Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

01/10/1927

The year in which a vessel’s construction is completed.

Year of ship completion

1885

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Murdoch & Murray

The name of the yard where the vessel was built.

Yard name

The Dublin Dockyard

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

Gen 10013

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

Genoa 9769

The date of first visit by a surveyor.

Date of first survey

30/05/1927

The individual and/or organisation listed

Ship owner

Viglienzoni & Siccardi

Location where the document is written.

Location of Document Creation

Genoa

Location where a vessel’s survey was undertaken.

Location of Survey

Genoa

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Cargo

Is the steamer assisted by sail?

Sail assisted steamer

No

A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.

Under Deck Tonnage

405

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

2

Name of ship as recorded on the record

Ship name

Captain McCluze

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

10/09/1885

Unique identifier for a given ship, it is assigned by a builder.

Yard no

92

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Port Glasgow

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

8 Report of Survey for Repairs, &c.

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

23/08/1927

Name of the individual/entity/organisation responsible for authoring the record

Document author

Alex Lawrance

Name of surveyor.

Surveyor

Alexander Lawrance

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

100A1 cargo battens not fitted, s s No 1 - 27

A vessel’s means of propulsion.

Propulsion

Steam

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

501

Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.

Net Register Tonnage

249

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Pertinent, useful or interesting recorded content.

Notes - interesting informations

Spread over two pages , first page as "Rpt 8" in the top left hand corner while the second apge has "Rpt 9a".

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.