, Report of survey for repairs for Stettin, 16 July 1907 1906, Report of survey for repairs of engines and boilers for Stettin, 16 July 1907 1906, Report of survey for repairs for Stettin, 19 September 1908 1908, Copy of letter from the Secretary to Leith Surveyors stating that Stettin is laid up for overhaul and that the boiler survey should be carried out, 8 September 1908 1908, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the steamer is laid up for overhaul and that the special survey of boilers should take place next week, 5 September 1908 1908, Report of survey for repairs of engines and boilers for Stettin, 19 September 1908 1908, Report of survey for repairs for Stettin, 2 October 1909 1909, Report of survey for repairs of engines and boilers for Stettin, 2 October 1909 1909, Plan of Rudder of Stettin, 1910. Scale 1"=one foot. Details 3"= one foot, 19 September 1910 1910, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding the special survey no. 2 and boiler survey for Stettin, 29 October 1910 1910, Letter from Leith Surveyor to the Secretary stating that they met with the owners of Stettin and arranged the special survey no. 2 to be carried out after the New Year holidays, 28 November 1910 1910, Copy of letter from the Secretary to Leith Surveyors regarding the report no. 13106 for Stettin and asking when the ship's owners expect the special survey no.2 to be carried out, 25 November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee about damage and repairs made to Stettin after grounding, 7 October 1910 1910, Postponed survey form for Stettin, 27 June 1910 1910, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating the special survey no.2 will be carried out in Leith in September, 23 October 1910 1910, Report of survey for repairs for Stettin, 5 October 1910 1910, Report of survey for repairs of engines and boilers for Stettin, 21 October 1910 1910, Report of Ship forgings or castings for Stettin, 30 September 1910 1910, Note about the sketch of rudder for Stettin, 19 September 1910 1910, Letter from Leith surveyors to the Secretary regarding the plan of rudder for Stettin to be approved by the Committee, 16 September 1910 1910, Copy of letter from Secretary, Lloyd's Register London, to James Currie and Co, regarding agreement for date of carrying out special survey, 28 June 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the special survey no.2 for Stettin and the repairs made, 6 June 1911 1911, Report of survey for repairs for Stettin, 3 June 1911 1911, Report of survey for repairs of engines and boilers for Stettin, 3 June 1911 1911, Copy of letter from the Assistant to the Secretary to the owners of Stettin, James Currie & Co, regarding the boiler survey to take place in about two months' time, 12 July 1912 1912, Report of survey for repairs for Stettin, 17 August 1912 1912, Postponed survey form for Stettin, 11 July 1912 1912, Letter from the owners of Stettin to the Secretary regarding the ship special survey and boilers survey, 9 July 1912 1912, Report of survey for repairs of engines and boilers for Stettin, 17 August 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the conditions of Stettin after repair, 29 December 1913 1913, Report of survey for repairs for Stettin, 27 December 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of Stettin taking place in three weeks’ time, 14 November 1913 1913, Postponed survey form for Stettin, 13 November 1913 1913, Letter from Leith surveyors to the Secretary regarding the survey of Stettin, 8 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin, 7 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin being carried out after the strike of the boilers makers, 9 November 1913 1913, Postponed survey form for Stettin, 8 September 1913 1913, Letter from Leith surveyors to the Secretary regarding the postpone of survey of Stettin due to the boilers makers strike, 5 September 1913 1913, Copy of letter from the Secretary to Leith surveyors regarding the survey of screw shaft of Stettin, 3 September 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating the Committee has agreed with the survey being carried out next month, 4 September 1913 1913, Postponed survey form for Stettin, 3 September 1913 1913, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft, 2 July 1913 1913, Report of survey for repairs of engines and boilers for Stettin, 27 December 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with postponing the special survey, 9 June 1914 1914, Postponed survey form for Stettin, 8 June 1914 1914, Letter from Leith surveyors to the Secretary regarding the special survey of Stettin, 4 June 1914 1914, Copy of letter from the Secretary to Leith surveyors enclosing a letter sent by the owners of Stettin about her fourth special survey no. 3, 3 June 1914 1914, Postponed survey form for Stettin, 2 June 1914 1914, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding postponing the second special survey no. 3 of Stettin, 29 May 1914 1914, Report of survey for repairs of engines and boilers for Stettin, 2 July 1915 1915, Copy of letter from the Secretary to Newcastle-on-Tyne surveyors regarding the special survey of Stettin, 12 August 1913 1915, Letter from Aberdeen surveyors to the Secretary stating that Stettin has sailed to Newcastle-on-Tyne as she failed to obtain docking facilities at that port, 10 August 1915 1915, Remarks to the Chief Ship Surveyor regarding the fourth special survey no. 3 for Stettin, 13 July 1915 1915, Copy of letter from the Secretary to the Surveyors in Hull, Grimsby, Middlesbrough, Newcastle, Sunderland and Hartlepool, regarding the fourth special survey no. 3 of Stettin, which will be carried out at some East coast port, 19 July 1915 1915, Letter from Leith surveyors to the Secretary regarding the survey of Stettin to be carried out at some East coast port, 12 July 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the fourth special survey no. 3 for Stettin, 5 July 1915 1915, Report of survey for repairs for Stettin, 2 July 1915 1915, Letter from Leith surveyors to the Secretary stating that the special survey of Stettin is being carried out at that port, 22 May 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 for Stettin, 21 May 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding her survey, 20 April 1915 1915, Extract from a letter dated 15 April 1915 from James Currie & Co regarding surveying Stettin. Extract dated 16 April 1915 1915, Letter from Leith surveyors to the Secretary stating that they had spoken to the owners of Stettin and due to a shortage of labour it has been difficult to find a dry dock to carry out the special survey, 13 April 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the importance of carrying out the special survey due to the age of the ship, 13 April 1915 1915, Postponed survey form for Stettin, 12 April 1915 1915, Copy of letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding the survey of Stettin being postponed, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 of Stettin, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors enclosing information about the communication between the owners of Stettin, 26 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with the special survey being carried out in the next two or three months, 26 January 1915 1915, Postponed survey form for Stettin, 25 January 1915 1915, Letter from Leith surveyors to the Secretary regarding the special survey no.3 and boiler survey of Stettin, 23 January 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding postponing the survey of Stettin, 21 January 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the fourth special survey no.3 and special annual boiler survey of Stettin, 20 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the letter sent by the latter about the thrust shaft, 1 November 1915 1915, Letter from Lisbon surveyors to the Secretary about the repair of shaft of Stettin, 25 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 28 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 23 October 1915 1915, Copy of letter from the Assistant to the Secretary to Lisbon surveyors regarding the repair of Stettin's thrust shaft being not satisfactory, 18 October 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the new thrust shaft she received in Lisbon, 1916 1915, Letter reporting that the new thrust shaft for Stettin is not considered satisfactory, 14 October 1915 1915, London Office Copy of document certifying that surveyor has examined the machinery of Stettin and stating his recommendations, 4 October 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 6 October 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 67857, 19 August 1915 1915, Report of Survey for Repairs for Stettin, 18 August 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 August 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the thrust shaft supplied in Lisbon and if it will be approved by the Committee as a permanent repair, 29 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon and stating that it will be approved by the Committee as a permanent repair, 28 April 1916 1916, Letter reporting the results of the test carried out on Stettin's new thrust shaft that was made in Lisbon, 27 April 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the result of the tests carried out on the new thrust shaft, 14 April 1916 1916, Letter from Professor R Stanfield to James Currie & Co regarding the results of the test of the transverse section of the shaft of Stettin, 11 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Letter reporting that Stettin's new thrust shaft is not satisfactory to be recommended as a permanent repair, 22 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin stating that the repair of the thrust shaft is being looked at, 14 March 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary enclosing drawings and plans of the shaft of Stettin, 6 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the repair of the thrust shaft, 28 January 1916 1916, Postponed survey form for Stettin, 22 January 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft of Stettin, 24 January 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding when the ship will be in position to have the thrust shaft examined, 21 January 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to London Report 79106, 13 July 1917 1916, Report of Survey for Repairs for Stettin due to collision with ice, 1 July 1916 1916, Report of Survey for Repairs of Engines and Boilers for Stettin, 14 July 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70096, 27 July 1917 1917, London Office Copy of document certifying that surveyor has examined damage and transmitted the Report, and stating his Recommendations, 24 July 1917 1917, Report of Survey for Repairs for Stettin 1917, Letter from Newcastle surveyors informing Lloyd's Register London that Stettin is under survey at Newcastle, 21 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding whether Stettin has yet come under inspection, 20 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding their report 70069, and Stettin's owners' intention to make repairs at South Shields within the next couple of days, and calling attention to the need for the Annu 1917, Letter from James Currie & Co Managers, informing Lloyd's Register London that they have arranged for repairs of damage previously communicated by Smith's Dry Dock Co, South Shields, on the steamer's return there in the next day or two, 1 August 1917 1917, Copy of letter from Lloyd's Register's London Secretary to James Currie and Co, informing them of the damage done to Stettin when striking a quay wall, that temporary repairs have been effected but that for the vessel to remain in class permanent repairs 1917, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70306, 2 October 1917 1917, Report of Survey for Repairs for Stettin, 29 September 1917 1917, Report of Survey for Repairs of Engines and Boilers for Stettin, 1 October 1917 1917, Certificate of approval of a stockless anchor, with cancelled written across it, 4 September 1917 1917, Correspondence to Lloyd's Register's London Secretary regarding Stettin Report 71400, acknowledging remarks on the Rules for Engines and Boilers with a working pressure of less than 60lbs, 23 November 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 71400, 19 November 1918 1918, Report of survey for repairs of Stettin, 5 November 1918 1918, Memo to Newcastle surveyors regarding Rules for Engines and Boilers of a greater working pressure than 60lbs per square inch, 18 November 1918 1918, Report of Survey for Repairs of Boilers and Engines of Stettin, 13 November 1918 1918, Copy of letter from London Secretary to James Currie and Co regarding state or survey of Stettin, 17 October 1919 1919, Postponed Survey form for Stettin, October 1919 1919, Letter from James Currie and Co to Secretary, Lloyd's Register London, regarding postponing survey of Stettin, 10 October 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Leith Report 15769, 2 July 1920 1920, Report of Survey for Repairs of Stettin, 28 June 1920 1920, Copy of letter from Lloyd's Register London Secretary to Leith Surveyors, 30 March 1920 1920, Postponed Survey form for Stettin, 29 March 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 24 March 1920 1920, Copy of Letter from Lloyd's Register London Secretary to Leith Surveyors, 19 March 1920 1920, Letter from the Surveyors at Hull, per N Rowall, to London Secretary regarding state of survey of Stettin, 18 March 1920 1920, Copy of letter from the London Secretary to the Hull Surveyors regarding state of survey of Stettin, 17 March 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 10 February 1920 1920, Postponed Survey form for Stettin, 9 February 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 5 February 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 28 January 1920 1920, Report of Survey for Repairs of Engines and Boilers for Stettin, 28 June 1920 1920, Copy of letter from the Secretary to the owners of Stettin saying the Committee has agreed with postponing the boiler survey, 23 August 1921 1921, Report of Survey for Repairs of Stettin, 16 September 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London regarding Stettin now undergoing survey, 3 September 1921 1921, Postponed Surveys form for Stettin, 22 August 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London explaining why Stettin had not undergone survey, 18 August 1921 1921, Report of Survey for Repairs of Engines and Boilers for Stettin, 16 September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Stettin survey, with reference to Leith Report 16187, 6 October 1921 1922, Report of Survey for Repairs of Stettin, 3 October 1921 1922, Correspondence of Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding ongoing surveys on Stettin, 14 September 1922 1922, Copy of letter from Lloyd's Register London Assistant to the Secretary to Leith Surveyors regarding survey of Stettin's screwshaft, 21 July 1922 1922, Postponed Surveys form for Stettin, 20 July 1922 1922, Letter from Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding proposed survey date for Stettin's screw shaft, 17 July 1922 1922, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans of owners of Stettin for survey of screwshaft, 14 July 1922 1922, Report of Survey for Repairs of Boilers and Engines for Stettin, 26 September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding carrying out part of Stettin's Special Survey, with reference to Leith Report 16388, 30 October 1923 1923, Report of Survey for Repairs of Stettin, 24 October 1923 1923, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors, regarding Rule requirements for cables, 20 October 1923 1923, Remarks to the Chief Ship Surveyor regarding Rule requirements for cables, 19 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London requesting clarification on Rules for chains, 18 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London regarding proposed timeline for survey, 22 September 1923 1923, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding letter from Stettin's owners and requesting clarification of when the boiler survey shall be held, 21 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London, regarding carrying out a part survey, 18 September 1923 1923, Copy of letter from Assistant to the Secretary to James Currie and Co regarding schedule for surveys of Stettin, 14 September 1923 1923, Postponed Surveys form for Stettin, 13 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London querying survey schedule of Stettin, 10 September 1923 1923, Report of Survey for Repairs of Engines and Boilers for Stettin, 23 October 1923 1923, Letter from Leith Surveyor A T Thomas to James Currie and Co, informing them of future survey schedule for Stettin, 23 October 1923 1923, Plan of Main Boiler for Stettin, 24 May 1924 1924, Plan of Donkey Boiler for Stettin, 24 May 1924 1924, Hatch Plan of Stettin, 2 October 1924 1924, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Stettin, with reference to Leith Report 16388, 19 May 1924 1924, Letter from A T Thomas, Leith Surveyor, to J F Hill of London, regarding surveying Stettin, 16 May 1924 1924, Extract from a letter dated 14 May 1924 from Leith surveyors regarding examining Stettin. Extract dated 15 May 1924 1924, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans for survey of Stettin and expiry of year of grace, 14 May 1924 1924, Letter from Leith surveyor A T Thomas to Secretary, London, regarding proposed examination part of Stettin's combustion chamber, 18 April 1924 1924, Copy of letter from Assistant to the Secretary to the Leith surveyors questioning owners' arrangements to have Stettin's combustion chamber examined, 16 April 1924 1924, Report of Survey for Repairs of Engines and Boilers for Stettin, 12 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding fulfilment of special survey on Stettin, in reference to Leith Report 16611, 22 November 1924 1924, Report of Survey for Repairs of Stettin, 15 November 1924 1924, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 November 1924 1924, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding completion of reports on Stettin's new boilers, 31 October 1924 1924, Note submitting that certain reports be forwarded to the Leith Surveyors for their guidance and completion, 29 October 1924 1924, Note submitting that the amended plans of boilers for Stettin merit approval, 29 May 1924 1924, Correspondence accompanying boiler plans submitted for approval for Stettin from the Glasgow office to London, 26 May 1924 1924, Letter from Jas S Cairns submitting for approval plans for new boilers for the Stettin to the Glasgow Secretary, 26 May 1924 1924, Note submitting that plans for Stettin's boilers merit approval, 24 April 1924 1924, Letter from Leith Surveyors, per A T T[homas], to Secretary, London, noting they are forwarding plans of new boilers intended for Stettin, 14 April 1924 1924, Report on Main Boiler for Stettin, 11 October 1924 1924, Report on Donkey Boiler for Stettin, 11 October 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Delivery note for 3 furnaces from Forth Shipbuilding and Engineering, Glasgow, 4 July 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 27 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, LR stamp and signature J Barr, 2 July 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 14 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 28 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 26 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 17 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 16790, 28 August 1925 1925, Report of Survey for Repairs on Stettin, 25 August 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 August 1925 1925, Memo regarding approving a steel cylinder cover on Stettin, 5 October 1925 1925, Letter from Leith Surveyor to Secretary, London, regarding steel cover repair examined, 2 October 1925 1925, Letter from Hamburg Office to Secretary, London, regarding request by Leith Surveyors, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding Hamburg report on Stettin, 1 October 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding their request for the Hamburg report, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to A Chisholm, requesting a report for the Leith Surveyors, 30 September 1925 1925, Translation of Cablegram sent to Surveyors at Hamburg, 30 September 1925 1925, Copy of Cablegram from London Office to Hamburg Office, 30 September 1925 1925, Letter from Leith Surveyors, per A T T[homas], to London Office asking for a Hamburg report to be sent to them, 29 September 1925 1925, London Office Copy of document certifying that Hamburg surveyor has examined damage and transmitted the Report, and stating his Recommendations, 25 September 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 September 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 16897, March 1926 1926, Report of Survey for Repairs to Stettin, 30 March 1926 1926, Report of Survey for Repairs of Engines and Boilers to Stettin, 30 March 1926 1926, Report of Survey for Repairs to Stettin, 15 June 1927 1927, Report of Survey for Repairs of Engines and Boilers to Stettin, 15 June 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 17291, 8 December 1927 1927, Copy of Certificate of Survey after damage to Stettin by a breaker in heavy weather, 23 November 1927 1927, Report of Survey for Repairs to Stettin, 3 December 1927 1927, Question and Answer memo between London and Leith Offices regarding Hamburg Report 17858, 21 February 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 1 February 1928 1928, Correspondence memo with particulars from Leith Surveyors to Secretary, London, regarding return of report, 27 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 25 January 1928 1928, Copy of Certificate of Survey from Hamburg after collision damage suffered by Stettin, 22 January 1928 1928, Report of Survey for Repairs of Stettin, 23 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 17339, 15 March 1928 1928, Report of Survey for Repairs of Stettin, 5 March 1928 1928, Copy of letter from the Clerk of the Classification Committee to James Currie and Co, with a copy to the Leith Office, regarding 6th Special Survey of Stettin, 14 December 1928 1928, Postponed Survey form for Stettin's 6th Special Survey, 13 December 1928 1928, Letter from James Currie and Co to Lloyd's Register Secretary, London, regarding deferring Stettin's 6th Special Survey, 11 December 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage, in reference to Dundee Report 8638, 30 March 1928 1928, Copy of Certificate of Survey regarding damage and report of repairs to Stettin's port bow shell plating, Dundee, 23 March 1928 1928, Report of Survey for Repairs to Stettin, 23 March 1928 1928, Letter from Lloyd's Register Engineer Surveyor to James Currie and Co regarding schedule for survey of Stettin's propeller shaft, 5 March 1929 1929, Copy of letter from the Secretary, London, to the Secretary, Glasgow, returning Stettin boiler plans, 29 May 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin and 6th Special Survey, in reference to Leith Report 17540, 13 March 1929 1929, Report of Survey for Repairs of Stettin, 5 March 1929 1929, Report of Survey for Repairs of Engines and Boilers for Stettin, 5 March 1929 1929, Copy of letter from pro Secretary, London, to Leith Surveyors regarding examination of Stettin's screwshaft, 16 April 1930 1930, Postponed Survey form for Stettin's screwshaft, 14 April 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 9 April 1930 1930, Copy of letter from Secretary, London, to Leith Surveyors informing them Committee are agreeable to postponing Stettin's screwshaft survey, 25 February 1930 1930, Postponed Survey form for Stettin's screwshaft, 24 February 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 17 February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 17802, 22 May 1930 1930, Report of Survey for Repairs to Stettin, 15 May 1930 1930, Report on Engine Forgings for Stettin, 8 May 1930 1930, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 May 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 18082, 2 November 1931 1931, Form or memo from Secretary, Glasgow, to Secretary, London, regarding presence of Stettin, 16 October 1931 1931, Question and Answer memo from Secretary, London, to Leith Surveyors regarding Stettin Boiler Survey, 5 October 1931 1931, Copy of letter from pro Secretary, London, with copy to Leith, to James Currie and Co regarding postponing Stettin Boiler Survey, 26 June 1931 1931, Postponed Surveys form for Stettin's Boiler Survey, 25 June 1931 1931, Letter from James Currie and Co regarding postponing Boiler Survey due on Stettin, 20 June 1931 1931, Report of Survey for Repairs on Stettin, 26 October 1931 1931, Report of Survey for Repairs of Engines and Boilers on Stettin, 26 October 1931 1931, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of survey for Stettin, 23 December 1932 1932, Postponed Surveys form for Stettin, 22 December 1932 1932, Letter from Leith Surveyors per John Houston to the Secretary, London, regarding outstanding survey on Stettin, 17 December 1932 1932, Letter from James Currie and Co to Leith Surveyors regarding schedule of survey for Stettin, 16 December 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 14 December 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 24 November 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 September 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 21 June 1932 1932, Postponed Surveys form for Stettin, 20 June 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 June 1932 1932, Copy of letter from pro Secretary, London to Leith Surveyors regarding Stettin boiler survey schedule, 9 October 1931 1932, Postponed Surveys form for Stettin, 8 October 1931 1932, Report of Total Loss, Casualty, , for Stettin, which has been sold to be broken up, 4 December 1933 1933, Letter from Leith Surveyors, per John Houston, to Secretary, London, informing them Stettin is being broken up, 1 December 1933 1933, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of demolition for Stettin, 27 November 1933 1933, Copy of letter from Leith Surveyors, per John Houston, to the Secretary, London, regarding the firm to which Stettin was sold to be broken up, 24 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 23 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 31 August 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 15 June 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 16 March 1933 1933, Note related to Stettin stating SS no. 2 held now posting no date, Note regarding Stettin stating "Vessel left Lisbon Oct 3. + 3 mos from dats. of survey would expire 12/15" no date, Sketch or plan of steel cover part for Stettin no date )
The individual and/or organisation listed
Leith, Hull & Hamburg Steam Packet Co ( Certificate for vessels navigated by Steam for Stettin, 30 November 1864 1864, Iron Ship survey report for Stettin, 2 December 1864 1864, Letter from Glasgow surveyor to the Secretary sending the machinery certificate and Stettin's report of survey no. 4255, 8 July 1876 1876, Report of survey for repairs for Stettin, 8 July 1876 1876, Memo from Messrs Napier Ltd. stating that Stettin's boilers are fitted in accordance with the Committee requirements and should have the notification Lloyd's MC in the Register Book, 3 July 1876 1876, Details of main boilers of Stettin, 29 June 1876 1876, Engineer surveyor's report on machinery for Stettin, 26 June 1876 1876, Annual surveys for Stettin, 30 November 1876 1876, Report of survey for repairs for Stettin, 16 January 1879 1879, Report of survey for repairs of engines and boilers for Stettin, 16 January 1880 1880, Cover note for reports number 4308 and 57 of Stettin, 31 January 1880 1880, Report of survey for repairs for Stettin, 28 January 1880 1880, Report of survey for repairs for Stettin, 2 February 1881 1881, Report of survey for repairs for Stettin, 27 January 1882 1882, Annual surveys for Stettin, 6 January 1883 1883, Annual surveys for Stettin, 23 January 1884 1884, Report of survey for repairs for Stettin, 30 January 1885 1885, Report of survey for repairs of engines and boilers for Stettin, 30 January 1885 1885, Report of survey for repairs for Stettin, 27 January 1886 1886, Report of survey for repairs of engines and boilers for Stettin, 30 January 1886 1886, Report of survey for repairs for Stettin, 26 February 1887 1887, Report of survey for repairs of engines and boilers for Stettin, 15 March 1887 1887, Report of survey for repairs for Stettin, 21 May 1888 1888, Report of survey for repairs of engines and boilers for Stettin, 25 May 1888 1888, Report of survey for repairs for Stettin, 29 December 1888 1888, Particulars for record of double bottoms in Lloyd's Register for Stettin, 5 December 1889 1889, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 10 December 1889 1889, Report of Survey for Repairs for Stettin, 6 December 1889 1889, Report on Machinery for Stettin, 3 December 1889 1889, Report of Survey for Repairs for Stettin, 18 October 1890 1890, Report of Survey for Repairs for Stettin, 6 November 1891 1891, Report of Survey for Repairs for Stettin, 16 January 1893 1893, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 19 February 1894 1894, Report of survey for repairs for Stettin, 12 February 1894 1894, Report of survey for repairs of engines and boilers for Stettin, 13 February 1894 1894, Letter from the surveyor Jas Barclay to the Secretary in London enclosing a letter received from the Master of Stettin about the boiler survey to be held at Bergen, 9 June 1894 1894, Letter from the Master of Stettin Otto E Jacobsen to the surveyor James Barclay about the survey of boilers to take place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to E Rusten, owner of Stettin, stating he agrees with the survey of boilers taking place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to Bergen surveyor stating that Stettin will have the survey of boilers carried out in Bergen, 8 June 1894 1894, Note stating the boiler survey for Stettin is due to April and the owners state the ship will be at Bergen where the survey will take place, 8 June 1894 1894, Letter from Erik Rusten, owner of Stettin, to Lloyd's Register stating that he wishes the survey of boilers to take place in Bergen, 4 June 1894 1894, Report of Survey for repairs of engines and boilers for Stettin, 12 July 1894 1894, Report of survey for repairs for Stettin, 6 February 1895 1895, Report of survey for repairs of engines and boilers for Stettin, 6 February 1895 1895, Report of survey for repairs for Stettin, 19 March 1896 1896, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin about the survey of boilers, 23 March 1896 1896, Letter from Leith surveyor to the Secretary stating that the Stettin is under survey, 5 March 1896 1896, Letter from the Secretary to the Leith Surveyor questioning about the survey of Stettin, 3 March 1896 1896, Copy of Letter from the Secretary to the owner of Stettin stating that he agrees with the boiler survey of that ship being carried out when she is in dry dock in the following month, 29 January 1896 1896, Note stating the boiler survey for Stettin will be in dry dock in the following month, 29 January 1896 1896, Letter from the owner of Stettin to the Secretary stating the ship will be in dry dock next month for the survey, 27 January 1896 1896, Report of survey for repairs of engines and boilers for Stettin, 19 March 1896 1896, Report of survey for repairs for Stettin, 19 March 1897 1897, Letter from the Leith surveyor to the Secretary stating that Stettin is now employed in the emigrant trade and therefore the pressure of boiler has been reduced, 24 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 19 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 26 July 1897 1897, Remarks of the Chief Surveyor to the Classing Committee about the special survey of the ship Stettin, 4 March 1898 1898, Copy of letter from the Secretary to the owners of Stettin stating that the special survey will take place when the ship is placed in dry dock, 3 February 1898 1898, Note stating the ship Stettin will be soon in dry dock to be surveyed, 3 February 1898 1898, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating their intention to put the ship in dry dock to be surveyed, 1 February 1898 1898, Report of survey for repairs for Stettin, 3 March 1898 1898, Report of survey for repairs of engines and boilers for Stettin, 3 March 1898 1898, Remarks of the Chief Surveyor to the Classing Committee about the damage and temporary repairs suffered by Stettin, 31 March 1898 1898, Letter from the Bremerhaven surveyor about the repairs to Stettin, 29 March 1898 1898, Cover note for report number 534 of Stettin, 1 April 1898 1898, Report of survey for repairs for Stettin, 28 March 1898 1898, Remarks of the Ship Surveyor to the Classing Committee saying the damage to Stettin has been repaired and she should remain classed, 6 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1899 1899, Report of survey for repairs of engines and boilers for Stettin, 5 April 1899 1899, Report of survey for repairs for Stettin, 28 April 1900 1900, Report of survey for repairs of engines and boilers for Stettin, 28 April 1900 1900, Report of survey for repairs for Stettin, 2 May 1901 1901, Report of survey for repairs of engines and boilers for Stettin, 2 May 1901 1901, Remarks of the Ship Surveyor to the Classing Committee about the special survey of Stettin and the particulars of her plating, 7 April 1902 1902, Report of survey for repairs for Stettin, 4 April 1902 1902, Copy of letter from the Secretary to the owners of Stettin statin the Committee agreed with the special survey being carried out in the next two months, 31 January 1902 1902, Postponed survey form for Stettin, 30 January 1902 1902, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating they expect to attend the special survey within the next two months, 29 January 1902 1902, Report of survey for repairs of engines and boilers for Stettin, 4 April 1902 1902, Report of survey for repairs for Stettin, 11 May 1903 1903, Copy of letter from the Secretary to Leith Surveyors stating that the steamer Stettin has been booked for the annual boiler survey that will take place in a few days, 7 April 1903 1903, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the annual overhaul has been booked for that next few days, 4 April 1903 1903, Report of survey for repairs of engines and boilers for Stettin, 11 May 1903 1903, Report of survey for repairs for Stettin, 29 June 1904 1904, Report of survey for repairs of engines and boilers for Stettin, 29 June 1904 1904, Report of survey for repairs for Stettin, 11 July 1905 1905, Report of survey for repairs of engines and boilers for Stettin, 11 July 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the damage and repairs to Stettin, 24 August 1905 1905, Report of survey for repairs for Stettin, 22 August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the special survey no.1 of Stettin, 26 July 1906 1906, Copy of letter from the Secretary to Leith Surveyors stating that Stettin will be in dry dock on her arrival from Konigsberg when the special survey no.1 will be carried out, 22 June 1906 1906, Copy of letter from the Secretary to the owners of Stettin stating that the special survey no.1 will be carried out next week in Leith, 22 June 1906 1906, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the special survey no.1 will be carried out in the next week on her arrival from Konigsberg, 20 June 1906 1906, Report of survey for repairs for Stettin, 23 July 1906 1906, Report of survey for repairs of engines and boilers for Stettin, 24 July 1906 1906, Report of survey for repairs for Stettin, 16 July 1907 1906, Report of survey for repairs of engines and boilers for Stettin, 16 July 1907 1906, Report of survey for repairs for Stettin, 19 September 1908 1908, Copy of letter from the Secretary to Leith Surveyors stating that Stettin is laid up for overhaul and that the boiler survey should be carried out, 8 September 1908 1908, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the steamer is laid up for overhaul and that the special survey of boilers should take place next week, 5 September 1908 1908, Report of survey for repairs of engines and boilers for Stettin, 19 September 1908 1908, Report of survey for repairs for Stettin, 2 October 1909 1909, Report of survey for repairs of engines and boilers for Stettin, 2 October 1909 1909, Plan of Rudder of Stettin, 1910. Scale 1"=one foot. Details 3"= one foot, 19 September 1910 1910, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding the special survey no. 2 and boiler survey for Stettin, 29 October 1910 1910, Letter from Leith Surveyor to the Secretary stating that they met with the owners of Stettin and arranged the special survey no. 2 to be carried out after the New Year holidays, 28 November 1910 1910, Copy of letter from the Secretary to Leith