Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
18/10/1892
The year in which a vessel’s construction is completed.
1888
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
William Simons & Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Renfrew
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Letter
The individual and/or organisation listed
A. & A. Y. Mackay
A vessel’s means of propulsion.
Steam
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1029
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by collision
Physical extent of a record.
1
Name of ship as recorded on the record
Abertay
The process of transferring a vessel to water, but not necessarily her completion.
13/07/1888
Unique identifier for a given ship, it is assigned by a builder.
258
The country in which the vessel’s construction took place, at the time of writing.
United Kingdom
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Broad categories and subdivisions of vessels related to their purpose or function.
Cargo
Is the steamer assisted by sail?
No
Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.
635
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Recorded information relating the specific cargo being conveyed.
coal
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.