Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
27/07/1839
The year in which a vessel’s construction is completed.
1817
The port or place in which the vessel’s construction took place, at the time of writing.
Greenock
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
5479
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Clyde 87; 314; 410
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Mikea
Location where the document is written.
London
Location where a vessel’s survey was undertaken.
London
Date of the meeting of the Classing Committee.
30/07/1839
The name of the port/place of destination given.
Demerara
A vessel’s means of propulsion.
Sail
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Glasgow
The process of transferring a vessel to water, but not necessarily her completion.
__/__/1817
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Lon
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Annual Surveys
The listed port to which a given vessel belongs.
Glasgow
The individual and/or organisation listed
Boyle
Name of the individual/entity/organisation responsible for authoring the record
Peter Courtenay
Name of surveyor.
Peter Courtenay
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
Res. 1837 to 6A1
Recorded information related to a vessel’s movements.
London; Demerara
Physical arrangement of a ship’s masts, sails and rigging.
Bk - Barque
Predominant material(s) utilised in a vessel’s construction.
Wood
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
359
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Pertinent, useful or interesting recorded content.
Surveys for two ships on document. Other ship is Euterpe; LRF-PUN-LON605-0371b-R; London 5479
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.