Surveyors regarding the report no. 13106 for Stettin and asking when the ship's owners expect the special survey no.2 to be carried out, 25 November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee about damage and repairs made to Stettin after grounding, 7 October 1910 1910, Postponed survey form for Stettin, 27 June 1910 1910, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating the special survey no.2 will be carried out in Leith in September, 23 October 1910 1910, Report of survey for repairs for Stettin, 5 October 1910 1910, Report of survey for repairs of engines and boilers for Stettin, 21 October 1910 1910, Report of Ship forgings or castings for Stettin, 30 September 1910 1910, Note about the sketch of rudder for Stettin, 19 September 1910 1910, Letter from Leith surveyors to the Secretary regarding the plan of rudder for Stettin to be approved by the Committee, 16 September 1910 1910, Copy of letter from Secretary, Lloyd's Register London, to James Currie and Co, regarding agreement for date of carrying out special survey, 28 June 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the special survey no.2 for Stettin and the repairs made, 6 June 1911 1911, Report of survey for repairs for Stettin, 3 June 1911 1911, Report of survey for repairs of engines and boilers for Stettin, 3 June 1911 1911, Copy of letter from the Assistant to the Secretary to the owners of Stettin, James Currie & Co, regarding the boiler survey to take place in about two months' time, 12 July 1912 1912, Report of survey for repairs for Stettin, 17 August 1912 1912, Postponed survey form for Stettin, 11 July 1912 1912, Letter from the owners of Stettin to the Secretary regarding the ship special survey and boilers survey, 9 July 1912 1912, Report of survey for repairs of engines and boilers for Stettin, 17 August 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the conditions of Stettin after repair, 29 December 1913 1913, Report of survey for repairs for Stettin, 27 December 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of Stettin taking place in three weeks’ time, 14 November 1913 1913, Postponed survey form for Stettin, 13 November 1913 1913, Letter from Leith surveyors to the Secretary regarding the survey of Stettin, 8 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin, 7 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin being carried out after the strike of the boilers makers, 9 November 1913 1913, Postponed survey form for Stettin, 8 September 1913 1913, Letter from Leith surveyors to the Secretary regarding the postpone of survey of Stettin due to the boilers makers strike, 5 September 1913 1913, Copy of letter from the Secretary to Leith surveyors regarding the survey of screw shaft of Stettin, 3 September 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating the Committee has agreed with the survey being carried out next month, 4 September 1913 1913, Postponed survey form for Stettin, 3 September 1913 1913, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft, 2 July 1913 1913, Report of survey for repairs of engines and boilers for Stettin, 27 December 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with postponing the special survey, 9 June 1914 1914, Postponed survey form for Stettin, 8 June 1914 1914, Letter from Leith surveyors to the Secretary regarding the special survey of Stettin, 4 June 1914 1914, Copy of letter from the Secretary to Leith surveyors enclosing a letter sent by the owners of Stettin about her fourth special survey no. 3, 3 June 1914 1914, Postponed survey form for Stettin, 2 June 1914 1914, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding postponing the second special survey no. 3 of Stettin, 29 May 1914 1914, Report of survey for repairs of engines and boilers for Stettin, 2 July 1915 1915, Copy of letter from the Secretary to Newcastle-on-Tyne surveyors regarding the special survey of Stettin, 12 August 1913 1915, Letter from Aberdeen surveyors to the Secretary stating that Stettin has sailed to Newcastle-on-Tyne as she failed to obtain docking facilities at that port, 10 August 1915 1915, Remarks to the Chief Ship Surveyor regarding the fourth special survey no. 3 for Stettin, 13 July 1915 1915, Copy of letter from the Secretary to the Surveyors in Hull, Grimsby, Middlesbrough, Newcastle, Sunderland and Hartlepool, regarding the fourth special survey no. 3 of Stettin, which will be carried out at some East coast port, 19 July 1915 1915, Letter from Leith surveyors to the Secretary regarding the survey of Stettin to be carried out at some East coast port, 12 July 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the fourth special survey no. 3 for Stettin, 5 July 1915 1915, Report of survey for repairs for Stettin, 2 July 1915 1915, Letter from Leith surveyors to the Secretary stating that the special survey of Stettin is being carried out at that port, 22 May 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 for Stettin, 21 May 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding her survey, 20 April 1915 1915, Extract from a letter dated 15 April 1915 from James Currie & Co regarding surveying Stettin. Extract dated 16 April 1915 1915, Letter from Leith surveyors to the Secretary stating that they had spoken to the owners of Stettin and due to a shortage of labour it has been difficult to find a dry dock to carry out the special survey, 13 April 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the importance of carrying out the special survey due to the age of the ship, 13 April 1915 1915, Postponed survey form for Stettin, 12 April 1915 1915, Copy of letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding the survey of Stettin being postponed, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 of Stettin, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors enclosing information about the communication between the owners of Stettin, 26 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with the special survey being carried out in the next two or three months, 26 January 1915 1915, Postponed survey form for Stettin, 25 January 1915 1915, Letter from Leith surveyors to the Secretary regarding the special survey no.3 and boiler survey of Stettin, 23 January 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding postponing the survey of Stettin, 21 January 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the fourth special survey no.3 and special annual boiler survey of Stettin, 20 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the letter sent by the latter about the thrust shaft, 1 November 1915 1915, Letter from Lisbon surveyors to the Secretary about the repair of shaft of Stettin, 25 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 28 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 23 October 1915 1915, Copy of letter from the Assistant to the Secretary to Lisbon surveyors regarding the repair of Stettin's thrust shaft being not satisfactory, 18 October 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the new thrust shaft she received in Lisbon, 1916 1915, Letter reporting that the new thrust shaft for Stettin is not considered satisfactory, 14 October 1915 1915, London Office Copy of document certifying that surveyor has examined the machinery of Stettin and stating his recommendations, 4 October 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 6 October 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 67857, 19 August 1915 1915, Report of Survey for Repairs for Stettin, 18 August 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 August 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the thrust shaft supplied in Lisbon and if it will be approved by the Committee as a permanent repair, 29 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon and stating that it will be approved by the Committee as a permanent repair, 28 April 1916 1916, Letter reporting the results of the test carried out on Stettin's new thrust shaft that was made in Lisbon, 27 April 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the result of the tests carried out on the new thrust shaft, 14 April 1916 1916, Letter from Professor R Stanfield to James Currie & Co regarding the results of the test of the transverse section of the shaft of Stettin, 11 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Letter reporting that Stettin's new thrust shaft is not satisfactory to be recommended as a permanent repair, 22 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin stating that the repair of the thrust shaft is being looked at, 14 March 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary enclosing drawings and plans of the shaft of Stettin, 6 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the repair of the thrust shaft, 28 January 1916 1916, Postponed survey form for Stettin, 22 January 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft of Stettin, 24 January 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding when the ship will be in position to have the thrust shaft examined, 21 January 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to London Report 79106, 13 July 1917 1916, Report of Survey for Repairs for Stettin due to collision with ice, 1 July 1916 1916, Report of Survey for Repairs of Engines and Boilers for Stettin, 14 July 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70096, 27 July 1917 1917, London Office Copy of document certifying that surveyor has examined damage and transmitted the Report, and stating his Recommendations, 24 July 1917 1917, Report of Survey for Repairs for Stettin 1917, Letter from Newcastle surveyors informing Lloyd's Register London that Stettin is under survey at Newcastle, 21 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding whether Stettin has yet come under inspection, 20 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding their report 70069, and Stettin's owners' intention to make repairs at South Shields within the next couple of days, and calling attention to the need for the Annu 1917, Letter from James Currie & Co Managers, informing Lloyd's Register London that they have arranged for repairs of damage previously communicated by Smith's Dry Dock Co, South Shields, on the steamer's return there in the next day or two, 1 August 1917 1917, Copy of letter from Lloyd's Register's London Secretary to James Currie and Co, informing them of the damage done to Stettin when striking a quay wall, that temporary repairs have been effected but that for the vessel to remain in class permanent repairs 1917, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70306, 2 October 1917 1917, Report of Survey for Repairs for Stettin, 29 September 1917 1917, Report of Survey for Repairs of Engines and Boilers for Stettin, 1 October 1917 1917, Certificate of approval of a stockless anchor, with cancelled written across it, 4 September 1917 1917, Correspondence to Lloyd's Register's London Secretary regarding Stettin Report 71400, acknowledging remarks on the Rules for Engines and Boilers with a working pressure of less than 60lbs, 23 November 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 71400, 19 November 1918 1918, Report of survey for repairs of Stettin, 5 November 1918 1918, Memo to Newcastle surveyors regarding Rules for Engines and Boilers of a greater working pressure than 60lbs per square inch, 18 November 1918 1918, Report of Survey for Repairs of Boilers and Engines of Stettin, 13 November 1918 1918, Copy of letter from London Secretary to James Currie and Co regarding state or survey of Stettin, 17 October 1919 1919, Postponed Survey form for Stettin, October 1919 1919, Letter from James Currie and Co to Secretary, Lloyd's Register London, regarding postponing survey of Stettin, 10 October 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Leith Report 15769, 2 July 1920 1920, Report of Survey for Repairs of Stettin, 28 June 1920 1920, Copy of letter from Lloyd's Register London Secretary to Leith Surveyors, 30 March 1920 1920, Postponed Survey form for Stettin, 29 March 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 24 March 1920 1920, Copy of Letter from Lloyd's Register London Secretary to Leith Surveyors, 19 March 1920 1920, Letter from the Surveyors at Hull, per N Rowall, to London Secretary regarding state of survey of Stettin, 18 March 1920 1920, Copy of letter from the London Secretary to the Hull Surveyors regarding state of survey of Stettin, 17 March 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 10 February 1920 1920, Postponed Survey form for Stettin, 9 February 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 5 February 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 28 January 1920 1920, Report of Survey for Repairs of Engines and Boilers for Stettin, 28 June 1920 1920, Copy of letter from the Secretary to the owners of Stettin saying the Committee has agreed with postponing the boiler survey, 23 August 1921 1921, Report of Survey for Repairs of Stettin, 16 September 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London regarding Stettin now undergoing survey, 3 September 1921 1921, Postponed Surveys form for Stettin, 22 August 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London explaining why Stettin had not undergone survey, 18 August 1921 1921, Report of Survey for Repairs of Engines and Boilers for Stettin, 16 September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Stettin survey, with reference to Leith Report 16187, 6 October 1921 1922, Report of Survey for Repairs of Stettin, 3 October 1921 1922, Correspondence of Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding ongoing surveys on Stettin, 14 September 1922 1922, Copy of letter from Lloyd's Register London Assistant to the Secretary to Leith Surveyors regarding survey of Stettin's screwshaft, 21 July 1922 1922, Postponed Surveys form for Stettin, 20 July 1922 1922, Letter from Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding proposed survey date for Stettin's screw shaft, 17 July 1922 1922, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans of owners of Stettin for survey of screwshaft, 14 July 1922 1922, Report of Survey for Repairs of Boilers and Engines for Stettin, 26 September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding carrying out part of Stettin's Special Survey, with reference to Leith Report 16388, 30 October 1923 1923, Report of Survey for Repairs of Stettin, 24 October 1923 1923, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors, regarding Rule requirements for cables, 20 October 1923 1923, Remarks to the Chief Ship Surveyor regarding Rule requirements for cables, 19 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London requesting clarification on Rules for chains, 18 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London regarding proposed timeline for survey, 22 September 1923 1923, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding letter from Stettin's owners and requesting clarification of when the boiler survey shall be held, 21 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London, regarding carrying out a part survey, 18 September 1923 1923, Copy of letter from Assistant to the Secretary to James Currie and Co regarding schedule for surveys of Stettin, 14 September 1923 1923, Postponed Surveys form for Stettin, 13 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London querying survey schedule of Stettin, 10 September 1923 1923, Report of Survey for Repairs of Engines and Boilers for Stettin, 23 October 1923 1923, Letter from Leith Surveyor A T Thomas to James Currie and Co, informing them of future survey schedule for Stettin, 23 October 1923 1923, Plan of Main Boiler for Stettin, 24 May 1924 1924, Plan of Donkey Boiler for Stettin, 24 May 1924 1924, Hatch Plan of Stettin, 2 October 1924 1924, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Stettin, with reference to Leith Report 16388, 19 May 1924 1924, Letter from A T Thomas, Leith Surveyor, to J F Hill of London, regarding surveying Stettin, 16 May 1924 1924, Extract from a letter dated 14 May 1924 from Leith surveyors regarding examining Stettin. Extract dated 15 May 1924 1924, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans for survey of Stettin and expiry of year of grace, 14 May 1924 1924, Letter from Leith surveyor A T Thomas to Secretary, London, regarding proposed examination part of Stettin's combustion chamber, 18 April 1924 1924, Copy of letter from Assistant to the Secretary to the Leith surveyors questioning owners' arrangements to have Stettin's combustion chamber examined, 16 April 1924 1924, Report of Survey for Repairs of Engines and Boilers for Stettin, 12 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding fulfilment of special survey on Stettin, in reference to Leith Report 16611, 22 November 1924 1924, Report of Survey for Repairs of Stettin, 15 November 1924 1924, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 November 1924 1924, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding completion of reports on Stettin's new boilers, 31 October 1924 1924, Note submitting that certain reports be forwarded to the Leith Surveyors for their guidance and completion, 29 October 1924 1924, Note submitting that the amended plans of boilers for Stettin merit approval, 29 May 1924 1924, Correspondence accompanying boiler plans submitted for approval for Stettin from the Glasgow office to London, 26 May 1924 1924, Letter from Jas S Cairns submitting for approval plans for new boilers for the Stettin to the Glasgow Secretary, 26 May 1924 1924, Note submitting that plans for Stettin's boilers merit approval, 24 April 1924 1924, Letter from Leith Surveyors, per A T T[homas], to Secretary, London, noting they are forwarding plans of new boilers intended for Stettin, 14 April 1924 1924, Report on Main Boiler for Stettin, 11 October 1924 1924, Report on Donkey Boiler for Stettin, 11 October 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Delivery note for 3 furnaces from Forth Shipbuilding and Engineering, Glasgow, 4 July 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 27 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, LR stamp and signature J Barr, 2 July 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 14 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 28 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 26 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 17 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 16790, 28 August 1925 1925, Report of Survey for Repairs on Stettin, 25 August 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 August 1925 1925, Memo regarding approving a steel cylinder cover on Stettin, 5 October 1925 1925, Letter from Leith Surveyor to Secretary, London, regarding steel cover repair examined, 2 October 1925 1925, Letter from Hamburg Office to Secretary, London, regarding request by Leith Surveyors, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding Hamburg report on Stettin, 1 October 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding their request for the Hamburg report, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to A Chisholm, requesting a report for the Leith Surveyors, 30 September 1925 1925, Translation of Cablegram sent to Surveyors at Hamburg, 30 September 1925 1925, Copy of Cablegram from London Office to Hamburg Office, 30 September 1925 1925, Letter from Leith Surveyors, per A T T[homas], to London Office asking for a Hamburg report to be sent to them, 29 September 1925 1925, London Office Copy of document certifying that Hamburg surveyor has examined damage and transmitted the Report, and stating his Recommendations, 25 September 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 September 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 16897, March 1926 1926, Report of Survey for Repairs to Stettin, 30 March 1926 1926, Report of Survey for Repairs of Engines and Boilers to Stettin, 30 March 1926 1926, Report of Survey for Repairs to Stettin, 15 June 1927 1927, Report of Survey for Repairs of Engines and Boilers to Stettin, 15 June 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 17291, 8 December 1927 1927, Copy of Certificate of Survey after damage to Stettin by a breaker in heavy weather, 23 November 1927 1927, Report of Survey for Repairs to Stettin, 3 December 1927 1927, Question and Answer memo between London and Leith Offices regarding Hamburg Report 17858, 21 February 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 1 February 1928 1928, Correspondence memo with particulars from Leith Surveyors to Secretary, London, regarding return of report, 27 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 25 January 1928 1928, Copy of Certificate of Survey from Hamburg after collision damage suffered by Stettin, 22 January 1928 1928, Report of Survey for Repairs of Stettin, 23 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 17339, 15 March 1928 1928, Report of Survey for Repairs of Stettin, 5 March 1928 1928, Copy of letter from the Clerk of the Classification Committee to James Currie and Co, with a copy to the Leith Office, regarding 6th Special Survey of Stettin, 14 December 1928 1928, Postponed Survey form for Stettin's 6th Special Survey, 13 December 1928 1928, Letter from James Currie and Co to Lloyd's Register Secretary, London, regarding deferring Stettin's 6th Special Survey, 11 December 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage, in reference to Dundee Report 8638, 30 March 1928 1928, Copy of Certificate of Survey regarding damage and report of repairs to Stettin's port bow shell plating, Dundee, 23 March 1928 1928, Report of Survey for Repairs to Stettin, 23 March 1928 1928, Letter from Lloyd's Register Engineer Surveyor to James Currie and Co regarding schedule for survey of Stettin's propeller shaft, 5 March 1929 1929, Copy of letter from the Secretary, London, to the Secretary, Glasgow, returning Stettin boiler plans, 29 May 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin and 6th Special Survey, in reference to Leith Report 17540, 13 March 1929 1929, Report of Survey for Repairs of Stettin, 5 March 1929 1929, Report of Survey for Repairs of Engines and Boilers for Stettin, 5 March 1929 1929, Copy of letter from pro Secretary, London, to Leith Surveyors regarding examination of Stettin's screwshaft, 16 April 1930 1930, Postponed Survey form for Stettin's screwshaft, 14 April 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 9 April 1930 1930, Copy of letter from Secretary, London, to Leith Surveyors informing them Committee are agreeable to postponing Stettin's screwshaft survey, 25 February 1930 1930, Postponed Survey form for Stettin's screwshaft, 24 February 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 17 February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 17802, 22 May 1930 1930, Report of Survey for Repairs to Stettin, 15 May 1930 1930, Report on Engine Forgings for Stettin, 8 May 1930 1930, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 May 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 18082, 2 November 1931 1931, Form or memo from Secretary, Glasgow, to Secretary, London, regarding presence of Stettin, 16 October 1931 1931, Question and Answer memo from Secretary, London, to Leith Surveyors regarding Stettin Boiler Survey, 5 October 1931 1931, Copy of letter from pro Secretary, London, with copy to Leith, to James Currie and Co regarding postponing Stettin Boiler Survey, 26 June 1931 1931, Postponed Surveys form for Stettin's Boiler Survey, 25 June 1931 1931, Letter from James Currie and Co regarding postponing Boiler Survey due on Stettin, 20 June 1931 1931, Report of Survey for Repairs on Stettin, 26 October 1931 1931, Report of Survey for Repairs of Engines and Boilers on Stettin, 26 October 1931 1931, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of survey for Stettin, 23 December 1932 1932, Postponed Surveys form for Stettin, 22 December 1932 1932, Letter from Leith Surveyors per John Houston to the Secretary, London, regarding outstanding survey on Stettin, 17 December 1932 1932, Letter from James Currie and Co to Leith Surveyors regarding schedule of survey for Stettin, 16 December 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 14 December 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 24 November 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 September 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 21 June 1932 1932, Postponed Surveys form for Stettin, 20 June 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 June 1932 1932, Copy of letter from pro Secretary, London to Leith Surveyors regarding Stettin boiler survey schedule, 9 October 1931 1932, Postponed Surveys form for Stettin, 8 October 1931 1932, Report of Total Loss, Casualty, , for Stettin, which has been sold to be broken up, 4 December 1933 1933, Letter from Leith Surveyors, per John Houston, to Secretary, London, informing them Stettin is being broken up, 1 December 1933 1933, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of demolition for Stettin, 27 November 1933 1933, Copy of letter from Leith Surveyors, per John Houston, to the Secretary, London, regarding the firm to which Stettin was sold to be broken up, 24 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 23 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 31 August 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 15 June 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 16 March 1933 1933, Note related to Stettin stating SS no. 2 held now posting no date, Note regarding Stettin stating "Vessel left Lisbon Oct 3. + 3 mos from dats. of survey would expire 12/15" no date, Sketch or plan of steel cover part for Stettin no date )
Location where a vessel’s survey was undertaken.
Glasgow ( Certificate for vessels navigated by Steam for Stettin, 30 November 1864 1864, Iron Ship survey report for Stettin, 2 December 1864 1864, Report of survey for repairs for Stettin, 8 July 1876 1876, Details of main boilers of Stettin, 29 June 1876 1876, Engineer surveyor's report on machinery for Stettin, 26 June 1876 1876, Plan of Main Boiler for Stettin, 24 May 1924 1924, Plan of Donkey Boiler for Stettin, 24 May 1924 1924, Report on Main Boiler for Stettin, 11 October 1924 1924, Report on Donkey Boiler for Stettin, 11 October 1924 1924 )
London ( Annual surveys for Stettin, 30 November 1876 1876, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to London Report 79106, 13 July 1917 1916, Report of Survey for Repairs for Stettin due to collision with ice, 1 July 1916 1916, Report of Survey for Repairs of Engines and Boilers for Stettin, 14 July 1916 1916 )
Leith ( Report of survey for repairs for Stettin, 16 January 1879 1879, Report of survey for repairs for Stettin, 2 February 1881 1881, Report of survey for repairs for Stettin, 27 January 1882 1882, Annual surveys for Stettin, 6 January 1883 1883, Annual surveys for Stettin, 23 January 1884 1884, Report of survey for repairs for Stettin, 30 January 1885 1885, Report of survey for repairs of engines and boilers for Stettin, 30 January 1885 1885, Report of survey for repairs for Stettin, 27 January 1886 1886, Report of survey for repairs of engines and boilers for Stettin, 30 January 1886 1886, Report of survey for repairs for Stettin, 26 February 1887 1887, Report of survey for repairs of engines and boilers for Stettin, 15 March 1887 1887, Report of survey for repairs for Stettin, 21 May 1888 1888, Report of survey for repairs of engines and boilers for Stettin, 25 May 1888 1888, Report of survey for repairs for Stettin, 29 December 1888 1888, Particulars for record of double bottoms in Lloyd's Register for Stettin, 5 December 1889 1889, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 10 December 1889 1889, Report of Survey for Repairs for Stettin, 6 December 1889 1889, Report on Machinery for Stettin, 3 December 1889 1889, Report of Survey for Repairs for Stettin, 18 October 1890 1890, Report of Survey for Repairs for Stettin, 6 November 1891 1891, Report of Survey for Repairs for Stettin, 16 January 1893 1893, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 19 February 1894 1894, Report of survey for repairs for Stettin, 12 February 1894 1894, Report of survey for repairs of engines and boilers for Stettin, 13 February 1894 1894, Report of survey for repairs for Stettin, 6 February 1895 1895, Report of survey for repairs of engines and boilers for Stettin, 6 February 1895 1895, Report of survey for repairs for Stettin, 19 March 1896 1896, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin about the survey of boilers, 23 March 1896 1896, Letter from Leith surveyor to the Secretary stating that the Stettin is under survey, 5 March 1896 1896, Report of survey for repairs of engines and boilers for Stettin, 19 March 1896 1896, Report of survey for repairs for Stettin, 19 March 1897 1897, Letter from the Leith surveyor to the Secretary stating that Stettin is now employed in the emigrant trade and therefore the pressure of boiler has been reduced, 24 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 19 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 26 July 1897 1897, Remarks of the Chief Surveyor to the Classing Committee about the special survey of the ship Stettin, 4 March 1898 1898, Copy of letter from the Secretary to the owners of Stettin stating that the special survey will take place when the ship is placed in dry dock, 3 February 1898 1898, Report of survey for repairs for Stettin, 3 March 1898 1898, Report of survey for repairs of engines and boilers for Stettin, 3 March 1898 1898, Report of survey for repairs for Stettin, 5 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1899 1899, Report of survey for repairs of engines and boilers for Stettin, 5 April 1899 1899, Report of survey for repairs for Stettin, 28 April 1900 1900, Report of survey for repairs of engines and boilers for Stettin, 28 April 1900 1900, Report of survey for repairs for Stettin, 2 May 1901 1901, Report of survey for repairs of engines and boilers for Stettin, 2 May 1901 1901, Remarks of the Ship Surveyor to the Classing Committee about the special survey of Stettin and the particulars of her plating, 7 April 1902 1902, Report of survey for repairs for Stettin, 4 April 1902 1902, Report of survey for repairs of engines and boilers for Stettin, 4 April 1902 1902, Report of survey for repairs for Stettin, 11 May 1903 1903, Report of survey for repairs of engines and boilers for Stettin, 11 May 1903 1903, Report of survey for repairs for Stettin, 29 June 1904 1904, Report of survey for repairs of engines and boilers for Stettin, 29 June 1904 1904, Report of survey for repairs for Stettin, 11 July 1905 1905, Report of survey for repairs of engines and boilers for Stettin, 11 July 1905 1905, Report of survey for repairs for Stettin, 22 August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the special survey no.1 of Stettin, 26 July 1906 1906, Report of survey for repairs for Stettin, 23 July 1906 1906, Report of survey for repairs of engines and boilers for Stettin, 24 July 1906 1906, Report of survey for repairs for Stettin, 16 July 1907 1906, Report of survey for repairs of engines and boilers for Stettin, 16 July 1907 1906, Report of survey for repairs for Stettin, 19 September 1908 1908, Report of survey for repairs of engines and boilers for Stettin, 19 September 1908 1908, Report of survey for repairs for Stettin, 2 October 1909 1909, Report of survey for repairs of engines and boilers for Stettin, 2 October 1909 1909, Plan of Rudder of Stettin, 1910. Scale 1"=one foot. Details 3"= one foot, 19 September 1910 1910, Report of survey for repairs for Stettin, 5 October 1910 1910, Report of survey for repairs of engines and boilers for Stettin, 21 October 1910 1910, Report of Ship forgings or castings for Stettin, 30 September 1910 1910, Report of survey for repairs for Stettin, 3 June 1911 1911, Report of survey for repairs of engines and boilers for Stettin, 3 June 1911 1911, Report of survey for repairs for Stettin, 17 August 1912 1912, Report of survey for repairs of engines and boilers for Stettin, 17 August 1912 1912, Report of survey for repairs for Stettin, 27 December 1913 1913, Report of survey for repairs of engines and boilers for Stettin, 27 December 1913 1913, Report of survey for repairs of engines and boilers for Stettin, 2 July 1915 1915, Report of survey for repairs for Stettin, 2 July 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Leith Report 15769, 2 July 1920 1920, Report of Survey for Repairs of Stettin, 28 June 1920 1920, Report of Survey for Repairs of Engines and Boilers for Stettin, 28 June 1920 1920, Report of Survey for Repairs of Stettin, 16 September 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London regarding Stettin now undergoing survey, 3 September 1921 1921, Report of Survey for Repairs of Engines and Boilers for Stettin, 16 September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Stettin survey, with reference to Leith Report 16187, 6 October 1921 1922, Report of Survey for Repairs of Stettin, 3 October 1921 1922, Correspondence of Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding ongoing surveys on Stettin, 14 September 1922 1922, Report of Survey for Repairs of Boilers and Engines for Stettin, 26 September 1922 1922, Report of Survey for Repairs of Stettin, 24 October 1923 1923, Report of Survey for Repairs of Engines and Boilers for Stettin, 23 October 1923 1923, Report of Survey for Repairs of Engines and Boilers for Stettin, 12 June 1924 1924, Report of Survey for Repairs of Stettin, 15 November 1924 1924, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 November 1924 1924, Report of Survey for Repairs on Stettin, 25 August 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 August 1925 1925, Report of Survey for Repairs to Stettin, 30 March 1926 1926, Report of Survey for Repairs of Engines and Boilers to Stettin, 30 March 1926 1926, Report of Survey for Repairs to Stettin, 15 June 1927 1927, Report of Survey for Repairs of Engines and Boilers to Stettin, 15 June 1927 1927, Copy of Certificate of Survey after damage to Stettin by a breaker in heavy weather, 23 November 1927 1927, Report of Survey for Repairs to Stettin, 3 December 1927 1927, Report of Survey for Repairs of Stettin, 5 March 1928 1928, Report of Survey for Repairs of Stettin, 5 March 1929 1929, Report of Survey for Repairs of Engines and Boilers for Stettin, 5 March 1929 1929, Report of Survey for Repairs to Stettin, 15 May 1930 1930, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 May 1930 1930, Report of Survey for Repairs on Stettin, 26 October 1931 1931, Report of Survey for Repairs of Engines and Boilers on Stettin, 26 October 1931 1931 )
Granton; Leith ( Report of survey for repairs of engines and boilers for Stettin, 16 January 1880 1880, Report of survey for repairs for Stettin, 28 January 1880 1880 )
Bergen ( Report of Survey for repairs of engines and boilers for Stettin, 12 July 1894 1894 )
Bremerhaven ( Letter from the Bremerhaven surveyor about the repairs to Stettin, 29 March 1898 1898 )
Bremen ( Report of survey for repairs for Stettin, 28 March 1898 1898 )
Lisbon ( London Office Copy of document certifying that surveyor has examined the machinery of Stettin and stating his recommendations, 4 October 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 6 October 1915 1915 )
Leith; Newcastle upon Tyne; Newcastle ( Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 67857, 19 August 1915 1915 )
South Shields ( Report of Survey for Repairs for Stettin, 18 August 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 August 1915 1915, Report of survey for repairs of Stettin, 5 November 1918 1918, Report of Survey for Repairs of Boilers and Engines of Stettin, 13 November 1918 1918 )
Newcastle upon Tyne; Newcastle ( Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70096, 27 July 1917 1917, London Office Copy of document certifying that surveyor has examined damage and transmitted the Report, and stating his Recommendations, 24 July 1917 1917, Report of Survey for Repairs for Stettin 1917, Letter from Newcastle surveyors informing Lloyd's Register London that Stettin is under survey at Newcastle, 21 September 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70306, 2 October 1917 1917, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 71400, 19 November 1918 1918 )
North Shields ( Report of Survey for Repairs for Stettin, 29 September 1917 1917, Report of Survey for Repairs of Engines and Boilers for Stettin, 1 October 1917 1917 )
Hamburg ( London Office Copy of document certifying that Hamburg surveyor has examined damage and transmitted the Report, and stating his Recommendations, 25 September 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 September 1925 1925, Copy of Certificate of Survey from Hamburg after collision damage suffered by Stettin, 22 January 1928 1928, Report of Survey for Repairs of Stettin, 23 January 1928 1928 )
Dundee ( Copy of Certificate of Survey regarding damage and report of repairs to Stettin's port bow shell plating, Dundee, 23 March 1928 1928, Report of Survey for Repairs to Stettin, 23 March 1928 1928 )
The name of the port/place of destination given.
