Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
01/07/1885
The year in which a vessel’s construction is completed.
1885
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Murdoch & Murray
The name of the yard where the vessel was built.
The Dublin Dockyard
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Engine Forgings or Castings
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
16/06/1885
Location where the document is written.
Glasgow
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
J & T Young
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Pertinent, useful or interesting recorded content.
Engine Forgings or Castings No 1070; Manufactured by The Irvine Forge Co of Irvine
Name of ship as recorded on the record
Captain McClure
The process of transferring a vessel to water, but not necessarily her completion.
10/09/1885
Unique identifier for a given ship, it is assigned by a builder.
92
The port or place in which the vessel’s construction took place, at the time of writing.
Port Glasgow
Additional numbers that feature on a given record that may be used for identification.
Lloyd's
The date of first visit by a surveyor.
02/06/1885
Name of the individual/entity/organisation responsible for authoring the record
George Newcomb
Name of surveyor.
George Newcomb
Predominant material(s) utilised in a vessel’s construction.
Iron
Location of construction for a vessel’s engines.
Ayr
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.