Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
24/10/1950
The year in which a vessel’s construction is completed.
1931
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Vickers Armstrongs Ltd
The name of the yard where the vessel was built.
Naval Yard
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Sou
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
8 Report of Survey for Repairs, &c.
The listed port to which a given vessel belongs.
London
The date of first visit by a surveyor.
16/04/1948
The individual and/or organisation listed
Ministry of Transport
Name of the individual/entity/organisation responsible for authoring the record
J F Nicholas; E M Hart; J M Robertson
Location where a vessel’s survey was undertaken.
Southampton
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
22424
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
The official record pronounced by the Committee
Burnt - Laid up
Vessel’s place of loss or disposal/last known recorded location.
Hebburn on Tyne
1950
Name of ship as recorded on the record
New Australia
The process of transferring a vessel to water, but not necessarily her completion.
17/03/1931
Unique identifier for a given ship, it is assigned by a builder.
1
The port or place in which the vessel’s construction took place, at the time of writing.
High Walker, Newcastle
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
20458
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Leith 22039
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
14/08/1950
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Shaw Savill & Albion Co Ltd
Location where the document is written.
Southampton
Date of the meeting of the Classing Committee.
19/01/1951
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1950
Contextual information related to the reasons of the vessel’s loss or disposal.
Fire Broke out in Public rooms while in Dry Dock at Hebburn on Tyne & Laid up
Recorded date for the vessel’s loss or disposal.
24/03/1947
Physical extent of a record.
13
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.