Hull; Hamburg ( Certificate for vessels navigated by Steam for Stettin, 30 November 1864 1864 )
Baltic ( Iron Ship survey report for Stettin, 2 December 1864 1864, Report of Survey for Repairs for Stettin, 6 December 1889 1889, Report of Survey for Repairs for Stettin, 6 November 1891 1891, Report of survey for repairs of engines and boilers for Stettin, 13 February 1894 1894, Report of survey for repairs for Stettin, 5 April 1899 1899, Report of survey for repairs of engines and boilers for Stettin, 5 April 1899 1899, Report of survey for repairs for Stettin, 28 April 1900 1900, Report of survey for repairs of engines and boilers for Stettin, 28 April 1900 1900, Report of survey for repairs for Stettin, 19 September 1908 1908, Report of survey for repairs of engines and boilers for Stettin, 19 September 1908 1908, Report of survey for repairs for Stettin, 3 June 1911 1911, Report of survey for repairs for Stettin, 17 August 1912 1912, Postponed Survey form for Stettin, 29 March 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 24 March 1920 1920 )
Copenhagen ( Report of survey for repairs for Stettin, 16 January 1879 1879, Report of survey for repairs for Stettin, 2 February 1881 1881, Report of survey for repairs for Stettin, 27 January 1882 1882, Annual surveys for Stettin, 23 January 1884 1884 )
Hull ( Report of survey for repairs for Stettin, 28 January 1880 1880, Report of Survey for Repairs of Stettin, 24 October 1923 1923 )
Bremerhaven ( Annual surveys for Stettin, 6 January 1883 1883, Report of survey for repairs for Stettin, 12 February 1894 1894 )
Hamburg ( Report of survey for repairs for Stettin, 30 January 1885 1885, Report of survey for repairs for Stettin, 22 August 1905 1905, Report of Survey for Repairs of Stettin, 16 September 1921 1921, Report of Survey for Repairs of Stettin, 3 October 1921 1922, Report of Survey for Repairs to Stettin, 3 December 1927 1927, Report of Survey for Repairs of Stettin, 5 March 1928 1928, Report of Survey for Repairs of Stettin, 5 March 1929 1929, Report of Survey for Repairs of Engines and Boilers for Stettin, 5 March 1929 1929, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 May 1930 1930 )
Dundee; Hamburg ( Report of survey for repairs for Stettin, 26 February 1887 1887, Report of Survey for Repairs on Stettin, 25 August 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 August 1925 1925 )
Stettin ( Report of survey for repairs for Stettin, 21 May 1888 1888 )
Drontheim ( Report of Survey for repairs of engines and boilers for Stettin, 12 July 1894 1894 )
Bremen ( Report of survey for repairs for Stettin, 6 February 1895 1895, Report of survey for repairs of engines and boilers for Stettin, 6 February 1895 1895, Report of survey for repairs for Stettin, 19 March 1896 1896, Report of survey for repairs of engines and boilers for Stettin, 19 March 1896 1896, Report of survey for repairs for Stettin, 19 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 19 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 26 July 1897 1897, Report of survey for repairs for Stettin, 3 March 1898 1898, Report of survey for repairs of engines and boilers for Stettin, 3 March 1898 1898, Report of survey for repairs for Stettin, 5 April 1898 1898, Report of survey for repairs for Stettin, 2 May 1901 1901, Report of survey for repairs of engines and boilers for Stettin, 2 May 1901 1901, Report of survey for repairs for Stettin, 4 April 1902 1902, Report of Survey for Repairs of Stettin, 15 November 1924 1924, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 November 1924 1924, Report of Survey for Repairs to Stettin, 15 June 1927 1927, Report of Survey for Repairs of Engines and Boilers to Stettin, 15 June 1927 1927 )
Leith ( Report of survey for repairs for Stettin, 28 March 1898 1898, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 August 1915 1915, Letter from the Surveyors at Hull, per N Rowall, to London Secretary regarding state of survey of Stettin, 18 March 1920 1920, Report of Survey for Repairs of Stettin, 23 January 1928 1928 )
Seville; International ports; United Kingdom ( Report of Survey for Repairs of Engines and Boilers of Stettin, 6 October 1915 1915 )
Genoa ( Report of Survey for Repairs for Stettin due to collision with ice, 1 July 1916 1916, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 10 February 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 5 February 1920 1920 )
Lisbon; Genoa ( Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 28 January 1920 1920 )
United Kingdom ( Report of Survey for Repairs of Engines and Boilers of Stettin, 25 September 1925 1925 )
Continent ( Report of Survey for Repairs on Stettin, 26 October 1931 1931 )
A vessel’s means of propulsion.
Steam ( Certificate for vessels navigated by Steam for Stettin, 30 November 1864 1864, Iron Ship survey report for Stettin, 2 December 1864 1864, Letter from Glasgow surveyor to the Secretary sending the machinery certificate and Stettin's report of survey no. 4255, 8 July 1876 1876, Report of survey for repairs for Stettin, 8 July 1876 1876, Memo from Messrs Napier Ltd. stating that Stettin's boilers are fitted in accordance with the Committee requirements and should have the notification Lloyd's MC in the Register Book, 3 July 1876 1876, Details of main boilers of Stettin, 29 June 1876 1876, Engineer surveyor's report on machinery for Stettin, 26 June 1876 1876, Annual surveys for Stettin, 30 November 1876 1876, Report of survey for repairs for Stettin, 16 January 1879 1879, Report of survey for repairs of engines and boilers for Stettin, 16 January 1880 1880, Cover note for reports number 4308 and 57 of Stettin, 31 January 1880 1880, Report of survey for repairs for Stettin, 28 January 1880 1880, Report of survey for repairs for Stettin, 2 February 1881 1881, Report of survey for repairs for Stettin, 27 January 1882 1882, Annual surveys for Stettin, 6 January 1883 1883, Annual surveys for Stettin, 23 January 1884 1884, Report of survey for repairs for Stettin, 30 January 1885 1885, Report of survey for repairs of engines and boilers for Stettin, 30 January 1885 1885, Report of survey for repairs for Stettin, 27 January 1886 1886, Report of survey for repairs of engines and boilers for Stettin, 30 January 1886 1886, Report of survey for repairs for Stettin, 26 February 1887 1887, Report of survey for repairs of engines and boilers for Stettin, 15 March 1887 1887, Report of survey for repairs for Stettin, 21 May 1888 1888, Report of survey for repairs of engines and boilers for Stettin, 25 May 1888 1888, Report of survey for repairs for Stettin, 29 December 1888 1888, Particulars for record of double bottoms in Lloyd's Register for Stettin, 5 December 1889 1889, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 10 December 1889 1889, Report of Survey for Repairs for Stettin, 6 December 1889 1889, Report on Machinery for Stettin, 3 December 1889 1889, Report of Survey for Repairs for Stettin, 18 October 1890 1890, Report of Survey for Repairs for Stettin, 6 November 1891 1891, Report of Survey for Repairs for Stettin, 16 January 1893 1893, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 19 February 1894 1894, Report of survey for repairs for Stettin, 12 February 1894 1894, Report of survey for repairs of engines and boilers for Stettin, 13 February 1894 1894, Letter from the surveyor Jas Barclay to the Secretary in London enclosing a letter received from the Master of Stettin about the boiler survey to be held at Bergen, 9 June 1894 1894, Letter from the Master of Stettin Otto E Jacobsen to the surveyor James Barclay about the survey of boilers to take place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to E Rusten, owner of Stettin, stating he agrees with the survey of boilers taking place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to Bergen surveyor stating that Stettin will have the survey of boilers carried out in Bergen, 8 June 1894 1894, Note stating the boiler survey for Stettin is due to April and the owners state the ship will be at Bergen where the survey will take place, 8 June 1894 1894, Letter from Erik Rusten, owner of Stettin, to Lloyd's Register stating that he wishes the survey of boilers to take place in Bergen, 4 June 1894 1894, Report of Survey for repairs of engines and boilers for Stettin, 12 July 1894 1894, Report of survey for repairs for Stettin, 6 February 1895 1895, Report of survey for repairs of engines and boilers for Stettin, 6 February 1895 1895, Report of survey for repairs for Stettin, 19 March 1896 1896, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin about the survey of boilers, 23 March 1896 1896, Letter from Leith surveyor to the Secretary stating that the Stettin is under survey, 5 March 1896 1896, Letter from the Secretary to the Leith Surveyor questioning about the survey of Stettin, 3 March 1896 1896, Copy of Letter from the Secretary to the owner of Stettin stating that he agrees with the boiler survey of that ship being carried out when she is in dry dock in the following month, 29 January 1896 1896, Note stating the boiler survey for Stettin will be in dry dock in the following month, 29 January 1896 1896, Letter from the owner of Stettin to the Secretary stating the ship will be in dry dock next month for the survey, 27 January 1896 1896, Report of survey for repairs of engines and boilers for Stettin, 19 March 1896 1896, Report of survey for repairs for Stettin, 19 March 1897 1897, Letter from the Leith surveyor to the Secretary stating that Stettin is now employed in the emigrant trade and therefore the pressure of boiler has been reduced, 24 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 19 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 26 July 1897 1897, Remarks of the Chief Surveyor to the Classing Committee about the special survey of the ship Stettin, 4 March 1898 1898, Copy of letter from the Secretary to the owners of Stettin stating that the special survey will take place when the ship is placed in dry dock, 3 February 1898 1898, Note stating the ship Stettin will be soon in dry dock to be surveyed, 3 February 1898 1898, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating their intention to put the ship in dry dock to be surveyed, 1 February 1898 1898, Report of survey for repairs for Stettin, 3 March 1898 1898, Report of survey for repairs of engines and boilers for Stettin, 3 March 1898 1898, Remarks of the Chief Surveyor to the Classing Committee about the damage and temporary repairs suffered by Stettin, 31 March 1898 1898, Letter from the Bremerhaven surveyor about the repairs to Stettin, 29 March 1898 1898, Cover note for report number 534 of Stettin, 1 April 1898 1898, Report of survey for repairs for Stettin, 28 March 1898 1898, Remarks of the Ship Surveyor to the Classing Committee saying the damage to Stettin has been repaired and she should remain classed, 6 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1899 1899, Report of survey for repairs of engines and boilers for Stettin, 5 April 1899 1899, Report of survey for repairs for Stettin, 28 April 1900 1900, Report of survey for repairs of engines and boilers for Stettin, 28 April 1900 1900, Report of survey for repairs for Stettin, 2 May 1901 1901, Report of survey for repairs of engines and boilers for Stettin, 2 May 1901 1901, Remarks of the Ship Surveyor to the Classing Committee about the special survey of Stettin and the particulars of her plating, 7 April 1902 1902, Report of survey for repairs for Stettin, 4 April 1902 1902, Copy of letter from the Secretary to the owners of Stettin statin the Committee agreed with the special survey being carried out in the next two months, 31 January 1902 1902, Postponed survey form for Stettin, 30 January 1902 1902, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating they expect to attend the special survey within the next two months, 29 January 1902 1902, Report of survey for repairs of engines and boilers for Stettin, 4 April 1902 1902, Report of survey for repairs for Stettin, 11 May 1903 1903, Copy of letter from the Secretary to Leith Surveyors stating that the steamer Stettin has been booked for the annual boiler survey that will take place in a few days, 7 April 1903 1903, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the annual overhaul has been booked for that next few days, 4 April 1903 1903, Report of survey for repairs of engines and boilers for Stettin, 11 May 1903 1903, Report of survey for repairs for Stettin, 29 June 1904 1904, Report of survey for repairs of engines and boilers for Stettin, 29 June 1904 1904, Report of survey for repairs for Stettin, 11 July 1905 1905, Report of survey for repairs of engines and boilers for Stettin, 11 July 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the damage and repairs to Stettin, 24 August 1905 1905, Report of survey for repairs for Stettin, 22 August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the special survey no.1 of Stettin, 26 July 1906 1906, Copy of letter from the Secretary to Leith Surveyors stating that Stettin will be in dry dock on her arrival from Konigsberg when the special survey no.1 will be carried out, 22 June 1906 1906, Copy of letter from the Secretary to the owners of Stettin stating that the special survey no.1 will be carried out next week in Leith, 22 June 1906 1906, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the special survey no.1 will be carried out in the next week on her arrival from Konigsberg, 20 June 1906 1906, Report of survey for repairs for Stettin, 23 July 1906 1906, Report of survey for repairs of engines and boilers for Stettin, 24 July 1906 1906, Report of survey for repairs for Stettin, 16 July 1907 1906, Report of survey for repairs of engines and boilers for Stettin, 16 July 1907 1906, Report of survey for repairs for Stettin, 19 September 1908 1908, Copy of letter from the Secretary to Leith Surveyors stating that Stettin is laid up for overhaul and that the boiler survey should be carried out, 8 September 1908 1908, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the steamer is laid up for overhaul and that the special survey of boilers should take place next week, 5 September 1908 1908, Report of survey for repairs of engines and boilers for Stettin, 19 September 1908 1908, Report of survey for repairs for Stettin, 2 October 1909 1909, Report of survey for repairs of engines and boilers for Stettin, 2 October 1909 1909, Plan of Rudder of Stettin, 1910. Scale 1"=one foot. Details 3"= one foot, 19 September 1910 1910, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding the special survey no. 2 and boiler survey for Stettin, 29 October 1910 1910, Letter from Leith Surveyor to the Secretary stating that they met with the owners of Stettin and arranged the special survey no. 2 to be carried out after the New Year holidays, 28 November 1910 1910, Copy of letter from the Secretary to Leith Surveyors regarding the report no. 13106 for Stettin and asking when the ship's owners expect the special survey no.2 to be carried out, 25 November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee about damage and repairs made to Stettin after grounding, 7 October 1910 1910, Postponed survey form for Stettin, 27 June 1910 1910, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating the special survey no.2 will be carried out in Leith in September, 23 October 1910 1910, Report of survey for repairs for Stettin, 5 October 1910 1910, Report of survey for repairs of engines and boilers for Stettin, 21 October 1910 1910, Report of Ship forgings or castings for Stettin, 30 September 1910 1910, Note about the sketch of rudder for Stettin, 19 September 1910 1910, Letter from Leith surveyors to the Secretary regarding the plan of rudder for Stettin to be approved by the Committee, 16 September 1910 1910, Copy of letter from Secretary, Lloyd's Register London, to James Currie and Co, regarding agreement for date of carrying out special survey, 28 June 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the special survey no.2 for Stettin and the repairs made, 6 June 1911 1911, Report of survey for repairs for Stettin, 3 June 1911 1911, Report of survey for repairs of engines and boilers for Stettin, 3 June 1911 1911, Copy of letter from the Assistant to the Secretary to the owners of Stettin, James Currie & Co, regarding the boiler survey to take place in about two months' time, 12 July 1912 1912, Report of survey for repairs for Stettin, 17 August 1912 1912, Postponed survey form for Stettin, 11 July 1912 1912, Letter from the owners of Stettin to the Secretary regarding the ship special survey and boilers survey, 9 July 1912 1912, Report of survey for repairs of engines and boilers for Stettin, 17 August 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the conditions of Stettin after repair, 29 December 1913 1913, Report of survey for repairs for Stettin, 27 December 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of Stettin taking place in three weeks’ time, 14 November 1913 1913, Postponed survey form for Stettin, 13 November 1913 1913, Letter from Leith surveyors to the Secretary regarding the survey of Stettin, 8 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin, 7 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin being carried out after the strike of the boilers makers, 9 November 1913 1913, Postponed survey form for Stettin, 8 September 1913 1913, Letter from Leith surveyors to the Secretary regarding the postpone of survey of Stettin due to the boilers makers strike, 5 September 1913 1913, Copy of letter from the Secretary to Leith surveyors regarding the survey of screw shaft of Stettin, 3 September 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating the Committee has agreed with the survey being carried out next month, 4 September 1913 1913, Postponed survey form for Stettin, 3 September 1913 1913, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft, 2 July 1913 1913, Report of survey for repairs of engines and boilers for Stettin, 27 December 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with postponing the special survey, 9 June 1914 1914, Postponed survey form for Stettin, 8 June 1914 1914, Letter from Leith surveyors to the Secretary regarding the special survey of Stettin, 4 June 1914 1914, Copy of letter from the Secretary to Leith surveyors enclosing a letter sent by the owners of Stettin about her fourth special survey no. 3, 3 June 1914 1914, Postponed survey form for Stettin, 2 June 1914 1914, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding postponing the second special survey no. 3 of Stettin, 29 May 1914 1914, Report of survey for repairs of engines and boilers for Stettin, 2 July 1915 1915, Copy of letter from the Secretary to Newcastle-on-Tyne surveyors regarding the special survey of Stettin, 12 August 1913 1915, Letter from Aberdeen surveyors to the Secretary stating that Stettin has sailed to Newcastle-on-Tyne as she failed to obtain docking facilities at that port, 10 August 1915 1915, Remarks to the Chief Ship Surveyor regarding the fourth special survey no. 3 for Stettin, 13 July 1915 1915, Copy of letter from the Secretary to the Surveyors in Hull, Grimsby, Middlesbrough, Newcastle, Sunderland and Hartlepool, regarding the fourth special survey no. 3 of Stettin, which will be carried out at some East coast port, 19 July 1915 1915, Letter from Leith surveyors to the Secretary regarding the survey of Stettin to be carried out at some East coast port, 12 July 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the fourth special survey no. 3 for Stettin, 5 July 1915 1915, Report of survey for repairs for Stettin, 2 July 1915 1915, Letter from Leith surveyors to the Secretary stating that the special survey of Stettin is being carried out at that port, 22 May 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 for Stettin, 21 May 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding her survey, 20 April 1915 1915, Extract from a letter dated 15 April 1915 from James Currie & Co regarding surveying Stettin. Extract dated 16 April 1915 1915, Letter from Leith surveyors to the Secretary stating that they had spoken to the owners of Stettin and due to a shortage of labour it has been difficult to find a dry dock to carry out the special survey, 13 April 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the importance of carrying out the special survey due to the age of the ship, 13 April 1915 1915, Postponed survey form for Stettin, 12 April 1915 1915, Copy of letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding the survey of Stettin being postponed, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 of Stettin, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors enclosing information about the communication between the owners of Stettin, 26 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with the special survey being carried out in the next two or three months, 26 January 1915 1915, Postponed survey form for Stettin, 25 January 1915 1915, Letter from Leith surveyors to the Secretary regarding the special survey no.3 and boiler survey of Stettin, 23 January 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding postponing the survey of Stettin, 21 January 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the fourth special survey no.3 and special annual boiler survey of Stettin, 20 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the letter sent by the latter about the thrust shaft, 1 November 1915 1915, Letter from Lisbon surveyors to the Secretary about the repair of shaft of Stettin, 25 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 28 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 23 October 1915 1915, Copy of letter from the Assistant to the Secretary to Lisbon surveyors regarding the repair of Stettin's thrust shaft being not satisfactory, 18 October 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the new thrust shaft she received in Lisbon, 1916 1915, Letter reporting that the new thrust shaft for Stettin is not considered satisfactory, 14 October 1915 1915, London Office Copy of document certifying that surveyor has examined the machinery of Stettin and stating his recommendations, 4 October 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 6 October 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 67857, 19 August 1915 1915, Report of Survey for Repairs for Stettin, 18 August 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 August 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the thrust shaft supplied in Lisbon and if it will be approved by the Committee as a permanent repair, 29 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon and stating that it will be approved by the Committee as a permanent repair, 28 April 1916 1916, Letter reporting the results of the test carried out on Stettin's new thrust shaft that was made in Lisbon, 27 April 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the result of the tests carried out on the new thrust shaft, 14 April 1916 1916, Letter from Professor R Stanfield to James Currie & Co regarding the results of the test of the transverse section of the shaft of Stettin, 11 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Letter reporting that Stettin's new thrust shaft is not satisfactory to be recommended as a permanent repair, 22 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin stating that the repair of the thrust shaft is being looked at, 14 March 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary enclosing drawings and plans of the shaft of Stettin, 6 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the repair of the thrust shaft, 28 January 1916 1916, Postponed survey form for Stettin, 22 January 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft of Stettin, 24 January 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding when the ship will be in position to have the thrust shaft examined, 21 January 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to London Report 79106, 13 July 1917 1916, Report of Survey for Repairs for Stettin due to collision with ice, 1 July 1916 1916, Report of Survey for Repairs of Engines and Boilers for Stettin, 14 July 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70096, 27 July 1917 1917, London Office Copy of document certifying that surveyor has examined damage and transmitted the Report, and stating his Recommendations, 24 July 1917 1917, Report of Survey for Repairs for Stettin 1917, Letter from Newcastle surveyors informing Lloyd's Register London that Stettin is under survey at Newcastle, 21 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding whether Stettin has yet come under inspection, 20 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding their report 70069, and Stettin's owners' intention to make repairs at South Shields within the next couple of days, and calling attention to the need for the Annu 1917, Letter from James Currie & Co Managers, informing Lloyd's Register London that they have arranged for repairs of damage previously communicated by Smith's Dry Dock Co, South Shields, on the steamer's return there in the next day or two, 1 August 1917 1917, Copy of letter from Lloyd's Register's London Secretary to James Currie and Co, informing them of the damage done to Stettin when striking a quay wall, that temporary repairs have been effected but that for the vessel to remain in class permanent repairs 1917, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70306, 2 October 1917 1917, Report of Survey for Repairs for Stettin, 29 September 1917 1917, Report of Survey for Repairs of Engines and Boilers for Stettin, 1 October 1917 1917, Certificate of approval of a stockless anchor, with cancelled written across it, 4 September 1917 1917, Correspondence to Lloyd's Register's London Secretary regarding Stettin Report 71400, acknowledging remarks on the Rules for Engines and Boilers with a working pressure of less than 60lbs, 23 November 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 71400, 19 November 1918 1918, Report of survey for repairs of Stettin, 5 November 1918 1918, Memo to Newcastle surveyors regarding Rules for Engines and Boilers of a greater working pressure than 60lbs per square inch, 18 November 1918 1918, Report of Survey for Repairs of Boilers and Engines of Stettin, 13 November 1918 1918, Copy of letter from London Secretary to James Currie and Co regarding state or survey of Stettin, 17 October 1919 1919, Postponed Survey form for Stettin, October 1919 1919, Letter from James Currie and Co to Secretary, Lloyd's Register London, regarding postponing survey of Stettin, 10 October 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Leith Report 15769, 2 July 1920 1920, Report of Survey for Repairs of Stettin, 28 June 1920 1920, Copy of letter from Lloyd's Register London Secretary to Leith Surveyors, 30 March 1920 1920, Postponed Survey form for Stettin, 29 March 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 24 March 1920 1920, Copy of Letter from Lloyd's Register London Secretary to Leith Surveyors, 19 March 1920 1920, Letter from the Surveyors at Hull, per N Rowall, to London Secretary regarding state of survey of Stettin, 18 March 1920 1920, Copy of letter from the London Secretary to the Hull Surveyors regarding state of survey of Stettin, 17 March 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 10 February 1920 1920, Postponed Survey form for Stettin, 9 February 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 5 February 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 28 January 1920 1920, Report of Survey for Repairs of Engines and Boilers for Stettin, 28 June 1920 1920, Copy of letter from the Secretary to the owners of Stettin saying the Committee has agreed with postponing the boiler survey, 23 August 1921 1921, Report of Survey for Repairs of Stettin, 16 September 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London regarding Stettin now undergoing survey, 3 September 1921 1921, Postponed Surveys form for Stettin, 22 August 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London explaining why Stettin had not undergone survey, 18 August 1921 1921, Report of Survey for Repairs of Engines and Boilers for Stettin, 16 September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Stettin survey, with reference to Leith Report 16187, 6 October 1921 1922, Report of Survey for Repairs of Stettin, 3 October 1921 1922, Correspondence of Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding ongoing surveys on Stettin, 14 September 1922 1922, Copy of letter from Lloyd's Register London Assistant to the Secretary to Leith Surveyors regarding survey of Stettin's screwshaft, 21 July 1922 1922, Postponed Surveys form for Stettin, 20 July 1922 1922, Letter from Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding proposed survey date for Stettin's screw shaft, 17 July 1922 1922, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans of owners of Stettin for survey of screwshaft, 14 July 1922 1922, Report of Survey for Repairs of Boilers and Engines for Stettin, 26 September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding carrying out part of Stettin's Special Survey, with reference to Leith Report 16388, 30 October 1923 1923, Report of Survey for Repairs of Stettin, 24 October 1923 1923, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors, regarding Rule requirements for cables, 20 October 1923 1923, Remarks to the Chief Ship Surveyor regarding Rule requirements for cables, 19 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London requesting clarification on Rules for chains, 18 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London regarding proposed timeline for survey, 22 September 1923 1923, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding letter from Stettin's owners and requesting clarification of when the boiler survey shall be held, 21 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London, regarding carrying out a part survey, 18 September 1923 1923, Copy of letter from Assistant to the Secretary to James Currie and Co regarding schedule for surveys of Stettin, 14 September 1923 1923, Postponed Surveys form for Stettin, 13 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London querying survey schedule of Stettin, 10 September 1923 1923, Report of Survey for Repairs of Engines and Boilers for Stettin, 23 October 1923 1923, Letter from Leith Surveyor A T Thomas to James Currie and Co, informing them of future survey schedule for Stettin, 23 October 1923 1923, Plan of Main Boiler for Stettin, 24 May 1924 1924, Plan of Donkey Boiler for Stettin, 24 May 1924 1924, Hatch Plan of Stettin, 2 October 1924 1924, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Stettin, with reference to Leith Report 16388, 19 May 1924 1924, Letter from A T Thomas, Leith Surveyor, to J F Hill of London, regarding surveying Stettin, 16 May 1924 1924, Extract from a letter dated 14 May 1924 from Leith surveyors regarding examining Stettin. Extract dated 15 May 1924 1924, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans for survey of Stettin and expiry of year of grace, 14 May 1924 1924, Letter from Leith surveyor A T Thomas to Secretary, London, regarding proposed examination part of Stettin's combustion chamber, 18 April 1924 1924, Copy of letter from Assistant to the Secretary to the Leith surveyors questioning owners' arrangements to have Stettin's combustion chamber examined, 16 April 1924 1924, Report of Survey for Repairs of Engines and Boilers for Stettin, 12 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding fulfilment of special survey on Stettin, in reference to Leith Report 16611, 22 November 1924 1924, Report of Survey for Repairs of Stettin, 15 November 1924 1924, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 November 1924 1924, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding completion of reports on Stettin's new boilers, 31 October 1924 1924, Note submitting that certain reports be forwarded to the Leith Surveyors for their guidance and completion, 29 October 1924 1924, Note submitting that the amended plans of boilers for Stettin merit approval, 29 May 1924 1924, Correspondence accompanying boiler plans submitted for approval for Stettin from the Glasgow office to London, 26 May 1924 1924, Letter from Jas S Cairns submitting for approval plans for new boilers for the Stettin to the Glasgow Secretary, 26 May 1924 1924, Note submitting that plans for Stettin's boilers merit approval, 24 April 1924 1924, Letter from Leith Surveyors, per A T T[homas], to Secretary, London, noting they are forwarding plans of new boilers intended for Stettin, 14 April 1924 1924, Report on Main Boiler for Stettin, 11 October 1924 1924, Report on Donkey Boiler for Stettin, 11 October 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Delivery note for 3 furnaces from Forth Shipbuilding and Engineering, Glasgow, 4 July 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 27 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, LR stamp and signature J Barr, 2 July 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 14 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 28 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 26 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 17 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 16790, 28 August 1925 1925, Report of Survey for Repairs on Stettin, 25 August 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 August 1925 1925, Memo regarding approving a steel cylinder cover on Stettin, 5 October 1925 1925, Letter from Leith Surveyor to Secretary, London, regarding steel cover repair examined, 2 October 1925 1925, Letter from Hamburg Office to Secretary, London, regarding request by Leith Surveyors, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding Hamburg report on Stettin, 1 October 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding their request for the Hamburg report, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to A Chisholm, requesting a report for the Leith Surveyors, 30 September 1925 1925, Translation of Cablegram sent to Surveyors at Hamburg, 30 September 1925 1925, Copy of Cablegram from London Office to Hamburg Office, 30 September 1925 1925, Letter from Leith Surveyors, per A T T[homas], to London Office asking for a Hamburg report to be sent to them, 29 September 1925 1925, London Office Copy of document certifying that Hamburg surveyor has examined damage and transmitted the Report, and stating his Recommendations, 25 September 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 September 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 16897, March 1926 1926, Report of Survey for Repairs to Stettin, 30 March 1926 1926, Report of Survey for Repairs of Engines and Boilers to Stettin, 30 March 1926 1926, Report of Survey for Repairs to Stettin, 15 June 1927 1927, Report of Survey for Repairs of Engines and Boilers to Stettin, 15 June 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 17291, 8 December 1927 1927, Copy of Certificate of Survey after damage to Stettin by a breaker in heavy weather, 23 November 1927 1927, Report of Survey for Repairs to Stettin, 3 December 1927 1927, Question and Answer memo between London and Leith Offices regarding Hamburg Report 17858, 21 February 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 1 February 1928 1928, Correspondence memo with particulars from Leith Surveyors to Secretary, London, regarding return of report, 27 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 25 January 1928 1928, Copy of Certificate of Survey from Hamburg after collision damage suffered by Stettin, 22 January 1928 1928, Report of Survey for Repairs of Stettin, 23 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 17339, 15 March 1928 1928, Report of Survey for Repairs of Stettin, 5 March 1928 1928, Copy of letter from the Clerk of the Classification Committee to James Currie and Co, with a copy to the Leith Office, regarding 6th Special Survey of Stettin, 14 December 1928 1928, Postponed Survey form for Stettin's 6th Special Survey, 13 December 1928 1928, Letter from James Currie and Co to Lloyd's Register Secretary, London, regarding deferring Stettin's 6th Special Survey, 11 December 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage, in reference to Dundee Report 8638, 30 March 1928 1928, Copy of Certificate of Survey regarding damage and report of repairs to Stettin's port bow shell plating, Dundee, 23 March 1928 1928, Report of Survey for Repairs to Stettin, 23 March 1928 1928, Letter from Lloyd's Register Engineer Surveyor to James Currie and Co regarding schedule for survey of Stettin's propeller shaft, 5 March 1929 1929, Copy of letter from the Secretary, London, to the Secretary, Glasgow, returning Stettin boiler plans, 29 May 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin and 6th Special Survey, in reference to Leith Report 17540, 13 March 1929 1929, Report of Survey for Repairs of Stettin, 5 March 1929 1929, Report of Survey for Repairs of Engines and Boilers for Stettin, 5 March 1929 1929, Copy of letter from pro Secretary, London, to Leith Surveyors regarding examination of Stettin's screwshaft, 16 April 1930 1930, Postponed Survey form for Stettin's screwshaft, 14 April 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 9 April 1930 1930, Copy of letter from Secretary, London, to Leith Surveyors informing them Committee are agreeable to postponing Stettin's screwshaft survey, 25 February 1930 1930, Postponed Survey form for Stettin's screwshaft, 24 February 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 17 February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 17802, 22 May 1930 1930, Report of Survey for Repairs to Stettin, 15 May 1930 1930, Report on Engine Forgings for Stettin, 8 May 1930 1930, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 May 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 18082, 2 November 1931 1931, Form or memo from Secretary, Glasgow, to Secretary, London, regarding presence of Stettin, 16 October 1931 1931, Question and Answer memo from Secretary, London, to Leith Surveyors regarding Stettin Boiler Survey, 5 October 1931 1931, Copy of letter from pro Secretary, London, with copy to Leith, to James Currie and Co regarding postponing Stettin Boiler Survey, 26 June 1931 1931, Postponed Surveys form for Stettin's Boiler Survey, 25 June 1931 1931, Letter from James Currie and Co regarding postponing Boiler Survey due on Stettin, 20 June 1931 1931, Report of Survey for Repairs on Stettin, 26 October 1931 1931, Report of Survey for Repairs of Engines and Boilers on Stettin, 26 October 1931 1931, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of survey for Stettin, 23 December 1932 1932, Postponed Surveys form for Stettin, 22 December 1932 1932, Letter from Leith Surveyors per John Houston to the Secretary, London, regarding outstanding survey on Stettin, 17 December 1932 1932, Letter from James Currie and Co to Leith Surveyors regarding schedule of survey for Stettin, 16 December 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 14 December 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 24 November 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 September 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 21 June 1932 1932, Postponed Surveys form for Stettin, 20 June 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 June 1932 1932, Copy of letter from pro Secretary, London to Leith Surveyors regarding Stettin boiler survey schedule, 9 October 1931 1932, Postponed Surveys form for Stettin, 8 October 1931 1932, Report of Total Loss, Casualty, , for Stettin, which has been sold to be broken up, 4 December 1933 1933, Letter from Leith Surveyors, per John Houston, to Secretary, London, informing them Stettin is being broken up, 1 December 1933 1933, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of demolition for Stettin, 27 November 1933 1933, Copy of letter from Leith Surveyors, per John Houston, to the Secretary, London, regarding the firm to which Stettin was sold to be broken up, 24 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 23 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 31 August 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 15 June 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 16 March 1933 1933, Note related to Stettin stating SS no. 2 held now posting no date, Note regarding Stettin stating "Vessel left Lisbon Oct 3. + 3 mos from dats. of survey would expire 12/15" no date, Sketch or plan of steel cover part for Stettin no date )
Predominant material(s) utilised in a vessel’s construction.
