Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

23/02/1922

The year in which a vessel’s construction is completed.

Year of ship completion

1919

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Charles Rennoldson & Co

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

South Shields

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

Report of Total Loss, Casualty, &c./ Wreck reports

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Ship manager

J S Evans

The name of the port/place from which a vessel’s voyage originated.

Voyage from

Llanelly

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined

A vessel’s means of propulsion.

Propulsion

Steam

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

703

Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.

Net Register Tonnage

319

Location of construction for a vessel’s engines.

Location of engine build

North Shields

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Used to indicate the capability of early reciprocating steam engines, based on dimensions rather than performance. It is not a true indication of actual engine power.

Horsepower nominal

110

Prescribed by flag/registration authorities, and usually excludes a small part of the stern. It is measured from the foreside of the stern at the extreme top to the afterside of the stern post.

Registered Length

180.4

Measurement from the underside of the upper deck on the centre line to the upper side of the bottom plating.

Registered Depth

12.4

Name of ship as recorded on the record

Ship name

Canterbury Bell

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

14/05/1919

Unique identifier for a given ship, it is assigned by a builder.

Yard no

197

A unique number allocated to a specific vessel by an official registration authority of the country of registry (flag) that the vessel belongs to (post. 1855).

Official number

143297

Additional numbers that feature on a given record that may be used for identification.

Other numbers document know by

6812

The individual and/or organisation listed

Ship owner

Haig Shipping Co Ltd

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1 10.20; in red +LMC 6.19

The name of the port/place of destination given.

Destined voyage

Corcubion

Physical arrangement of a ship’s masts, sails and rigging.

Rig

Sr - Schooner

Is the steamer assisted by sail?

Sail assisted steamer

No

A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.

Under Deck Tonnage

490

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Triple expansion engine, 3 cylinders

Engine builder as written

Shields Engineering Co Ltd

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Recorded information relating the specific cargo being conveyed.

Cargo

coal

Also referred to as extreme breadth. The distance from the extreme starboard side to the extreme port side.

Registered Beam

28

Physical extent of a record.

Number of parts

1

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.