Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

17/08/1922

The year in which a vessel’s construction is completed.

Year of ship completion

1922

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Furness Shipbuilding Co Ltd

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Haverton Hill-on-Tees

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Mdb

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

4 Report on Machinery

The listed port to which a given vessel belongs.

Port belonging to

Manchester

The date of first visit by a surveyor.

Date of first survey

09/06/1922

The individual and/or organisation listed

Ship owner

Manchester Liners Ltd

Location where the document is written.

Location of Document Creation

Middlesbrough

Location where a vessel’s survey was undertaken.

Location of Survey

Middlesbrough

Date of the meeting of the Classing Committee.

Date of Classing committee

09/08/1922

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Cargo

Type of fuel used onboard a vessel.

Fuel

Steam - Oil

Is the steamer assisted by sail?

Sail assisted steamer

No

Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.

Net Register Tonnage

4780

Location of construction for a vessel’s engines.

Location of engine build

Hartlepool

Date in which construction of a vessel’s engines were completed.

Year of engine build

1922

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Used to indicate the capability of early reciprocating steam engines, based on dimensions rather than performance. It is not a true indication of actual engine power.

Horsepower nominal

1004

Pertinent, useful or interesting recorded content.

Notes - interesting informations

Engines made at Hartlepool, boilers at Middlesbrough

Name of ship as recorded on the record

Ship name

Manchester Regiment

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

09/05/1923

Unique identifier for a given ship, it is assigned by a builder.

Yard no

18

The country in which the vessel’s construction took place, at the time of writing.

Country of build

United Kingdom

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

11370

The country (flag) that a vessel is registered to, at the time of writing.

Country of registration

United Kingdom

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

08/03/1923

Name of the individual/entity/organisation responsible for authoring the record

Document author

Wm Morrison; Wm Cowie

Name of surveyor.

Surveyor

William Morrison; William Cowie

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+LMC 8,22

Recorded information related to a vessel’s movements.

Voyage information

Middlesbrough

A vessel’s means of propulsion.

Propulsion

Steam

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

7680

Description/specifications listed of the vessel’s engines and machinery. (The engines/machinery may have been surveyed separately before being assigned to a vessel).

Engine/Machinery details

Geared turbines

The country, at the time of writing, where a vessel’s engines were constructed.

Country of engine build

United Kingdom

Engine builder as written

Richardsons Westgarth & Co Ltd

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Physical extent of a record.

Number of parts

1

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.