Iron ( Certificate for vessels navigated by Steam for Stettin, 30 November 1864 1864, Iron Ship survey report for Stettin, 2 December 1864 1864, Letter from Glasgow surveyor to the Secretary sending the machinery certificate and Stettin's report of survey no. 4255, 8 July 1876 1876, Report of survey for repairs for Stettin, 8 July 1876 1876, Memo from Messrs Napier Ltd. stating that Stettin's boilers are fitted in accordance with the Committee requirements and should have the notification Lloyd's MC in the Register Book, 3 July 1876 1876, Details of main boilers of Stettin, 29 June 1876 1876, Engineer surveyor's report on machinery for Stettin, 26 June 1876 1876, Annual surveys for Stettin, 30 November 1876 1876, Report of survey for repairs for Stettin, 16 January 1879 1879, Report of survey for repairs of engines and boilers for Stettin, 16 January 1880 1880, Cover note for reports number 4308 and 57 of Stettin, 31 January 1880 1880, Report of survey for repairs for Stettin, 28 January 1880 1880, Report of survey for repairs for Stettin, 2 February 1881 1881, Report of survey for repairs for Stettin, 27 January 1882 1882, Annual surveys for Stettin, 6 January 1883 1883, Annual surveys for Stettin, 23 January 1884 1884, Report of survey for repairs for Stettin, 30 January 1885 1885, Report of survey for repairs of engines and boilers for Stettin, 30 January 1885 1885, Report of survey for repairs for Stettin, 27 January 1886 1886, Report of survey for repairs of engines and boilers for Stettin, 30 January 1886 1886, Report of survey for repairs for Stettin, 26 February 1887 1887, Report of survey for repairs of engines and boilers for Stettin, 15 March 1887 1887, Report of survey for repairs for Stettin, 21 May 1888 1888, Report of survey for repairs of engines and boilers for Stettin, 25 May 1888 1888, Report of survey for repairs for Stettin, 29 December 1888 1888, Particulars for record of double bottoms in Lloyd's Register for Stettin, 5 December 1889 1889, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 10 December 1889 1889, Report of Survey for Repairs for Stettin, 6 December 1889 1889, Report on Machinery for Stettin, 3 December 1889 1889, Report of Survey for Repairs for Stettin, 18 October 1890 1890, Report of Survey for Repairs for Stettin, 6 November 1891 1891, Report of Survey for Repairs for Stettin, 16 January 1893 1893, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 19 February 1894 1894, Report of survey for repairs for Stettin, 12 February 1894 1894, Report of survey for repairs of engines and boilers for Stettin, 13 February 1894 1894, Report of survey for repairs for Stettin, 6 February 1895 1895, Report of survey for repairs of engines and boilers for Stettin, 6 February 1895 1895, Report of survey for repairs for Stettin, 19 March 1896 1896, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin about the survey of boilers, 23 March 1896 1896, Letter from Leith surveyor to the Secretary stating that the Stettin is under survey, 5 March 1896 1896, Letter from the Secretary to the Leith Surveyor questioning about the survey of Stettin, 3 March 1896 1896, Copy of Letter from the Secretary to the owner of Stettin stating that he agrees with the boiler survey of that ship being carried out when she is in dry dock in the following month, 29 January 1896 1896, Note stating the boiler survey for Stettin will be in dry dock in the following month, 29 January 1896 1896, Letter from the owner of Stettin to the Secretary stating the ship will be in dry dock next month for the survey, 27 January 1896 1896, Report of survey for repairs of engines and boilers for Stettin, 19 March 1896 1896, Report of survey for repairs for Stettin, 19 March 1897 1897, Letter from the Leith surveyor to the Secretary stating that Stettin is now employed in the emigrant trade and therefore the pressure of boiler has been reduced, 24 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 19 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 26 July 1897 1897, Remarks of the Chief Surveyor to the Classing Committee about the special survey of the ship Stettin, 4 March 1898 1898, Copy of letter from the Secretary to the owners of Stettin stating that the special survey will take place when the ship is placed in dry dock, 3 February 1898 1898, Note stating the ship Stettin will be soon in dry dock to be surveyed, 3 February 1898 1898, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating their intention to put the ship in dry dock to be surveyed, 1 February 1898 1898, Report of survey for repairs for Stettin, 3 March 1898 1898, Report of survey for repairs of engines and boilers for Stettin, 3 March 1898 1898, Remarks of the Chief Surveyor to the Classing Committee about the damage and temporary repairs suffered by Stettin, 31 March 1898 1898, Letter from the Bremerhaven surveyor about the repairs to Stettin, 29 March 1898 1898, Cover note for report number 534 of Stettin, 1 April 1898 1898, Report of survey for repairs for Stettin, 28 March 1898 1898, Remarks of the Ship Surveyor to the Classing Committee saying the damage to Stettin has been repaired and she should remain classed, 6 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1899 1899, Report of survey for repairs of engines and boilers for Stettin, 5 April 1899 1899, Report of survey for repairs for Stettin, 28 April 1900 1900, Report of survey for repairs of engines and boilers for Stettin, 28 April 1900 1900, Report of survey for repairs for Stettin, 2 May 1901 1901, Report of survey for repairs of engines and boilers for Stettin, 2 May 1901 1901, Remarks of the Ship Surveyor to the Classing Committee about the special survey of Stettin and the particulars of her plating, 7 April 1902 1902, Report of survey for repairs for Stettin, 4 April 1902 1902, Copy of letter from the Secretary to the owners of Stettin statin the Committee agreed with the special survey being carried out in the next two months, 31 January 1902 1902, Postponed survey form for Stettin, 30 January 1902 1902, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating they expect to attend the special survey within the next two months, 29 January 1902 1902, Report of survey for repairs of engines and boilers for Stettin, 4 April 1902 1902, Report of survey for repairs for Stettin, 11 May 1903 1903, Copy of letter from the Secretary to Leith Surveyors stating that the steamer Stettin has been booked for the annual boiler survey that will take place in a few days, 7 April 1903 1903, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the annual overhaul has been booked for that next few days, 4 April 1903 1903, Report of survey for repairs of engines and boilers for Stettin, 11 May 1903 1903, Report of survey for repairs for Stettin, 29 June 1904 1904, Report of survey for repairs of engines and boilers for Stettin, 29 June 1904 1904, Report of survey for repairs for Stettin, 11 July 1905 1905, Report of survey for repairs of engines and boilers for Stettin, 11 July 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the damage and repairs to Stettin, 24 August 1905 1905, Report of survey for repairs for Stettin, 22 August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the special survey no.1 of Stettin, 26 July 1906 1906, Copy of letter from the Secretary to Leith Surveyors stating that Stettin will be in dry dock on her arrival from Konigsberg when the special survey no.1 will be carried out, 22 June 1906 1906, Copy of letter from the Secretary to the owners of Stettin stating that the special survey no.1 will be carried out next week in Leith, 22 June 1906 1906, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the special survey no.1 will be carried out in the next week on her arrival from Konigsberg, 20 June 1906 1906, Report of survey for repairs for Stettin, 23 July 1906 1906, Report of survey for repairs of engines and boilers for Stettin, 24 July 1906 1906, Report of survey for repairs for Stettin, 16 July 1907 1906, Report of survey for repairs of engines and boilers for Stettin, 16 July 1907 1906, Report of survey for repairs for Stettin, 19 September 1908 1908, Copy of letter from the Secretary to Leith Surveyors stating that Stettin is laid up for overhaul and that the boiler survey should be carried out, 8 September 1908 1908, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the steamer is laid up for overhaul and that the special survey of boilers should take place next week, 5 September 1908 1908, Report of survey for repairs of engines and boilers for Stettin, 19 September 1908 1908, Report of survey for repairs for Stettin, 2 October 1909 1909, Report of survey for repairs of engines and boilers for Stettin, 2 October 1909 1909, Plan of Rudder of Stettin, 1910. Scale 1"=one foot. Details 3"= one foot, 19 September 1910 1910, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding the special survey no. 2 and boiler survey for Stettin, 29 October 1910 1910, Letter from Leith Surveyor to the Secretary stating that they met with the owners of Stettin and arranged the special survey no. 2 to be carried out after the New Year holidays, 28 November 1910 1910, Copy of letter from the Secretary to Leith Surveyors regarding the report no. 13106 for Stettin and asking when the ship's owners expect the special survey no.2 to be carried out, 25 November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee about damage and repairs made to Stettin after grounding, 7 October 1910 1910, Postponed survey form for Stettin, 27 June 1910 1910, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating the special survey no.2 will be carried out in Leith in September, 23 October 1910 1910, Report of survey for repairs for Stettin, 5 October 1910 1910, Report of survey for repairs of engines and boilers for Stettin, 21 October 1910 1910, Report of Ship forgings or castings for Stettin, 30 September 1910 1910, Note about the sketch of rudder for Stettin, 19 September 1910 1910, Letter from Leith surveyors to the Secretary regarding the plan of rudder for Stettin to be approved by the Committee, 16 September 1910 1910, Copy of letter from Secretary, Lloyd's Register London, to James Currie and Co, regarding agreement for date of carrying out special survey, 28 June 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the special survey no.2 for Stettin and the repairs made, 6 June 1911 1911, Report of survey for repairs for Stettin, 3 June 1911 1911, Report of survey for repairs of engines and boilers for Stettin, 3 June 1911 1911, Copy of letter from the Assistant to the Secretary to the owners of Stettin, James Currie & Co, regarding the boiler survey to take place in about two months' time, 12 July 1912 1912, Report of survey for repairs for Stettin, 17 August 1912 1912, Postponed survey form for Stettin, 11 July 1912 1912, Letter from the owners of Stettin to the Secretary regarding the ship special survey and boilers survey, 9 July 1912 1912, Report of survey for repairs of engines and boilers for Stettin, 17 August 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the conditions of Stettin after repair, 29 December 1913 1913, Report of survey for repairs for Stettin, 27 December 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of Stettin taking place in three weeks’ time, 14 November 1913 1913, Postponed survey form for Stettin, 13 November 1913 1913, Letter from Leith surveyors to the Secretary regarding the survey of Stettin, 8 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin, 7 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin being carried out after the strike of the boilers makers, 9 November 1913 1913, Postponed survey form for Stettin, 8 September 1913 1913, Letter from Leith surveyors to the Secretary regarding the postpone of survey of Stettin due to the boilers makers strike, 5 September 1913 1913, Copy of letter from the Secretary to Leith surveyors regarding the survey of screw shaft of Stettin, 3 September 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating the Committee has agreed with the survey being carried out next month, 4 September 1913 1913, Postponed survey form for Stettin, 3 September 1913 1913, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft, 2 July 1913 1913, Report of survey for repairs of engines and boilers for Stettin, 27 December 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with postponing the special survey, 9 June 1914 1914, Postponed survey form for Stettin, 8 June 1914 1914, Letter from Leith surveyors to the Secretary regarding the special survey of Stettin, 4 June 1914 1914, Copy of letter from the Secretary to Leith surveyors enclosing a letter sent by the owners of Stettin about her fourth special survey no. 3, 3 June 1914 1914, Postponed survey form for Stettin, 2 June 1914 1914, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding postponing the second special survey no. 3 of Stettin, 29 May 1914 1914, Report of survey for repairs of engines and boilers for Stettin, 2 July 1915 1915, Copy of letter from the Secretary to Newcastle-on-Tyne surveyors regarding the special survey of Stettin, 12 August 1913 1915, Letter from Aberdeen surveyors to the Secretary stating that Stettin has sailed to Newcastle-on-Tyne as she failed to obtain docking facilities at that port, 10 August 1915 1915, Remarks to the Chief Ship Surveyor regarding the fourth special survey no. 3 for Stettin, 13 July 1915 1915, Copy of letter from the Secretary to the Surveyors in Hull, Grimsby, Middlesbrough, Newcastle, Sunderland and Hartlepool, regarding the fourth special survey no. 3 of Stettin, which will be carried out at some East coast port, 19 July 1915 1915, Letter from Leith surveyors to the Secretary regarding the survey of Stettin to be carried out at some East coast port, 12 July 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the fourth special survey no. 3 for Stettin, 5 July 1915 1915, Report of survey for repairs for Stettin, 2 July 1915 1915, Letter from Leith surveyors to the Secretary stating that the special survey of Stettin is being carried out at that port, 22 May 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 for Stettin, 21 May 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding her survey, 20 April 1915 1915, Extract from a letter dated 15 April 1915 from James Currie & Co regarding surveying Stettin. Extract dated 16 April 1915 1915, Letter from Leith surveyors to the Secretary stating that they had spoken to the owners of Stettin and due to a shortage of labour it has been difficult to find a dry dock to carry out the special survey, 13 April 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the importance of carrying out the special survey due to the age of the ship, 13 April 1915 1915, Postponed survey form for Stettin, 12 April 1915 1915, Copy of letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding the survey of Stettin being postponed, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 of Stettin, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors enclosing information about the communication between the owners of Stettin, 26 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with the special survey being carried out in the next two or three months, 26 January 1915 1915, Postponed survey form for Stettin, 25 January 1915 1915, Letter from Leith surveyors to the Secretary regarding the special survey no.3 and boiler survey of Stettin, 23 January 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding postponing the survey of Stettin, 21 January 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the fourth special survey no.3 and special annual boiler survey of Stettin, 20 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the letter sent by the latter about the thrust shaft, 1 November 1915 1915, Letter from Lisbon surveyors to the Secretary about the repair of shaft of Stettin, 25 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 28 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 23 October 1915 1915, Copy of letter from the Assistant to the Secretary to Lisbon surveyors regarding the repair of Stettin's thrust shaft being not satisfactory, 18 October 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the new thrust shaft she received in Lisbon, 1916 1915, Letter reporting that the new thrust shaft for Stettin is not considered satisfactory, 14 October 1915 1915, London Office Copy of document certifying that surveyor has examined the machinery of Stettin and stating his recommendations, 4 October 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 6 October 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 67857, 19 August 1915 1915, Report of Survey for Repairs for Stettin, 18 August 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 August 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the thrust shaft supplied in Lisbon and if it will be approved by the Committee as a permanent repair, 29 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon and stating that it will be approved by the Committee as a permanent repair, 28 April 1916 1916, Letter reporting the results of the test carried out on Stettin's new thrust shaft that was made in Lisbon, 27 April 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the result of the tests carried out on the new thrust shaft, 14 April 1916 1916, Letter from Professor R Stanfield to James Currie & Co regarding the results of the test of the transverse section of the shaft of Stettin, 11 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Letter reporting that Stettin's new thrust shaft is not satisfactory to be recommended as a permanent repair, 22 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin stating that the repair of the thrust shaft is being looked at, 14 March 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary enclosing drawings and plans of the shaft of Stettin, 6 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the repair of the thrust shaft, 28 January 1916 1916, Postponed survey form for Stettin, 22 January 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft of Stettin, 24 January 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding when the ship will be in position to have the thrust shaft examined, 21 January 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to London Report 79106, 13 July 1917 1916, Report of Survey for Repairs for Stettin due to collision with ice, 1 July 1916 1916, Report of Survey for Repairs of Engines and Boilers for Stettin, 14 July 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70096, 27 July 1917 1917, London Office Copy of document certifying that surveyor has examined damage and transmitted the Report, and stating his Recommendations, 24 July 1917 1917, Report of Survey for Repairs for Stettin 1917, Letter from Newcastle surveyors informing Lloyd's Register London that Stettin is under survey at Newcastle, 21 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding whether Stettin has yet come under inspection, 20 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding their report 70069, and Stettin's owners' intention to make repairs at South Shields within the next couple of days, and calling attention to the need for the Annu 1917, Letter from James Currie & Co Managers, informing Lloyd's Register London that they have arranged for repairs of damage previously communicated by Smith's Dry Dock Co, South Shields, on the steamer's return there in the next day or two, 1 August 1917 1917, Copy of letter from Lloyd's Register's London Secretary to James Currie and Co, informing them of the damage done to Stettin when striking a quay wall, that temporary repairs have been effected but that for the vessel to remain in class permanent repairs 1917, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70306, 2 October 1917 1917, Report of Survey for Repairs for Stettin, 29 September 1917 1917, Report of Survey for Repairs of Engines and Boilers for Stettin, 1 October 1917 1917, Certificate of approval of a stockless anchor, with cancelled written across it, 4 September 1917 1917, Correspondence to Lloyd's Register's London Secretary regarding Stettin Report 71400, acknowledging remarks on the Rules for Engines and Boilers with a working pressure of less than 60lbs, 23 November 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 71400, 19 November 1918 1918, Report of survey for repairs of Stettin, 5 November 1918 1918, Memo to Newcastle surveyors regarding Rules for Engines and Boilers of a greater working pressure than 60lbs per square inch, 18 November 1918 1918, Report of Survey for Repairs of Boilers and Engines of Stettin, 13 November 1918 1918, Copy of letter from London Secretary to James Currie and Co regarding state or survey of Stettin, 17 October 1919 1919, Postponed Survey form for Stettin, October 1919 1919, Letter from James Currie and Co to Secretary, Lloyd's Register London, regarding postponing survey of Stettin, 10 October 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Leith Report 15769, 2 July 1920 1920, Report of Survey for Repairs of Stettin, 28 June 1920 1920, Copy of letter from Lloyd's Register London Secretary to Leith Surveyors, 30 March 1920 1920, Postponed Survey form for Stettin, 29 March 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 24 March 1920 1920, Copy of Letter from Lloyd's Register London Secretary to Leith Surveyors, 19 March 1920 1920, Letter from the Surveyors at Hull, per N Rowall, to London Secretary regarding state of survey of Stettin, 18 March 1920 1920, Copy of letter from the London Secretary to the Hull Surveyors regarding state of survey of Stettin, 17 March 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 10 February 1920 1920, Postponed Survey form for Stettin, 9 February 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 5 February 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 28 January 1920 1920, Report of Survey for Repairs of Engines and Boilers for Stettin, 28 June 1920 1920, Copy of letter from the Secretary to the owners of Stettin saying the Committee has agreed with postponing the boiler survey, 23 August 1921 1921, Report of Survey for Repairs of Stettin, 16 September 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London regarding Stettin now undergoing survey, 3 September 1921 1921, Postponed Surveys form for Stettin, 22 August 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London explaining why Stettin had not undergone survey, 18 August 1921 1921, Report of Survey for Repairs of Engines and Boilers for Stettin, 16 September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Stettin survey, with reference to Leith Report 16187, 6 October 1921 1922, Report of Survey for Repairs of Stettin, 3 October 1921 1922, Correspondence of Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding ongoing surveys on Stettin, 14 September 1922 1922, Copy of letter from Lloyd's Register London Assistant to the Secretary to Leith Surveyors regarding survey of Stettin's screwshaft, 21 July 1922 1922, Postponed Surveys form for Stettin, 20 July 1922 1922, Letter from Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding proposed survey date for Stettin's screw shaft, 17 July 1922 1922, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans of owners of Stettin for survey of screwshaft, 14 July 1922 1922, Report of Survey for Repairs of Boilers and Engines for Stettin, 26 September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding carrying out part of Stettin's Special Survey, with reference to Leith Report 16388, 30 October 1923 1923, Report of Survey for Repairs of Stettin, 24 October 1923 1923, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors, regarding Rule requirements for cables, 20 October 1923 1923, Remarks to the Chief Ship Surveyor regarding Rule requirements for cables, 19 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London requesting clarification on Rules for chains, 18 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London regarding proposed timeline for survey, 22 September 1923 1923, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding letter from Stettin's owners and requesting clarification of when the boiler survey shall be held, 21 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London, regarding carrying out a part survey, 18 September 1923 1923, Copy of letter from Assistant to the Secretary to James Currie and Co regarding schedule for surveys of Stettin, 14 September 1923 1923, Postponed Surveys form for Stettin, 13 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London querying survey schedule of Stettin, 10 September 1923 1923, Report of Survey for Repairs of Engines and Boilers for Stettin, 23 October 1923 1923, Letter from Leith Surveyor A T Thomas to James Currie and Co, informing them of future survey schedule for Stettin, 23 October 1923 1923, Plan of Main Boiler for Stettin, 24 May 1924 1924, Plan of Donkey Boiler for Stettin, 24 May 1924 1924, Hatch Plan of Stettin, 2 October 1924 1924, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Stettin, with reference to Leith Report 16388, 19 May 1924 1924, Letter from A T Thomas, Leith Surveyor, to J F Hill of London, regarding surveying Stettin, 16 May 1924 1924, Extract from a letter dated 14 May 1924 from Leith surveyors regarding examining Stettin. Extract dated 15 May 1924 1924, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans for survey of Stettin and expiry of year of grace, 14 May 1924 1924, Letter from Leith surveyor A T Thomas to Secretary, London, regarding proposed examination part of Stettin's combustion chamber, 18 April 1924 1924, Copy of letter from Assistant to the Secretary to the Leith surveyors questioning owners' arrangements to have Stettin's combustion chamber examined, 16 April 1924 1924, Report of Survey for Repairs of Engines and Boilers for Stettin, 12 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding fulfilment of special survey on Stettin, in reference to Leith Report 16611, 22 November 1924 1924, Report of Survey for Repairs of Stettin, 15 November 1924 1924, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 November 1924 1924, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding completion of reports on Stettin's new boilers, 31 October 1924 1924, Note submitting that certain reports be forwarded to the Leith Surveyors for their guidance and completion, 29 October 1924 1924, Note submitting that the amended plans of boilers for Stettin merit approval, 29 May 1924 1924, Correspondence accompanying boiler plans submitted for approval for Stettin from the Glasgow office to London, 26 May 1924 1924, Letter from Jas S Cairns submitting for approval plans for new boilers for the Stettin to the Glasgow Secretary, 26 May 1924 1924, Note submitting that plans for Stettin's boilers merit approval, 24 April 1924 1924, Letter from Leith Surveyors, per A T T[homas], to Secretary, London, noting they are forwarding plans of new boilers intended for Stettin, 14 April 1924 1924, Report on Main Boiler for Stettin, 11 October 1924 1924, Report on Donkey Boiler for Stettin, 11 October 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Delivery note for 3 furnaces from Forth Shipbuilding and Engineering, Glasgow, 4 July 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 27 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, LR stamp and signature J Barr, 2 July 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 14 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 28 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 26 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 17 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 16790, 28 August 1925 1925, Report of Survey for Repairs on Stettin, 25 August 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 August 1925 1925, Memo regarding approving a steel cylinder cover on Stettin, 5 October 1925 1925, Letter from Leith Surveyor to Secretary, London, regarding steel cover repair examined, 2 October 1925 1925, Letter from Hamburg Office to Secretary, London, regarding request by Leith Surveyors, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding Hamburg report on Stettin, 1 October 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding their request for the Hamburg report, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to A Chisholm, requesting a report for the Leith Surveyors, 30 September 1925 1925, Translation of Cablegram sent to Surveyors at Hamburg, 30 September 1925 1925, Copy of Cablegram from London Office to Hamburg Office, 30 September 1925 1925, Letter from Leith Surveyors, per A T T[homas], to London Office asking for a Hamburg report to be sent to them, 29 September 1925 1925, London Office Copy of document certifying that Hamburg surveyor has examined damage and transmitted the Report, and stating his Recommendations, 25 September 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 September 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 16897, March 1926 1926, Report of Survey for Repairs to Stettin, 30 March 1926 1926, Report of Survey for Repairs of Engines and Boilers to Stettin, 30 March 1926 1926, Report of Survey for Repairs to Stettin, 15 June 1927 1927, Report of Survey for Repairs of Engines and Boilers to Stettin, 15 June 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 17291, 8 December 1927 1927, Copy of Certificate of Survey after damage to Stettin by a breaker in heavy weather, 23 November 1927 1927, Report of Survey for Repairs to Stettin, 3 December 1927 1927, Question and Answer memo between London and Leith Offices regarding Hamburg Report 17858, 21 February 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 1 February 1928 1928, Correspondence memo with particulars from Leith Surveyors to Secretary, London, regarding return of report, 27 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 25 January 1928 1928, Copy of Certificate of Survey from Hamburg after collision damage suffered by Stettin, 22 January 1928 1928, Report of Survey for Repairs of Stettin, 23 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 17339, 15 March 1928 1928, Report of Survey for Repairs of Stettin, 5 March 1928 1928, Copy of letter from the Clerk of the Classification Committee to James Currie and Co, with a copy to the Leith Office, regarding 6th Special Survey of Stettin, 14 December 1928 1928, Postponed Survey form for Stettin's 6th Special Survey, 13 December 1928 1928, Letter from James Currie and Co to Lloyd's Register Secretary, London, regarding deferring Stettin's 6th Special Survey, 11 December 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage, in reference to Dundee Report 8638, 30 March 1928 1928, Copy of Certificate of Survey regarding damage and report of repairs to Stettin's port bow shell plating, Dundee, 23 March 1928 1928, Report of Survey for Repairs to Stettin, 23 March 1928 1928, Letter from Lloyd's Register Engineer Surveyor to James Currie and Co regarding schedule for survey of Stettin's propeller shaft, 5 March 1929 1929, Copy of letter from the Secretary, London, to the Secretary, Glasgow, returning Stettin boiler plans, 29 May 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin and 6th Special Survey, in reference to Leith Report 17540, 13 March 1929 1929, Report of Survey for Repairs of Stettin, 5 March 1929 1929, Report of Survey for Repairs of Engines and Boilers for Stettin, 5 March 1929 1929, Copy of letter from pro Secretary, London, to Leith Surveyors regarding examination of Stettin's screwshaft, 16 April 1930 1930, Postponed Survey form for Stettin's screwshaft, 14 April 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 9 April 1930 1930, Copy of letter from Secretary, London, to Leith Surveyors informing them Committee are agreeable to postponing Stettin's screwshaft survey, 25 February 1930 1930, Postponed Survey form for Stettin's screwshaft, 24 February 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 17 February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 17802, 22 May 1930 1930, Report of Survey for Repairs to Stettin, 15 May 1930 1930, Report on Engine Forgings for Stettin, 8 May 1930 1930, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 May 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 18082, 2 November 1931 1931, Form or memo from Secretary, Glasgow, to Secretary, London, regarding presence of Stettin, 16 October 1931 1931, Question and Answer memo from Secretary, London, to Leith Surveyors regarding Stettin Boiler Survey, 5 October 1931 1931, Copy of letter from pro Secretary, London, with copy to Leith, to James Currie and Co regarding postponing Stettin Boiler Survey, 26 June 1931 1931, Postponed Surveys form for Stettin's Boiler Survey, 25 June 1931 1931, Letter from James Currie and Co regarding postponing Boiler Survey due on Stettin, 20 June 1931 1931, Report of Survey for Repairs on Stettin, 26 October 1931 1931, Report of Survey for Repairs of Engines and Boilers on Stettin, 26 October 1931 1931, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of survey for Stettin, 23 December 1932 1932, Postponed Surveys form for Stettin, 22 December 1932 1932, Letter from Leith Surveyors per John Houston to the Secretary, London, regarding outstanding survey on Stettin, 17 December 1932 1932, Letter from James Currie and Co to Leith Surveyors regarding schedule of survey for Stettin, 16 December 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 14 December 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 24 November 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 September 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 21 June 1932 1932, Postponed Surveys form for Stettin, 20 June 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 June 1932 1932, Copy of letter from pro Secretary, London to Leith Surveyors regarding Stettin boiler survey schedule, 9 October 1931 1932, Postponed Surveys form for Stettin, 8 October 1931 1932, Report of Total Loss, Casualty, , for Stettin, which has been sold to be broken up, 4 December 1933 1933, Letter from Leith Surveyors, per John Houston, to Secretary, London, informing them Stettin is being broken up, 1 December 1933 1933, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of demolition for Stettin, 27 November 1933 1933, Copy of letter from Leith Surveyors, per John Houston, to the Secretary, London, regarding the firm to which Stettin was sold to be broken up, 24 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 23 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 31 August 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 15 June 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 16 March 1933 1933, Note related to Stettin stating SS no. 2 held now posting no date, Note regarding Stettin stating "Vessel left Lisbon Oct 3. + 3 mos from dats. of survey would expire 12/15" no date, Sketch or plan of steel cover part for Stettin no date )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
706 ( Certificate for vessels navigated by Steam for Stettin, 30 November 1864 1864, Iron Ship survey report for Stettin, 2 December 1864 1864 )
759 ( Letter from Glasgow surveyor to the Secretary sending the machinery certificate and Stettin's report of survey no. 4255, 8 July 1876 1876, Report of survey for repairs for Stettin, 8 July 1876 1876, Memo from Messrs Napier Ltd. stating that Stettin's boilers are fitted in accordance with the Committee requirements and should have the notification Lloyd's MC in the Register Book, 3 July 1876 1876, Details of main boilers of Stettin, 29 June 1876 1876, Engineer surveyor's report on machinery for Stettin, 26 June 1876 1876, Annual surveys for Stettin, 30 November 1876 1876, Report of survey for repairs for Stettin, 16 January 1879 1879, Report of survey for repairs of engines and boilers for Stettin, 16 January 1880 1880, Cover note for reports number 4308 and 57 of Stettin, 31 January 1880 1880, Report of survey for repairs for Stettin, 28 January 1880 1880, Report of survey for repairs for Stettin, 2 February 1881 1881, Report of survey for repairs for Stettin, 27 January 1882 1882, Annual surveys for Stettin, 6 January 1883 1883, Annual surveys for Stettin, 23 January 1884 1884 )
830 ( Report of survey for repairs for Stettin, 30 January 1885 1885, Report of survey for repairs of engines and boilers for Stettin, 30 January 1885 1885, Report of survey for repairs for Stettin, 27 January 1886 1886, Report of survey for repairs of engines and boilers for Stettin, 30 January 1886 1886, Report of survey for repairs for Stettin, 26 February 1887 1887, Report of survey for repairs of engines and boilers for Stettin, 15 March 1887 1887, Report of survey for repairs for Stettin, 21 May 1888 1888, Report of survey for repairs of engines and boilers for Stettin, 25 May 1888 1888, Report of survey for repairs for Stettin, 29 December 1888 1888, Particulars for record of double bottoms in Lloyd's Register for Stettin, 5 December 1889 1889, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 10 December 1889 1889, Report of Survey for Repairs for Stettin, 6 December 1889 1889, Report on Machinery for Stettin, 3 December 1889 1889 )
857 ( Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with postponing the special survey, 9 June 1914 1914, Postponed survey form for Stettin, 8 June 1914 1914, Letter from Leith surveyors to the Secretary regarding the special survey of Stettin, 4 June 1914 1914, Copy of letter from the Secretary to Leith surveyors enclosing a letter sent by the owners of Stettin about her fourth special survey no. 3, 3 June 1914 1914, Postponed survey form for Stettin, 2 June 1914 1914, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding postponing the second special survey no. 3 of Stettin, 29 May 1914 1914, Letter from Aberdeen surveyors to the Secretary stating that Stettin has sailed to Newcastle-on-Tyne as she failed to obtain docking facilities at that port, 10 August 1915 1915, Remarks to the Chief Ship Surveyor regarding the fourth special survey no. 3 for Stettin, 13 July 1915 1915, Copy of letter from the Secretary to the Surveyors in Hull, Grimsby, Middlesbrough, Newcastle, Sunderland and Hartlepool, regarding the fourth special survey no. 3 of Stettin, which will be carried out at some East coast port, 19 July 1915 1915, Letter from Leith surveyors to the Secretary regarding the survey of Stettin to be carried out at some East coast port, 12 July 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the fourth special survey no. 3 for Stettin, 5 July 1915 1915, Report of survey for repairs for Stettin, 2 July 1915 1915, Letter from Leith surveyors to the Secretary stating that the special survey of Stettin is being carried out at that port, 22 May 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 for Stettin, 21 May 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding her survey, 20 April 1915 1915, Extract from a letter dated 15 April 1915 from James Currie & Co regarding surveying Stettin. Extract dated 16 April 1915 1915, Letter from Leith surveyors to the Secretary stating that they had spoken to the owners of Stettin and due to a shortage of labour it has been difficult to find a dry dock to carry out the special survey, 13 April 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the importance of carrying out the special survey due to the age of the ship, 13 April 1915 1915, Postponed survey form for Stettin, 12 April 1915 1915, Copy of letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding the survey of Stettin being postponed, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 of Stettin, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors enclosing information about the communication between the owners of Stettin, 26 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with the special survey being carried out in the next two or three months, 26 January 1915 1915, Postponed survey form for Stettin, 25 January 1915 1915, Letter from Leith surveyors to the Secretary regarding the special survey no.3 and boiler survey of Stettin, 23 January 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding postponing the survey of Stettin, 21 January 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the fourth special survey no.3 and special annual boiler survey of Stettin, 20 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the letter sent by the latter about the thrust shaft, 1 November 1915 1915, Letter from Lisbon surveyors to the Secretary about the repair of shaft of Stettin, 25 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 28 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 23 October 1915 1915, Copy of letter from the Assistant to the Secretary to Lisbon surveyors regarding the repair of Stettin's thrust shaft being not satisfactory, 18 October 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the new thrust shaft she received in Lisbon, 1916 1915, Letter reporting that the new thrust shaft for Stettin is not considered satisfactory, 14 October 1915 1915, London Office Copy of document certifying that surveyor has examined the machinery of Stettin and stating his recommendations, 4 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the thrust shaft supplied in Lisbon and if it will be approved by the Committee as a permanent repair, 29 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon and stating that it will be approved by the Committee as a permanent repair, 28 April 1916 1916, Letter reporting the results of the test carried out on Stettin's new thrust shaft that was made in Lisbon, 27 April 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the result of the tests carried out on the new thrust shaft, 14 April 1916 1916, Letter from Professor R Stanfield to James Currie & Co regarding the results of the test of the transverse section of the shaft of Stettin, 11 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Letter reporting that Stettin's new thrust shaft is not satisfactory to be recommended as a permanent repair, 22 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin stating that the repair of the thrust shaft is being looked at, 14 March 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary enclosing drawings and plans of the shaft of Stettin, 6 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the repair of the thrust shaft, 28 January 1916 1916, Postponed survey form for Stettin, 22 January 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft of Stettin, 24 January 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding when the ship will be in position to have the thrust shaft examined, 21 January 1916 1916, Note regarding Stettin stating "Vessel left Lisbon Oct 3. + 3 mos from dats. of survey would expire 12/15" no date )
Is machinery fitted at the aft of the vessel?
No ( Certificate for vessels navigated by Steam for Stettin, 30 November 1864 1864, Iron Ship survey report for Stettin, 2 December 1864 1864, Letter from Glasgow surveyor to the Secretary sending the machinery certificate and Stettin's report of survey no. 4255, 8 July 1876 1876, Report of survey for repairs for Stettin, 8 July 1876 1876, Memo from Messrs Napier Ltd. stating that Stettin's boilers are fitted in accordance with the Committee requirements and should have the notification Lloyd's MC in the Register Book, 3 July 1876 1876, Details of main boilers of Stettin, 29 June 1876 1876, Engineer surveyor's report on machinery for Stettin, 26 June 1876 1876, Annual surveys for Stettin, 30 November 1876 1876, Report of survey for repairs for Stettin, 16 January 1879 1879, Report of survey for repairs of engines and boilers for Stettin, 16 January 1880 1880, Cover note for reports number 4308 and 57 of Stettin, 31 January 1880 1880, Report of survey for repairs for Stettin, 28 January 1880 1880, Report of survey for repairs for Stettin, 2 February 1881 1881, Report of survey for repairs for Stettin, 27 January 1882 1882, Annual surveys for Stettin, 6 January 1883 1883, Annual surveys for Stettin, 23 January 1884 1884, Report of survey for repairs for Stettin, 30 January 1885 1885, Report of survey for repairs of engines and boilers for Stettin, 30 January 1885 1885, Report of survey for repairs for Stettin, 27 January 1886 1886, Report of survey for repairs of engines and boilers for Stettin, 30 January 1886 1886, Report of survey for repairs for Stettin, 26 February 1887 1887, Report of survey for repairs of engines and boilers for Stettin, 15 March 1887 1887, Report of survey for repairs for Stettin, 21 May 1888 1888, Report of survey for repairs of engines and boilers for Stettin, 25 May 1888 1888, Report of survey for repairs for Stettin, 29 December 1888 1888, Particulars for record of double bottoms in Lloyd's Register for Stettin, 5 December 1889 1889, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 10 December 1889 1889, Report of Survey for Repairs for Stettin, 6 December 1889 1889, Report on Machinery for Stettin, 3 December 1889 1889, Report of Survey for Repairs for Stettin, 18 October 1890 1890, Report of Survey for Repairs for Stettin, 6 November 1891 1891, Report of Survey for Repairs for Stettin, 16 January 1893 1893, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 19 February 1894 1894, Report of survey for repairs for Stettin, 12 February 1894 1894, Report of survey for repairs of engines and boilers for Stettin, 13 February 1894 1894, Letter from the surveyor Jas Barclay to the Secretary in London enclosing a letter received from the Master of Stettin about the boiler survey to be held at Bergen, 9 June 1894 1894, Letter from the Master of Stettin Otto E Jacobsen to the surveyor James Barclay about the survey of boilers to take place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to E Rusten, owner of Stettin, stating he agrees with the survey of boilers taking place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to Bergen surveyor stating that Stettin will have the survey of boilers carried out in Bergen, 8 June 1894 1894, Note stating the boiler survey for Stettin is due to April and the owners state the ship will be at Bergen where the survey will take place, 8 June 1894 1894, Letter from Erik Rusten, owner of Stettin, to Lloyd's Register stating that he wishes the survey of boilers to take place in Bergen, 4 June 1894 1894, Report of Survey for repairs of engines and boilers for Stettin, 12 July 1894 1894, Report of survey for repairs for Stettin, 6 February 1895 1895, Report of survey for repairs of engines and boilers for Stettin, 6 February 1895 1895, Report of survey for repairs for Stettin, 19 March 1896 1896, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin about the survey of boilers, 23 March 1896 1896, Letter from Leith surveyor to the Secretary stating that the Stettin is under survey, 5 March 1896 1896, Letter from the Secretary to the Leith Surveyor questioning about the survey of Stettin, 3 March 1896 1896, Copy of Letter from the Secretary to the owner of Stettin stating that he agrees with the boiler survey of that ship being carried out when she is in dry dock in the following month, 29 January 1896 1896, Note stating the boiler survey for Stettin will be in dry dock in the following month, 29 January 1896 1896, Letter from the owner of Stettin to the Secretary stating the ship will be in dry dock next month for the survey, 27 January 1896 1896, Report of survey for repairs of engines and boilers for Stettin, 19 March 1896 1896, Report of survey for repairs for Stettin, 19 March 1897 1897, Letter from the Leith surveyor to the Secretary stating that Stettin is now employed in the emigrant trade and therefore the pressure of boiler has been reduced, 24 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 19 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 26 July 1897 1897, Remarks of the Chief Surveyor to the Classing Committee about the special survey of the ship Stettin, 4 March 1898 1898, Copy of letter from the Secretary to the owners of Stettin stating that the special survey will take place when the ship is placed in dry dock, 3 February 1898 1898, Note stating the ship Stettin will be soon in dry dock to be surveyed, 3 February 1898 1898, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating their intention to put the ship in dry dock to be surveyed, 1 February 1898 1898, Report of survey for repairs for Stettin, 3 March 1898 1898, Report of survey for repairs of engines and boilers for Stettin, 3 March 1898 1898, Remarks of the Chief Surveyor to the Classing Committee about the damage and temporary repairs suffered by Stettin, 31 March 1898 1898, Letter from the Bremerhaven surveyor about the repairs to Stettin, 29 March 1898 1898, Cover note for report number 534 of Stettin, 1 April 1898 1898, Report of survey for repairs for Stettin, 28 March 1898 1898, Remarks of the Ship Surveyor to the Classing Committee saying the damage to Stettin has been repaired and she should remain classed, 6 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1899 1899, Report of survey for repairs of engines and boilers for Stettin, 5 April 1899 1899, Report of survey for repairs for Stettin, 28 April 1900 1900, Report of survey for repairs of engines and boilers for Stettin, 28 April 1900 1900, Report of survey for repairs for Stettin, 2 May 1901 1901, Report of survey for repairs of engines and boilers for Stettin, 2 May 1901 1901, Remarks of the Ship Surveyor to the Classing Committee about the special survey of Stettin and the particulars of her plating, 7 April 1902 1902, Report of survey for repairs for Stettin, 4 April 1902 1902, Copy of letter from the Secretary to the owners of Stettin statin the Committee agreed with the special survey being carried out in the next two months, 31 January 1902 1902, Postponed survey form for Stettin, 30 January 1902 1902, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating they expect to attend the special survey within the next two months, 29 January 1902 1902, Report of survey for repairs of engines and boilers for Stettin, 4 April 1902 1902, Report of survey for repairs for Stettin, 11 May 1903 1903, Copy of letter from the Secretary to Leith Surveyors stating that the steamer Stettin has been booked for the annual boiler survey that will take place in a few days, 7 April 1903 1903, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the annual overhaul has been booked for that next few days, 4 April 1903 1903, Report of survey for repairs of engines and boilers for Stettin, 11 May 1903 1903, Report of survey for repairs for Stettin, 29 June 1904 1904, Report of survey for repairs of engines and boilers for Stettin, 29 June 1904 1904, Report of survey for repairs for Stettin, 11 July 1905 1905, Report of survey for repairs of engines and boilers for Stettin, 11 July 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the damage and repairs to Stettin, 24 August 1905 1905, Report of survey for repairs for Stettin, 22 August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the special survey no.1 of Stettin, 26 July 1906 1906, Copy of letter from the Secretary to Leith Surveyors stating that Stettin will be in dry dock on her arrival from Konigsberg when the special survey no.1 will be carried out, 22 June 1906 1906, Copy of letter from the Secretary to the owners of Stettin stating that the special survey no.1 will be carried out next week in Leith, 22 June 1906 1906, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the special survey no.1 will be carried out in the next week on her arrival from Konigsberg, 20 June 1906 1906, Report of survey for repairs for Stettin, 23 July 1906 1906, Report of survey for repairs of engines and boilers for Stettin, 24 July 1906 1906, Report of survey for repairs for Stettin, 16 July 1907 1906, Report of survey for repairs of engines and boilers for Stettin, 16 July 1907 1906, Report of survey for repairs for Stettin, 19 September 1908 1908, Copy of letter from the Secretary to Leith Surveyors stating that Stettin is laid up for overhaul and that the boiler survey should be carried out, 8 September 1908 1908, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the steamer is laid up for overhaul and that the special survey of boilers should take place next week, 5 September 1908 1908, Report of survey for repairs of engines and boilers for Stettin, 19 September 1908 1908, Report of survey for repairs for Stettin, 2 October 1909 1909, Report of survey for repairs of engines and boilers for Stettin, 2 October 1909 1909, Plan of Rudder of Stettin, 1910. Scale 1"=one foot. Details 3"= one foot, 19 September 1910 1910, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding the special survey no. 2 and boiler survey for Stettin, 29 October 1910 1910, Letter from Leith Surveyor to the Secretary stating that they met with the owners of Stettin and arranged the special survey no. 2 to be carried out after the New Year holidays, 28 November 1910 1910, Copy of letter from the Secretary to Leith Surveyors regarding the report no. 13106 for Stettin and asking when the ship's owners expect the special survey no.2 to be carried out, 25 November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee about damage and repairs made to Stettin after grounding, 7 October 1910 1910, Postponed survey form for Stettin, 27 June 1910 1910, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating the special survey no.2 will be carried out in Leith in September, 23 October 1910 1910, Report of survey for repairs for Stettin, 5 October 1910 1910, Report of survey for repairs of engines and boilers for Stettin, 21 October 1910 1910, Report of Ship forgings or castings for Stettin, 30 September 1910 1910, Note about the sketch of rudder for Stettin, 19 September 1910 1910, Letter from Leith surveyors to the Secretary regarding the plan of rudder for Stettin to be approved by the Committee, 16 September 1910 1910, Copy of letter from Secretary, Lloyd's Register London, to James Currie and Co, regarding agreement for date of carrying out special survey, 28 June 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the special survey no.2 for Stettin and the repairs made, 6 June 1911 1911, Report of survey for repairs for Stettin, 3 June 1911 1911, Report of survey for repairs of engines and boilers for Stettin, 3 June 1911 1911, Copy of letter from the Assistant to the Secretary to the owners of Stettin, James Currie & Co, regarding the boiler survey to take place in about two months' time, 12 July 1912 1912, Report of survey for repairs for Stettin, 17 August 1912 1912, Postponed survey form for Stettin, 11 July 1912 1912, Letter from the owners of Stettin to the Secretary regarding the ship special survey and boilers survey, 9 July 1912 1912, Report of survey for repairs of engines and boilers for Stettin, 17 August 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the conditions of Stettin after repair, 29 December 1913 1913, Report of survey for repairs for Stettin, 27 December 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of Stettin taking place in three weeks’ time, 14 November 1913 1913, Postponed survey form for Stettin, 13 November 1913 1913, Letter from Leith surveyors to the Secretary regarding the survey of Stettin, 8 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin, 7 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin being carried out after the strike of the boilers makers, 9 November 1913 1913, Postponed survey form for Stettin, 8 September 1913 1913, Letter from Leith surveyors to the Secretary regarding the postpone of survey of Stettin due to the boilers makers strike, 5 September 1913 1913, Copy of letter from the Secretary to Leith surveyors regarding the survey of screw shaft of Stettin, 3 September 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating the Committee has agreed with the survey being carried out next month, 4 September 1913 1913, Postponed survey form for Stettin, 3 September 1913 1913, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft, 2 July 1913 1913, Report of survey for repairs of engines and boilers for Stettin, 27 December 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with postponing the special survey, 9 June 1914 1914, Postponed survey form for Stettin, 8 June 1914 1914, Letter from Leith surveyors to the Secretary regarding the special survey of Stettin, 4 June 1914 1914, Copy of letter from the Secretary to Leith surveyors enclosing a letter sent by the owners of Stettin about her fourth special survey no. 3, 3 June 1914 1914, Postponed survey form for Stettin, 2 June 1914 1914, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding postponing the second special survey no. 3 of Stettin, 29 May 1914 1914, Report of survey for repairs of engines and boilers for Stettin, 2 July 1915 1915, Copy of letter from the Secretary to Newcastle-on-Tyne surveyors regarding the special survey of Stettin, 12 August 1913 1915, Letter from Aberdeen surveyors to the Secretary stating that Stettin has sailed to Newcastle-on-Tyne as she failed to obtain docking facilities at that port, 10 August 1915 1915, Remarks to the Chief Ship Surveyor regarding the fourth special survey no. 3 for Stettin, 13 July 1915 1915, Copy of letter from the Secretary to the Surveyors in Hull, Grimsby, Middlesbrough, Newcastle, Sunderland and Hartlepool, regarding the fourth special survey no. 3 of Stettin, which will be carried out at some East coast port, 19 July 1915 1915, Letter from Leith surveyors to the Secretary regarding the survey of Stettin to be carried out at some East coast port, 12 July 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the fourth special survey no. 3 for Stettin, 5 July 1915 1915, Report of survey for repairs for Stettin, 2 July 1915 1915, Letter from Leith surveyors to the Secretary stating that the special survey of Stettin is being carried out at that port, 22 May 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 for Stettin, 21 May 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding her survey, 20 April 1915 1915, Extract from a letter dated 15 April 1915 from James Currie & Co regarding surveying Stettin. Extract dated 16 April 1915 1915, Letter from Leith surveyors to the Secretary stating that they had spoken to the owners of Stettin and due to a shortage of labour it has been difficult to find a dry dock to carry out the special survey, 13 April 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the importance of carrying out the special survey due to the age of the ship, 13 April 1915 1915, Postponed survey form for Stettin, 12 April 1915 1915, Copy of letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding the survey of Stettin being postponed, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 of Stettin, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors enclosing information about the communication between the owners of Stettin, 26 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with the special survey being carried out in the next two or three months, 26 January 1915 1915, Postponed survey form for Stettin, 25 January 1915 1915, Letter from Leith surveyors to the Secretary regarding the special survey no.3 and boiler survey of Stettin, 23 January 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding postponing the survey of Stettin, 21 January 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the fourth special survey no.3 and special annual boiler survey of Stettin, 20 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the letter sent by the latter about the thrust shaft, 1 November 1915 1915, Letter from Lisbon surveyors to the Secretary about the repair of shaft of Stettin, 25 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 28 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 23 October 1915 1915, Copy of letter from the Assistant to the Secretary to Lisbon surveyors regarding the repair of Stettin's thrust shaft being not satisfactory, 18 October 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the new thrust shaft she received in Lisbon, 1916 1915, Letter reporting that the new thrust shaft for Stettin is not considered satisfactory, 14 October 1915 1915, London Office Copy of document certifying that surveyor has examined the machinery of Stettin and stating his recommendations, 4 October 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 6 October 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 67857, 19 August 1915 1915, Report of Survey for Repairs for Stettin, 18 August 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 August 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the thrust shaft supplied in Lisbon and if it will be approved by the Committee as a permanent repair, 29 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon and stating that it will be approved by the Committee as a permanent repair, 28 April 1916 1916, Letter reporting the results of the test carried out on Stettin's new thrust shaft that was made in Lisbon, 27 April 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the result of the tests carried out on the new thrust shaft, 14 April 1916 1916, Letter from Professor R Stanfield to James Currie & Co regarding the results of the test of the transverse section of the shaft of Stettin, 11 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Letter reporting that Stettin's new thrust shaft is not satisfactory to be recommended as a permanent repair, 22 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin stating that the repair of the thrust shaft is being looked at, 14 March 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary enclosing drawings and plans of the shaft of Stettin, 6 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the repair of the thrust shaft, 28 January 1916 1916, Postponed survey form for Stettin, 22 January 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft of Stettin, 24 January 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding when the ship will be in position to have the thrust shaft examined, 21 January 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to London Report 79106, 13 July 1917 1916, Report of Survey for Repairs for Stettin due to collision with ice, 1 July 1916 1916, Report of Survey for Repairs of Engines and Boilers for Stettin, 14 July 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70096, 27 July 1917 1917, London Office Copy of document certifying that surveyor has examined damage and transmitted the Report, and stating his Recommendations, 24 July 1917 1917, Report of Survey for Repairs for Stettin 1917, Letter from Newcastle surveyors informing Lloyd's Register London that Stettin is under survey at Newcastle, 21 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding whether Stettin has yet come under inspection, 20 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding their report 70069, and Stettin's owners' intention to make repairs at South Shields within the next couple of days, and calling attention to the need for the Annu 1917, Letter from James Currie & Co Managers, informing Lloyd's Register London that they have arranged for repairs of damage previously communicated by Smith's Dry Dock Co, South Shields, on the steamer's return there in the next day or two, 1 August 1917 1917, Copy of letter from Lloyd's Register's London Secretary to James Currie and Co, informing them of the damage done to Stettin when striking a quay wall, that temporary repairs have been effected but that for the vessel to remain in class permanent repairs 1917, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70306, 2 October 1917 1917, Report of Survey for Repairs for Stettin, 29 September 1917 1917, Report of Survey for Repairs of Engines and Boilers for Stettin, 1 October 1917 1917, Certificate of approval of a stockless anchor, with cancelled written across it, 4 September 1917 1917, Correspondence to Lloyd's Register's London Secretary regarding Stettin Report 71400, acknowledging remarks on the Rules for Engines and Boilers with a working pressure of less than 60lbs, 23 November 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 71400, 19 November 1918 1918, Report of survey for repairs of Stettin, 5 November 1918 1918, Memo to Newcastle surveyors regarding Rules for Engines and Boilers of a greater working pressure than 60lbs per square inch, 18 November 1918 1918, Report of Survey for Repairs of Boilers and Engines of Stettin, 13 November 1918 1918, Copy of letter from London Secretary to James Currie and Co regarding state or survey of Stettin, 17 October 1919 1919, Postponed Survey form for Stettin, October 1919 1919, Letter from James Currie and Co to Secretary, Lloyd's Register London, regarding postponing survey of Stettin, 10 October 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Leith Report 15769, 2 July 1920 1920, Report of Survey for Repairs of Stettin, 28 June 1920 1920, Copy of letter from Lloyd's Register London Secretary to Leith Surveyors, 30 March 1920 1920, Postponed Survey form for Stettin, 29 March 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 24 March 1920 1920, Copy of Letter from Lloyd's Register London Secretary to Leith Surveyors, 19 March 1920 1920, Letter from the Surveyors at Hull, per N Rowall, to London Secretary regarding state of survey of Stettin, 18 March 1920 1920, Copy of letter from the London Secretary to the Hull Surveyors regarding state of survey of Stettin, 17 March 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 10 February 1920 1920, Postponed Survey form for Stettin, 9 February 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 5 February 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 28 January 1920 1920, Report of Survey for Repairs of Engines and Boilers for Stettin, 28 June 1920 1920, Copy of letter from the Secretary to the owners of Stettin saying the Committee has agreed with postponing the boiler survey, 23 August 1921 1921, Report of Survey for Repairs of Stettin, 16 September 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London regarding Stettin now undergoing survey, 3 September 1921 1921, Postponed Surveys form for Stettin, 22 August 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London explaining why Stettin had not undergone survey, 18 August 1921 1921, Report of Survey for Repairs of Engines and Boilers for Stettin, 16 September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Stettin survey, with reference to Leith Report 16187, 6 October 1921 1922, Report of Survey for Repairs of Stettin, 3 October 1921 1922, Correspondence of Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding ongoing surveys on Stettin, 14 September 1922 1922, Copy of letter from Lloyd's Register London Assistant to the Secretary to Leith Surveyors regarding survey of Stettin's screwshaft, 21 July 1922 1922, Postponed Surveys form for Stettin, 20 July 1922 1922, Letter from Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding proposed survey date for Stettin's screw shaft, 17 July 1922 1922, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans of owners of Stettin for survey of screwshaft, 14 July 1922 1922, Report of Survey for Repairs of Boilers and Engines for Stettin, 26 September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding carrying out part of Stettin's Special Survey, with reference to Leith Report 16388, 30 October 1923 1923, Report of Survey for Repairs of Stettin, 24 October 1923 1923, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors, regarding Rule requirements for cables, 20 October 1923 1923, Remarks to the Chief Ship Surveyor regarding Rule requirements for cables, 19 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London requesting clarification on Rules for chains, 18 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London regarding proposed timeline for survey, 22 September 1923 1923, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding letter from Stettin's owners and requesting clarification of when the boiler survey shall be held, 21 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London, regarding carrying out a part survey, 18 September 1923 1923, Copy of letter from Assistant to the Secretary to James Currie and Co regarding schedule for surveys of Stettin, 14 September 1923 1923, Postponed Surveys form for Stettin, 13 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London querying survey schedule of Stettin, 10 September 1923 1923, Report of Survey for Repairs of Engines and Boilers for Stettin, 23 October 1923 1923, Letter from Leith Surveyor A T Thomas to James Currie and Co, informing them of future survey schedule for Stettin, 23 October 1923 1923, Plan of Main Boiler for Stettin, 24 May 1924 1924, Plan of Donkey Boiler for Stettin, 24 May 1924 1924, Hatch Plan of Stettin, 2 October 1924 1924, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Stettin, with reference to Leith Report 16388, 19 May 1924 1924, Letter from A T Thomas, Leith Surveyor, to J F Hill of London, regarding surveying Stettin, 16 May 1924 1924, Extract from a letter dated 14 May 1924 from Leith surveyors regarding examining Stettin. Extract dated 15 May 1924 1924, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans for survey of Stettin and expiry of year of grace, 14 May 1924 1924, Letter from Leith surveyor A T Thomas to Secretary, London, regarding proposed examination part of Stettin's combustion chamber, 18 April 1924 1924, Copy of letter from Assistant to the Secretary to the Leith surveyors questioning owners' arrangements to have Stettin's combustion chamber examined, 16 April 1924 1924, Report of Survey for Repairs of Engines and Boilers for Stettin, 12 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding fulfilment of special survey on Stettin, in reference to Leith Report 16611, 22 November 1924 1924, Report of Survey for Repairs of Stettin, 15 November 1924 1924, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 November 1924 1924, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding completion of reports on Stettin's new boilers, 31 October 1924 1924, Note submitting that certain reports be forwarded to the Leith Surveyors for their guidance and completion, 29 October 1924 1924, Note submitting that the amended plans of boilers for Stettin merit approval, 29 May 1924 1924, Correspondence accompanying boiler plans submitted for approval for Stettin from the Glasgow office to London, 26 May 1924 1924, Letter from Jas S Cairns submitting for approval plans for new boilers for the Stettin to the Glasgow Secretary, 26 May 1924 1924, Note submitting that plans for Stettin's boilers merit approval, 24 April 1924 1924, Letter from Leith Surveyors, per A T T[homas], to Secretary, London, noting they are forwarding plans of new boilers intended for Stettin, 14 April 1924 1924, Report on Main Boiler for Stettin, 11 October 1924 1924, Report on Donkey Boiler for Stettin, 11 October 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Delivery note for 3 furnaces from Forth Shipbuilding and Engineering, Glasgow, 4 July 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 27 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, LR stamp and signature J Barr, 2 July 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 14 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 28 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 26 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 17 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 16790, 28 August 1925 1925, Report of Survey for Repairs on Stettin, 25 August 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 August 1925 1925, Memo regarding approving a steel cylinder cover on Stettin, 5 October 1925 1925, Letter from Leith Surveyor to Secretary, London, regarding steel cover repair examined, 2 October 1925 1925, Letter from Hamburg Office to Secretary, London, regarding request by Leith Surveyors, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding Hamburg report on Stettin, 1 October 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding their request for the Hamburg report, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to A Chisholm, requesting a report for the Leith Surveyors, 30 September 1925 1925, Translation of Cablegram sent to Surveyors at Hamburg, 30 September 1925 1925, Copy of Cablegram from London Office to Hamburg Office, 30 September 1925 1925, Letter from Leith Surveyors, per A T T[homas], to London Office asking for a Hamburg report to be sent to them, 29 September 1925 1925, London Office Copy of document certifying that Hamburg surveyor has examined damage and transmitted the Report, and stating his Recommendations, 25 September 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 September 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 16897, March 1926 1926, Report of Survey for Repairs to Stettin, 30 March 1926 1926, Report of Survey for Repairs of Engines and Boilers to Stettin, 30 March 1926 1926, Report of Survey for Repairs to Stettin, 15 June 1927 1927, Report of Survey for Repairs of Engines and Boilers to Stettin, 15 June 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 17291, 8 December 1927 1927, Copy of Certificate of Survey after damage to Stettin by a breaker in heavy weather, 23 November 1927 1927, Report of Survey for Repairs to Stettin, 3 December 1927 1927, Question and Answer memo between London and Leith Offices regarding Hamburg Report 17858, 21 February 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 1 February 1928 1928, Correspondence memo with particulars from Leith Surveyors to Secretary, London, regarding return of report, 27 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 25 January 1928 1928, Copy of Certificate of Survey from Hamburg after collision damage suffered by Stettin, 22 January 1928 1928, Report of Survey for Repairs of Stettin, 23 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 17339, 15 March 1928 1928, Report of Survey for Repairs of Stettin, 5 March 1928 1928, Copy of letter from the Clerk of the Classification Committee to James Currie and Co, with a copy to the Leith Office, regarding 6th Special Survey of Stettin, 14 December 1928 1928, Postponed Survey form for Stettin's 6th Special Survey, 13 December 1928 1928, Letter from James Currie and Co to Lloyd's Register Secretary, London, regarding deferring Stettin's 6th Special Survey, 11 December 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage, in reference to Dundee Report 8638, 30 March 1928 1928, Copy of Certificate of Survey regarding damage and report of repairs to Stettin's port bow shell plating, Dundee, 23 March 1928 1928, Report of Survey for Repairs to Stettin, 23 March 1928 1928, Letter from Lloyd's Register Engineer Surveyor to James Currie and Co regarding schedule for survey of Stettin's propeller shaft, 5 March 1929 1929, Copy of letter from the Secretary, London, to the Secretary, Glasgow, returning Stettin boiler plans, 29 May 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin and 6th Special Survey, in reference to Leith Report 17540, 13 March 1929 1929, Report of Survey for Repairs of Stettin, 5 March 1929 1929, Report of Survey for Repairs of Engines and Boilers for Stettin, 5 March 1929 1929, Copy of letter from pro Secretary, London, to Leith Surveyors regarding examination of Stettin's screwshaft, 16 April 1930 1930, Postponed Survey form for Stettin's screwshaft, 14 April 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 9 April 1930 1930, Copy of letter from Secretary, London, to Leith Surveyors informing them Committee are agreeable to postponing Stettin's screwshaft survey, 25 February 1930 1930, Postponed Survey form for Stettin's screwshaft, 24 February 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 17 February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 17802, 22 May 1930 1930, Report of Survey for Repairs to Stettin, 15 May 1930 1930, Report on Engine Forgings for Stettin, 8 May 1930 1930, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 May 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 18082, 2 November 1931 1931, Form or memo from Secretary, Glasgow, to Secretary, London, regarding presence of Stettin, 16 October 1931 1931, Question and Answer memo from Secretary, London, to Leith Surveyors regarding Stettin Boiler Survey, 5 October 1931 1931, Copy of letter from pro Secretary, London, with copy to Leith, to James Currie and Co regarding postponing Stettin Boiler Survey, 26 June 1931 1931, Postponed Surveys form for Stettin's Boiler Survey, 25 June 1931 1931, Letter from James Currie and Co regarding postponing Boiler Survey due on Stettin, 20 June 1931 1931, Report of Survey for Repairs on Stettin, 26 October 1931 1931, Report of Survey for Repairs of Engines and Boilers on Stettin, 26 October 1931 1931, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of survey for Stettin, 23 December 1932 1932, Postponed Surveys form for Stettin, 22 December 1932 1932, Letter from Leith Surveyors per John Houston to the Secretary, London, regarding outstanding survey on Stettin, 17 December 1932 1932, Letter from James Currie and Co to Leith Surveyors regarding schedule of survey for Stettin, 16 December 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 14 December 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 24 November 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 September 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 21 June 1932 1932, Postponed Surveys form for Stettin, 20 June 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 June 1932 1932, Copy of letter from pro Secretary, London to Leith Surveyors regarding Stettin boiler survey schedule, 9 October 1931 1932, Postponed Surveys form for Stettin, 8 October 1931 1932, Report of Total Loss, Casualty, , for Stettin, which has been sold to be broken up, 4 December 1933 1933, Letter from Leith Surveyors, per John Houston, to Secretary, London, informing them Stettin is being broken up, 1 December 1933 1933, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of demolition for Stettin, 27 November 1933 1933, Copy of letter from Leith Surveyors, per John Houston, to the Secretary, London, regarding the firm to which Stettin was sold to be broken up, 24 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 23 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 31 August 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 15 June 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 16 March 1933 1933, Note related to Stettin stating SS no. 2 held now posting no date, Note regarding Stettin stating "Vessel left Lisbon Oct 3. + 3 mos from dats. of survey would expire 12/15" no date, Sketch or plan of steel cover part for Stettin no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Certificate for vessels navigated by Steam for Stettin, 30 November 1864 1864, Iron Ship survey report for Stettin, 2 December 1864 1864, Letter from Glasgow surveyor to the Secretary sending the machinery certificate and Stettin's report of survey no. 4255, 8 July 1876 1876, Report of survey for repairs for Stettin, 8 July 1876 1876, Memo from Messrs Napier Ltd. stating that Stettin's boilers are fitted in accordance with the Committee requirements and should have the notification Lloyd's MC in the Register Book, 3 July 1876 1876, Details of main boilers of Stettin, 29 June 1876 1876, Engineer surveyor's report on machinery for Stettin, 26 June 1876 1876, Annual surveys for Stettin, 30 November 1876 1876, Report of survey for repairs for Stettin, 16 January 1879 1879, Report of survey for repairs of engines and boilers for Stettin, 16 January 1880 1880, Cover note for reports number 4308 and 57 of Stettin, 31 January 1880 1880, Report of survey for repairs for Stettin, 28 January 1880 1880, Report of survey for repairs for Stettin, 2 February 1881 1881, Report of survey for repairs for Stettin, 27 January 1882 1882, Annual surveys for Stettin, 6 January 1883 1883, Annual surveys for Stettin, 23 January 1884 1884, Report of survey for repairs for Stettin, 30 January 1885 1885, Report of survey for repairs of engines and boilers for Stettin, 30 January 1885 1885, Report of survey for repairs for Stettin, 27 January 1886 1886, Report of survey for repairs of engines and boilers for Stettin, 30 January 1886 1886, Report of survey for repairs for Stettin, 26 February 1887 1887, Report of survey for repairs of engines and boilers for Stettin, 15 March 1887 1887, Report of survey for repairs for Stettin, 21 May 1888 1888, Report of survey for repairs of engines and boilers for Stettin, 25 May 1888 1888, Report of survey for repairs for Stettin, 29 December 1888 1888, Particulars for record of double bottoms in Lloyd's Register for Stettin, 5 December 1889 1889, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 10 December 1889 1889, Report of Survey for Repairs for Stettin, 6 December 1889 1889, Report on Machinery for Stettin, 3 December 1889 1889, Report of Survey for Repairs for Stettin, 18 October 1890 1890, Report of Survey for Repairs for Stettin, 6 November 1891 1891, Report of Survey for Repairs for Stettin, 16 January 1893 1893, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 19 February 1894 1894, Report of survey for repairs for Stettin, 12 February 1894 1894, Report of survey for repairs of engines and boilers for Stettin, 13 February 1894 1894, Letter from the surveyor Jas Barclay to the Secretary in London enclosing a letter received from the Master of Stettin about the boiler survey to be held at Bergen, 9 June 1894 1894, Letter from the Master of Stettin Otto E Jacobsen to the surveyor James Barclay about the survey of boilers to take place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to E Rusten, owner of Stettin, stating he agrees with the survey of boilers taking place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to Bergen surveyor stating that Stettin will have the survey of boilers carried out in Bergen, 8 June 1894 1894, Note stating the boiler survey for Stettin is due to April and the owners state the ship will be at Bergen where the survey will take place, 8 June 1894 1894, Letter from Erik Rusten, owner of Stettin, to Lloyd's Register stating that he wishes the survey of boilers to take place in Bergen, 4 June 1894 1894, Report of Survey for repairs of engines and boilers for Stettin, 12 July 1894 1894, Report of survey for repairs for Stettin, 6 February 1895 1895, Report of survey for repairs of engines and boilers for Stettin, 6 February 1895 1895, Report of survey for repairs for Stettin, 19 March 1896 1896, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin about the survey of boilers, 23 March 1896 1896, Letter from Leith surveyor to the Secretary stating that the Stettin is under survey, 5 March 1896 1896, Letter from the Secretary to the Leith Surveyor questioning about the survey of Stettin, 3 March 1896 1896, Copy of Letter from the Secretary to the owner of Stettin stating that he agrees with the boiler survey of that ship being carried out when she is in dry dock in the following month, 29 January 1896 1896, Note stating the boiler survey for Stettin will be in dry dock in the following month, 29 January 1896 1896, Letter from the owner of Stettin to the Secretary stating the ship will be in dry dock next month for the survey, 27 January 1896 1896, Report of survey for repairs of engines and boilers for Stettin, 19 March 1896 1896, Report of survey for repairs for Stettin, 19 March 1897 1897, Letter from the Leith surveyor to the Secretary stating that Stettin is now employed in the emigrant trade and therefore the pressure of boiler has been reduced, 24 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 19 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 26 July 1897 1897, Remarks of the Chief Surveyor to the Classing Committee about the special survey of the ship Stettin, 4 March 1898 1898, Copy of letter from the Secretary to the owners of Stettin stating that the special survey will take place when the ship is placed in dry dock, 3 February 1898 1898, Note stating the ship Stettin will be soon in dry dock to be surveyed, 3 February 1898 1898, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating their intention to put the ship in dry dock to be surveyed, 1 February 1898 1898, Report of survey for repairs for Stettin, 3 March 1898 1898, Report of survey for repairs of engines and boilers for Stettin, 3 March 1898 1898, Remarks of the Chief Surveyor to the Classing Committee about the damage and temporary repairs suffered by Stettin, 31 March 1898 1898, Letter from the Bremerhaven surveyor about the repairs to Stettin, 29 March 1898 1898, Cover note for report number 534 of Stettin, 1 April 1898 1898, Report of survey for repairs for Stettin, 28 March 1898 1898, Remarks of the Ship Surveyor to the Classing Committee saying the damage to Stettin has been repaired and she should remain classed, 6 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1899 1899, Report of survey for repairs of engines and boilers for Stettin, 5 April 1899 1899, Report of survey for repairs for Stettin, 28 April 1900 1900, Report of survey for repairs of engines and boilers for Stettin, 28 April 1900 1900, Report of survey for repairs for Stettin, 2 May 1901 1901, Report of survey for repairs of engines and boilers for Stettin, 2 May 1901 1901, Remarks of the Ship Surveyor to the Classing Committee about the special survey of Stettin and the particulars of her plating, 7 April 1902 1902, Report of survey for repairs for Stettin, 4 April 1902 1902, Copy of letter from the Secretary to the owners of Stettin statin the Committee agreed with the special survey being carried out in the next two months, 31 January 1902 1902, Postponed survey form for Stettin, 30 January 1902 1902, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating they expect to attend the special survey within the next two months, 29 January 1902 1902, Report of survey for repairs of engines and boilers for Stettin, 4 April 1902 1902, Report of survey for repairs for Stettin, 11 May 1903 1903, Copy of letter from the Secretary to Leith Surveyors stating that the steamer Stettin has been booked for the annual boiler survey that will take place in a few days, 7 April 1903 1903, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the annual overhaul has been booked for that next few days, 4 April 1903 1903, Report of survey for repairs of engines and boilers for Stettin, 11 May 1903 1903, Report of survey for repairs for Stettin, 29 June 1904 1904, Report of survey for repairs of engines and boilers for Stettin, 29 June 1904 1904, Report of survey for repairs for Stettin, 11 July 1905 1905, Report of survey for repairs of engines and boilers for Stettin, 11 July 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the damage and repairs to Stettin, 24 August 1905 1905, Report of survey for repairs for Stettin, 22 August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the special survey no.1 of Stettin, 26 July 1906 1906, Copy of letter from the Secretary to Leith Surveyors stating that Stettin will be in dry dock on her arrival from Konigsberg when the special survey no.1 will be carried out, 22 June 1906 1906, Copy of letter from the Secretary to the owners of Stettin stating that the special survey no.1 will be carried out next week in Leith, 22 June 1906 1906, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the special survey no.1 will be carried out in the next week on her arrival from Konigsberg, 20 June 1906 1906, Report of survey for repairs for Stettin, 23 July 1906 1906, Report of survey for repairs of engines and boilers for Stettin, 24 July 1906 1906, Report of survey for repairs for Stettin, 16 July 1907 1906, Report of survey for repairs of engines and boilers for Stettin, 16 July 1907 1906, Report of survey for repairs for Stettin, 19 September 1908 1908, Copy of letter from the Secretary to Leith Surveyors stating that Stettin is laid up for overhaul and that the boiler survey should be carried out, 8 September 1908 1908, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the steamer is laid up for overhaul and that the special survey of boilers should take place next week, 5 September 1908 1908, Report of survey for repairs of engines and boilers for Stettin, 19 September 1908 1908, Report of survey for repairs for Stettin, 2 October 1909 1909, Report of survey for repairs of engines and boilers for Stettin, 2 October 1909 1909, Plan of Rudder of Stettin, 1910. Scale 1"=one foot. Details 3"= one foot, 19 September 1910 1910, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding the special survey no. 2 and boiler survey for Stettin, 29 October 1910 1910, Letter from Leith Surveyor to the Secretary stating that they met with the owners of Stettin and arranged the special survey no. 2 to be carried out after the New Year holidays, 28 November 1910 1910, Copy of letter from the Secretary to Leith Surveyors regarding the report no. 13106 for Stettin and asking when the ship's owners expect the special survey no.2 to be carried out, 25 November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee about damage and repairs made to Stettin after grounding, 7 October 1910 1910, Postponed survey form for Stettin, 27 June 1910 1910, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating the special survey no.2 will be carried out in Leith in September, 23 October 1910 1910, Report of survey for repairs for Stettin, 5 October 1910 1910, Report of survey for repairs of engines and boilers for Stettin, 21 October 1910 1910, Report of Ship forgings or castings for Stettin, 30 September 1910 1910, Note about the sketch of rudder for Stettin, 19 September 1910 1910, Letter from Leith surveyors to the Secretary regarding the plan of rudder for Stettin to be approved by the Committee, 16 September 1910 1910, Copy of letter from Secretary, Lloyd's Register London, to James Currie and Co, regarding agreement for date of carrying out special survey, 28 June 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the special survey no.2 for Stettin and the repairs made, 6 June 1911 1911, Report of survey for repairs for Stettin, 3 June 1911 1911, Report of survey for repairs of engines and boilers for Stettin, 3 June 1911 1911, Copy of letter from the Assistant to the Secretary to the owners of Stettin, James Currie & Co, regarding the boiler survey to take place in about two months' time, 12 July 1912 1912, Report of survey for repairs for Stettin, 17 August 1912 1912, Postponed survey form for Stettin, 11 July 1912 1912, Letter from the owners of Stettin to the Secretary regarding the ship special survey and boilers survey, 9 July 1912 1912, Report of survey for repairs of engines and boilers for Stettin, 17 August 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the conditions of Stettin after repair, 29 December 1913 1913, Report of survey for repairs for Stettin, 27 December 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of Stettin taking place in three weeks’ time, 14 November 1913 1913, Postponed survey form for Stettin, 13 November 1913 1913, Letter from Leith surveyors to the Secretary regarding the survey of Stettin, 8 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin, 7 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin being carried out after the strike of the boilers makers, 9 November 1913 1913, Postponed survey form for Stettin, 8 September 1913 1913, Letter from Leith surveyors to the Secretary regarding the postpone of survey of Stettin due to the boilers makers strike, 5 September 1913 1913, Copy of letter from the Secretary to Leith surveyors regarding the survey of screw shaft of Stettin, 3 September 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating the Committee has agreed with the survey being carried out next month, 4 September 1913 1913, Postponed survey form for Stettin, 3 September 1913 1913, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft, 2 July 1913 1913, Report of survey for repairs of engines and boilers for Stettin, 27 December 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with postponing the special survey, 9 June 1914 1914, Postponed survey form for Stettin, 8 June 1914 1914, Letter from Leith surveyors to the Secretary regarding the special survey of Stettin, 4 June 1914 1914, Copy of letter from the Secretary to Leith surveyors enclosing a letter sent by the owners of Stettin about her fourth special survey no. 3, 3 June 1914 1914, Postponed survey form for Stettin, 2 June 1914 1914, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding postponing the second special survey no. 3 of Stettin, 29 May 1914 1914, Report of survey for repairs of engines and boilers for Stettin, 2 July 1915 1915, Copy of letter from the Secretary to Newcastle-on-Tyne surveyors regarding the special survey of Stettin, 12 August 1913 1915, Letter from Aberdeen surveyors to the Secretary stating that Stettin has sailed to Newcastle-on-Tyne as she failed to obtain docking facilities at that port, 10 August 1915 1915, Remarks to the Chief Ship Surveyor regarding the fourth special survey no. 3 for Stettin, 13 July 1915 1915, Copy of letter from the Secretary to the Surveyors in Hull, Grimsby, Middlesbrough, Newcastle, Sunderland and Hartlepool, regarding the fourth special survey no. 3 of Stettin, which will be carried out at some East coast port, 19 July 1915 1915, Letter from Leith surveyors to the Secretary regarding the survey of Stettin to be carried out at some East coast port, 12 July 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the fourth special survey no. 3 for Stettin, 5 July 1915 1915, Report of survey for repairs for Stettin, 2 July 1915 1915, Letter from Leith surveyors to the Secretary stating that the special survey of Stettin is being carried out at that port, 22 May 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 for Stettin, 21 May 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding her survey, 20 April 1915 1915, Extract from a letter dated 15 April 1915 from James Currie & Co regarding surveying Stettin. Extract dated 16 April 1915 1915, Letter from Leith surveyors to the Secretary stating that they had spoken to the owners of Stettin and due to a shortage of labour it has been difficult to find a dry dock to carry out the special survey, 13 April 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the importance of carrying out the special survey due to the age of the ship, 13 April 1915 1915, Postponed survey form for Stettin, 12 April 1915 1915, Copy of letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding the survey of Stettin being postponed, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 of Stettin, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors enclosing information about the communication between the owners of Stettin, 26 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with the special survey being carried out in the next two or three months, 26 January 1915 1915, Postponed survey form for Stettin, 25 January 1915 1915, Letter from Leith surveyors to the Secretary regarding the special survey no.3 and boiler survey of Stettin, 23 January 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding postponing the survey of Stettin, 21 January 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the fourth special survey no.3 and special annual boiler survey of Stettin, 20 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the letter sent by the latter about the thrust shaft, 1 November 1915 1915, Letter from Lisbon surveyors to the Secretary about the repair of shaft of Stettin, 25 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 28 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 23 October 1915 1915, Copy of letter from the Assistant to the Secretary to Lisbon surveyors regarding the repair of Stettin's thrust shaft being not satisfactory, 18 October 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the new thrust shaft she received in Lisbon, 1916 1915, Letter reporting that the new thrust shaft for Stettin is not considered satisfactory, 14 October 1915 1915, London Office Copy of document certifying that surveyor has examined the machinery of Stettin and stating his recommendations, 4 October 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 6 October 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 67857, 19 August 1915 1915, Report of Survey for Repairs for Stettin, 18 August 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 August 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the thrust shaft supplied in Lisbon and if it will be approved by the Committee as a permanent repair, 29 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon and stating that it will be approved by the Committee as a permanent repair, 28 April 1916 1916, Letter reporting the results of the test carried out on Stettin's new thrust shaft that was made in Lisbon, 27 April 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the result of the tests carried out on the new thrust shaft, 14 April 1916 1916, Letter from Professor R Stanfield to James Currie & Co regarding the results of the test of the transverse section of the shaft of Stettin, 11 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Letter reporting that Stettin's new thrust shaft is not satisfactory to be recommended as a permanent repair, 22 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin stating that the repair of the thrust shaft is being looked at, 14 March 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary enclosing drawings and plans of the shaft of Stettin, 6 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the repair of the thrust shaft, 28 January 1916 1916, Postponed survey form for Stettin, 22 January 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft of Stettin, 24 January 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding when the ship will be in position to have the thrust shaft examined, 21 January 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to London Report 79106, 13 July 1917 1916, Report of Survey for Repairs for Stettin due to collision with ice, 1 July 1916 1916, Report of Survey for Repairs of Engines and Boilers for Stettin, 14 July 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70096, 27 July 1917 1917, London Office Copy of document certifying that surveyor has examined damage and transmitted the Report, and stating his Recommendations, 24 July 1917 1917, Report of Survey for Repairs for Stettin 1917, Letter from Newcastle surveyors informing Lloyd's Register London that Stettin is under survey at Newcastle, 21 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding whether Stettin has yet come under inspection, 20 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding their report 70069, and Stettin's owners' intention to make repairs at South Shields within the next couple of days, and calling attention to the need for the Annu 1917, Letter from James Currie & Co Managers, informing Lloyd's Register London that they have arranged for repairs of damage previously communicated by Smith's Dry Dock Co, South Shields, on the steamer's return there in the next day or two, 1 August 1917 1917, Copy of letter from Lloyd's Register's London Secretary to James Currie and Co, informing them of the damage done to Stettin when striking a quay wall, that temporary repairs have been effected but that for the vessel to remain in class permanent repairs 1917, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70306, 2 October 1917 1917, Report of Survey for Repairs for Stettin, 29 September 1917 1917, Report of Survey for Repairs of Engines and Boilers for Stettin, 1 October 1917 1917, Certificate of approval of a stockless anchor, with cancelled written across it, 4 September 1917 1917, Correspondence to Lloyd's Register's London Secretary regarding Stettin Report 71400, acknowledging remarks on the Rules for Engines and Boilers with a working pressure of less than 60lbs, 23 November 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 71400, 19 November 1918 1918, Report of survey for repairs of Stettin, 5 November 1918 1918, Memo to Newcastle surveyors regarding Rules for Engines and Boilers of a greater working pressure than 60lbs per square inch, 18 November 1918 1918, Report of Survey for Repairs of Boilers and Engines of Stettin, 13 November 1918 1918, Copy of letter from London Secretary to James Currie and Co regarding state or survey of Stettin, 17 October 1919 1919, Postponed Survey form for Stettin, October 1919 1919, Letter from James Currie and Co to Secretary, Lloyd's Register London, regarding postponing survey of Stettin, 10 October 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Leith Report 15769, 2 July 1920 1920, Report of Survey for Repairs of Stettin, 28 June 1920 1920, Copy of letter from Lloyd's Register London Secretary to Leith Surveyors, 30 March 1920 1920, Postponed Survey form for Stettin, 29 March 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 24 March 1920 1920, Copy of Letter from Lloyd's Register London Secretary to Leith Surveyors, 19 March 1920 1920, Letter from the Surveyors at Hull, per N Rowall, to London Secretary regarding state of survey of Stettin, 18 March 1920 1920, Copy of letter from the London Secretary to the Hull Surveyors regarding state of survey of Stettin, 17 March 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 10 February 1920 1920, Postponed Survey form for Stettin, 9 February 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 5 February 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 28 January 1920 1920, Report of Survey for Repairs of Engines and Boilers for Stettin, 28 June 1920 1920, Copy of letter from the Secretary to the owners of Stettin saying the Committee has agreed with postponing the boiler survey, 23 August 1921 1921, Report of Survey for Repairs of Stettin, 16 September 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London regarding Stettin now undergoing survey, 3 September 1921 1921, Postponed Surveys form for Stettin, 22 August 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London explaining why Stettin had not undergone survey, 18 August 1921 1921, Report of Survey for Repairs of Engines and Boilers for Stettin, 16 September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Stettin survey, with reference to Leith Report 16187, 6 October 1921 1922, Report of Survey for Repairs of Stettin, 3 October 1921 1922, Correspondence of Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding ongoing surveys on Stettin, 14 September 1922 1922, Copy of letter from Lloyd's Register London Assistant to the Secretary to Leith Surveyors regarding survey of Stettin's screwshaft, 21 July 1922 1922, Postponed Surveys form for Stettin, 20 July 1922 1922, Letter from Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding proposed survey date for Stettin's screw shaft, 17 July 1922 1922, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans of owners of Stettin for survey of screwshaft, 14 July 1922 1922, Report of Survey for Repairs of Boilers and Engines for Stettin, 26 September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding carrying out part of Stettin's Special Survey, with reference to Leith Report 16388, 30 October 1923 1923, Report of Survey for Repairs of Stettin, 24 October 1923 1923, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors, regarding Rule requirements for cables, 20 October 1923 1923, Remarks to the Chief Ship Surveyor regarding Rule requirements for cables, 19 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London requesting clarification on Rules for chains, 18 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London regarding proposed timeline for survey, 22 September 1923 1923, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding letter from Stettin's owners and requesting clarification of when the boiler survey shall be held, 21 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London, regarding carrying out a part survey, 18 September 1923 1923, Copy of letter from Assistant to the Secretary to James Currie and Co regarding schedule for surveys of Stettin, 14 September 1923 1923, Postponed Surveys form for Stettin, 13 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London querying survey schedule of Stettin, 10 September 1923 1923, Report of Survey for Repairs of Engines and Boilers for Stettin, 23 October 1923 1923, Letter from Leith Surveyor A T Thomas to James Currie and Co, informing them of future survey schedule for Stettin, 23 October 1923 1923, Plan of Main Boiler for Stettin, 24 May 1924 1924, Plan of Donkey Boiler for Stettin, 24 May 1924 1924, Hatch Plan of Stettin, 2 October 1924 1924, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Stettin, with reference to Leith Report 16388, 19 May 1924 1924, Letter from A T Thomas, Leith Surveyor, to J F Hill of London, regarding surveying Stettin, 16 May 1924 1924, Extract from a letter dated 14 May 1924 from Leith surveyors regarding examining Stettin. Extract dated 15 May 1924 1924, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans for survey of Stettin and expiry of year of grace, 14 May 1924 1924, Letter from Leith surveyor A T Thomas to Secretary, London, regarding proposed examination part of Stettin's combustion chamber, 18 April 1924 1924, Copy of letter from Assistant to the Secretary to the Leith surveyors questioning owners' arrangements to have Stettin's combustion chamber examined, 16 April 1924 1924, Report of Survey for Repairs of Engines and Boilers for Stettin, 12 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding fulfilment of special survey on Stettin, in reference to Leith Report 16611, 22 November 1924 1924, Report of Survey for Repairs of Stettin, 15 November 1924 1924, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 November 1924 1924, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding completion of reports on Stettin's new boilers, 31 October 1924 1924, Note submitting that certain reports be forwarded to the Leith Surveyors for their guidance and completion, 29 October 1924 1924, Note submitting that the amended plans of boilers for Stettin merit approval, 29 May 1924 1924, Correspondence accompanying boiler plans submitted for approval for Stettin from the Glasgow office to London, 26 May 1924 1924, Letter from Jas S Cairns submitting for approval plans for new boilers for the Stettin to the Glasgow Secretary, 26 May 1924 1924, Note submitting that plans for Stettin's boilers merit approval, 24 April 1924 1924, Letter from Leith Surveyors, per A T T[homas], to Secretary, London, noting they are forwarding plans of new boilers intended for Stettin, 14 April 1924 1924, Report on Main Boiler for Stettin, 11 October 1924 1924, Report on Donkey Boiler for Stettin, 11 October 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Delivery note for 3 furnaces from Forth Shipbuilding and Engineering, Glasgow, 4 July 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 27 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, LR stamp and signature J Barr, 2 July 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 14 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 28 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 26 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 17 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 16790, 28 August 1925 1925, Report of Survey for Repairs on Stettin, 25 August 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 August 1925 1925, Memo regarding approving a steel cylinder cover on Stettin, 5 October 1925 1925, Letter from Leith Surveyor to Secretary, London, regarding steel cover repair examined, 2 October 1925 1925, Letter from Hamburg Office to Secretary, London, regarding request by Leith Surveyors, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding Hamburg report on Stettin, 1 October 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding their request for the Hamburg report, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to A Chisholm, requesting a report for the Leith Surveyors, 30 September 1925 1925, Translation of Cablegram sent to Surveyors at Hamburg, 30 September 1925 1925, Copy of Cablegram from London Office to Hamburg Office, 30 September 1925 1925, Letter from Leith Surveyors, per A T T[homas], to London Office asking for a Hamburg report to be sent to them, 29 September 1925 1925, London Office Copy of document certifying that Hamburg surveyor has examined damage and transmitted the Report, and stating his Recommendations, 25 September 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 September 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 16897, March 1926 1926, Report of Survey for Repairs to Stettin, 30 March 1926 1926, Report of Survey for Repairs of Engines and Boilers to Stettin, 30 March 1926 1926, Report of Survey for Repairs to Stettin, 15 June 1927 1927, Report of Survey for Repairs of Engines and Boilers to Stettin, 15 June 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 17291, 8 December 1927 1927, Copy of Certificate of Survey after damage to Stettin by a breaker in heavy weather, 23 November 1927 1927, Report of Survey for Repairs to Stettin, 3 December 1927 1927, Question and Answer memo between London and Leith Offices regarding Hamburg Report 17858, 21 February 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 1 February 1928 1928, Correspondence memo with particulars from Leith Surveyors to Secretary, London, regarding return of report, 27 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 25 January 1928 1928, Copy of Certificate of Survey from Hamburg after collision damage suffered by Stettin, 22 January 1928 1928, Report of Survey for Repairs of Stettin, 23 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 17339, 15 March 1928 1928, Report of Survey for Repairs of Stettin, 5 March 1928 1928, Copy of letter from the Clerk of the Classification Committee to James Currie and Co, with a copy to the Leith Office, regarding 6th Special Survey of Stettin, 14 December 1928 1928, Postponed Survey form for Stettin's 6th Special Survey, 13 December 1928 1928, Letter from James Currie and Co to Lloyd's Register Secretary, London, regarding deferring Stettin's 6th Special Survey, 11 December 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage, in reference to Dundee Report 8638, 30 March 1928 1928, Copy of Certificate of Survey regarding damage and report of repairs to Stettin's port bow shell plating, Dundee, 23 March 1928 1928, Report of Survey for Repairs to Stettin, 23 March 1928 1928, Letter from Lloyd's Register Engineer Surveyor to James Currie and Co regarding schedule for survey of Stettin's propeller shaft, 5 March 1929 1929, Copy of letter from the Secretary, London, to the Secretary, Glasgow, returning Stettin boiler plans, 29 May 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin and 6th Special Survey, in reference to Leith Report 17540, 13 March 1929 1929, Report of Survey for Repairs of Stettin, 5 March 1929 1929, Report of Survey for Repairs of Engines and Boilers for Stettin, 5 March 1929 1929, Copy of letter from pro Secretary, London, to Leith Surveyors regarding examination of Stettin's screwshaft, 16 April 1930 1930, Postponed Survey form for Stettin's screwshaft, 14 April 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 9 April 1930 1930, Copy of letter from Secretary, London, to Leith Surveyors informing them Committee are agreeable to postponing Stettin's screwshaft survey, 25 February 1930 1930, Postponed Survey form for Stettin's screwshaft, 24 February 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 17 February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 17802, 22 May 1930 1930, Report of Survey for Repairs to Stettin, 15 May 1930 1930, Report on Engine Forgings for Stettin, 8 May 1930 1930, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 May 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 18082, 2 November 1931 1931, Form or memo from Secretary, Glasgow, to Secretary, London, regarding presence of Stettin, 16 October 1931 1931, Question and Answer memo from Secretary, London, to Leith Surveyors regarding Stettin Boiler Survey, 5 October 1931 1931, Copy of letter from pro Secretary, London, with copy to Leith, to James Currie and Co regarding postponing Stettin Boiler Survey, 26 June 1931 1931, Postponed Surveys form for Stettin's Boiler Survey, 25 June 1931 1931, Letter from James Currie and Co regarding postponing Boiler Survey due on Stettin, 20 June 1931 1931, Report of Survey for Repairs on Stettin, 26 October 1931 1931, Report of Survey for Repairs of Engines and Boilers on Stettin, 26 October 1931 1931, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of survey for Stettin, 23 December 1932 1932, Postponed Surveys form for Stettin, 22 December 1932 1932, Letter from Leith Surveyors per John Houston to the Secretary, London, regarding outstanding survey on Stettin, 17 December 1932 1932, Letter from James Currie and Co to Leith Surveyors regarding schedule of survey for Stettin, 16 December 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 14 December 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 24 November 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 September 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 21 June 1932 1932, Postponed Surveys form for Stettin, 20 June 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 June 1932 1932, Copy of letter from pro Secretary, London to Leith Surveyors regarding Stettin boiler survey schedule, 9 October 1931 1932, Postponed Surveys form for Stettin, 8 October 1931 1932, Report of Total Loss, Casualty, , for Stettin, which has been sold to be broken up, 4 December 1933 1933, Letter from Leith Surveyors, per John Houston, to Secretary, London, informing them Stettin is being broken up, 1 December 1933 1933, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of demolition for Stettin, 27 November 1933 1933, Copy of letter from Leith Surveyors, per John Houston, to the Secretary, London, regarding the firm to which Stettin was sold to be broken up, 24 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 23 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 31 August 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 15 June 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 16 March 1933 1933, Note related to Stettin stating SS no. 2 held now posting no date, Note regarding Stettin stating "Vessel left Lisbon Oct 3. + 3 mos from dats. of survey would expire 12/15" no date, Sketch or plan of steel cover part for Stettin no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Certificate for vessels navigated by Steam for Stettin, 30 November 1864 1864, Iron Ship survey report for Stettin, 2 December 1864 1864, Letter from Glasgow surveyor to the Secretary sending the machinery certificate and Stettin's report of survey no. 4255, 8 July 1876 1876, Report of survey for repairs for Stettin, 8 July 1876 1876, Memo from Messrs Napier Ltd. stating that Stettin's boilers are fitted in accordance with the Committee requirements and should have the notification Lloyd's MC in the Register Book, 3 July 1876 1876, Details of main boilers of Stettin, 29 June 1876 1876, Engineer surveyor's report on machinery for Stettin, 26 June 1876 1876, Annual surveys for Stettin, 30 November 1876 1876, Report of survey for repairs for Stettin, 16 January 1879 1879, Report of survey for repairs of engines and boilers for Stettin, 16 January 1880 1880, Cover note for reports number 4308 and 57 of Stettin, 31 January 1880 1880, Report of survey for repairs for Stettin, 28 January 1880 1880, Report of survey for repairs for Stettin, 2 February 1881 1881, Report of survey for repairs for Stettin, 27 January 1882 1882, Annual surveys for Stettin, 6 January 1883 1883, Annual surveys for Stettin, 23 January 1884 1884, Report of survey for repairs for Stettin, 30 January 1885 1885, Report of survey for repairs of engines and boilers for Stettin, 30 January 1885 1885, Report of survey for repairs for Stettin, 27 January 1886 1886, Report of survey for repairs of engines and boilers for Stettin, 30 January 1886 1886, Report of survey for repairs for Stettin, 26 February 1887 1887, Report of survey for repairs of engines and boilers for Stettin, 15 March 1887 1887, Report of survey for repairs for Stettin, 21 May 1888 1888, Report of survey for repairs of engines and boilers for Stettin, 25 May 1888 1888, Report of survey for repairs for Stettin, 29 December 1888 1888, Particulars for record of double bottoms in Lloyd's Register for Stettin, 5 December 1889 1889, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 10 December 1889 1889, Report of Survey for Repairs for Stettin, 6 December 1889 1889, Report on Machinery for Stettin, 3 December 1889 1889, Report of Survey for Repairs for Stettin, 18 October 1890 1890, Report of Survey for Repairs for Stettin, 6 November 1891 1891, Report of Survey for Repairs for Stettin, 16 January 1893 1893, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 19 February 1894 1894, Report of survey for repairs for Stettin, 12 February 1894 1894, Report of survey for repairs of engines and boilers for Stettin, 13 February 1894 1894, Letter from the surveyor Jas Barclay to the Secretary in London enclosing a letter received from the Master of Stettin about the boiler survey to be held at Bergen, 9 June 1894 1894, Letter from the Master of Stettin Otto E Jacobsen to the surveyor James Barclay about the survey of boilers to take place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to E Rusten, owner of Stettin, stating he agrees with the survey of boilers taking place in Bergen, 8 June 1894 1894, Copy of letter from the Secretary to Bergen surveyor stating that Stettin will have the survey of boilers carried out in Bergen, 8 June 1894 1894, Note stating the boiler survey for Stettin is due to April and the owners state the ship will be at Bergen where the survey will take place, 8 June 1894 1894, Letter from Erik Rusten, owner of Stettin, to Lloyd's Register stating that he wishes the survey of boilers to take place in Bergen, 4 June 1894 1894, Report of Survey for repairs of engines and boilers for Stettin, 12 July 1894 1894, Report of survey for repairs for Stettin, 6 February 1895 1895, Report of survey for repairs of engines and boilers for Stettin, 6 February 1895 1895, Report of survey for repairs for Stettin, 19 March 1896 1896, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin about the survey of boilers, 23 March 1896 1896, Letter from Leith surveyor to the Secretary stating that the Stettin is under survey, 5 March 1896 1896, Letter from the Secretary to the Leith Surveyor questioning about the survey of Stettin, 3 March 1896 1896, Copy of Letter from the Secretary to the owner of Stettin stating that he agrees with the boiler survey of that ship being carried out when she is in dry dock in the following month, 29 January 1896 1896, Note stating the boiler survey for Stettin will be in dry dock in the following month, 29 January 1896 1896, Letter from the owner of Stettin to the Secretary stating the ship will be in dry dock next month for the survey, 27 January 1896 1896, Report of survey for repairs of engines and boilers for Stettin, 19 March 1896 1896, Report of survey for repairs for Stettin, 19 March 1897 1897, Letter from the Leith surveyor to the Secretary stating that Stettin is now employed in the emigrant trade and therefore the pressure of boiler has been reduced, 24 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 19 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 26 July 1897 1897, Remarks of the Chief Surveyor to the Classing Committee about the special survey of the ship Stettin, 4 March 1898 1898, Copy of letter from the Secretary to the owners of Stettin stating that the special survey will take place when the ship is placed in dry dock, 3 February 1898 1898, Note stating the ship Stettin will be soon in dry dock to be surveyed, 3 February 1898 1898, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating their intention to put the ship in dry dock to be surveyed, 1 February 1898 1898, Report of survey for repairs for Stettin, 3 March 1898 1898, Report of survey for repairs of engines and boilers for Stettin, 3 March 1898 1898, Remarks of the Chief Surveyor to the Classing Committee about the damage and temporary repairs suffered by Stettin, 31 March 1898 1898, Letter from the Bremerhaven surveyor about the repairs to Stettin, 29 March 1898 1898, Cover note for report number 534 of Stettin, 1 April 1898 1898, Report of survey for repairs for Stettin, 28 March 1898 1898, Remarks of the Ship Surveyor to the Classing Committee saying the damage to Stettin has been repaired and she should remain classed, 6 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1898 1898, Report of survey for repairs for Stettin, 5 April 1899 1899, Report of survey for repairs of engines and boilers for Stettin, 5 April 1899 1899, Report of survey for repairs for Stettin, 28 April 1900 1900, Report of survey for repairs of engines and boilers for Stettin, 28 April 1900 1900, Report of survey for repairs for Stettin, 2 May 1901 1901, Report of survey for repairs of engines and boilers for Stettin, 2 May 1901 1901, Remarks of the Ship Surveyor to the Classing Committee about the special survey of Stettin and the particulars of her plating, 7 April 1902 1902, Report of survey for repairs for Stettin, 4 April 1902 1902, Copy of letter from the Secretary to the owners of Stettin statin the Committee agreed with the special survey being carried out in the next two months, 31 January 1902 1902, Postponed survey form for Stettin, 30 January 1902 1902, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating they expect to attend the special survey within the next two months, 29 January 1902 1902, Report of survey for repairs of engines and boilers for Stettin, 4 April 1902 1902, Report of survey for repairs for Stettin, 11 May 1903 1903, Copy of letter from the Secretary to Leith Surveyors stating that the steamer Stettin has been booked for the annual boiler survey that will take place in a few days, 7 April 1903 1903, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the annual overhaul has been booked for that next few days, 4 April 1903 1903, Report of survey for repairs of engines and boilers for Stettin, 11 May 1903 1903, Report of survey for repairs for Stettin, 29 June 1904 1904, Report of survey for repairs of engines and boilers for Stettin, 29 June 1904 1904, Report of survey for repairs for Stettin, 11 July 1905 1905, Report of survey for repairs of engines and boilers for Stettin, 11 July 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the damage and repairs to Stettin, 24 August 1905 1905, Report of survey for repairs for Stettin, 22 August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the special survey no.1 of Stettin, 26 July 1906 1906, Copy of letter from the Secretary to Leith Surveyors stating that Stettin will be in dry dock on her arrival from Konigsberg when the special survey no.1 will be carried out, 22 June 1906 1906, Copy of letter from the Secretary to the owners of Stettin stating that the special survey no.1 will be carried out next week in Leith, 22 June 1906 1906, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the special survey no.1 will be carried out in the next week on her arrival from Konigsberg, 20 June 1906 1906, Report of survey for repairs for Stettin, 23 July 1906 1906, Report of survey for repairs of engines and boilers for Stettin, 24 July 1906 1906, Report of survey for repairs for Stettin, 16 July 1907 1906, Report of survey for repairs of engines and boilers for Stettin, 16 July 1907 1906, Report of survey for repairs for Stettin, 19 September 1908 1908, Copy of letter from the Secretary to Leith Surveyors stating that Stettin is laid up for overhaul and that the boiler survey should be carried out, 8 September 1908 1908, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the steamer is laid up for overhaul and that the special survey of boilers should take place next week, 5 September 1908 1908, Report of survey for repairs of engines and boilers for Stettin, 19 September 1908 1908, Report of survey for repairs for Stettin, 2 October 1909 1909, Report of survey for repairs of engines and boilers for Stettin, 2 October 1909 1909, Plan of Rudder of Stettin, 1910. Scale 1"=one foot. Details 3"= one foot, 19 September 1910 1910, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding the special survey no. 2 and boiler survey for Stettin, 29 October 1910 1910, Letter from Leith Surveyor to the Secretary stating that they met with the owners of Stettin and arranged the special survey no. 2 to be carried out after the New Year holidays, 28 November 1910 1910, Copy of letter from the Secretary to Leith Surveyors regarding the report no. 13106 for Stettin and asking when the ship's owners expect the special survey no.2 to be carried out, 25 November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee about damage and repairs made to Stettin after grounding, 7 October 1910 1910, Postponed survey form for Stettin, 27 June 1910 1910, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating the special survey no.2 will be carried out in Leith in September, 23 October 1910 1910, Report of survey for repairs for Stettin, 5 October 1910 1910, Report of survey for repairs of engines and boilers for Stettin, 21 October 1910 1910, Report of Ship forgings or castings for Stettin, 30 September 1910 1910, Note about the sketch of rudder for Stettin, 19 September 1910 1910, Letter from Leith surveyors to the Secretary regarding the plan of rudder for Stettin to be approved by the Committee, 16 September 1910 1910, Copy of letter from Secretary, Lloyd's Register London, to James Currie and Co, regarding agreement for date of carrying out special survey, 28 June 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the special survey no.2 for Stettin and the repairs made, 6 June 1911 1911, Report of survey for repairs for Stettin, 3 June 1911 1911, Report of survey for repairs of engines and boilers for Stettin, 3 June 1911 1911, Copy of letter from the Assistant to the Secretary to the owners of Stettin, James Currie & Co, regarding the boiler survey to take place in about two months' time, 12 July 1912 1912, Report of survey for repairs for Stettin, 17 August 1912 1912, Postponed survey form for Stettin, 11 July 1912 1912, Letter from the owners of Stettin to the Secretary regarding the ship special survey and boilers survey, 9 July 1912 1912, Report of survey for repairs of engines and boilers for Stettin, 17 August 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the conditions of Stettin after repair, 29 December 1913 1913, Report of survey for repairs for Stettin, 27 December 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of Stettin taking place in three weeks’ time, 14 November 1913 1913, Postponed survey form for Stettin, 13 November 1913 1913, Letter from Leith surveyors to the Secretary regarding the survey of Stettin, 8 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin, 7 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin being carried out after the strike of the boilers makers, 9 November 1913 1913, Postponed survey form for Stettin, 8 September 1913 1913, Letter from Leith surveyors to the Secretary regarding the postpone of survey of Stettin due to the boilers makers strike, 5 September 1913 1913, Copy of letter from the Secretary to Leith surveyors regarding the survey of screw shaft of Stettin, 3 September 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating the Committee has agreed with the survey being carried out next month, 4 September 1913 1913, Postponed survey form for Stettin, 3 September 1913 1913, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft, 2 July 1913 1913, Report of survey for repairs of engines and boilers for Stettin, 27 December 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with postponing the special survey, 9 June 1914 1914, Postponed survey form for Stettin, 8 June 1914 1914, Letter from Leith surveyors to the Secretary regarding the special survey of Stettin, 4 June 1914 1914, Copy of letter from the Secretary to Leith surveyors enclosing a letter sent by the owners of Stettin about her fourth special survey no. 3, 3 June 1914 1914, Postponed survey form for Stettin, 2 June 1914 1914, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding postponing the second special survey no. 3 of Stettin, 29 May 1914 1914, Report of survey for repairs of engines and boilers for Stettin, 2 July 1915 1915, Copy of letter from the Secretary to Newcastle-on-Tyne surveyors regarding the special survey of Stettin, 12 August 1913 1915, Letter from Aberdeen surveyors to the Secretary stating that Stettin has sailed to Newcastle-on-Tyne as she failed to obtain docking facilities at that port, 10 August 1915 1915, Remarks to the Chief Ship Surveyor regarding the fourth special survey no. 3 for Stettin, 13 July 1915 1915, Copy of letter from the Secretary to the Surveyors in Hull, Grimsby, Middlesbrough, Newcastle, Sunderland and Hartlepool, regarding the fourth special survey no. 3 of Stettin, which will be carried out at some East coast port, 19 July 1915 1915, Letter from Leith surveyors to the Secretary regarding the survey of Stettin to be carried out at some East coast port, 12 July 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the fourth special survey no. 3 for Stettin, 5 July 1915 1915, Report of survey for repairs for Stettin, 2 July 1915 1915, Letter from Leith surveyors to the Secretary stating that the special survey of Stettin is being carried out at that port, 22 May 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 for Stettin, 21 May 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding her survey, 20 April 1915 1915, Extract from a letter dated 15 April 1915 from James Currie & Co regarding surveying Stettin. Extract dated 16 April 1915 1915, Letter from Leith surveyors to the Secretary stating that they had spoken to the owners of Stettin and due to a shortage of labour it has been difficult to find a dry dock to carry out the special survey, 13 April 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the importance of carrying out the special survey due to the age of the ship, 13 April 1915 1915, Postponed survey form for Stettin, 12 April 1915 1915, Copy of letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding the survey of Stettin being postponed, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 of Stettin, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors enclosing information about the communication between the owners of Stettin, 26 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with the special survey being carried out in the next two or three months, 26 January 1915 1915, Postponed survey form for Stettin, 25 January 1915 1915, Letter from Leith surveyors to the Secretary regarding the special survey no.3 and boiler survey of Stettin, 23 January 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding postponing the survey of Stettin, 21 January 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the fourth special survey no.3 and special annual boiler survey of Stettin, 20 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the letter sent by the latter about the thrust shaft, 1 November 1915 1915, Letter from Lisbon surveyors to the Secretary about the repair of shaft of Stettin, 25 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 28 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 23 October 1915 1915, Copy of letter from the Assistant to the Secretary to Lisbon surveyors regarding the repair of Stettin's thrust shaft being not satisfactory, 18 October 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the new thrust shaft she received in Lisbon, 1916 1915, Letter reporting that the new thrust shaft for Stettin is not considered satisfactory, 14 October 1915 1915, London Office Copy of document certifying that surveyor has examined the machinery of Stettin and stating his recommendations, 4 October 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 6 October 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 67857, 19 August 1915 1915, Report of Survey for Repairs for Stettin, 18 August 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 August 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the thrust shaft supplied in Lisbon and if it will be approved by the Committee as a permanent repair, 29 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon and stating that it will be approved by the Committee as a permanent repair, 28 April 1916 1916, Letter reporting the results of the test carried out on Stettin's new thrust shaft that was made in Lisbon, 27 April 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the result of the tests carried out on the new thrust shaft, 14 April 1916 1916, Letter from Professor R Stanfield to James Currie & Co regarding the results of the test of the transverse section of the shaft of Stettin, 11 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Letter reporting that Stettin's new thrust shaft is not satisfactory to be recommended as a permanent repair, 22 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin stating that the repair of the thrust shaft is being looked at, 14 March 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary enclosing drawings and plans of the shaft of Stettin, 6 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the repair of the thrust shaft, 28 January 1916 1916, Postponed survey form for Stettin, 22 January 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft of Stettin, 24 January 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding when the ship will be in position to have the thrust shaft examined, 21 January 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to London Report 79106, 13 July 1917 1916, Report of Survey for Repairs for Stettin due to collision with ice, 1 July 1916 1916, Report of Survey for Repairs of Engines and Boilers for Stettin, 14 July 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70096, 27 July 1917 1917, London Office Copy of document certifying that surveyor has examined damage and transmitted the Report, and stating his Recommendations, 24 July 1917 1917, Report of Survey for Repairs for Stettin 1917, Letter from Newcastle surveyors informing Lloyd's Register London that Stettin is under survey at Newcastle, 21 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding whether Stettin has yet come under inspection, 20 September 1917 1917, Copy of letter from Lloyd's Register London Secretary to the Newcastle surveyors, regarding their report 70069, and Stettin's owners' intention to make repairs at South Shields within the next couple of days, and calling attention to the need for the Annu 1917, Letter from James Currie & Co Managers, informing Lloyd's Register London that they have arranged for repairs of damage previously communicated by Smith's Dry Dock Co, South Shields, on the steamer's return there in the next day or two, 1 August 1917 1917, Copy of letter from Lloyd's Register's London Secretary to James Currie and Co, informing them of the damage done to Stettin when striking a quay wall, that temporary repairs have been effected but that for the vessel to remain in class permanent repairs 1917, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 70306, 2 October 1917 1917, Report of Survey for Repairs for Stettin, 29 September 1917 1917, Report of Survey for Repairs of Engines and Boilers for Stettin, 1 October 1917 1917, Certificate of approval of a stockless anchor, with cancelled written across it, 4 September 1917 1917, Correspondence to Lloyd's Register's London Secretary regarding Stettin Report 71400, acknowledging remarks on the Rules for Engines and Boilers with a working pressure of less than 60lbs, 23 November 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Newcastle Report 71400, 19 November 1918 1918, Report of survey for repairs of Stettin, 5 November 1918 1918, Memo to Newcastle surveyors regarding Rules for Engines and Boilers of a greater working pressure than 60lbs per square inch, 18 November 1918 1918, Report of Survey for Repairs of Boilers and Engines of Stettin, 13 November 1918 1918, Copy of letter from London Secretary to James Currie and Co regarding state or survey of Stettin, 17 October 1919 1919, Postponed Survey form for Stettin, October 1919 1919, Letter from James Currie and Co to Secretary, Lloyd's Register London, regarding postponing survey of Stettin, 10 October 1919 1919, Remarks of the Chief Ship Surveyor to the Classing Committee with reference to Leith Report 15769, 2 July 1920 1920, Report of Survey for Repairs of Stettin, 28 June 1920 1920, Copy of letter from Lloyd's Register London Secretary to Leith Surveyors, 30 March 1920 1920, Postponed Survey form for Stettin, 29 March 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 24 March 1920 1920, Copy of Letter from Lloyd's Register London Secretary to Leith Surveyors, 19 March 1920 1920, Letter from the Surveyors at Hull, per N Rowall, to London Secretary regarding state of survey of Stettin, 18 March 1920 1920, Copy of letter from the London Secretary to the Hull Surveyors regarding state of survey of Stettin, 17 March 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 10 February 1920 1920, Postponed Survey form for Stettin, 9 February 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 5 February 1920 1920, Copy of letter from London Secretary to Leith Surveyors regarding state of survey of Stettin, 28 January 1920 1920, Report of Survey for Repairs of Engines and Boilers for Stettin, 28 June 1920 1920, Copy of letter from the Secretary to the owners of Stettin saying the Committee has agreed with postponing the boiler survey, 23 August 1921 1921, Report of Survey for Repairs of Stettin, 16 September 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London regarding Stettin now undergoing survey, 3 September 1921 1921, Postponed Surveys form for Stettin, 22 August 1921 1921, Letter from James Currie and Co to Lloyd's Register Secretary London explaining why Stettin had not undergone survey, 18 August 1921 1921, Report of Survey for Repairs of Engines and Boilers for Stettin, 16 September 1921 1921, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Stettin survey, with reference to Leith Report 16187, 6 October 1921 1922, Report of Survey for Repairs of Stettin, 3 October 1921 1922, Correspondence of Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding ongoing surveys on Stettin, 14 September 1922 1922, Copy of letter from Lloyd's Register London Assistant to the Secretary to Leith Surveyors regarding survey of Stettin's screwshaft, 21 July 1922 1922, Postponed Surveys form for Stettin, 20 July 1922 1922, Letter from Leith Surveyors, per A T Thomas, to Lloyd's Register Secretary London regarding proposed survey date for Stettin's screw shaft, 17 July 1922 1922, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans of owners of Stettin for survey of screwshaft, 14 July 1922 1922, Report of Survey for Repairs of Boilers and Engines for Stettin, 26 September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding carrying out part of Stettin's Special Survey, with reference to Leith Report 16388, 30 October 1923 1923, Report of Survey for Repairs of Stettin, 24 October 1923 1923, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors, regarding Rule requirements for cables, 20 October 1923 1923, Remarks to the Chief Ship Surveyor regarding Rule requirements for cables, 19 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London requesting clarification on Rules for chains, 18 October 1923 1923, Letter from Leith Surveyors, per A T T[homas], to Lloyd's Register Secretary London regarding proposed timeline for survey, 22 September 1923 1923, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding letter from Stettin's owners and requesting clarification of when the boiler survey shall be held, 21 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London, regarding carrying out a part survey, 18 September 1923 1923, Copy of letter from Assistant to the Secretary to James Currie and Co regarding schedule for surveys of Stettin, 14 September 1923 1923, Postponed Surveys form for Stettin, 13 September 1923 1923, Letter from James Currie and Co to Lloyd's Register Secretary London querying survey schedule of Stettin, 10 September 1923 1923, Report of Survey for Repairs of Engines and Boilers for Stettin, 23 October 1923 1923, Letter from Leith Surveyor A T Thomas to James Currie and Co, informing them of future survey schedule for Stettin, 23 October 1923 1923, Plan of Main Boiler for Stettin, 24 May 1924 1924, Plan of Donkey Boiler for Stettin, 24 May 1924 1924, Hatch Plan of Stettin, 2 October 1924 1924, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding Survey Partly Held for Stettin, with reference to Leith Report 16388, 19 May 1924 1924, Letter from A T Thomas, Leith Surveyor, to J F Hill of London, regarding surveying Stettin, 16 May 1924 1924, Extract from a letter dated 14 May 1924 from Leith surveyors regarding examining Stettin. Extract dated 15 May 1924 1924, Copy of letter from Assistant to the Secretary, Lloyd's Register London, to Leith Surveyors regarding plans for survey of Stettin and expiry of year of grace, 14 May 1924 1924, Letter from Leith surveyor A T Thomas to Secretary, London, regarding proposed examination part of Stettin's combustion chamber, 18 April 1924 1924, Copy of letter from Assistant to the Secretary to the Leith surveyors questioning owners' arrangements to have Stettin's combustion chamber examined, 16 April 1924 1924, Report of Survey for Repairs of Engines and Boilers for Stettin, 12 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding fulfilment of special survey on Stettin, in reference to Leith Report 16611, 22 November 1924 1924, Report of Survey for Repairs of Stettin, 15 November 1924 1924, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 November 1924 1924, Copy of letter from Assistant to the Secretary to Leith Surveyors regarding completion of reports on Stettin's new boilers, 31 October 1924 1924, Note submitting that certain reports be forwarded to the Leith Surveyors for their guidance and completion, 29 October 1924 1924, Note submitting that the amended plans of boilers for Stettin merit approval, 29 May 1924 1924, Correspondence accompanying boiler plans submitted for approval for Stettin from the Glasgow office to London, 26 May 1924 1924, Letter from Jas S Cairns submitting for approval plans for new boilers for the Stettin to the Glasgow Secretary, 26 May 1924 1924, Note submitting that plans for Stettin's boilers merit approval, 24 April 1924 1924, Letter from Leith Surveyors, per A T T[homas], to Secretary, London, noting they are forwarding plans of new boilers intended for Stettin, 14 April 1924 1924, Report on Main Boiler for Stettin, 11 October 1924 1924, Report on Donkey Boiler for Stettin, 11 October 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 26 June 1924 1924, Delivery note for 3 furnaces from Forth Shipbuilding and Engineering, Glasgow, 4 July 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature J Barr, 27 June 1924 1924, Receipt with specifications for order from The Steel Company of Scotland Ltd, LR stamp and signature J Barr, 2 July 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 14 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 28 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 26 June 1924 1924, Receipt for boiler plate with specifications for order from The Steel Company of Scotland Ltd, with LR stamp and signature R K Macmillan, 17 June 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 16790, 28 August 1925 1925, Report of Survey for Repairs on Stettin, 25 August 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 August 1925 1925, Memo regarding approving a steel cylinder cover on Stettin, 5 October 1925 1925, Letter from Leith Surveyor to Secretary, London, regarding steel cover repair examined, 2 October 1925 1925, Letter from Hamburg Office to Secretary, London, regarding request by Leith Surveyors, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding Hamburg report on Stettin, 1 October 1925 1925, Copy of letter from Assistant to the Secretary, London, to Leith Surveyors regarding their request for the Hamburg report, 30 September 1925 1925, Copy of letter from Assistant to the Secretary, London, to A Chisholm, requesting a report for the Leith Surveyors, 30 September 1925 1925, Translation of Cablegram sent to Surveyors at Hamburg, 30 September 1925 1925, Copy of Cablegram from London Office to Hamburg Office, 30 September 1925 1925, Letter from Leith Surveyors, per A T T[homas], to London Office asking for a Hamburg report to be sent to them, 29 September 1925 1925, London Office Copy of document certifying that Hamburg surveyor has examined damage and transmitted the Report, and stating his Recommendations, 25 September 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 September 1925 1925, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 16897, March 1926 1926, Report of Survey for Repairs to Stettin, 30 March 1926 1926, Report of Survey for Repairs of Engines and Boilers to Stettin, 30 March 1926 1926, Report of Survey for Repairs to Stettin, 15 June 1927 1927, Report of Survey for Repairs of Engines and Boilers to Stettin, 15 June 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Leith Report 17291, 8 December 1927 1927, Copy of Certificate of Survey after damage to Stettin by a breaker in heavy weather, 23 November 1927 1927, Report of Survey for Repairs to Stettin, 3 December 1927 1927, Question and Answer memo between London and Leith Offices regarding Hamburg Report 17858, 21 February 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 1 February 1928 1928, Correspondence memo with particulars from Leith Surveyors to Secretary, London, regarding return of report, 27 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee, in reference to Hamburg Report 17858, 25 January 1928 1928, Copy of Certificate of Survey from Hamburg after collision damage suffered by Stettin, 22 January 1928 1928, Report of Survey for Repairs of Stettin, 23 January 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin by collision, in reference to Leith Report 17339, 15 March 1928 1928, Report of Survey for Repairs of Stettin, 5 March 1928 1928, Copy of letter from the Clerk of the Classification Committee to James Currie and Co, with a copy to the Leith Office, regarding 6th Special Survey of Stettin, 14 December 1928 1928, Postponed Survey form for Stettin's 6th Special Survey, 13 December 1928 1928, Letter from James Currie and Co to Lloyd's Register Secretary, London, regarding deferring Stettin's 6th Special Survey, 11 December 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage, in reference to Dundee Report 8638, 30 March 1928 1928, Copy of Certificate of Survey regarding damage and report of repairs to Stettin's port bow shell plating, Dundee, 23 March 1928 1928, Report of Survey for Repairs to Stettin, 23 March 1928 1928, Letter from Lloyd's Register Engineer Surveyor to James Currie and Co regarding schedule for survey of Stettin's propeller shaft, 5 March 1929 1929, Copy of letter from the Secretary, London, to the Secretary, Glasgow, returning Stettin boiler plans, 29 May 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Stettin and 6th Special Survey, in reference to Leith Report 17540, 13 March 1929 1929, Report of Survey for Repairs of Stettin, 5 March 1929 1929, Report of Survey for Repairs of Engines and Boilers for Stettin, 5 March 1929 1929, Copy of letter from pro Secretary, London, to Leith Surveyors regarding examination of Stettin's screwshaft, 16 April 1930 1930, Postponed Survey form for Stettin's screwshaft, 14 April 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 9 April 1930 1930, Copy of letter from Secretary, London, to Leith Surveyors informing them Committee are agreeable to postponing Stettin's screwshaft survey, 25 February 1930 1930, Postponed Survey form for Stettin's screwshaft, 24 February 1930 1930, Question and Answer memo between London Office and Leith Surveyors regarding arrangements for examination of Stettin's screwshaft, 17 February 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 17802, 22 May 1930 1930, Report of Survey for Repairs to Stettin, 15 May 1930 1930, Report on Engine Forgings for Stettin, 8 May 1930 1930, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 May 1930 1930, Remarks of the Chief Ship Surveyor to the Classing Committee regarding repairs, in reference to Leith Report 18082, 2 November 1931 1931, Form or memo from Secretary, Glasgow, to Secretary, London, regarding presence of Stettin, 16 October 1931 1931, Question and Answer memo from Secretary, London, to Leith Surveyors regarding Stettin Boiler Survey, 5 October 1931 1931, Copy of letter from pro Secretary, London, with copy to Leith, to James Currie and Co regarding postponing Stettin Boiler Survey, 26 June 1931 1931, Postponed Surveys form for Stettin's Boiler Survey, 25 June 1931 1931, Letter from James Currie and Co regarding postponing Boiler Survey due on Stettin, 20 June 1931 1931, Report of Survey for Repairs on Stettin, 26 October 1931 1931, Report of Survey for Repairs of Engines and Boilers on Stettin, 26 October 1931 1931, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of survey for Stettin, 23 December 1932 1932, Postponed Surveys form for Stettin, 22 December 1932 1932, Letter from Leith Surveyors per John Houston to the Secretary, London, regarding outstanding survey on Stettin, 17 December 1932 1932, Letter from James Currie and Co to Leith Surveyors regarding schedule of survey for Stettin, 16 December 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 14 December 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 24 November 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 September 1932 1932, Copy of letter from pro Secretary, London, to Leith Surveyors regarding surveys, 21 June 1932 1932, Postponed Surveys form for Stettin, 20 June 1932 1932, Question and Answer memo between London Office and Leith Surveyors regarding survey schedule of Stettin, 15 June 1932 1932, Copy of letter from pro Secretary, London to Leith Surveyors regarding Stettin boiler survey schedule, 9 October 1931 1932, Postponed Surveys form for Stettin, 8 October 1931 1932, Report of Total Loss, Casualty, , for Stettin, which has been sold to be broken up, 4 December 1933 1933, Letter from Leith Surveyors, per John Houston, to Secretary, London, informing them Stettin is being broken up, 1 December 1933 1933, Copy of letter from Clerk to the Classification Committee to Leith Surveyors regarding schedule of demolition for Stettin, 27 November 1933 1933, Copy of letter from Leith Surveyors, per John Houston, to the Secretary, London, regarding the firm to which Stettin was sold to be broken up, 24 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 23 November 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 31 August 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 15 June 1933 1933, Question and Answer memo between London Office and Leith Surveyors regarding status of Stettin, 16 March 1933 1933, Note related to Stettin stating SS no. 2 held now posting no date, Note regarding Stettin stating "Vessel left Lisbon Oct 3. + 3 mos from dats. of survey would expire 12/15" no date, Sketch or plan of steel cover part for Stettin no date )
Name of surveyor.
Alfred Darling ( Iron Ship survey report for Stettin, 2 December 1864 1864 )
James Bowes ( Letter from Glasgow surveyor to the Secretary sending the machinery certificate and Stettin's report of survey no. 4255, 8 July 1876 1876 )
William T Mumford ( Report of survey for repairs for Stettin, 8 July 1876 1876 )
James Mollison ( Details of main boilers of Stettin, 29 June 1876 1876, Engineer surveyor's report on machinery for Stettin, 26 June 1876 1876 )
J W Scullard ( Annual surveys for Stettin, 30 November 1876 1876 )
John Dawkins ( Report of survey for repairs for Stettin, 16 January 1879 1879, Cover note for reports number 4308 and 57 of Stettin, 31 January 1880 1880, Report of survey for repairs for Stettin, 28 January 1880 1880 )
John Sturrock ( Report of survey for repairs of engines and boilers for Stettin, 16 January 1880 1880 )
Wilhelm Paulsen ( Report of survey for repairs for Stettin, 2 February 1881 1881, Report of survey for repairs for Stettin, 27 January 1882 1882, Annual surveys for Stettin, 6 January 1883 1883, Report of survey for repairs for Stettin, 30 January 1885 1885, Report of survey for repairs for Stettin, 27 January 1886 1886, Report of survey for repairs for Stettin, 26 February 1887 1887, Report of survey for repairs for Stettin, 21 May 1888 1888, Particulars for record of double bottoms in Lloyd's Register for Stettin, 5 December 1889 1889, Report of Survey for Repairs for Stettin, 18 October 1890 1890, Report of survey for repairs for Stettin, 12 February 1894 1894, Report of survey for repairs for Stettin, 5 April 1898 1898 )
William James Darling ( Annual surveys for Stettin, 23 January 1884 1884, Report of survey for repairs of engines and boilers for Stettin, 30 January 1885 1885, Report of survey for repairs of engines and boilers for Stettin, 30 January 1886 1886, Report of survey for repairs of engines and boilers for Stettin, 15 March 1887 1887, Report of survey for repairs of engines and boilers for Stettin, 25 May 1888 1888, Report of survey for repairs for Stettin, 29 December 1888 1888, Report on Machinery for Stettin, 3 December 1889 1889, Report of Survey for Repairs for Stettin, 6 November 1891 1891, Report of Survey for Repairs for Stettin, 16 January 1893 1893 )
Benjamin Martell ( Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 10 December 1889 1889, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin, 19 February 1894 1894, Remarks of the Chief Ship Surveyor to the Classing Committee for Stettin about the survey of boilers, 23 March 1896 1896 )
Wilhelm Paulsen; William James Darling ( Report of Survey for Repairs for Stettin, 6 December 1889 1889 )
Maurice Ritson; James Henry Mancor ( Report of survey for repairs of engines and boilers for Stettin, 13 February 1894 1894 )
Thomas Field ( Report of survey for repairs for Stettin, 6 February 1895 1895, Report of survey for repairs of engines and boilers for Stettin, 6 February 1895 1895, Report of survey for repairs for Stettin, 19 March 1896 1896, Letter from Leith surveyor to the Secretary stating that the Stettin is under survey, 5 March 1896 1896, Report of survey for repairs of engines and boilers for Stettin, 19 March 1896 1896, Report of survey for repairs for Stettin, 19 March 1897 1897, Letter from the Leith surveyor to the Secretary stating that Stettin is now employed in the emigrant trade and therefore the pressure of boiler has been reduced, 24 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 19 March 1897 1897, Report of survey for repairs of engines and boilers for Stettin, 26 July 1897 1897, Report of survey for repairs for Stettin, 3 March 1898 1898, Report of survey for repairs of engines and boilers for Stettin, 3 March 1898 1898, Report of survey for repairs for Stettin, 2 May 1901 1901, Report of survey for repairs of engines and boilers for Stettin, 2 May 1901 1901 )
F Thomsen ( Letter from the Bremerhaven surveyor about the repairs to Stettin, 29 March 1898 1898, Report of survey for repairs for Stettin, 28 March 1898 1898 )
Harry Clarke ( Report of survey for repairs for Stettin, 5 April 1899 1899, Report of survey for repairs of engines and boilers for Stettin, 5 April 1899 1899, Report of survey for repairs for Stettin, 28 April 1900 1900, Report of survey for repairs of engines and boilers for Stettin, 28 April 1900 1900 )
Thomas Field; George Denniston Aitken ( Report of survey for repairs for Stettin, 4 April 1902 1902 )
Thomas Lee Thornton ( Report of survey for repairs of engines and boilers for Stettin, 4 April 1902 1902, Report of survey for repairs for Stettin, 11 May 1903 1903, Report of survey for repairs of engines and boilers for Stettin, 11 May 1903 1903, Report of survey for repairs for Stettin, 29 June 1904 1904, Report of survey for repairs of engines and boilers for Stettin, 29 June 1904 1904 )
John Charles Gordon Williamson ( Report of survey for repairs for Stettin, 11 July 1905 1905, Report of survey for repairs of engines and boilers for Stettin, 11 July 1905 1905 )
George Denniston Aitken ( Report of survey for repairs for Stettin, 22 August 1905 1905 )
George Alfred Hake ( Report of survey for repairs for Stettin, 23 July 1906 1906, Report of survey for repairs for Stettin, 19 September 1908 1908, Report of survey for repairs of engines and boilers for Stettin, 19 September 1908 1908, Letter from Leith Surveyor to the Secretary stating that they met with the owners of Stettin and arranged the special survey no. 2 to be carried out after the New Year holidays, 28 November 1910 1910, Report of survey for repairs for Stettin, 3 June 1911 1911, Report of survey for repairs of engines and boilers for Stettin, 3 June 1911 1911, Report of survey for repairs for Stettin, 17 August 1912 1912, Report of survey for repairs of engines and boilers for Stettin, 17 August 1912 1912, Letter from Leith surveyors to the Secretary regarding the survey of Stettin, 8 November 1913 1913, Letter from Leith surveyors to the Secretary regarding the postpone of survey of Stettin due to the boilers makers strike, 5 September 1913 1913, Report of survey for repairs of engines and boilers for Stettin, 27 December 1913 1913, Letter from Leith surveyors to the Secretary regarding the special survey of Stettin, 4 June 1914 1914, Report of survey for repairs of engines and boilers for Stettin, 2 July 1915 1915, Letter from Leith surveyors to the Secretary regarding the survey of Stettin to be carried out at some East coast port, 12 July 1915 1915, Letter from Leith surveyors to the Secretary stating that the special survey of Stettin is being carried out at that port, 22 May 1915 1915, Letter from Leith surveyors to the Secretary stating that they had spoken to the owners of Stettin and due to a shortage of labour it has been difficult to find a dry dock to carry out the special survey, 13 April 1915 1915, Letter from Leith surveyors to the Secretary regarding the special survey no.3 and boiler survey of Stettin, 23 January 1915 1915 )
George Alfred Hake; Andrew Thompson Graham ( Report of survey for repairs of engines and boilers for Stettin, 24 July 1906 1906 )
Andrew Thompson Graham ( Report of survey for repairs for Stettin, 16 July 1907 1906 )
Andrew Thompson Graham; George Alfred Hake ( Report of survey for repairs of engines and boilers for Stettin, 16 July 1907 1906 )
William Dennis Heck ( Report of survey for repairs for Stettin, 2 October 1909 1909, Report of survey for repairs of engines and boilers for Stettin, 2 October 1909 1909, Report of survey for repairs for Stettin, 5 October 1910 1910, Report of survey for repairs of engines and boilers for Stettin, 21 October 1910 1910, Report of Ship forgings or castings for Stettin, 30 September 1910 1910, Letter from Leith surveyors to the Secretary regarding the plan of rudder for Stettin to be approved by the Committee, 16 September 1910 1910, Report of survey for repairs for Stettin, 27 December 1913 1913 )
George Alfred Hake; John Ranson Henderson ( Report of survey for repairs for Stettin, 2 July 1915 1915 )
George Payne ( Letter from Lisbon surveyors to the Secretary about the repair of shaft of Stettin, 25 October 1915 1915, London Office Copy of document certifying that surveyor has examined the machinery of Stettin and stating his recommendations, 4 October 1915 1915, Report of Survey for Repairs of Engines and Boilers of Stettin, 6 October 1915 1915 )
Thomas Stonham Shute ( Report of Survey for Repairs for Stettin, 18 August 1915 1915 )
George Murdoch ( Report of Survey for Repairs of Engines and Boilers of Stettin, 15 August 1915 1915 )
David Nicholas ( Report of Survey for Repairs for Stettin due to collision with ice, 1 July 1916 1916 )
Harry Peel Cornish ( Report of Survey for Repairs of Engines and Boilers for Stettin, 14 July 1916 1916 )
Arthur Scullard ( London Office Copy of document certifying that surveyor has examined damage and transmitted the Report, and stating his Recommendations, 24 July 1917 1917, Report of Survey for Repairs for Stettin 1917, Report of Survey for Repairs for Stettin, 29 September 1917 1917 )
Reginald A Bain ( Report of Survey for Repairs of Engines and Boilers for Stettin, 1 October 1917 1917 )
George Lang Brown ( Report of survey for repairs of Stettin, 5 November 1918 1918 )
W L Hall ( Report of Survey for Repairs of Boilers and Engines of Stettin, 13 November 1918 1918 )
Charles Martell; J R Williamson ( Report of Survey for Repairs of Stettin, 28 June 1920 1920, Report of Survey for Repairs of Engines and Boilers for Stettin, 28 June 1920 1920 )
Charles Martell ( Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 24 March 1920 1920, Letter from C Martell to Lloyd's Register London regarding state of surveys for Stettin, 5 February 1920 1920 )
John Davey ( Report of Survey for Repairs of Stettin, 16 September 1921 1921, Report of Survey for Repairs of Engines and Boilers for Stettin, 16 September 1921 1921 )
Robert Cheetham; Alexander Waite Paterson ( Report of Survey for Repairs of Stettin, 3 October 1921 1922, Report of Survey for Repairs of Stettin, 15 November 1924 1924 )
Arthur Theophilus Thomas ( Report of Survey for Repairs of Boilers and Engines for Stettin, 26 September 1922 1922, Report of Survey for Repairs of Stettin, 24 October 1923 1923, Report of Survey for Repairs of Engines and Boilers for Stettin, 23 October 1923 1923, Letter from Leith Surveyor A T Thomas to James Currie and Co, informing them of future survey schedule for Stettin, 23 October 1923 1923, Letter from A T Thomas, Leith Surveyor, to J F Hill of London, regarding surveying Stettin, 16 May 1924 1924, Letter from Leith surveyor A T Thomas to Secretary, London, regarding proposed examination part of Stettin's combustion chamber, 18 April 1924 1924, Letter from Leith Surveyor to Secretary, London, regarding steel cover repair examined, 2 October 1925 1925, Report of Survey for Repairs to Stettin, 15 June 1927 1927, Report of Survey for Repairs of Engines and Boilers to Stettin, 15 June 1927 1927 )
Robert James Easthope ( Report of Survey for Repairs of Engines and Boilers for Stettin, 12 June 1924 1924, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 November 1924 1924, Report of Survey for Repairs on Stettin, 25 August 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 August 1925 1925 )
Wilfred Lane; Robert James Easthope ( Report on Main Boiler for Stettin, 11 October 1924 1924, Report on Donkey Boiler for Stettin, 11 October 1924 1924 )
Alexander Chisholm ( Letter from Hamburg Office to Secretary, London, regarding request by Leith Surveyors, 30 September 1925 1925 )
Victor Franz Julius Sdrowok ( London Office Copy of document certifying that Hamburg surveyor has examined damage and transmitted the Report, and stating his Recommendations, 25 September 1925 1925, Report of Survey for Repairs of Engines and Boilers of Stettin, 25 September 1925 1925 )
Alexander David Morrison ( Report of Survey for Repairs to Stettin, 30 March 1926 1926, Report of Survey for Repairs of Engines and Boilers to Stettin, 30 March 1926 1926 )
Clive Bell ( Copy of Certificate of Survey after damage to Stettin by a breaker in heavy weather, 23 November 1927 1927, Report of Survey for Repairs to Stettin, 3 December 1927 1927, Report of Survey for Repairs of Stettin, 5 March 1928 1928 )
Friedrich Hermann Ohlzen ( Copy of Certificate of Survey from Hamburg after collision damage suffered by Stettin, 22 January 1928 1928, Report of Survey for Repairs of Stettin, 23 January 1928 1928 )
Herbert Younger Bell ( Copy of Certificate of Survey regarding damage and report of repairs to Stettin's port bow shell plating, Dundee, 23 March 1928 1928, Report of Survey for Repairs to Stettin, 23 March 1928 1928 )
Evan Edwards ( Report of Survey for Repairs of Stettin, 5 March 1929 1929, Report of Survey for Repairs to Stettin, 15 May 1930 1930 )
Herbert Cannington Rogers ( Report of Survey for Repairs of Engines and Boilers for Stettin, 5 March 1929 1929, Report of Survey for Repairs of Engines and Boilers of Stettin, 15 May 1930 1930 )
John Houston ( Report on Engine Forgings for Stettin, 8 May 1930 1930, Report of Survey for Repairs on Stettin, 26 October 1931 1931 )
Charles Reginald Rowcliffe; John Houston ( Report of Survey for Repairs of Engines and Boilers on Stettin, 26 October 1931 1931 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
James Currie & Co ( Letter from the owner of Stettin to the Secretary stating the ship will be in dry dock next month for the survey, 27 January 1896 1896, Remarks of the Chief Surveyor to the Classing Committee about the special survey of the ship Stettin, 4 March 1898 1898, Copy of letter from the Secretary to the owners of Stettin stating that the special survey will take place when the ship is placed in dry dock, 3 February 1898 1898, Note stating the ship Stettin will be soon in dry dock to be surveyed, 3 February 1898 1898, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating their intention to put the ship in dry dock to be surveyed, 1 February 1898 1898, Remarks of the Chief Surveyor to the Classing Committee about the damage and temporary repairs suffered by Stettin, 31 March 1898 1898, Cover note for report number 534 of Stettin, 1 April 1898 1898, Remarks of the Ship Surveyor to the Classing Committee saying the damage to Stettin has been repaired and she should remain classed, 6 April 1898 1898, Remarks of the Ship Surveyor to the Classing Committee about the special survey of Stettin and the particulars of her plating, 7 April 1902 1902, Copy of letter from the Secretary to the owners of Stettin statin the Committee agreed with the special survey being carried out in the next two months, 31 January 1902 1902, Postponed survey form for Stettin, 30 January 1902 1902, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating they expect to attend the special survey within the next two months, 29 January 1902 1902, Copy of letter from the Secretary to Leith Surveyors stating that the steamer Stettin has been booked for the annual boiler survey that will take place in a few days, 7 April 1903 1903, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the annual overhaul has been booked for that next few days, 4 April 1903 1903, Remarks of the Chief Ship Surveyor to the Classing Committee about the damage and repairs to Stettin, 24 August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee about the special survey no.1 of Stettin, 26 July 1906 1906, Copy of letter from the Secretary to Leith Surveyors stating that Stettin will be in dry dock on her arrival from Konigsberg when the special survey no.1 will be carried out, 22 June 1906 1906, Copy of letter from the Secretary to the owners of Stettin stating that the special survey no.1 will be carried out next week in Leith, 22 June 1906 1906, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the special survey no.1 will be carried out in the next week on her arrival from Konigsberg, 20 June 1906 1906, Copy of letter from the Secretary to Leith Surveyors stating that Stettin is laid up for overhaul and that the boiler survey should be carried out, 8 September 1908 1908, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating that the steamer is laid up for overhaul and that the special survey of boilers should take place next week, 5 September 1908 1908, Remarks to the Chief Ship Surveyor and Chief Engineer Surveyor regarding the special survey no. 2 and boiler survey for Stettin, 29 October 1910 1910, Copy of letter from the Secretary to Leith Surveyors regarding the report no. 13106 for Stettin and asking when the ship's owners expect the special survey no.2 to be carried out, 25 November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee about damage and repairs made to Stettin after grounding, 7 October 1910 1910, Postponed survey form for Stettin, 27 June 1910 1910, Letter from the owners of Stettin, James Currie & Co, to the Secretary stating the special survey no.2 will be carried out in Leith in September, 23 October 1910 1910, Note about the sketch of rudder for Stettin, 19 September 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the special survey no.2 for Stettin and the repairs made, 6 June 1911 1911, Copy of letter from the Assistant to the Secretary to the owners of Stettin, James Currie & Co, regarding the boiler survey to take place in about two months' time, 12 July 1912 1912, Postponed survey form for Stettin, 11 July 1912 1912, Letter from the owners of Stettin to the Secretary regarding the ship special survey and boilers survey, 9 July 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the conditions of Stettin after repair, 29 December 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of Stettin taking place in three weeks’ time, 14 November 1913 1913, Postponed survey form for Stettin, 13 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin, 7 November 1913 1913, Copy of letter from the Assistant to the Secretary to Leith surveyors regarding the survey of the screw shaft and boilers of Stettin being carried out after the strike of the boilers makers, 9 November 1913 1913, Postponed survey form for Stettin, 8 September 1913 1913, Copy of letter from the Secretary to Leith surveyors regarding the survey of screw shaft of Stettin, 3 September 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating the Committee has agreed with the survey being carried out next month, 4 September 1913 1913, Postponed survey form for Stettin, 3 September 1913 1913, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft, 2 July 1913 1913, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with postponing the special survey, 9 June 1914 1914, Postponed survey form for Stettin, 8 June 1914 1914, Copy of letter from the Secretary to Leith surveyors enclosing a letter sent by the owners of Stettin about her fourth special survey no. 3, 3 June 1914 1914, Postponed survey form for Stettin, 2 June 1914 1914, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding postponing the second special survey no. 3 of Stettin, 29 May 1914 1914, Copy of letter from the Secretary to Newcastle-on-Tyne surveyors regarding the special survey of Stettin, 12 August 1913 1915, Letter from Aberdeen surveyors to the Secretary stating that Stettin has sailed to Newcastle-on-Tyne as she failed to obtain docking facilities at that port, 10 August 1915 1915, Remarks to the Chief Ship Surveyor regarding the fourth special survey no. 3 for Stettin, 13 July 1915 1915, Copy of letter from the Secretary to the Surveyors in Hull, Grimsby, Middlesbrough, Newcastle, Sunderland and Hartlepool, regarding the fourth special survey no. 3 of Stettin, which will be carried out at some East coast port, 19 July 1915 1915, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the fourth special survey no. 3 for Stettin, 5 July 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 for Stettin, 21 May 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding her survey, 20 April 1915 1915, Extract from a letter dated 15 April 1915 from James Currie & Co regarding surveying Stettin. Extract dated 16 April 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the importance of carrying out the special survey due to the age of the ship, 13 April 1915 1915, Postponed survey form for Stettin, 12 April 1915 1915, Copy of letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding the survey of Stettin being postponed, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the special survey no.3 of Stettin, 9 April 1915 1915, Copy of letter from the Secretary to Leith surveyors enclosing information about the communication between the owners of Stettin, 26 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin stating that the Committee agreed with the special survey being carried out in the next two or three months, 26 January 1915 1915, Postponed survey form for Stettin, 25 January 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary in London regarding postponing the survey of Stettin, 21 January 1915 1915, Copy of letter from the Secretary to Leith surveyors regarding the fourth special survey no.3 and special annual boiler survey of Stettin, 20 January 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the letter sent by the latter about the thrust shaft, 1 November 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 28 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the repair of the thrust shaft made in Lisbon, 23 October 1915 1915, Copy of letter from the Assistant to the Secretary to Lisbon surveyors regarding the repair of Stettin's thrust shaft being not satisfactory, 18 October 1915 1915, Copy of letter from the Secretary to the owners of Stettin regarding the new thrust shaft she received in Lisbon, 1916 1915, Letter reporting that the new thrust shaft for Stettin is not considered satisfactory, 14 October 1915 1915, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the thrust shaft supplied in Lisbon and if it will be approved by the Committee as a permanent repair, 29 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon and stating that it will be approved by the Committee as a permanent repair, 28 April 1916 1916, Letter reporting the results of the test carried out on Stettin's new thrust shaft that was made in Lisbon, 27 April 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the result of the tests carried out on the new thrust shaft, 14 April 1916 1916, Letter from Professor R Stanfield to James Currie & Co regarding the results of the test of the transverse section of the shaft of Stettin, 11 April 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the thrust shaft supplied in Lisbon, 24 March 1916 1916, Letter reporting that Stettin's new thrust shaft is not satisfactory to be recommended as a permanent repair, 22 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin stating that the repair of the thrust shaft is being looked at, 14 March 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary enclosing drawings and plans of the shaft of Stettin, 6 March 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding the repair of the thrust shaft, 28 January 1916 1916, Postponed survey form for Stettin, 22 January 1916 1916, Letter from the owners of Stettin, James Currie & Co, to the Secretary regarding the examination of the shaft of Stettin, 24 January 1916 1916, Copy of letter from the Secretary to the owners of Stettin regarding when the ship will be in position to have the thrust shaft examined, 21 January 1916 1916, Copy of letter from the Secretary to the owners of Stettin saying the Committee has agreed with postponing the boiler survey, 23 August 1921 1921, Note related to Stettin stating SS no. 2 held now posting no date, Note regarding Stettin stating "Vessel left Lisbon Oct 3. + 3 mos from dats. of survey would expire 12/15" no date )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.